Waterproof connecting structure of steel structure MIC (Microphone) integrated toilet
By adopting CFC substrate partition design and modular assembly of dry and wet partitions on the ground of the steel structure bathroom, the long construction cycle and pollution problems are solved, and an efficient and environmentally friendly waterproof connection structure is realized, reducing costs and environmental impacts.
Patent Information
- Application Number
- CN202411777047.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-05
- Publication Date
- 2025-01-10
AI Technical Summary
The ground construction period of steel structure integrated building bathrooms has a long process and complex process, which is prone to water leakage problems, and traditional wet operations pollute the environment and are not environmentally friendly.
Adopt a steel structure MIC integrated bathroom waterproof connection structure, through CFC substrate partition design, combined with modular assembly of dry and wet partitions, waterproof coils and support bases support the shower area, and isolates the leakage pipeline from the dry area, and the dry area adopts dry type The construction process lays ceramic tiles to reduce wet cutting operations and reduce costs.
It improves construction efficiency, optimizes overall effect, extends service life, reduces production, transportation and installation costs, realizes environmentally friendly construction, and reduces garbage and noise pollution.
Smart Images

Figure CN119288091A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of steel structure modular integrated toilets, and in particular relates to a waterproof connection structure of a steel structure MIC integrated toilet. Background Art
[0002] Steel structure houses use steel structure as the main structure. According to the size on the steel structure design drawings, steel pretreatment and stamping, the structural box is assembled from parts to board walls in the factory, and then assembled into a complete box from board walls and structural columns and beams, polished, painted and decorated, but the building quality and interior decoration are relatively rough. The traditional indoor decoration floor technology system has many processes and is relatively complicated. It is easy to crack and leak during transportation and hoisting. In addition, the on-site construction generates a lot of noise, is time-consuming, and generates a lot of garbage, so it is gradually changed to modular integrated construction methods.
[0003] The common steel structure integrated building bathroom floor is basically constructed by the following procedures, namely, corrugated steel plate bottom, laying steel mesh, pouring fine stone concrete, and then waterproof layer, waterproof protective layer, leveling layer, adhesive layer, tile surface layer and other construction processes. The inventor found that the steel structure integrated building bathroom floor is prone to the following problems in application: 1. The construction period is long, and the workers' construction skills are difficult to control, which affects the final overall effect and service life; 2. Bathroom floor construction often uses uniform wet operation, which will cause pollution to the construction environment and is not environmentally friendly. Summary of the invention
[0004] The purpose of the present invention is to provide a steel structure MIC integrated toilet waterproof connection structure, which combines the dry and wet partitions of the steel structure, modularizes the assembly site without cutting wet operations, and has clear high and low levels, optimizes the overall effect and prolongs the service life.
[0005] The technical solution adopted by the present invention is as follows: A steel structure MIC integrated toilet waterproof connection structure, comprising a CFC substrate, a shower area and a dry area are arranged on the CFC substrate, wherein the shower area is vertically provided with a waterproof roll and a waterproof chassis, a support base for contacting the CFC substrate is fixed on the lower surface of the waterproof chassis, and the dry area is installed with ceramic tiles and a leaking pipe penetrating the waterproof roll; During installation, they are transported to the construction site for assembly piece by piece, and the dry and wet areas are divided into zones. The shower area is supported by the waterproof membrane and the support base to create a height difference with the dry area, so that the water in the shower area can pass over the dry area along the leaking pipe, and an adjustable support base is installed in the shower area, and an integrated decorative waterproof chassis is installed on it. The dry area floor is tiled with a dry construction process, and there is no cutting wet operation on site, with high construction efficiency and modular assembly. It combines the most cutting-edge prefabricated technology and environmentally friendly materials to provide a bathroom waterproof connection structure that is convenient, integrated, simple and practical, safe, durable, energy-saving and consumption-reducing, greatly reducing the costs of production, transportation, installation, etc.
[0006] As an optional solution, a waterproof tape is bonded to the upper surface of the CFC substrate for sticking to the junction of the ground and the wall. The waterproof tape passes through the shower area and the dry area and is used to stick to the edge seams of the waterproof membrane and the tiles relative to the wall, thereby reducing the friction of the installation gap and facilitating the improvement of the waterproof performance.
