Automatic processing equipment and processing technology for wire and cable production and manufacturing
By designing automated machining equipment in wire and cable manufacturing, layered pre -squeezing system and cooling sets are used to solve problems such as long production cycles and poor cooling in traditional process, and realize efficient production, improving insulation performance, saving space and saving space and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and saving space and space saving and space saving and space saving and space saving and space saving and space -saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving and space saving. cost.
Patent Information
- Application Number
- CN202411568242.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-05
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2044-11-05
AI Technical Summary
In the production and manufacturing of traditional wire and cables, the staged extrusion process leads to prolonging the production cycle, easy to contaminate dust during the cooling process, large space occupied by the production line, and difficult to accurately control the cooling rate, which affects the insulation performance and overall strength.
Design a wire and cable manufacturing automation processing equipment, use a layered pre -squeezed system and cooling suit group, squeezed out the multi -layer packaging materials and cooling the outer layer through the layered pre -squeezing system, softened the inner layer, and then squeezed out the combination. , Use the cooling suit to thoroughly cool the cable.
The cable production cycle has been shortened, the production efficiency is improved, the dust contamination between each layer is reduced, the insulation performance and the overall intensity are enhanced, and the production space and operating costs are saved.
Smart Images

Figure CN119381090A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of wire and cable processing, and in particular to automated processing equipment and a processing technology for producing wire and cable. Background Art
[0002] Wire and cable manufacturing refers to the entire process of processing conductors, insulating materials and other components into wires and cables. This process usually includes multiple processes such as conductor core twisting, insulation layer extrusion, and outer sheath extrusion. Among them, an automatic extrusion equipment for wire and cable manufacturing will be used. Traditional extrusion equipment mostly adopts a staged extrusion process. After the first layer of the conductor core is extruded on the outer wall, it is necessary to wait for the surface of the first layer to completely cool and form before extruding the next layer. This may lead to the following problems in the actual production process:
[0003] 1. Wires and cables need to wait for complete cooling after each layer of coating, which prolongs the production cycle and greatly reduces the overall production efficiency;
[0004] 2. Wires and cables may be contaminated with dust and impurities during the cooling process after each layer of coating, which will lead to poor bonding between the first layer and the second layer, affecting the insulation performance and overall strength;
[0005] 3. The phased process results in a very long extrusion line, which requires more production space to house equipment and cooling areas, increasing plant construction and operating costs;
[0006] 4. The cooling rate of each layer is difficult to control accurately. If the cooling time of the cladding is too long, its surface state may change, affecting the bonding strength with the next cladding;
[0007] 5. Too fast cooling may cause the material to shrink and deform, resulting in stress concentration inside the sheath, increasing the risk of cable breakage or damage during use.
[0008] Therefore, it is necessary to invent an automated processing equipment and processing technology for producing wires and cables. Summary of the invention
[0009] In order to achieve the above-mentioned purpose, the present invention provides the following technical solutions: an automated processing equipment for the production of wires and cables, comprising an extruded shell, a feeding turret is arranged at one end of the extruded shell, a wire core winding roller is rotatably mounted on the feeding turret, a wire core is wound on the surface of the wire core winding roller, the wire core enters from one end of the extruded shell and passes out from the other end, a receiving turret is arranged at the other end of the extruded shell, a wire take-up roller is rotatably mounted on the receiving turret, a first injection conduit, a second injection conduit and a third injection conduit are respectively arranged on both sides of one end of the extruded shell close to the feeding turret, the The first injection conduit, the second injection conduit and the third injection conduit are each connected to a corresponding injection molding device at one end away from the extruded shell, and the injection molding device is used to inject cable packaging material into the corresponding first injection conduit, the second injection conduit or the third injection conduit. A cooling sleeve is arranged between the extruded shell and the receiving turntable, and the cooling sleeve is used to thoroughly cool the cable output by the extruded shell. A layered pre-extrusion system is arranged in the extruded shell, and the layered pre-extrusion system is used to simultaneously pre-extrude multiple layers of packaging material, cool the outer layer of the multi-layer packaging material, soften the inner layer of the multi-layer packaging material, and then extrude the combination of the multi-layer packaging material.
[0010] Preferably, the layered pre-extrusion system includes a first extrusion groove, which is arranged at the center of the inner wall of the extrusion shell, and the first extrusion groove wraps the outside of the wire core passing through the extrusion shell. A second extrusion groove is arranged on the outside of the first extrusion groove, and a third extrusion groove is arranged on the outside of the second extrusion groove. The first extrusion groove, the second extrusion groove and the third extrusion groove are all tubular structures, and a gap is arranged between the first extrusion groove, the second extrusion groove and the third extrusion groove.
[0011] Preferably, one end of the first extrusion groove is connected to the first injection conduit, one end of the second extrusion groove is connected to the second injection conduit, one end of the third extrusion groove is connected to the third injection conduit, one end of the second extrusion groove away from the second injection conduit is retracted inward and connected to the first extrusion groove, and one end of the third extrusion groove away from the third injection conduit is retracted inward and connected to the second extrusion groove.
