Load test tool for well drilling hoisting system
By designing the load test tooling of the drilling lift system, using amplified tension module and lever structure, combined with buffer components, the problem of the failure to achieve the required load due to site limitations is solved, and the accuracy of load control and system stability and safety are achieved.
Patent Information
- Application Number
- CN202411559660.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-04
- Publication Date
- 2025-01-14
AI Technical Summary
When performing load tests for drilling lifting systems, due to site restrictions, it is impossible to directly mount the required test load weight on the main hook, and the direct use of the hull structure may cause damage to the hull structure.
A load test tooling for drilling lifting system was designed, including drilling table, lifting ring, weighing sensor, movable module, reaction force component and buffering component. By amplifying the tension module and lever structure, sufficient reaction force is generated by using limited tension force, combined with The buffer assembly evenly distributes the force to ensure the stability and safety of the load plate.
It significantly improves the load control accuracy and system stability and safety, and can flexibly adjust the reaction force according to on-site requirements, ensure that the force under the load plate meets the test requirements, avoids stress concentration and impact, and protects the safety of the system.
Smart Images

Figure CN119309835A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of marine engineering, and in particular to a load test tool for a drilling hoisting system. Background Art
[0002] The drilling hoisting system is one of the key systems of the drilling system. Load testing of the drilling hoisting system is an essential and key link in the drilling assembly and manufacturing. The purpose of load testing the derrick, drilling platform and supporting structure under the specified load is to verify the overall strength of the relevant structures and the rationality of design, process manufacturing and quality control. It can also verify that the hydraulic brake system and the traveling carriage system can operate under the specified load. Due to the special nature of large-scale drilling equipment that is inconvenient to move, the test needs to be carried out on-site at the construction plant. Therefore, it is necessary to formulate a corresponding test plan and design a tooling structure that meets the test requirements according to the conditions of the construction site to ensure the smooth progress of the test.
[0003] During the load test, due to site limitations, it is usually impossible to directly mount the deadweight on the main hook to reach the required test or test load weight. Therefore, it is necessary to use the reaction force to make the main hook load reach the specified value. However, in the direction of the load and the position of the ship, there is no other object that can apply the reaction force except the structure of the drilling ship itself. Directly using the hull structure may cause damage to the hull structure. Therefore, it is necessary to provide a drilling hoisting system load test fixture to meet the normal operation of the load test. Summary of the invention
[0004] In view of this, the purpose of the present invention is to propose a drilling hoisting system load test tool to solve the problem that during the load test, due to site limitations, it is usually impossible to directly mount the dead weight on the main hook to reach the load weight required for the test or experiment.
[0005] Based on the above purpose, the present invention provides a drilling lifting system load test tool, including a drilling platform and a lifting ring connected to an external top drive device, a connecting tool is arranged below the lifting ring, a weighing sensor is connected below the connecting tool, a movable module is connected below the weighing sensor, the movable module includes a plurality of shackles fixedly arranged below the weighing sensor, two groups of annular steel cables are arranged below the plurality of shackles, and movable load rods are arranged below the two annular steel cables, a fixed module is also arranged below the drilling platform, a load plate is movably installed at the middle part of the lower end of the fixed module, the load plate is adapted to the movable load rod, and the load plate is arranged in a trapezoidal shape; A buffer assembly, the buffer assembly is arranged on both sides below the load plate, and the buffer assembly is used to initially buffer the rise of the movable load rod; Two reaction force components, the reaction force components are arranged on both sides of the drilling platform, and one end of the two reaction force components is rotatably connected to the two ends of the load plate respectively, the reaction force components include a driving module, a first amplification module and a second amplification module, the driving module is used to provide initial power to the reaction force component, and the first amplification module and the second amplification module are used to amplify the force generated by the driving module.
