Method for installing trapezoidal or parallelogram unit curtain wall with inwards-inclined lower part
By setting up lifting accessories and real-time measurement devices on the curtain wall unit, the problems of unstable center of gravity and inaccurate posture during the installation process of the lower inclination unit are solved, and the safe, fast and precise installation of the curtain wall unit is achieved.
Patent Information
- Application Number
- CN202411628183.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-14
- Publication Date
- 2025-02-07
AI Technical Summary
When installing trapezoidal or parallelogram unit curtain walls, the lower inclined unit is difficult to maintain the center of gravity and the design posture after the crane is lifted, resulting in unsafe, fast and inaccurate installation.
By setting up lifting accessories on the curtain wall unit, including force hanging codes and temporary hanging codes, the aerial posture is adjusted using lifting equipment and hand-pulled hoists, and a real-time measurement device for inclination angle is installed on the panel to monitor and adjust the inclination angle of the curtain wall unit in real time. , ensure its correct posture during installation.
It realizes safe, fast and precise installation of curtain wall units, improves installation accuracy and efficiency, and ensures the safety of the installation process.
Smart Images

Figure CN119392939A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of installation engineering, and more specifically to an installation method of a lower inward-inclined trapezoidal or parallelogram unit curtain wall. Background Art
[0002] Glass curtain walls are a common form of building envelope structure. As the country vigorously promotes prefabricated buildings, unitized glass curtain walls are increasingly being used.
[0003] When the curtain wall facade adopts trapezoidal or parallelogram units due to the overall appearance of the building, especially when the upper and lower parts are tilted inward at a certain angle in the direction perpendicular to the enclosure surface, it is extremely difficult to keep the center of gravity stable and the installation posture the same as the design in the natural vertical state of the curtain wall unit after being lifted by the crane, making it difficult to install safely, quickly and accurately. At present, there is no public information on the research that specifically describes the above content. Summary of the invention
[0004] In view of this, an object of the present invention is to provide a method for installing a lower inward-inclined trapezoidal or parallelogram unit curtain wall, aiming to solve the problems existing in the prior art.
[0005] According to the present invention, a method for installing a lower inward-inclined trapezoidal or parallelogram unit curtain wall is provided, comprising:
[0006] Step 1: Arrange hanging accessories on the curtain wall unit to be installed, wherein the hanging accessories include a force-bearing hanging weight and a temporary hanging weight;
[0007] Step 2: hoisting the curtain wall unit into the air through the load-bearing hanging hooks and the temporary hanging hooks, and adjusting the aerial posture;
[0008] Step 3: Install a real-time tilt angle measuring device on the panel of the curtain wall unit to be installed, so as to observe the tilt angle of the curtain wall unit in a direction perpendicular to the panel in real time;
[0009] Step 4: Lift the curtain wall unit to be installed to the pre-installation height, move it closer to the pre-installation position, and then adjust the curtain wall unit to be installed to a preset aerial posture;
[0010] Step 5: Hang the curtain wall unit to be installed on the building structure and perform a pre-positioning;
[0011] Step 6: Move and adjust the curtain wall unit to be installed downward along the enclosure surface, so as to achieve secondary pre-positioning of the curtain wall unit to be installed;
[0012] Step 7: Horizontally move the curtain wall unit to be installed onto the adjacent curtain wall unit that has been installed;
[0013] Step 8: Move the curtain wall unit to be installed downward along the enclosure surface for a second time to adjust the curtain wall unit to be installed so that the curtain wall unit to be installed moves downward to the intended installation position.
[0014] Preferably, the step one comprises:
[0015] The load-bearing hanging weight is installed on the upper part of the curtain wall unit to be installed, and the temporary hanging weight is installed on the lower part.
[0016] Preferably, the step 2 comprises:
[0017] The curtain wall units to be installed are transported to the site after being processed in the factory. They are hoisted by hoisting equipment through hoisting poles and vertical hand chain hoists. The hoisting points are set on the hoisting holes on the two load-bearing hanging brackets and the temporary hanging brackets.
[0018] The aerial posture of the curtain wall unit to be installed is adjusted by a vertical hand winch so that the upper side and the lower side of the curtain wall unit to be installed are parallel to the horizontal plane.
[0019] Preferably, the real-time tilt angle measuring device comprises an angle measuring plate, a rotating shaft, a pointer and a hanging ball, the angle measuring plate is rotatably disposed on the rotating shaft, the pointer is rotatably disposed on the rotating shaft, and the hanging ball is fixedly connected to the pointer and rotatably disposed on the rotating shaft.