[0012] Preferably, a first insulation sleeve is arranged between the first extrusion groove and the second extrusion groove, and a second insulation sleeve is arranged between the second extrusion groove and the third extrusion groove. The first insulation sleeve and the second insulation sleeve are tubular structures, and the first insulation sleeve and the second insulation sleeve are embedded and installed inside the extrusion shell.
[0013] Preferably, a first cooling conduit is arranged between the first extrusion groove and the first insulation sleeve, a second cooling conduit is arranged between the second extrusion groove and the second insulation sleeve, and a third cooling conduit is arranged outside the third extrusion groove. The first cooling conduit, the second cooling conduit and the third cooling conduit are hollow spiral tubular structures, and the first cooling conduit, the second cooling conduit and the third cooling conduit are embedded and installed inside the extruded shell, and one end of the first cooling conduit, the second cooling conduit and the third cooling conduit extends out of the extruded shell and is connected to the condenser.
[0014] Preferably, a first heating conduit is arranged between the second extrusion groove and the first insulation sleeve, and a second heating conduit is arranged between the third extrusion groove and the second insulation sleeve. The first heating conduit and the second heating conduit are hollow spiral tubular structures, and the first heating conduit and the second heating conduit are embedded and installed inside the extruded outer shell. One end of the first heating conduit and the second heating conduit extends out of the extruded outer shell and is connected to the water heater.
[0015] Preferably, the injection molding device includes an extrusion shell, a motor is fixedly installed at one end of the extrusion shell, an injection molding interface is fixedly installed at the other end of the extrusion shell, the end of the injection molding interface away from the extrusion shell can be inserted and connected to the first injection conduit, the second injection conduit or the third injection conduit, a conveying screw is rotatably installed in the extrusion shell, one end of the conveying screw is fixedly connected to the output end of the motor, a stirring screw is arranged at a certain interval in the middle of the conveying screw, an injection funnel is fixedly installed on the top surface of the extrusion shell close to the motor, and a heating wire is embedded in the extrusion shell outside the conveying screw and the stirring screw.
[0016] Preferably, the cooling kit includes a water cooling cabin, one end of which is connected to an end of the extruded package shell away from the first injection conduit, the water cooling cabin is provided with an opening, spray conduits are installed on both sides and the top surface of the inner wall of the water cooling cabin, a plurality of pressurized nozzles are installed on the surface of the spray conduit, a water tank is provided on one side of the water cooling cabin, one end of the spray conduit close to the extruded package shell extends out of the water cooling cabin and is connected to the water tank, and a drain pipe is fixedly installed on the bottom surface of one end of the water cooling cabin close to the extruded package shell.
[0017] Preferably, a loading wheel is rotatably arranged between the wire core winding roller and the extrusion package shell, and a receiving wheel is rotatably arranged between the wire taking-up roller and the water cooling chamber. The wire core on the wire core winding roller bypasses the top slot of the loading wheel and passes through the extrusion package shell and the water cooling chamber in sequence. The wire core passing through the water cooling chamber bypasses the top slot of the receiving wheel and is wound on the surface of the wire taking-up roller.
[0018] A processing technology for automated processing equipment for manufacturing electric wires and cables, comprising the following steps:
[0019] S1. The staff installs the wire core winding roller on the feeding turret, pulls out one end of the wire core on the wire core winding roller, and passes it through the extruded shell and water cooling chamber in sequence, then passes through the top slot of the take-up wheel and fixes it on the surface of the take-up roller;
[0020] S2. The staff injects the outer layer raw material into the injection funnels on the extruded shell connected to the first injection conduit, the second injection conduit and the third injection conduit, respectively, and turns on the power of the electric heating wire and starts the motor to drive the conveying screw and the stirring screw to rotate. The electric heating wire melts the outer layer raw material and stirs it evenly through the stirring screw. Finally, the conveying screw pushes and injects the raw material from the injection interface into the first injection conduit, the second injection conduit and the third injection conduit;
[0021] S3. Start the wire core winding roller, feeding wheel, take-up roller and take-up wheel to rotate, drive the wire core to move slowly and uniformly in the extrusion shell, then the first package in the first injection conduit is squeezed into the first extrusion groove and wrapped around the outer wall of the wire core, and at the same time, the second package in the second injection conduit is squeezed into the second extrusion groove, and the third package in the third injection conduit is squeezed into the third extrusion groove;
[0022] S4. Start the condenser to circulate the coolant in the first cooling conduit, the second cooling conduit and the third cooling conduit, and start the water heater to circulate the hot water in the first heating conduit and the second heating conduit. The first cooling conduit cools the first package material in the first extrusion groove and solidifies it on the surface of the wire core to form a first package layer; the second cooling conduit cools the outer side of the second package material in the second injection conduit to lower its overall temperature and solidify it on the surface, and the first heating conduit softens the inner side of the second package material in the second injection conduit to maintain its fluidity and adhesion; on the other hand, the third cooling conduit cools the outer side of the third package material in the third injection conduit to lower its overall temperature and solidify it on the surface, and the second heating conduit softens the inner side of the third package material in the third cooling conduit to solidify it on the surface; after the first package layer is completely solidified, the second package material is extruded and coated on the surface of the first package layer to form a second package layer, and then the third package material is extruded and coated on the surface of the second package layer to form a third package layer;
[0023] S5. After the first, second and third claddings are completely coated on the surface of the wire core, as the wire core enters the water cooling chamber, the pressurized nozzle is started to draw water from the water tank through the spray conduit and spray it out, so as to further cool the wire core in the water cooling chamber and the first, second and third claddings on the surface;
[0024] S6. The wire core with completely cooled surface coating passes through the water cooling cabin, bypasses the slot on the top of the take-up wheel and is wound on the surface of the take-up roller. After the wire core is extruded, the staff removes the take-up roller on the take-up turntable, labels it and then packs it for storage.