[0006] Preferably, the buffer assembly includes two buffer plates fixedly installed under the load plate, a plurality of positioning plates are arranged at the bottom of the buffer plates, the positioning plates are arranged in a U-shape, two slide rails are arranged on the bottom surface of the positioning plates, sliders are slidably installed on both sides of the two slide rails, a first rotating plate is rotatably installed at both ends of one of the sliders, a second rotating plate is rotatably installed at both ends of the other slider, the two first rotating plates and the two second rotating plates are respectively staggered, and positioning wheels are rotatably installed between the two first rotating plates and the two second rotating plates.
[0007] Preferably, a positioning rod is also provided in the middle part of the positioning plate and passes through the slider. The slider is slidably connected to the positioning rod, and buffer springs are provided on both sides of the positioning rod located on the slider. The sides of the two sliders that are away from each other are respectively fixedly connected to one end of the two buffer springs, and the other ends of the two buffer springs are respectively fixedly connected to the two ends of the positioning plate.
[0008] Preferably, the driving assembly comprises a mounting base fixedly mounted on both sides of the top of the drilling platform, a mounting frame is arranged at the top of the mounting base, and a pull pump is arranged on one side of the mounting frame.
[0009] Preferably, the pulling force of the two pulling pumps is set to 10t, and the two driving components, the two first amplifying modules and the two second amplifying modules are all symmetrically arranged.
[0010] Preferably, the first amplification module includes a first fixed pulley and a positioning rope fixedly installed on the top surface of the drilling platform, and a second fixed pulley fixedly installed on one side of the drilling platform. A first movable pulley is provided at the other end of the positioning rope, and the positioning rope is arranged around the first fixed pulley. A second movable pulley is also rotatably installed on one side of the positioning rope. A steel wire rope is also fixedly connected below the pull pump, and the other end of the steel wire rope is connected to the second movable pulley and is located on one side of the first fixed pulley. The steel wire rope is arranged around the first fixed pulley and the first movable pulley, and the first movable pulley and the second movable pulley are used to increase the pulling force of the pull pump.
[0011] Preferably, the second amplification module includes a fixing frame fixedly installed on both sides of the fixing module below the drilling platform, a lever is rotatably installed on the top of the fixing frame, a side of the lever close to the second movable pulley is set as a force arm, one end of the force arm is rotatably connected to the bottom end of the second movable pulley, and a side of the lever close to the load plate is set as a load arm, one end of the load arm is rotatably connected to one end of the load plate.
[0012] Preferably, the upper load limits of the lifting ring and the weighing sensor are both set to 500t.
[0013] Preferably, the drilling platform, the movable load rod, the load plate, the mounting base, the mounting frame, the fixing frame and the lever are all made of DH36 material.
[0014] Beneficial effects of the present invention: 1. This kind of drilling hoisting system load test fixture is provided with a reaction force component. The reaction force component significantly amplifies the initial pulling force of the pulling pump by combining two pulling pumps with a pulling force of 10t, a first amplification module and a second amplification module. The combination of a fixed pulley and a movable pulley effectively utilizes the mechanical advantage of the pulley, so that the original pulling force acts on the load plate after multiple amplifications, generating a greater reaction force. Combined with the lever structure, the pulling force transmitted by the movable pulley is further amplified by reasonably adjusting the amplification ratio of the force arm and the load arm, thereby more accurately controlling the test load, so that the reaction force can be flexibly adjusted according to on-site needs, greatly improving the control accuracy of the load, and by setting a suitable amplification ratio, the limited pulling force can be converted into sufficient reaction force to ensure that the force borne by the load plate meets the test requirements. At the same time, the stability and safety of the system operation are guaranteed by the dispersion and symmetry of the force.
