Construction method for rebuilding old residential building and additionally installing elevator
By conducting detailed surveys and reinforcement of elevator shafts on the corridor structure of the old community, combined with the method of setting the slope structure at the outside of the unit door, solve the problem of non -obstacle travel such as old, weak, sick and disabled, and the stability of the elevator installation. And security, while improving the convenience of travel for the elderly.
Patent Information
- Application Number
- CN202411723469.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-28
- Publication Date
- 2025-01-21
AI Technical Summary
The existing methods of installing elevators have not effectively solved the barrier-free travel problems of urgently needed people such as the elderly, weak, sick and disabled.
By conducting field surveys of the building channel structure of the old community, determine the construction location and method installed by the elevator, and the elevator shaft is reinforced by multi -rooted steel pipe pipe piles and basic steel bars, and the slope structure is set on the outside of the unit door for the elderly and wheelchairs. Pass.
The elevator installation does not affect the traffic of the old community residents, ensuring the stability and safety of the elevator's installation structure, and improving the convenience of travel for the elderly.
Smart Images

Figure CN119332969A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of old residential quarters reconstruction, and in particular to a construction method for installing elevators in residential buildings in old residential quarters. Background Art
[0002] Most old buildings were built in the 1960s and 1970s. They are characterized by a large number of floors and are not equipped with elevators. As time goes by, the residents of old buildings gradually enter old age and have difficulty going up and down stairs and inconvenience in travel. Taking the elevator up and down the stairs has become a strong desire and urgent need for residents of old buildings. In the construction of installing elevators in multi-story old buildings, common entry methods are direct entry on the flat floor and entry on the upper and lower half floors. In the first entry method, a door needs to be opened in the resident's home when installing the elevator, which damages the decoration of the original house. In the second method, the flat floor location of the elevator is at the original floor conversion platform (also known as the rest platform). Users who take the elevator need to go up and down half a flight of stairs before entering the house. This installation method still does not solve the problem of barrier-free travel for the elderly, the weak, the sick and the disabled and other people in urgent need;
[0003] To this end, this patent proposes a construction method for renovating and installing elevators in old residential buildings to solve the above problems. Summary of the invention
[0004] 1. Technical issues to be resolved
[0005] In view of the deficiencies in the prior art, the present invention provides a construction method for retrofitting and installing elevators in old residential buildings, which solves the problem that the existing method of installing elevators still fails to solve the problem of barrier-free travel for people in urgent need, such as the elderly, the weak, the sick and the disabled.
[0006] (II) Technical solution
[0007] To achieve the above purpose, the present invention is implemented by the following technical scheme: a construction method for installing an elevator in an old residential building renovation, comprising the following installation construction steps:
[0008] S1. Conduct on-site surveys of the corridor structures of old residential areas where elevators are required, and measure the height of the corridor floors, the net height of the staircase transfer platforms, and the position between the corridor windows and unit doors;
[0009] S2. Investigate the structural characteristics and distribution of corridors in old residential areas to determine whether the opening of doors on the exterior walls of buildings during construction will affect the structure of the house and whether it will have an impact on the firmness of the house;
[0010] S3. Issue a survey report based on the above survey results to determine the construction location and method of installing the elevator;
[0011] S4, excavation of elevator foundation pit and installation of elevator shaft base, multiple steel pipe piles are evenly arranged in the foundation pit, concrete is poured in the steel pipe piles to improve the overall strength of the steel pipe piles, and then the elevator foundation steel bars are tied, the foundation steel bars are connected to the base of the foundation pit through embedded steel bars, and steel plates are embedded in the elevator foundation pit, the elevator shaft columns are installed and welded to the embedded steel plates, and the elevator foundation concrete is poured to complete the installation of the elevator shaft base;
[0012] S5. Construction of the top of the elevator shaft;
[0013] S6. Installation and connection of elevator shaft;
[0014] S7, elevator installation and trial operation;
[0015] S8. Carry out the construction of the elevator gallery to connect the elevator shaft with the original house, then construct the barrier-free entrance slope at the opening of the unit door, and install guardrails on the barrier-free entrance slope to improve safety;
[0016] S9. Set the time and date for regular maintenance, and post precautions and emergency help methods inside the elevator.