[0025] The beneficial effects of the present invention are as follows: the staff pulls the wire core out from the wire core winding roller, passes it through the extruded shell and the cooling sleeve in sequence, and fixes it on the surface of the take-up roller; the wire core is driven to move in the extruded shell by starting the wire core winding roller and the take-up roller, and the injection molding device is started at the same time to pre-extrude the multi-layer packaging material through the layered pre-extrusion system, and then the outer layer of the multi-layer packaging material is cooled, and the inner layer of the multi-layer packaging material is softened at the same time, and then the combination of the multi-layer packaging material is extruded again, and finally the cable output from the extruded shell is thoroughly cooled by the cooling sleeve; so as to achieve the effect of pre-extrusion and pre-cooling of the multi-layer packaging material, and at the same time perform surface cooling of the multi-layer packaging material, shorten the cable production cycle, and greatly improve the overall production efficiency; and the one-time combined extrusion method minimizes the possibility of dust and impurities contaminating between each layer of packaging material, so that each layer of packaging material is tightly connected, and the insulation performance and overall strength are improved; the one-time combined extrusion process effectively shortens the production line, saves a lot of production space, and saves plant construction and operation costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 A front view of an automated processing equipment for manufacturing electric wires and cables provided by the present invention;
[0027] Figure 2 A top view of an automated processing equipment for producing and manufacturing electric wires and cables provided by the present invention;
[0028] Figure 3 A front view of an automated processing equipment for producing and manufacturing electric wires and cables provided by the present invention;
[0029] Figure 4 A schematic diagram of the front end structure of an extruded housing of an automated processing equipment for manufacturing electric wires and cables provided by the present invention;
[0030] Figure 5 A schematic diagram of the rear end structure of an extruded shell of an automated processing equipment for manufacturing electric wires and cables provided by the present invention;
[0031] Figure 6 A schematic diagram of the internal structure of an extruded shell of an automated processing equipment for manufacturing electric wires and cables provided by the present invention;
[0032] Figure 7 A schematic diagram of the internal structure of a heat-insulating sleeve of an automated processing equipment for manufacturing electric wires and cables provided by the present invention;
[0033] Figure 8 A schematic diagram of the internal injection of materials into an extruded shell of an automated processing equipment for manufacturing electric wires and cables provided by the present invention;
[0034] Fig. 9 A cross-sectional view of an extruded shell of an automated processing equipment for manufacturing electric wires and cables provided by the present invention;
[0035] Fig.10 A schematic diagram of the internal structure of an injection molding device of an automated processing equipment for manufacturing electric wires and cables provided by the present invention;
[0036] Fig.11 A schematic diagram of the connection of an injection molding interface for automated processing equipment for manufacturing electric wires and cables provided by the present invention;
[0037] Fig.12 A cross-sectional view of a material injection funnel of an automated processing equipment for manufacturing electric wires and cables provided by the present invention;
[0038] Fig.13 A schematic diagram of the internal structure of a water-cooled cabin of automated processing equipment for producing and manufacturing wires and cables provided by the present invention.
[0039] In the figure: a wire core winding roller 11, a feeding turret 12, a feeding wheel 13, a wire take-up roller 14, a receiving turret 15, a receiving wheel 16, a wire core 17, a first extrusion slot 18, a second extrusion slot 19, a third extrusion slot 20, an extrusion shell 21, a first injection conduit 22, a second injection conduit 23, a third injection conduit 24, a first insulation sleeve 25, a second insulation sleeve 26, a first cooling conduit 27, a second cooling conduit 28, a third cooling conduit 29, a first heating conduit 30, a second heating conduit 31, a water cooling cabin 32, a drain pipe 33, a spray conduit 34, a pressurized nozzle 35, a water tank 36, an extrusion shell 41, an injection funnel 42, an injection interface 43, a motor 44, a conveying screw 45, a stirring screw 46, and a heating wire 47. DETAILED DESCRIPTION
[0040] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0041] Embodiment 1, as Figure 1 - Figure 6As shown, an automated processing equipment for producing and manufacturing electric wires and cables in an embodiment of the first aspect of the present invention comprises an extruded shell 21, a feeding turret 12 is arranged at one end of the extruded shell 21, a wire core winding roller 11 is rotatably mounted on the feeding turret 12, a wire core 17 is wound on the surface of the wire core winding roller 11, the wire core 17 enters from one end of the extruded shell 21 and then passes out from the other end, a receiving turret 15 is arranged at the other end of the extruded shell 21, a wire take-up roller 14 is rotatably mounted on the receiving turret 15, and a first injection conduit 22, a second injection conduit 23 and a third injection conduit 24 are respectively arranged on both sides of one end of the extruded shell 21 close to the feeding turret 12 The first injection conduit 22, the second injection conduit 23 and the third injection conduit 24 are each connected to a corresponding injection molding device at one end away from the extruded shell 21. The injection molding device is used to inject cable packaging material into the corresponding first injection conduit 22, the second injection conduit 23 or the third injection conduit 24. A cooling sleeve is arranged between the extruded shell 21 and the receiving turntable 15. The cooling sleeve is used to thoroughly cool the cable output by the extruded shell 21. A layered pre-extrusion system is arranged in the extruded shell 21. The layered pre-extrusion system is used to simultaneously pre-extrude multiple layers of packaging material, cool the outer layer of the multi-layer packaging material, soften the inner layer of the multi-layer packaging material, and then extrude the combination of the multi-layer packaging material.