[0007] As an optional solution, the leaking pipeline includes a partition and a drain pipe nested together, the partition is hook-shaped and has two sides respectively bonded to the wall and the tile, and the drain pipe runs through the waterproof membrane to catch the water leakage from the waterproof chassis.
[0008] As an optional solution, the four sides of the waterproof chassis are integrally installed with curved folded edges, the waterproof chassis is provided with a drain outlet for water leakage during showering, and the upper surface of the waterproof membrane is provided with a glass sliding door spaced from the folded edge.
[0009] As an optional solution, a threaded hole is opened in the middle of the support base and a threaded rod for suspending the waterproof chassis is installed through the threaded hole, and one end of the threaded rod extends out of the threaded hole and is fixed with a foot plate.
[0010] As an option, it also includes: A seat ring, the seat ring is bonded to the shower area and staggered with the support base; The alloy petal is fixed to the lower surface of the waterproof chassis. When the waterproof chassis is installed, the alloy petal is inserted into the seat ring in a ring shape to support the waterproof chassis together with the support base.
[0011] As an optional scheme, an outer wedge-shaped substrate and an inner wedge-shaped substrate are fixed at intervals on the upper surface of the seat ring, and the outer wedge-shaped substrate and the inner wedge-shaped substrate both have rounded corners for inserting the alloy petals. After the seat ring is installed, the waterproof chassis is dropped, and the alloy petals are slid into the gap between the outer wedge-shaped substrate and the inner wedge-shaped substrate along these rounded corners, so that the outer wedge-shaped substrate and the inner wedge-shaped substrate respectively limit and support the alloy petals on both sides, which makes it convenient for the alloy petals to quickly find the correct position, thereby driving the waterproof chassis to fall into place quickly.
[0012] As an optional solution, two glue bags are embedded and installed between the outer wedge-shaped substrate and the inner wedge-shaped substrate, and the two glue bags are respectively loaded with glue A and glue B for bonding the alloy petals.
[0013] As an optional solution, a blade for piercing the glue bag is fixed on the lower surface of the alloy petal, and an M-shaped through hole for accommodating the A glue and the B glue is opened in the middle of the alloy petal.
[0014] As an optional solution, a flange outer ring connected to the waterproof chassis is fixed to the edge of the alloy petal, and both sides of the alloy petal are bonded with attachment elastic edges; When the blade pierces the glue bag, the glue A and the glue B flowing out of the glue bag are limited by the attached elastic edge.
[0015] The technical effects achieved by the present invention are: The present invention prepares materials in a modular manner in a factory, transports them to the construction site for piece-by-piece assembly and construction, adopts a dry and wet zoning form, installs an adjustable support base in the shower area, and then installs a decorative integrated waterproof chassis on it, and adopts a dry construction process to lay tiles on the dry area floor. There is no cutting wet operation on site, and the construction efficiency is high. The modular assembly combines the most cutting-edge prefabricated technology and environmentally friendly materials today to provide a bathroom waterproof connection structure that is convenient, integrated, simple and practical, safe, durable, energy-saving and consumption-reducing, and greatly reduces the costs of production, transportation, installation, etc.
[0016] After the seat ring is installed, the waterproof chassis is dropped, and the alloy petals are slid into the gap between the outer wedge-shaped substrate and the inner wedge-shaped substrate along the rounded corners, so that the outer wedge-shaped substrate and the inner wedge-shaped substrate are respectively limited to both sides and support the alloy petals, which is convenient for the alloy petals to quickly find the correct position, thereby driving the waterproof chassis to fall into place quickly.
[0017] When the alloy petal descends, the present invention drives the blade to first enter between the outer wedge-shaped substrate and the inner wedge-shaped substrate, and uses the sharp blade to cut the glue bag, so that the A glue and B glue flow out from the rupture toward the middle to prevent overflow to one side. At the same time, the blade guides the mixed glue to be distributed to both sides, so as to bond the alloy petal over a larger area. An M-shaped through hole for accommodating A glue and B glue is opened in the middle of the alloy petal, so that the mixed glue is partially filled into the M-shaped through hole. After solidification, this part spans the alloy petal, and the firmness is higher. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a front view of the waterproof connection structure of the bathroom in the first embodiment of the present invention; Figure 2 is a cross-sectional view of a bathroom waterproof connection structure in Embodiment 1 of the present invention; Figure 3is a bottom view of the CFC substrate in the second embodiment of the present invention; Figure 4 is a front view of the seat ring in the second embodiment of the present invention; Figure 5 is a partial cross-sectional view of the seat ring in the second embodiment of the present invention; Figure 6 It is a front view of a single alloy petal in the second embodiment of the present invention.