[0015] 2. This type of drilling hoisting system load test fixture is equipped with a buffer assembly. The positioning plate in the buffer assembly guides the slider to move smoothly through the slide rail. The slider cooperates with the staggered rotating plates and positioning wheels to ensure uniform force distribution, reduce stress concentration, and avoid sudden impact. The positioning rod and the buffer spring gradually absorb and disperse the force generated by the rising load rod. The buffer spring gradually compresses when it is subjected to force, and continues to absorb the impact force as the force increases, so that the load plate remains stable during the force process, thereby improving the safety and stability of the system. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only for the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the structure of the activity module of the present invention; Figure 3 This is a schematic diagram of the planar structure of the buffer assembly of the present invention; Figure 4 This is a schematic diagram of the three-dimensional structure of the buffer assembly of the present invention; Figure 5 It is a schematic diagram of the structure of the reaction force assembly of the present invention; Figure 6 It is a schematic diagram of the position structure of the movable load rod of the present invention; Figure 7 This is a schematic diagram of the planar structure of the first amplification module of the present invention; Figure 8 It is a schematic diagram of the local structure of the first amplification module of the present invention.
[0018] The markings in the figure are: 1. Drilling platform; 2. Lifting ring; 3. Connecting tool; 4. Weighing sensor; 5. Shackle; 6. Annular steel cable; 7. Movable load rod; 8. Load plate; 9. Buffer plate; 10. Positioning plate; 11. Slide rail; 12. Sliding block; 13. First rotating plate; 14. Second rotating plate; 15. Positioning wheel; 16. Positioning rod; 17. Buffer spring; 18. Mounting base; 19. Mounting frame; 20. Pull pump; 21. Wire rope; 22. First fixed pulley; 23. Second fixed pulley; 24. First movable pulley; 25. Second movable pulley; 26. Fixed frame; 27. Force arm; 28. Load arm; 29. Positioning rope. DETAILED DESCRIPTION
[0019] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments.
[0020] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0021] like Figures 1 to 8 As shown, the drilling lifting system load test tooling includes a drilling platform 1 and a lifting ring 2 connected to an external top drive device, a connecting tool 3 is arranged below the lifting ring 2, a weighing sensor 4 is connected below the connecting tool 3, and a movable module is connected below the weighing sensor 4. The movable module includes a plurality of shackles 5 fixedly arranged below the weighing sensor 4, two groups of annular steel cables 6 are arranged below the plurality of shackles 5, and movable load rods 7 are arranged below the two annular steel cables 6. A fixed module is also arranged below the drilling platform 1, and a load plate 8 is movably installed in the middle of the lower end of the fixed module, the load plate 8 is adapted to the movable load rod 7, and the load plate 8 is arranged in a trapezoidal shape; a buffer component, the buffer component is arranged on the load plate 8 On both sides of the lower part, the buffer assembly is used to initially buffer the rise of the movable load rod 7; two reaction force assemblies, the reaction force assemblies are arranged on both sides of the drilling platform 1, and one end of the two reaction force assemblies is respectively rotatably connected to the two ends of the load plate 8, the reaction force assembly includes a driving module, a first amplifying module and a second amplifying module, the driving module is used to provide initial power to the reaction force assembly, the first amplifying module and the second amplifying module are used to amplify the force generated by the driving module, wherein the upper load limit of the lifting ring 2 and the weighing sensor 4 are both set to 500t, the drilling platform 1, the movable load rod 7, the load plate 8, the mounting base 18, the mounting frame 19, the fixing frame 26, and the lever are all set to DH36 material; At the beginning of the test, the main top drive drives the connection tool 3, the weighing sensor 4 and the active module to move upward through the lifting ring 2. The weighing sensor 4 monitors the load of the lifting ring 2 and the system in real time. When the load reaches a certain height, the shackle 5 in the active module drives the two sets of annular steel cables 6 to rise synchronously, and further pulls the active load rod 7 to rise. When the top of the active load rod 7 contacts the load plate 8, the buffer assembly begins to absorb the initial impact caused by the rise of the active load rod 7 to ensure the smooth transmission of the load. At the same time, the load plate 8 of the fixed module is pressed downward by force. The two ends of the load plate 8 are connected to the two sides of the drilling platform 1 through the reaction force assembly. The drive module in the reaction force assembly is started to provide initial power for the system. Through the first amplification module and the second amplification module, the initial power is amplified and generates a large reaction force, which further pushes the load plate 8 downward to apply a greater force. In this way, the reaction force is evenly transmitted to the active load rod 7 through the trapezoidal design of the load plate 8, and the load of the entire system gradually increases until the load reaches the preset standard. At this time, the weighing sensor 4 monitors the load data in real time to ensure the accuracy of the load and the safety of the system during the test.