[0042] In the above embodiment, it should be noted that the rotating shaft ends of the wire core winding roller 11 and the wire take-up roller 14 are both equipped with motors, and the wire core winding roller 11 and the wire take-up roller 14 are both configured as detachable structures, which can be removed from the feeding turret 12 or the receiving turret 15 for transportation; the extruded raw materials transported in the first injection conduit 22, the second injection conduit 23 and the third injection conduit 24 are respectively used to extrude the first cladding, the second cladding and the third cladding, and the extruded raw materials are initially plastic particles, which are heated and stirred by the injection molding device to soften into a fluid state and injected into the first injection conduit 22, the second injection conduit 23 or the third injection conduit 24; during use, the staff pulls the wire core 17 out of the wire core winding roller 11, and passes it through the extrusion shell 21 and the cooling sleeve in turn, and fixes it on the surface of the wire take-up roller 14; by starting the motor to drive the wire core winding roller 11 and the wire take-up roller 14 to rotate, the wire core 17 is driven in the extrusion shell 21 The cable is moved inside and the injection molding device is started to inject the extrusion raw materials into the first injection conduit 22, the second injection conduit 23 and the third injection conduit 24 at the same time. The multi-layer packaging material is pre-extruded through the layered pre-extrusion system, and then the outer layer of the multi-layer packaging material is cooled, and the inner layer of the multi-layer packaging material is heated and softened. Then, the combination of the multi-layer packaging material is extruded, and finally the cable output from the extruded shell 21 is thoroughly cooled through the cooling sleeve; so as to achieve the effect of pre-extrusion and pre-cooling of the multi-layer packaging material, and at the same time perform surface cooling of the multi-layer packaging material, shorten the cable production cycle, and greatly improve the overall production efficiency; and the one-time combined extrusion method minimizes the possibility of dust and impurities contaminating each layer of packaging material, so that each layer of packaging material is closely connected, and the insulation performance and overall strength are improved; the one-time combined extrusion process effectively shortens the production line, saves a lot of production space, and saves plant construction and operation costs.
[0043] Embodiment 2, as Figure 6 - Fig. 9 As shown, an automated processing equipment for manufacturing wires and cables includes a layered pre-extrusion system including a first extrusion groove 18, the first extrusion groove 18 is arranged at the center of the inner wall of an extrusion shell 21, the first extrusion groove 18 wraps the outer side of a wire core 17 passing through the extrusion shell 21, a second extrusion groove 19 is arranged on the outer side of the first extrusion groove 18, and a third extrusion groove 20 is arranged on the outer side of the second extrusion groove 19. The first extrusion groove 18, the second extrusion groove 19 and the third extrusion groove 20 are all tubular structures. A gap is provided between the packaging groove 18, the second packaging groove 19 and the third packaging groove 20. One end of the first packaging groove 18 is connected to the first injection conduit 22, one end of the second packaging groove 19 is connected to the second injection conduit 23, and one end of the third packaging groove 20 is connected to the third injection conduit 24. One end of the second packaging groove 19 away from the second injection conduit 23 is retracted inward and connected to the first packaging groove 18, and one end of the third packaging groove 20 away from the third injection conduit 24 is retracted inward and connected to the second packaging groove 19.
[0044] In the above embodiment, it should be noted that the injection molding device extrude the extruded raw material into the first extrusion groove 18 through the first injection conduit 22, and the first extrusion groove 18 is used to form the first cladding of the outer wall of the wire core 17; extrude the extruded raw material into the second extrusion groove 19 through the second injection conduit 23, and the second extrusion groove 19 is used to form the second cladding of the outer wall of the wire core 17; extrude the extruded raw material into the third extrusion groove 20 through the third injection conduit 24, and the third extrusion groove 20 is used to form the third cladding of the outer wall of the wire core 17.