[0019] In the accompanying drawings, the components represented by the reference numerals are listed as follows: 1. CFC substrate; 101. Waterproof tape; 2. Waterproof membrane; 201. Partition; 202. Drain pipe; 3. Waterproof chassis; 301. Folding edge; 302. Drain outlet; 303. Glass sliding door; 4. Support base; 401. Threaded rod; 402. Footboard; 5. Ceramic tile; 6. Seat ring; 601. Outer wedge-shaped substrate; 602. Inner wedge-shaped substrate; 603. Glue bag; 7. Alloy petal; 701. Blade; 702. M-shaped through hole; 703. Flange outer ring; 704. Attached elastic edge. DETAILED DESCRIPTION
[0020] In order to make the purpose and advantages of the present invention more clearly understood, the present invention is specifically described below in conjunction with embodiments. It should be understood that the following text is only used to describe one or several specific embodiments of the present invention, and does not strictly limit the scope of protection of the specific claims of the present invention.
[0021] At present, there are many companies in the market that do steel structure house construction, using steel structure as the main structure. According to the construction drawings, steel columns are buried and steel beams are installed with bolts. Compared with the traditional concrete pouring construction method, it saves time waiting for concrete to harden. The construction of the bathroom waterproof area still needs to be discussed, especially the more advanced modular construction method of the structure is more convenient.
[0022] Embodiment 1: like Figure 1-Figure 2As shown, a steel structure MIC integrated toilet waterproof connection structure is applied to steel structure housing construction, including a CFC substrate 1 (synthetic stone carbon fiber board). This green and environmentally friendly material is directly laid on the steel beam without laying steel mesh, laying fine stones, pouring concrete and other operations. The CFC substrate 1 adopts a partition design, with a shower area and a dry area, wherein the shower area is vertically provided with a waterproof membrane 2 and a waterproof chassis 3. The waterproof membrane 2 of the self-adhesive material is selected to surround and raise the waterproof chassis 3 from the bottom. In order to be higher than the dry area, A support base 4 for contacting the CFC substrate 1 is bonded to the lower surface of the waterproof chassis 3. The waterproof chassis 3 here adopts an integrated surface design, which is convenient for users to stand directly on the waterproof chassis 3. For example, when taking a shower, the waste water generated needs to be separated from the dry area. Therefore, tiles 5 and a leaking pipe running through the waterproof membrane 2 are installed in the dry area to create a height difference between the shower area and the dry area, so that the water in the shower area can pass over the dry area along the leaking pipe. The high and low levels are clearly distinguished, and the shower area and the dry area are highly isolated, which optimizes the overall effect and extends the service life.
[0023] During installation, CFC substrate 1, waterproof membrane 2, waterproof chassis 3, support base 4 and ceramic tile 5 can be prefabricated in the factory according to the construction drawings. First, CFC substrate 1 is installed as the bathroom floor base, and self-adhesive waterproof membrane 2 is laid on the floor and extended to the wall. Dry and wet zoning is adopted. Adjustable support base 4 is installed in the shower area, and decorative integrated waterproof chassis 3 is installed on it. Ceramic tile 5 is laid on the dry area floor using dry construction technology. There is no cutting wet operation on site, high construction efficiency, modular assembly, and better effect after on-site installation. It combines the most cutting-edge prefabricated technology and environmentally friendly materials to provide a bathroom waterproof connection structure that is convenient, integrated, simple and practical, safe and durable, and energy-saving and consumption-reducing, which greatly reduces the costs of production, transportation, installation, etc.
[0024] In particular, the modular production of the factory makes the waterproof chassis 3 in the wet area of the bathroom standardized and standardized, which is convenient for workers to operate and install on site. The dry and wet zoning form is also adopted. In the shower area, an adjustable support base 4 is installed, and the decorative integrated waterproof chassis 3 is installed on it. The dry area floor is paved with tiles 5 using a dry construction process. Compared with traditional operations, multiple construction processes are reduced, such as no need to fill mortar, etc., saving the cost of bathroom floor materials and labor. In addition, there will be no cutting operations on site, and only the waterproof chassis 3 needs to be customized in the factory, which can reduce garbage.