[0022] like Figure 1 , Figure 3 , Figure 4As shown, the buffer assembly includes two buffer plates 9 fixedly installed under the load plate 8, and a plurality of positioning plates 10 are arranged at the bottom of the buffer plates 9. The positioning plates 10 are arranged in a U shape. Two slide rails 11 are arranged on the bottom surface of the positioning plate 10. Slide blocks 12 are slidably installed on both sides of the two slide rails 11. First rotating plates 13 are rotatably installed at both ends of one of the slide blocks 12, and second rotating plates 14 are rotatably installed at both ends of the other slide block 12. The two first rotating plates 13 and the two second rotating plates 14 are respectively staggered, and positioning wheels 15 are rotatably installed between the two first rotating plates 13 and the two second rotating plates 14 shown. A positioning rod 16 is also arranged in the middle of the positioning plate 10 through the slider 12, and the slider 12 is slidably connected to the positioning rod 16, and the positioning rod 16 is located on both sides of the slider 12. Buffer springs 17 are sleeved, and the sides of the two sliders 12 away from each other are respectively fixedly connected to one end of the two buffer springs 17, and the other ends of the two buffer springs 17 are respectively fixedly connected to the two ends of the positioning plate 10; When the movable load rod 7 rises and contacts the load plate 8, the load plate 8 transmits the force to the buffer assembly below. The positioning plate 10 in the buffer assembly guides the slider 12 to move smoothly along the slide rail 11 through the slide rail 11 at its bottom. The two sides of the slider 12 are staggeredly connected by the first rotating plate 13 and the second rotating plate 14 installed by rotation. During the force-bearing process, the positioning wheel 15 starts to rotate to ensure that the force between the rotating plates and can be evenly distributed to reduce the impact concentration phenomenon. At the same time, the slider 12 drives the positioning rod 16 when moving, and the buffer springs 17 on both sides of the positioning rod 16 begin to compress, gradually absorbing the force generated by the rise of the movable load rod 7 to provide a buffering effect. As the force increases, the buffer spring 17 is further compressed, and the slider 12 moves smoothly to continue the buffering process, ensuring that the load plate 8 will not be suddenly subjected to excessive impact force, thereby protecting the stability and safety of the entire system.