[0045] Embodiment 3, as Figure 6 - Fig. 9 As shown, an automated processing equipment for manufacturing electric wires and cables includes: a first heat-insulating sleeve 25 is arranged between a first extrusion groove 18 and a second extrusion groove 19, a second heat-insulating sleeve 26 is arranged between the second extrusion groove 19 and the third extrusion groove 20, the first heat-insulating sleeve 25 and the second heat-insulating sleeve 26 are tubular structures, the first heat-insulating sleeve 25 and the second heat-insulating sleeve 26 are embedded and installed inside an extrusion shell 21, a first cooling conduit 27 is arranged between the first extrusion groove 18 and the first heat-insulating sleeve 25, a second cooling conduit 28 is arranged between the second extrusion groove 19 and the second heat-insulating sleeve 26, a third cooling conduit 29 is arranged outside the third extrusion groove 20, and the first cooling conduit 27, the second cooling conduit 28 and the third cooling conduit 29 are hollow spiral structures. The first cooling conduit 27, the second cooling conduit 28 and the third cooling conduit 29 are embedded in the extruded shell 21, one end of the first cooling conduit 27, the second cooling conduit 28 and the third cooling conduit 29 extends out of the extruded shell 21 and is connected to the condenser, a first heating conduit 30 is arranged between the second extruded groove 19 and the first insulation sleeve 25, a second heating conduit 31 is arranged between the third extruded groove 20 and the second insulation sleeve 26, the first heating conduit 30 and the second heating conduit 31 are hollow spiral tubular structures, the first heating conduit 30 and the second heating conduit 31 are embedded in the extruded shell 21, one end of the first heating conduit 30 and the second heating conduit 31 extends out of the extruded shell 21 and is connected to the water heater.
[0046] In the above embodiment, it should be noted that the first heat-insulating sleeve 25 and the second heat-insulating sleeve 26 are made of heat-insulating materials to block the heat transfer between the extrusion grooves;
[0047] The first cooling conduit 27, the second cooling conduit 28 and the third cooling conduit 29 are filled with coolant. The coolant in the first cooling conduit 27, the second cooling conduit 28 and the third cooling conduit 29 is circulated by starting the condenser to cool the outer sides of the first extrusion groove 18, the second extrusion groove 19 and the third extrusion groove 20, so as to accelerate the cooling and solidification of the first cladding layer and pre-cool the outer sides of the second cladding layer and the third cladding layer. The flow speed of the coolant in the first cooling conduit 27, the second cooling conduit 28 and the third cooling conduit 29 is controlled by the condenser respectively, so as to achieve the effect of accurately controlling the cooling rate of each cladding layer, and effectively avoid the problem of too long cooling time of the cladding layer.
[0048] Hot water is injected into the first heating conduit 30 and the second heating conduit 31. The hot water in the first heating conduit 30 and the second heating conduit 31 is circulated and heated by starting the water heater to heat the inside of the second extrusion groove 19 and the third extrusion groove 20, so as to soften the inside of the second and third cladding layers, prevent the inner walls thereof from solidifying prematurely during the pre-cooling process, ensure the bonding strength between the cladding layers, and slow down the cooling speed, reduce the stress concentration inside the cladding layers, and reduce the risk of breakage or damage of the cable during subsequent use;
[0049] After the first cladding surface in the first extrusion groove 18 solidifies, the second cladding is extruded along the second extrusion groove 19 and wrapped around the first cladding surface. After the second cladding surface solidifies, the third cladding is extruded along the third extrusion groove 20 and wrapped around the second cladding surface.
[0050] Embodiment 4, as Figure 1 - Figure 3 and Fig.10 - Fig.12 As shown, an automated processing equipment for manufacturing wires and cables includes an injection molding device including an extrusion shell 41, a motor 44 is fixedly installed at one end of the extrusion shell 41, an injection molding interface 43 is fixedly installed at the other end of the extrusion shell 41, and the end of the injection molding interface 43 away from the extrusion shell 41 can be inserted and connected to the first injection conduit 22, the second injection conduit 23 or the third injection conduit 24, a conveying screw 45 is rotatably installed in the extrusion shell 41, one end of the conveying screw 45 is fixedly connected to the output end of the motor 44, a stirring screw 46 is arranged at a certain interval in the middle of the conveying screw 45, an injection funnel 42 is fixedly installed at one end of the top surface of the extrusion shell 41 close to the motor 44, and a heating wire 47 is embedded and installed in the extrusion shell 41 outside the conveying screw 45 and the stirring screw 46.
[0051] In the above embodiment, it should be noted that the surface of the stirring screw 46 is provided with an opening, which can disturb the flow direction of the raw materials conveyed by the conveying screw 45 to achieve the effect of uniformly mixing the raw materials; by injecting the plastic granular raw materials into the injection funnel 42, and then starting the motor 44 to drive the conveying screw 45 and the stirring screw 46 to rotate, the raw materials are stirred while conveying, and at the same time, the power of the heating wire 47 is turned on to heat and melt the plastic granular raw materials to make them fluid, and finally, under the push of the conveying screw 45, they are extruded from the injection interface 43 and injected into the first injection conduit 22, the second injection conduit 23 or the third injection conduit 24.
[0052] Embodiment 5, as Figure 1 - Figure 3 and Fig.13 As shown, an automated processing equipment for manufacturing wires and cables includes a cooling kit including a water cooling cabin 32, one end of the water cooling cabin 32 is connected to an end of an extruded shell 21 away from a first injection conduit 22, the water cooling cabin 32 is provided with an opening, spray conduits 34 are installed on both sides and the top surface of the inner wall of the water cooling cabin 32, a plurality of pressurized nozzles 35 are installed on the surface of the spray conduit 34, a water tank 36 is provided on one side of the water cooling cabin 32, an end of the spray conduit 34 close to the extruded shell 21 extends out of the water cooling cabin 32 and is connected to the water tank 36, and a drain pipe 33 is fixedly installed on the bottom surface of one end of the water cooling cabin 32 close to the extruded shell 21.