[0017] Preferably, in S5, the steel wire rope is connected to the top of the elevator, and slide rail structures are arranged at the four ends of the elevator shaft to connect with the four ends of the elevator, and the elevator shaft is capped after the installation is completed.
[0018] Preferably: S7 includes the following trial operation steps;
[0019] A. Preparation:
[0020] B. Connect the power supply and start the machine;
[0021] C. System inspection;
[0022] D. Parameter debugging;
[0023] E. Multiple tests;
[0024] F. Notes.
[0025] Preferably, the building exterior wall in S2 comprises a double-layer exterior wall formwork, and high-strength concrete is poured inside the double-layer exterior wall formwork.
[0026] (III) Beneficial effects
[0027] The present invention provides a construction method for installing elevators in old residential buildings, which has the following beneficial effects:
[0028] 1. The present invention installs the elevator inside the exterior wall of the building through on-site survey, and uses multiple steel pipe piles, foundation steel bars and embedded bars to reinforce the elevator shaft. The construction operation is carried out without affecting the passage of residents in old residential areas. At the same time, the entire elevator installation structure will not change the original internal structure of the corridor, so as not to affect the stability of the residential corridor, so as to avoid subsequent safety hazards. At the same time, after the elevator is installed, considering that the occupancy rate of the elderly in the old residential areas is relatively high, a slope structure is set at the outer end of the unit door, which can be beneficial to the barrier-free passage of the elderly's wheelchairs and improve the use effect of the entire elevator. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of the installation of the elevator of the present invention.
[0030] Among them, 1. Interior walls of the building; 2. Stairs; 3. Household doors; 4. Elevator entrances; 5. Elevator shafts; 6. Unit doors; 7. Elevators; 8. Elevator ropes; 9. Exterior walls of the building. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] Example:
[0033] like Figure 1 As shown, the embodiment of the present invention provides a construction method for retrofitting and installing an elevator in an old residential building, including the following installation construction steps:
[0034] S1. Conduct field surveys on the corridor structures of old residential areas where elevators are to be installed, measure the height of the corridor floors, the net height of the staircase 2 transfer platform, and the position between the corridor windows and the unit doors 6, with a focus on measuring the distance between the building's inner wall 1 and the building's outer wall 9 and their heights;
[0035] S2. Investigate the structural characteristics and distribution of corridors in old residential areas to determine whether the opening of doors on the exterior walls of buildings during construction affects the structure of the house and the firmness of the house. By investigating the distribution of stairs 2, the spacing of each floor can be calculated;
[0036] S3. Issue a survey report based on the above survey results to determine the construction location and construction method for the installation of the elevator body 7;
[0037] S4, excavation of the elevator foundation pit and installation of the elevator shaft base, multiple steel pipe piles are evenly distributed in the foundation pit, concrete is poured in the steel pipe piles to improve the overall strength of the steel pipe piles, and then the elevator foundation steel bars are tied, the foundation steel bars are connected to the base of the foundation pit through embedded steel bars, and steel plates are embedded in the elevator foundation pit, the elevator shaft 5 columns are installed and welded to the embedded steel plates, and the elevator foundation concrete is poured to complete the installation of the elevator shaft base;
[0038] S5, top construction of elevator shaft 5;
[0039] S6, the elevator shaft 5 is installed and connected and fixed, and the elevator entrance 4 and the unit door 6 are designed in a parallel interactive manner to prevent the situation of falling down the elevator due to the different positions of the two ends during use;
[0040] S7, elevator installation and trial operation;
[0041] S8. Carry out the construction of the elevator gallery to connect the elevator shaft with the original house, then construct the barrier-free entrance slope at the opening of the unit door, and install guardrails on the barrier-free entrance slope to improve safety;
[0042] S9. Set the time and date for regular maintenance, and post precautions and emergency help methods inside the elevator.
[0043] In S5, the steel wire rope 8 is connected to the top of the elevator, and slide rail structures are arranged at the four ends of the elevator shaft 5 to connect with the four ends of the elevator. After the installation is completed, the elevator shaft is capped.