[0023] like Figure 1 , Figure 5 , Figure 6 , Figure 7 , Figure 8As shown, the driving assembly includes a mounting base 18 fixedly mounted on both sides of the top of the drilling platform 1, a mounting frame 19 is arranged on the top of the mounting base 18, a pulling pump 20 is arranged on one side of the mounting frame 19, and the pulling force of the two pulling pumps 20 is set to 10t. The two driving assemblies, the two first amplifying modules and the two second amplifying modules are symmetrically arranged. The first amplifying module includes a first fixed pulley 22 and a positioning rope 29 fixedly mounted on the top surface of the inside of the drilling platform 1, and a second fixed pulley 23 fixedly mounted on one side of the inside of the drilling platform 1. The other end of the positioning rope 29 is provided with a first movable pulley 24, the positioning rope 29 is arranged around the first fixed pulley 22, and a second movable pulley 25 is also rotatably installed on one side of the positioning rope 29. The pulling pump 20 A steel wire rope 21 is also fixedly connected below, the other end of the steel wire rope 21 is connected to the second movable pulley 25 and is located on one side of the first fixed pulley 22, the steel wire rope 21 is arranged around the first fixed pulley 22 and the first movable pulley 24, the first movable pulley 24 and the second movable pulley 25 are used to increase the pulling force of the pull pump 20, the second amplification module includes a fixing frame 26 fixedly installed on both sides of the fixing module below the drilling platform 1, a lever is rotatably installed on the top of the fixing frame 26, a side of the lever close to the second movable pulley 25 is set as a force arm 27, one end of the force arm 27 is rotatably connected to the bottom end of the second movable pulley 25, a side of the lever close to the load plate 8 is set as a load arm 28, one end of the load arm 28 is rotatably connected to one end of the load plate 8; When the test starts, the pulling pump 20 is started by the steel wire rope 21 installed on the mounting frame 19. After the steel wire rope 21 passes around the first fixed pulley 22 and the second fixed pulley 23, it is transmitted to the first movable pulley 24 and the second movable pulley 25. The pulling force of the pulling pump 20 is amplified by the action of the first movable pulley 24 and the second movable pulley 25. The amplified pulling force is further transmitted to the force applying arm 27 through the steel wire rope 21. The force applying arm 27 is connected to the bottom end of the second movable pulley 25 by rotation, and the pulling force is transmitted to the lever. The force applying arm 27 and the load arm 28 of the lever further amplify the pulling force transmitted by the movable pulley according to the amplification ratio, and finally acts on the load plate 8 through the load arm 28. When the movable load rod 7 rises and contacts the load plate 8, the load plate 8 is pushed downward under the reaction force from the load arm 28, and the load is gradually increased. , until the system reaches the preset test load, wherein by setting two pull pumps 20 with a pull force of t, and combining the first amplification module and the second amplification module, the system can significantly amplify the initial pull of the pull pump 20, and by using a combination of a fixed pulley and a movable pulley, the mechanical advantage of the pulley is effectively utilized, so that the pull of 10t can be amplified multiple times, thereby generating a greater reaction force on the load plate 8 and cooperating with the lever to further amplify the pull transmitted through the movable pulley, the amplification ratio of the force arm 27 and the load arm 28 can be flexibly adjusted according to the site conditions, which provides great freedom for the precise control of the load force, and by setting a reasonable amplification ratio, the lever can further convert the pull amplified by the movable pulley system into a greater reaction force, acting on the load plate 8, thereby achieving the expected test load.
[0024] A person skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of the present invention (including the claims) is limited to these examples. Under the concept of the present invention, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of the different aspects of the present invention as described above, which are not provided in detail for the sake of simplicity.
[0025] The present invention is intended to cover all such substitutions, modifications and variations that fall within the broad scope of the appended claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A drilling lifting system load test tool, characterized in that: include: A drilling platform (1) and a lifting ring (2) connected to an external top drive device, wherein a connecting tool (3) is arranged below the lifting ring (2), a weighing sensor (4) is connected below the connecting tool (3), a movable module is connected below the weighing sensor (4), the movable module comprises a plurality of shackles (5) fixedly arranged below the weighing sensor (4), two groups of annular steel cables (6) are arranged below the plurality of shackles (5), and movable load rods (7) are arranged below the two annular steel cables (6), and a fixed module is also arranged below the drilling platform (1), a load plate (8) is movably installed at the middle of the lower end of the fixed module, and the load plate (8) is connected to the movable module. The invention relates to a drilling platform (1) and a drilling rig (2). The drilling platform (1) is adapted to the movable load rod (7), the load plate (8) being arranged in a trapezoidal shape; a buffer assembly, the buffer assembly being arranged on both sides below the load plate (8), the buffer assembly being used to initially buffer the rise of the movable load rod (7); and two reaction force assemblies, the reaction force assemblies being arranged on both sides of the drilling platform (1), and one end of the two reaction force assemblies being rotatably connected to both ends of the load plate (8), respectively, the reaction force assemblies comprising a driving module, a first amplifying module and a second amplifying module, the driving module being used to provide initial power to the reaction force assembly, and the first amplifying module and the second amplifying module being used to amplify the force generated by the driving module.