[0053] In the above embodiment, it should be noted that cooling water is injected into the water tank 36, and the drain pipe 33 is used to discharge the waste water in the water cooling chamber 32; when the first layer, the second layer and the third layer are completely coated on the surface of the wire core 17 and the wire core 17 is extruded from the extruded shell 21 into the water cooling chamber 32, the pressurized nozzle 35 is started to draw water from the water tank 36 through the spray duct 34 and spray it out, so as to achieve the effect of further cooling the wire core 17 and the first layer, the second layer and the third layer on the surface, so that the softened surface inside the second layer and the third layer is completely solidified.
[0054] Embodiment 6, as Figure 1 - Figure 5 As shown, an automated processing equipment for the production of wires and cables includes a loading wheel 13 rotatably arranged between a wire core winding roller 11 and an extruded package shell 21, a receiving wheel 16 rotatably arranged between a take-up roller 14 and a water-cooling chamber 32, a wire core 17 on the wire core winding roller 11 bypasses the top slot of the loading wheel 13 and passes through the extruded package shell 21 and the water-cooling chamber 32 in sequence, and the wire core 17 passing through the water-cooling chamber 32 bypasses the top slot of the receiving wheel 16 and is wound on the surface of the take-up roller 14.
[0055] In the above embodiment, it should be noted that the loading wheel 13 is used to guide the wire core 17 into the extruded shell 21 , and the receiving wheel 16 is used to guide the cooled cable to be wound on the surface of the take-up roller 14 .
[0056] The processing technology of the present invention is as follows: a person skilled in the art installs the wire core winding roller 11 on the feeding rotating frame 12, pulls out one end of the wire core 17 on the wire core winding roller 11, and passes it through the extruded package shell 21 and the water cooling chamber 32 in sequence, then bypasses the slot on the top of the receiving wheel 16 and fixes it on the surface of the wire take-up roller 14; then the staff injects the outer coating raw material into the injection funnel 42 on the extruded package shell 21 connected to the first injection conduit 22, the second injection conduit 23 and the third injection conduit 24 respectively, connects the power of the electric heating wire 47 and starts the motor 44 to drive the conveying screw 45 and the stirring screw 46 to rotate, the electric heating wire 47 melts the outer coating raw material and stirs it evenly through the stirring screw 46, and finally pushes the conveying screw 45 from the injection molding machine. The interface 43 is injected into the first injection conduit 22, the second injection conduit 23 and the third injection conduit 24; the wire core winding roller 11, the feeding wheel 13, the wire take-up roller 14 and the material take-up wheel 16 are started to rotate, driving the wire core 17 to move slowly and uniformly in the extrusion shell 21, and then the first package in the first injection conduit 22 is squeezed into the first extrusion groove 18 and wrapped around the outer wall of the wire core 17, and at the same time, the second package in the second injection conduit 23 is squeezed into the second extrusion groove 19, and the third package in the third injection conduit 24 is squeezed into the third extrusion groove 20; then the condenser is started to circulate the coolant in the first cooling conduit 27, the second cooling conduit 28 and the third cooling conduit 29, and at the same time, the water heater is started to circulate the first heating conduit 30 and the second The hot water in the heating conduit 31, the first cooling conduit 27 cools the first bag material in the first extrusion groove 18 and solidifies it on the surface of the wire core 17 to form a first cladding layer; the second cooling conduit 28 cools the outer side of the second bag material in the second injection conduit 23, so that its overall temperature drops and the surface solidifies and forms, and at the same time the first heating conduit 30 softens the inner side of the second bag material in the second injection conduit 23 to maintain its fluidity and adhesion; on the other hand, the third cooling conduit 29 cools the outer side of the third bag material in the third injection conduit 24, so that its overall temperature drops and the surface solidifies and forms, and at the same time the second heating conduit 31 softens the inner side of the third bag material in the third cooling conduit 29, so that the surface solidifies and forms; after the first cladding layer is completely solidified, the second bag material is extruded and packaged. The second coating is formed on the surface of the first coating, and then the third coating is extruded and coated on the surface of the second coating to form the third coating; after the first coating, the second coating and the third coating are completely coated on the surface of the wire core 17, as the wire core 17 enters the water cooling chamber 32, the pressurized nozzle 35 is started to draw water from the water tank 36 through the spray duct 34 and spray it out, so as to further cool the wire core 17 in the water cooling chamber 32 and the first coating, the second coating and the third coating on the surface; the wire core 17 with the surface coating completely cooled and formed passes through the water cooling chamber 32, bypasses the slot on the top of the receiving wheel 16 and is wound on the surface of the take-up roller 14. After the extrusion of the wire core 17 is completed, the staff finally removes the take-up roller 14 on the receiving turntable 15, labels it, and packs it for storage.
[0057] The above is only a preferred embodiment of the present invention. Any person skilled in the art may modify the present invention by using the above technical solution or modify it into an equivalent technical solution. Therefore, any simple modification or equivalent replacement made according to the technical solution of the present invention shall fall within the scope of protection claimed by the present invention.