[0025] See attached Figure 1The main point to note in modular construction is that a certain margin should be left for the side seams to overcome the friction between the components. In this embodiment, a waterproof tape 101 for sticking to the junction of the ground and the wall is adhered to the upper surface of the CFC substrate 1. The waterproof tape 101 here passes through the shower area and the dry area, and is used to stick to the side seams of the waterproof membrane 2 and the tile 5 relative to the wall, thereby reducing the friction of the installation gap and facilitating the improvement of the waterproof performance.
[0026] See attached Figure 1 and Figure 2 A threaded hole is provided in the middle of the support base 4 and a threaded rod 401 for suspending the waterproof chassis 3 is installed through the threaded hole. The support base 4 can be raised by rotating the threaded rod 401 forward, or the support base 4 can be lowered by rotating the threaded rod 401 reversely. In order to increase the ground contact surface, one end of the threaded rod 401 is extended with a threaded hole and a foot plate 402 is welded thereto. The bottom surface of the foot plate 402 is frosted to prevent slipping.
[0027] See attached Figure 1 and Figure 2 The four sides of the waterproof chassis 3 are all integrated with curved folded edges 301, which fall onto the upper surface of the waterproof membrane 2 through the folded edges 301, and the gaps are glued with glass glue to ensure a tight fit. A drain port 302 is provided on the waterproof chassis 3 for water leakage during showering, and a stainless steel grate is used to filter impurities such as hair. The water splashing from above is blocked by a glass sliding door 303 spaced from the folded edges 301 on the upper surface of the waterproof membrane 2. The glass sliding door 303 can be opened when idle or when entering or exiting.
[0028] See attached Figure 1 and Figure 2 The leaking pipeline includes a partition 201 and a drain pipe 202 nested together. The edge of the drain pipe 202 is tightly bonded to the waterproof membrane 2. The external partition 201 is hook-shaped and its two sides are respectively bonded to the wall and the tile 5 to form a double-layer isolation layer. It can also prevent users from kicking the drain pipe 202 when they are active in the dry area. The drain pipe 202 runs through the waterproof membrane 2 to catch the water leakage from the waterproof chassis 3 and drain the waste water to the sewer.
[0029] The working principle of the present invention is as follows: a CFC substrate 1, a waterproof membrane 2, a waterproof chassis 3, a support base 4 and ceramic tiles 5 are prefabricated in a factory according to construction drawings, the CFC substrate 1 is first installed as the bathroom floor base, a self-adhesive waterproof membrane 2 is laid on the floor, and the laying is extended to the wall, a dry and wet partition is adopted, an adjustable support base 4 is installed in the shower area, and a decorative integrated waterproof chassis 3 is installed thereon, and ceramic tiles 5 are laid on the dry area floor using a dry construction process, and no cutting wet operation is performed on site.
[0030] Embodiment 2: For the multiple support bases 4 in the first embodiment, they all need to rotate and adjust the threaded rod 401 and keep the foot plate 402 at the same height. When the number is more than 5, the adjustment workload is large and time-consuming, and when the number is less than 5, there are fewer points to support the waterproof chassis 3, which makes it easy for the waterproof chassis 3 to cause the risk of stepping on the empty area of the support base 4, and also shortens the service life of the bathroom waterproof connection structure. Therefore, it is very necessary to improve the shower area of the bathroom waterproof connection structure in the first embodiment.
[0031] like Figure 3-Figure 6 As shown, a steel structure MIC integrated bathroom waterproof connection structure also includes a seat ring 6 and an alloy petal 7. Before installation, the seat ring 6 and the foot plate 402 are bonded to the shower area at the same time, and the seat ring 6 and the supporting base 4 are staggered, and the alloy petal 7 is fixed to the lower surface of the waterproof chassis 3 by screws. In this way, when the waterproof chassis 3 is installed, the alloy petal 7 is inserted into the seat ring 6 in a ring shape, which can not only jointly support the waterproof chassis 3, but also circumferentially limit the waterproof chassis 3 horizontally.
