Overall construction process of steel structure outer wall

Through the overall construction technology of steel structure exterior walls, including leveling of keel structure and injecting insulation and sealing materials into gaps, the problems of complex construction and poor insulation effect of existing steel structure exterior walls have been solved, and efficient and excellent construction results and good quality are achieved Thermal insulation and waterproof performance.

CN119392929APending Publication Date: 2025-02-07LIAOCHENG GAOLI METAL MATERIALS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411866998.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-18
Publication Date
2025-02-07

AI Technical Summary

Technical Problem

The construction methods of existing steel structure exterior walls are complex, especially the construction of insulation walls is difficult, and the insulation effect of traditional spliced ​​insulation boards is not good.

Method used

The overall construction process of steel structure exterior walls is adopted, including the construction of the main frame of the steel structure, the leveling of the keel structure, the installation of the outer and inner plates, and the setting of the decorative surface layer. Inject insulation and sealing materials into the gaps to improve the insulation effect.

Benefits of technology

The construction steps are simplified, the construction speed and quality are improved, the insulation and waterproofing are improved, and the aesthetics and corrosion resistance of the building exterior walls are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119392929A_ABST
    Figure CN119392929A_ABST
Patent Text Reader

Abstract

The invention discloses an integral construction process of a steel structure outer wall, which belongs to the technical field of building construction and comprises the following steps: S1, completing construction of a steel structure main frame; s2, a keel structure is adopted for leveling; s3, outer plates are installed on the outer sides of the steel structure main frame and the keel structure; and S4, a decorative surface layer is arranged on the outermost side. When construction of the thermal insulation wall is carried out, the inner plate is installed on the outer side of the outer plate, a gap exists between the inner plate and the outer plate, and a thermal insulation sealing material is arranged in the gap. According to the technical scheme, leveling is conducted through the keel structure, operation is convenient, installation of the external wall panel is convenient, when the heat preservation wall body is constructed, through the mode that foaming treatment is conducted through the gap, construction operation is easy and convenient, the heat preservation effect is good, and the attractiveness is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, in particular to the construction of a steel structure exterior wall, and specifically to an integral construction process for a steel structure exterior wall. Background Art

[0002] Steel structure exterior wall is one of the structural forms of building exterior wall. Steel structure exterior wall uses high-strength steel as the skeleton and has high wind and earthquake resistance. At the same time, its structure is lighter than the traditional brick-concrete structure and has better bearing capacity. It has many advantages such as good durability and fast construction speed. It is widely used in the construction field and can be applied to various types of buildings such as high-rise buildings, commercial buildings, public buildings and residential buildings.

[0003] The method commonly used for the steel structure exterior wall in the prior art is: after the main frame of the steel structure is built, the upper plate embedded parts are installed inside the prefabricated exterior wall panel, and then the upper column embedded parts are installed inside the steel structure frame column. At this time, the prefabricated exterior wall panel is hoisted by the prepared hoist. When the prefabricated exterior wall panel reaches the predetermined position in the steel structure frame column, the steel bars are welded between the steel structure frame column and the prefabricated exterior wall panel. The steps of this construction method are relatively complicated during operation. If it is the construction of an insulation wall, it is more difficult. In addition, the traditional insulation wall construction relies on splicing insulation boards, and the insulation effect is poor. Summary of the invention

[0004] In order to solve the above-mentioned deficiencies in the prior art, the purpose of the present invention is to provide a steel structure exterior wall integral construction process, which has strong operability and is conducive to improving construction speed and construction quality.

[0005] The technical solution adopted by the present invention to solve the technical problem is: A steel structure exterior wall integral construction process is provided, comprising the following steps: S1: The main steel structure frame is completed; S2: Use keel structure for leveling; S3: Install outer panels on the outside of the main steel structure frame and keel structure; S4: Arrange a decorative surface layer on the outermost side.

[0006] Furthermore, between step S3 and step S4, the following steps are further included: An inner plate is installed on the outer side of the outer plate, a gap exists between the inner plate and the outer plate, and a heat-insulating sealing material is arranged in the gap.

[0007] Furthermore, the width of the gap is 5-20 cm.

[0008] Furthermore, the thermal insulation sealing material is cement foam or polyurethane foam.

[0009] Furthermore, the outer plate is fixedly connected to the keel structure by bolts.

[0010] Furthermore, the inner plate and the outer plate are fixedly connected by bolts.

[0011] Furthermore, the outer panel is a fireproof cement board, one side of the fireproof cement board is a smooth surface and the other side is a rough surface, and the rough surface faces outwards during installation.

[0012] Furthermore, the inner panel is a fireproof cement board.

[0013] Furthermore, the decorative surface layer is fluorocarbon stone.

[0014] Compared with the prior art, the present invention has the following beneficial effects: 1. In the overall construction process of the steel structure exterior wall illustrated in the present invention, after the main frame of the steel structure is built, it is leveled through the keel structure. The keel structure is light in weight and high in strength, and it is very easy to operate to adjust the height difference using the keel structure, thereby making the operating steps of the overall construction process simpler and more operable, with low dependence on workers' experience, facilitating standardized operations, and helping to improve construction quality.

[0015] 2. The overall construction process of the steel structure exterior wall in the example of the present invention has a keel structure, so the outer panel can be connected to the keel structure by bolts when installing the outer panel, which is convenient for the installation of the outer panel. If it is an ordinary wall, it is a single-plate structure of one layer of outer panel; if it is an insulation wall, it is a double-plate structure composed of an outer panel and an inner panel, which has strong flexibility.