[0044] S7 includes the following commissioning steps:
[0045] A. Preparation:
[0046] a. Check all electrical and mechanical system connections to ensure that each part has been fully installed;
[0047] b. Monitor the power and signal systems to ensure that all systems are functioning properly;
[0048] c. Make sure all cables are connected properly to prevent any cables from being disconnected or loose;
[0049] d. Check and calibrate all sensors and measuring instruments to ensure accuracy and consistency;
[0050] B. Connect the power supply and start the machine;
[0051] a. Connect the power supply to the elevator control system under all safety measures;
[0052] b. After that, switch the elevator control system to "on" and check whether the elevator lights and sounds are normal;
[0053] C. System inspection;
[0054] a. First, conduct an internal inspection of the computer room, check the power supply voltage, and test whether the corresponding functions of the overload protection, grounding protection, and phase sequence protection systems are normal;
[0055] b. Check whether the roof equipment, including wire rope, emergency brake device, cam, drive device, etc., are normal;
[0056] c. Check the door machine to ensure that the door panels open and close normally and that the door opening and closing technology is stable and sensitive;
[0057] D. Parameter debugging;
[0058] a. Check and adjust the speed and acceleration of the elevator to ensure safety and compliance with requirements;
[0059] b. Check and adjust the door opening and closing time and sensitivity to ensure that the door opening and closing functions are normal;
[0060] c. Check and adjust the floor display to ensure accurate display of the floor number;
[0061] E. Multiple tests;
[0062] a. Carry out no-load test run: First, carry out no-load test run of the elevator to check whether all parameters of the elevator are normal;
[0063] b. Carry out rated load test run: load the elevator train with effective load and carry out rated load test run;
[0064] c. Conduct multiple test runs: Conduct at least five non-rated load runs to check whether the elevator is running stably and ensure that all systems are operating normally;
[0065] F. Notes:
[0066] a. Check all operations and parameter adjustment processes to ensure compliance with all relevant standards and regulations;
[0067] b. Before making any adjustments or changes during the trial run, make sure that the elevator has stopped and is in a safe state;
[0068] c. In any emergency, the power supply must be cut off and appropriate emergency measures must be taken to ensure the safety of personnel and equipment.
[0069] The building exterior wall in S2 includes a double-layer exterior wall formwork, and high-strength concrete is poured inside the double-layer exterior wall formwork.
[0070] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. The construction method for installing elevators in old residential buildings is characterized by: The installation steps include: S1. Conduct on-site surveys of the corridor structures of old residential areas where elevators are required, and measure the height of the corridor floors, the net height of the staircase transfer platforms, and the position between the corridor windows and unit doors; S2. Investigate the structural characteristics and distribution of corridors in old residential areas to determine whether the opening of doors on the exterior walls of buildings during construction will affect the structure of the house and whether it will have an impact on the firmness of the house; S3. Issue a survey report based on the above survey results to determine the construction location and method of installing the elevator; S4, excavation of elevator foundation pit and installation of elevator shaft base, multiple steel pipe piles are evenly arranged in the foundation pit, concrete is poured in the steel pipe piles to improve the overall strength of the steel pipe piles, and then the elevator foundation steel bars are tied, the foundation steel bars are connected to the base of the foundation pit through embedded steel bars, and steel plates are embedded in the elevator foundation pit, the elevator shaft columns are installed and welded to the embedded steel plates, and the elevator foundation concrete is poured to complete the installation of the elevator shaft base; S5. Construction of the top of the elevator shaft; S6. Elevator shaft installation and connection fixation; S7, elevator installation and trial operation; S8. Carry out the construction of the elevator gallery to connect the elevator shaft with the original house, then construct the barrier-free entrance slope at the opening of the unit door, and install guardrails on the barrier-free entrance slope to improve safety; S9. Set the time and date for regular maintenance, and post precautions and emergency help methods inside the elevator.
2. The construction method for installing elevators in old residential buildings according to claim 1 is characterized by: In the S5, the steel wire rope is connected to the top of the elevator, and slide rail structures are arranged at the four ends of the elevator shaft to connect with the four ends of the elevator. After the installation is completed, the elevator shaft is capped.
3. The construction method for installing elevators in old residential buildings according to claim 1 is characterized by: The S7 includes the following trial operation steps: A. Preparation; B. Connect the power supply and start the machine; C. System inspection; D. Parameter debugging; E. Multiple tests; F. Notes.
4. The construction method for installing elevators in old residential buildings according to claim 3 is characterized by: The building exterior wall in S2 includes a double-layer exterior wall formwork, and high-strength concrete is poured inside the double-layer exterior wall formwork.