[0032] See attached Figure 3 , Figure 4 and Figure 5 In this embodiment, the upper surface of the seat ring 6 is integrally installed with an outer wedge-shaped substrate 601 and an inner wedge-shaped substrate 602 separated from each other, and both the outer wedge-shaped substrate 601 and the inner wedge-shaped substrate 602 have rounded corners for inserting the alloy petal 7. After the seat ring 6 is installed, the waterproof chassis 3 is dropped, and the alloy petal 7 is slid into the gap between the outer wedge-shaped substrate 601 and the inner wedge-shaped substrate 602 along these rounded corners, so that the outer wedge-shaped substrate 601 and the inner wedge-shaped substrate 602 are respectively limited to both sides and support the alloy petal 7, so that the alloy petal 7 can quickly find the correct position, thereby driving the waterproof chassis 3 to fall into place quickly.
[0033] See attached Figure 3 , Figure 4 and Figure 5 In order to reinforce the connection between the alloy petal 7 and the seat ring 6, two glue bags 603 are embedded and installed between the outer wedge-shaped substrate 601 and the inner wedge-shaped substrate 602 of this embodiment. They are all made of vinyl film and will break when poked. The two glue bags 603 are respectively loaded with glue A and glue B for bonding the alloy petal 7. Once the alloy petal 7 penetrates between the outer wedge-shaped substrate 601 and the inner wedge-shaped substrate 602, the two glue bags 603 will be poked, and glue A and glue B will flow out to stick to the connection between the alloy petal 7 and the seat ring 6, so there is no need for manual reinforcement.
[0034] See attached Figure 3 , Figure 5 and Figure 6In order to successfully puncture the two glue bags 603, a blade 701 for puncturing the glue bags 603 is welded on the lower surface of the alloy petal 7 in this embodiment. When the alloy petal 7 descends, it drives the blade 701 to first enter between the outer wedge-shaped substrate 601 and the inner wedge-shaped substrate 602, and uses the sharp blade 701 to cut the glue bag 603, so that the A glue and B glue flow out of the rupture toward the middle to prevent overflow to one side. At the same time, the blade 701 drains the mixed glue to both sides to bond the alloy petal 7 to a larger area. An M-shaped through hole 702 for accommodating A glue and B glue is opened in the middle of the alloy petal 7, so that the mixed glue is partially filled into the M-shaped through hole 702. After solidification, this part spans the alloy petal 7, and the firmness is higher.
[0035] The mixed adhesive is firmly bonded, and is not soaked by water vapor or shower sewage, and can also avoid hot water in the surface area of the waterproof chassis 3, and is durable and will not rust. The mixed adhesive material is relatively soft and will not hinder the descent of the alloy petal 7. It can adapt to the gap between the alloy petal 7 and the outer wedge-shaped substrate 601 and the inner wedge-shaped substrate 602, and can leave enough space for the alloy petal 7 to be inserted.
[0036] See attached Figure 3 , Figure 5 and Figure 6 Before leaving the factory, the edge of the alloy petal 7 is integrally installed with a flange outer ring 703 connected to the waterproof chassis 3. Countersunk screws can be used to pass through the reserved holes of the flange outer ring 703 and drilled into the bottom surface of the waterproof chassis 3 for multi-point fastening to prevent escaping. Attachment elastic edges 704 are bonded on both sides of the alloy petal 7. The attachment elastic edges 704 can be made of a mixed material of absorbent sponge and high-elastic rubber. After falling, the mixed glue can be limited from the top to distribute to both sides; When the blade 701 pierces the glue bag 603, the glue A and glue B flowing out of the glue bag 603 are limited by the attached elastic edge 704, and the mixed glue is partially soaked and can be tightened from the top, so that the bonding surface is wider.
[0037] The working principle of the present invention is: the seat ring 6 and the foot plate 402 are bonded to the shower area at the same time, and the seat ring 6 and the supporting base 4 are staggered. When the waterproof bottom plate 3 is installed, the alloy petal 7 is inserted into the seat ring 6 in a ring shape.
[0038] When the alloy petal 7 descends, it drives the blade 701 to first enter between the outer wedge-shaped substrate 601 and the inner wedge-shaped substrate 602, and uses the sharp blade 701 to cut the glue bag 603, so that the A glue and B glue flow out toward the middle of the rupture to prevent overflow to one side. At the same time, the blade 701 drains the mixed glue to both sides, bonding the alloy petal 7 to a larger area, prompting the mixed glue to partially fill the M-shaped through hole 702, and after solidification, this part spans the alloy petal 7.