[0016] 3. In the overall construction process of the steel structure exterior wall of the example of the present invention, a gap is set between the outer plate and the inner plate, and the thermal insulation sealing material is injected into the gap. Compared with the traditional assembled insulation board, the operation method is simpler, and the thermal insulation effect and waterproof effect are improved.

[0017] 4. The overall construction process of the steel structure exterior wall in the example of the present invention is convenient for setting a decorative surface layer on the outermost side of the plate body, which meets people's needs for improving the aesthetics of the building exterior wall. The decorative surface layer is made of fluorocarbon stone, which not only has good aesthetics, but also has superior corrosion resistance and anti-aging properties, and can effectively avoid oxidation peeling and falling off.

[0018] 5. The overall construction process of the steel structure exterior wall in the example of the present invention uses fireproof cement boards for the outer and inner panels, which have good fireproof performance. In combination with other components, the exterior wall as a whole has good thermal insulation, fireproof and corrosion resistance. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings: Figure 1 This is a schematic diagram of the construction steps of the first embodiment of the present invention; Figure 2 This is a schematic diagram of the construction steps of the second embodiment of the present invention. DETAILED DESCRIPTION

[0020] The technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0021] The components of the embodiments of the present invention generally described and shown in the drawings herein may be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention.

[0022] Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making any creative work shall fall within the scope of protection of the present invention.

[0023] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0024] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0025] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. It should also be noted that, for ease of description, only the parts related to the invention are shown in the drawings.

[0026] Embodiment 1: This embodiment provides a steel structure exterior wall integral construction process, such as Figure 1As shown, this embodiment is a construction process of a common wall without an insulation layer, comprising the following steps: S1: The main steel structure frame is completed.

[0027] S2: Use keel structure for leveling. The keel structure can be a light steel keel. The cross section of the keel structure is U-shaped or groove-shaped. The keel structure is fixedly connected to the main steel structure frame by bolts, and the outer surface of the main steel structure frame is leveled during the installation of the keel structure.

[0028] S3: Install the outer plate on the outside of the main steel frame and the keel structure. The outer plate is fixed to the keel structure by bolts. The outer plate is a fireproof cement board. One side of the fireproof cement board is smooth and the other side is rough. The rough surface faces outward during installation.

[0029] S4: Arrange a decorative surface layer on the outermost side. In this embodiment, the decorative surface layer is fluorocarbon stone, which is scraped flat with fluorocarbon stone, which is not only beautiful but also has good anti-corrosion performance, thereby extending the service life of the exterior wall.

[0030] Embodiment 2: This embodiment provides a steel structure exterior wall integral construction process, such as Figure 2 As shown, this embodiment is a construction process of a thermal insulation wall. The difference between this embodiment and the first embodiment is that: Between step S3 and step S4 of the first embodiment, this embodiment further includes: An inner plate is installed on the outer side of the outer plate, a gap exists between the inner plate and the outer plate, and a heat-insulating sealing material is arranged in the gap.

[0031] Preferably, the width of the gap is 5-20 cm, for example, a gap of 10 cm can be set, and the gap is filled with a thermal insulation sealing material, and the thermal insulation sealing material is cement foam or polyurethane foam.

[0032] The inner plate is also made of fireproof cement board, and the inner plate and the outer plate are fixedly connected by bolts.

[0033] In this embodiment, after the aforementioned thermal insulation and sealing material solidifies, the exterior wall is smoothed using fluorocarbon stone.

[0034] This embodiment is a double-plate structure composed of an outer plate and an inner plate, and a thermal insulation sealing material is filled in the gap between the inner plate and the outer plate to form a thermal insulation wall structure with good thermal insulation, waterproof and corrosion resistance effects.

[0035] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the inventive concept. For example, the above features are replaced with (but not limited to) technical features with similar functions disclosed in the present application.

[0036] Except for the technical features described in the specification, the remaining technical features are known technologies to those skilled in the art. In order to highlight the innovative features of the present invention, the remaining technical features will not be described here in detail.

Claims

1. A steel structure exterior wall integral construction process, characterized in that: The following steps are involved: S1: The main steel structure frame is completed; S2: Use keel structure for leveling; S3: Install outer panels on the outside of the main steel structure frame and keel structure; S4: Arrange a decorative surface layer on the outermost side.

2. The overall construction process of the steel structure exterior wall according to claim 1 is characterized in that: Between step S3 and step S4, the method further includes: An inner plate is installed on the outer side of the outer plate, a gap exists between the inner plate and the outer plate, and a heat-insulating sealing material is arranged in the gap.

3. The overall construction process of the steel structure exterior wall according to claim 2 is characterized in that: The width of the gap is 5-20 cm.

4. The overall construction process of the steel structure exterior wall according to claim 2 is characterized in that: The thermal insulation sealing material is cement foam or polyurethane foam.

5. The overall construction process of the steel structure exterior wall according to claim 1 is characterized in that: The outer plate is fixedly connected to the keel structure by bolts.

6. The overall construction process of the steel structure exterior wall according to claim 2 is characterized in that: The inner plate and the outer plate are fixedly connected by bolts.

7. The overall construction process of the steel structure exterior wall according to claim 1 is characterized in that: The outer plate is a fireproof cement plate, one side of the fireproof cement plate is a smooth surface, and the other side is a rough surface, and the rough surface faces outwards during installation.

8. The overall construction process of the steel structure exterior wall according to claim 2 is characterized in that: The inner plate is a fireproof cement board.

9. The overall construction process of the steel structure exterior wall according to claim 1, characterized in that: The decorative surface layer is fluorocarbon stone.