Claims
1. An automated processing equipment for manufacturing electric wires and cables, comprising an extruded shell (21), a feeding turret (12) being provided at one end of the extruded shell (21), a wire core winding roller (11) being rotatably mounted on the feeding turret (12), a wire core (17) being wound around the surface of the wire core winding roller (11), the wire core (17) being inserted into the extruded shell (21) from one end and then exiting from the other end, a material receiving turret (15) being provided at the other end of the extruded shell (21), a wire receiving roller (14) being rotatably mounted on the material receiving turret (15), characterized in that: The first injection conduit (22), the second injection conduit (23) and the third injection conduit (24) are respectively arranged on both sides of one end of the extruded package shell (21) close to the feeding turret (12); the first injection conduit (22), the second injection conduit (23) and the third injection conduit (24) are respectively connected to corresponding injection molding devices at one end away from the extruded package shell (21); the injection molding devices are used to inject cable packaging materials into the corresponding first injection conduit (22), the second injection conduit (23) or the third injection conduit (24); a cooling sleeve group is arranged between the extruded package shell (21) and the receiving turret (15); the cooling sleeve group is used to thoroughly cool the cable output from the extruded package shell (21); a layered pre-extrusion system is arranged in the extruded package shell (21); the layered pre-extrusion system is used to simultaneously pre-extrude multiple layers of packaging materials, cool the outer layer of the multiple layers of packaging materials, soften the inner layer of the multiple layers of packaging materials, and then extrude the combination of the multiple layers of packaging materials.
2. The automated processing equipment for manufacturing electric wires and cables according to claim 1, characterized in that: The layered pre-extrusion system comprises a first extrusion groove (18), the first extrusion groove (18) being arranged at the center of the inner wall of an extrusion shell (21), the first extrusion groove (18) wrapping the outer side of a wire core (17) passing through the extrusion shell (21), a second extrusion groove (19) being arranged on the outer side of the first extrusion groove (18), a third extrusion groove (20) being arranged on the outer side of the second extrusion groove (19), the first extrusion groove (18), the second extrusion groove (19) and the third extrusion groove (20) all being tubular structures, and a gap being arranged between the first extrusion groove (18), the second extrusion groove (19) and the third extrusion groove (20).
3. The automated processing equipment for manufacturing electric wires and cables according to claim 2, characterized in that: One end of the first extrusion groove (18) is connected to the first injection conduit (22), one end of the second extrusion groove (19) is connected to the second injection conduit (23), and one end of the third extrusion groove (20) is connected to the third injection conduit (24). One end of the second extrusion groove (19) away from the second injection conduit (23) is inwardly contracted and connected to the first extrusion groove (18), and one end of the third extrusion groove (20) away from the third injection conduit (24) is inwardly contracted and connected to the second extrusion groove (19).
4. The automated processing equipment for manufacturing electric wires and cables according to claim 3, characterized in that: A first heat-insulating sleeve (25) is arranged between the first extrusion groove (18) and the second extrusion groove (19), and a second heat-insulating sleeve (26) is arranged between the second extrusion groove (19) and the third extrusion groove (20). The first heat-insulating sleeve (25) and the second heat-insulating sleeve (26) are tubular structures, and the first heat-insulating sleeve (25) and the second heat-insulating sleeve (26) are embedded and installed inside the extrusion shell (21).
5. The automated processing equipment for manufacturing electric wires and cables according to claim 4, characterized in that: A first cooling conduit (27) is arranged between the first extrusion groove (18) and the first insulation sleeve (25), a second cooling conduit (28) is arranged between the second extrusion groove (19) and the second insulation sleeve (26), and a third cooling conduit (29) is arranged outside the third extrusion groove (20). The first cooling conduit (27), the second cooling conduit (28) and the third cooling conduit (29) are hollow spiral tube structures. The first cooling conduit (27), the second cooling conduit (28) and the third cooling conduit (29) are embedded and installed inside the extrusion shell (21), and one end of the first cooling conduit (27), the second cooling conduit (28) and the third cooling conduit (29) extends out of the extrusion shell (21) and is connected to a condenser.
6. The automated processing equipment for manufacturing electric wires and cables according to claim 5, characterized in that: A first heating conduit (30) is arranged between the second extrusion groove (19) and the first heat-insulating sleeve (25), and a second heating conduit (31) is arranged between the third extrusion groove (20) and the second heat-insulating sleeve (26). The first heating conduit (30) and the second heating conduit (31) are hollow spiral tube structures. The first heating conduit (30) and the second heating conduit (31) are embedded and installed inside the extrusion shell (21). One end of the first heating conduit (30) and the second heating conduit (31) extends out of the extrusion shell (21) and is connected to the water heater.
7. The automated processing equipment for manufacturing electric wires and cables according to claim 1, characterized in that: The injection molding device comprises an extrusion shell (41), one end of which is fixedly mounted with a motor (44), and the other end of which is fixedly mounted with an injection molding interface (43), and the end of which, away from the extrusion shell (41), is capable of being inserted and connected to a first injection conduit (22), a second injection conduit (23) or a third injection conduit (24). A conveying screw (45) is rotatably mounted in the extrusion shell (41), one end of which is fixedly connected to an output end of the motor (44), and a stirring screw (46) is arranged and mounted at a certain interval in the middle of the conveying screw (45). An injection funnel (42) is fixedly mounted on the top surface of the extrusion shell (41) near the motor (44), and a heating wire (47) is embedded and mounted in the extrusion shell (41) outside the conveying screw (45) and the stirring screw (46).