[0039] The above is only an optional implementation of the present invention. It should be noted that, for those skilled in the art, several improvements and modifications can be made without departing from the principles of the present invention, and these improvements and modifications should also be considered as the protection scope of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention shall be implemented according to the conventional means in the art unless otherwise specified and limited.
Claims
1. A steel structure MIC integrated toilet waterproof connection structure, characterized by: It comprises a CFC substrate (1), wherein a shower area and a dry area are provided on the CFC substrate (1), wherein the shower area is vertically provided with a waterproof coiled material (2) and a waterproof base plate (3), a support base (4) for contacting the CFC substrate (1) is fixed on the lower surface of the waterproof base plate (3), and the dry area is installed with ceramic tiles (5) and a water leakage pipeline penetrating the waterproof coiled material (2); During installation, the shower area is supported by the waterproof coiled material (2) and the support base (4), creating a height difference with the dry area, so that water in the shower area can pass over the dry area along the leaking pipe.
2. A steel structure MIC integrated toilet waterproof connection structure according to claim 1, characterized in that: The upper surface of the CFC substrate (1) is bonded with a waterproof tape (101) for adhering to the junction between the ground and the wall. The waterproof tape (101) passes through the shower area and the dry area and is used to adhere to the side seams of the waterproof coiled material (2) and the tiles (5) relative to the wall.
3. A steel structure MIC integrated toilet waterproof connection structure according to claim 1, characterized in that: The leaking pipeline comprises a partition (201) and a drain pipe (202) nested together, the partition (201) being hook-shaped and having two sides respectively bonded to the wall surface and the tile (5), and the drain pipe (202) penetrating the waterproof coiled material (2) for catching water leakage from the waterproof chassis (3).
4. A steel structure MIC integrated toilet waterproof connection structure according to claim 1, characterized in that: The four sides of the waterproof chassis (3) are all integrally mounted with curved folded edges (301), the waterproof chassis (3) is provided with a drain port (302) for preventing water leakage during showering, and the upper surface of the waterproof coiled material (2) is provided with a glass sliding door (303) spaced from the folded edges (301).
5. The steel structure MIC integrated toilet waterproof connection structure according to claim 1, characterized in that: A threaded hole is provided in the middle of the support base (4) and a threaded rod (401) for suspending the waterproof chassis (3) is installed through the threaded hole. One end of the threaded rod (401) extends out of the threaded hole and is fixed with a foot plate (402).
6. A steel structure MIC integrated toilet waterproof connection structure according to claim 1, characterized in that: Also includes: A seat ring (6), the seat ring (6) being bonded to the shower area and staggered from the support base (4); The alloy petal (7) is fixed to the lower surface of the waterproof chassis (3). When the waterproof chassis (3) is installed, the alloy petal (7) is inserted into the seat ring (6) in a ring shape to support the waterproof chassis (3) together with the support base (4).
7. A steel structure MIC integrated toilet waterproof connection structure according to claim 6, characterized in that: An outer wedge-shaped substrate (601) and an inner wedge-shaped substrate (602) are fixed at intervals on the upper surface of the seat ring (6), and both the outer wedge-shaped substrate (601) and the inner wedge-shaped substrate (602) have rounded corners for inserting the alloy petal (7).
8. A steel structure MIC integrated toilet waterproof connection structure according to claim 7, characterized in that: Two glue bags (603) are embedded and installed between the outer wedge-shaped substrate (601) and the inner wedge-shaped substrate (602), and the two glue bags (603) are respectively loaded with glue A and glue B for bonding the alloy petals (7).
9. A steel structure MIC integrated toilet waterproof connection structure according to claim 8, characterized in that: A blade (701) for piercing the glue bag (603) is fixed on the lower surface of the alloy petal (7), and an M-shaped through hole (702) for accommodating the A glue and the B glue is provided in the middle of the alloy petal (7).
10. A steel structure MIC integrated toilet waterproof connection structure according to claim 9, characterized in that: A flange outer ring (703) connected to the waterproof chassis (3) is fixed to the edge of the alloy petal (7), and attachment elastic edges (704) are bonded to both sides of the alloy petal (7); When the blade (701) pierces the glue bag (603), the glue A and the glue B flowing out of the glue bag (603) are limited by the attached elastic edge (704).
Citation Information
Cited By
Dry area threshold stone module suitable for aging-adaptive rapid transformation
CN119801363A