2. The drilling lifting system load test tool according to claim 1, characterized in that: The buffer assembly comprises two buffer plates (9) fixedly mounted below the load plate (8), a plurality of positioning plates (10) being arranged at the bottom of each buffer plate (9), the positioning plates (10) being arranged in a U-shape, two slide rails (11) being arranged at the bottom of each positioning plate (10), sliders (12) being slidably mounted on both sides of the two slide rails (11), first rotating plates (13) being rotatably mounted at both ends of one of the sliders (12), and second rotating plates (14) being rotatably mounted at both ends of the other slider (12), the two first rotating plates (13) and the two second rotating plates (14) being arranged in a staggered manner, and positioning wheels (15) being rotatably mounted between the two first rotating plates (13) and the two second rotating plates (14).
3. The drilling lifting system load test tool according to claim 2, characterized in that: A positioning rod (16) is also provided in the middle of the positioning plate (10) and passes through the slider (12). The slider (12) is slidably connected to the positioning rod (16), and buffer springs (17) are sleeved on both sides of the positioning rod (16) located on the slider (12). The sides of the two sliders (12) that are away from each other are respectively fixedly connected to one end of the two buffer springs (17), and the other ends of the two buffer springs (17) are respectively fixedly connected to the two ends of the positioning plate (10).
4. The drilling lifting system load test tool according to claim 1, characterized in that: The driving assembly comprises a mounting base (18) fixedly mounted on both sides of the top of the drilling platform (1), a mounting frame (19) being arranged at the top of the mounting base (18), and a pull pump (20) being arranged at one side of the mounting frame (19).
5. The drilling lifting system load test tool according to claim 4, characterized in that: The pulling force of the two pulling pumps (20) is set to 10 t, and the two driving components, the two first amplifying modules and the two second amplifying modules are all symmetrically arranged.
6. The drilling lifting system load test tool according to claim 5, characterized in that: The first amplification module comprises a first fixed pulley (22) and a positioning rope (29) fixedly mounted on the top surface of the drilling platform (1), and a second fixed pulley (23) fixedly mounted on one side of the drilling platform (1); a first movable pulley (24) is arranged at the other end of the positioning rope (29); the positioning rope (29) is arranged around the first fixed pulley (22); a second movable pulley (25) is rotatably mounted on one side of the positioning rope (29); a steel wire rope (21) is fixedly connected below the pull pump (20); the other end of the steel wire rope (21) is connected to the second movable pulley (25) and is located on one side of the first fixed pulley (22); the steel wire rope (21) is arranged around the first fixed pulley (22) and the first movable pulley (24); the first movable pulley (24) and the second movable pulley (25) are used to increase the pulling force of the pull pump (20).
7. The drilling lifting system load test tool according to claim 6, characterized in that: The second amplification module comprises a fixing frame (26) fixedly mounted on both sides of the fixing module below the drilling platform (1); a lever is rotatably mounted on the top of the fixing frame (26); a force arm (27) is arranged on the side of the lever close to the second movable pulley (25); one end of the force arm (27) is rotatably connected to the bottom end of the second movable pulley (25); a load arm (28) is arranged on the side of the lever close to the load plate (8); one end of the load arm (28) is rotatably connected to one end of the load plate (8).
8. The drilling lifting system load test tool according to claim 1, characterized in that: The upper load limits of the lifting ring (2) and the weighing sensor (4) are both set to 500 t.
9. The drilling lifting system load test tool according to claim 7, characterized in that: The drilling platform (1), the movable load rod (7), the load plate (8), the mounting base (18), the mounting frame (19), the fixing frame (26), and the lever are all made of DH36 material.