8. The automated processing equipment for manufacturing electric wires and cables according to claim 1, characterized in that: The cooling sleeve assembly comprises a water cooling chamber (32), one end of the water cooling chamber (32) is connected to one end of the extruded package shell (21) away from the first injection pipe (22), the water cooling chamber (32) is provided with an opening, spray pipes (34) are installed on both sides and the top surface of the inner wall of the water cooling chamber (32), a plurality of pressurized nozzles (35) are installed on the surface of the spray pipe (34), a water tank (36) is arranged on one side of the water cooling chamber (32), one end of the spray pipe (34) close to the extruded package shell (21) extends out of the water cooling chamber (32) and is connected to the water tank (36), and a drainage pipe (33) is fixedly installed on the bottom surface of one end of the water cooling chamber (32) close to the extruded package shell (21).
9. The automated processing equipment for manufacturing electric wires and cables according to claim 8, characterized in that: A loading wheel (13) is rotatably arranged between the wire core winding roller (11) and the extruded package shell (21), and a receiving wheel (16) is rotatably arranged between the receiving roller (14) and the water cooling chamber (32). The wire core (17) on the wire core winding roller (11) bypasses the top slot of the loading wheel (13) and passes through the extruded package shell (21) and the water cooling chamber (32) in sequence. The wire core (17) that passes through the water cooling chamber (32) bypasses the top slot of the receiving wheel (16) and is wound on the surface of the receiving roller (14).
10. A process for processing electric wires and cables using the processing equipment according to any one of claims 1 to 9, characterized in that: The steps include: S1. The staff installs the wire core winding roller (11) on the feeding turret (12), pulls out one end of the wire core (17) on the wire core winding roller (11), and passes it through the extruded shell (21) and the water cooling chamber (32) in sequence, then passes through the top slot of the receiving wheel (16) and is fixed on the surface of the wire take-up roller (14); S2. The staff injects the outer layer raw material into the injection funnel (42) on the extruded shell (21) connected to the first injection conduit (22), the second injection conduit (23) and the third injection conduit (24), respectively, and turns on the power of the electric heating wire (47) and starts the motor (44) to drive the conveying screw (45) and the stirring screw (46) to rotate. The electric heating wire (47) melts the outer layer raw material and stirs it evenly through the stirring screw (46). Finally, under the push of the conveying screw (45), the raw material is injected from the injection interface (43) into the first injection conduit (22), the second injection conduit (23) and the third injection conduit (24); S3. Start the wire core winding roller (11), the feeding wheel (13), the wire take-up roller (14) and the take-up wheel (16) to rotate, driving the wire core (17) to move slowly and uniformly in the extrusion shell (21), and then the first package material in the first injection conduit (22) is squeezed into the first extrusion groove (18) and wrapped around the outer wall of the wire core (17), and at the same time, the second package material in the second injection conduit (23) is squeezed into the second extrusion groove (19), and the third package material in the third injection conduit (24) is squeezed into the third extrusion groove (20); S4. The condenser is started to circulate the coolant in the first cooling conduit (27), the second cooling conduit (28) and the third cooling conduit (29), and the water heater is started to circulate the hot water in the first heating conduit (30) and the second heating conduit (31). The first cooling conduit (27) cools the first package material in the first extrusion groove (18) and solidifies it on the surface of the wire core (17) to form a first package layer; the second cooling conduit (28) cools the outer side of the second package material in the second injection conduit (23) to reduce the overall temperature and solidify the surface. At the same time, the first heating conduit ( 30) softens the inner side of the second bag material in the second injection conduit (23) to maintain its fluidity and adhesion; on the other hand, the third cooling conduit (29) cools the outer side of the third bag material in the third injection conduit (24) to lower its overall temperature and solidify its surface, while the second heating conduit (31) softens the inner side of the third bag material in the third cooling conduit (29) to solidify its surface; after the first cladding is completely solidified, the second bag material is extruded and coated on the surface of the first cladding to form a second cladding, and then the third bag material is extruded and coated on the surface of the second cladding to form a third cladding; S5. After the first cladding, the second cladding and the third cladding are completely coated on the surface of the wire core (17), as the wire core (17) enters the water cooling chamber (32), the pressurized nozzle (35) is started to draw water from the water tank (36) through the spray conduit (34) and spray it out, so as to further cool the wire core (17) in the water cooling chamber (32) and the first cladding, the second cladding and the third cladding on the surface; S6. The wire core (17) whose surface coating is completely cooled and formed passes through the water cooling chamber (32), passes through the slot on the top of the receiving wheel (16) and is rolled up on the surface of the wire take-up roller (14). After the wire core (17) is extruded, the staff removes the wire take-up roller (14) from the receiving rotary frame (15), labels it and then packs it for storage.
Citation Information
Patent Citations
Extruded composite smooth aluminum sleeve cable production equipment and a production method
CN111524657A
Automatic extrusion equipment for wire and cable materials
CN117021533A
Multi-layer co-extrusion extruded composite smooth aluminum sleeve cable production equipment
CN221446878U
Manufacture of multilayer sheath cable and device therefor
JP1994314523A