[0020] Preferably, the step 4 comprises:
[0021] Lift the curtain wall unit to be installed to the pre-installation height and close to the intended installation location;
[0022] Connect the load-bearing hanging code of the curtain wall unit to be installed to the upper horizontal hand chain hoist, and fix the other end of the upper horizontal hand chain hoist to the building structure;
[0023] The lower part of the curtain wall unit to be installed is connected to the lower horizontal hand chain hoist through a suction cup, and the other end of the lower horizontal hand chain hoist is fixed to the building structure;
[0024] By pulling the upper horizontal hand chain hoist and the lower horizontal hand chain hoist, the aerial posture of the curtain wall unit 1 is adjusted so that the inward inclination angle of the lower part of the curtain wall unit 1 in the direction perpendicular to the enclosure surface is consistent with the design angle.
[0025] Preferably, the step five comprises:
[0026] By using the lifting equipment and various hand hoists, the curtain wall unit to be installed is moved close to the intended installation location;
[0027] The U-shaped groove of the force-bearing hanging code is hung on the corresponding adapter vertical plate 31, and the lower end of the curtain wall unit to be installed is aligned with the lower card groove, thereby realizing a one-time pre-positioning of the curtain wall unit to be installed.
[0028] Preferably, the step six comprises:
[0029] Unload the lifting equipment so that the load of the curtain wall unit to be installed is fully applied to the corresponding adapter through the load-bearing hanging weight;
[0030] The adjusting bolts on the load-bearing hanging brackets are adjusted so that the curtain wall unit to be installed moves downward along the enclosure surface. The lower end of the curtain wall unit to be installed is inserted into the lower slot on the building structure and stops when a preset distance is reserved from the bottom intended installation position, thereby realizing secondary pre-positioning of the curtain wall unit to be installed.
[0031] Preferably, the step seven comprises:
[0032] Install limit blocks at the corners of the adjacent curtain wall units that have been installed, and place thin jacks between the force-bearing hanging weights and the end plates of the corresponding adapters, wherein the thin jacks are arranged horizontally;
[0033] Through the thin jack external top, the external top force hanging weight moves horizontally, so that the curtain wall unit to be installed is driven by the force hanging weight to move to the limited position of the limit block.
[0034] Preferably, the step eight comprises:
[0035] The adjusting bolts on the load-bearing hanging brackets are adjusted again, so that the curtain wall unit to be installed is moved downward along the enclosure surface for a second time until it reaches the intended installation position.
[0036] Preferably, the method further comprises step nine:
[0037] After step eight, the hanging parts and auxiliary parts are removed, and the safety hanging code is installed on the curtain wall unit to be installed so that it is hung on the corresponding adapter.
[0038] The installation method of the lower inward-inclined trapezoidal or parallelogram unit curtain wall in the present invention is easy to implement and has the advantages of high installation accuracy, fast installation efficiency, orderly installation operation steps and high safety factor. The optimization of the unit curtain wall components can be easily achieved in the processing plant and can be achieved by using only common equipment and tooling on the market, and has great universal applicability. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] The above and other objects, features and advantages of the present invention will become more apparent through the following description of the embodiments of the present invention with reference to the accompanying drawings.
[0040] Figure 1 A flow chart showing the steps of a method for installing a lower inward-inclined trapezoidal or parallelogram unit curtain wall according to an embodiment of the present invention is shown.
[0041] Figure 2The figure shows the installation operation schematic diagram of step 1 of the installation method of the lower inward-inclined trapezoidal or parallelogram unit curtain wall according to an embodiment of the present invention.
[0042] Figure 3 Shows Figure 2 aa section view in.
[0043] Figure 4 A schematic diagram of the structure of a force-bearing hanging weight according to an embodiment of the present invention is shown (the structure of the force-bearing hanging weight and the temporary hanging weight can refer to that of the force-bearing hanging weight).
[0044] Figure 5 A schematic structural diagram of a transition piece according to an embodiment of the present invention is shown.
[0045] Figure 6 Shows Figure 5 The cc cross-sectional view in the figure.
[0046] Figure 7 Shows Figure 5 dd cross-sectional view in the figure.
[0047] Figure 8 A schematic diagram of the installation operation of step 2 according to an embodiment of the present invention is shown.
[0048] Fig. 9 A schematic diagram of the installation operation of step three according to an embodiment of the present invention is shown.
[0049] Fig.10 A schematic structural diagram of a device for real-time measurement of an inclination angle according to an embodiment of the present invention is shown.
[0050] Figure 11-12 A schematic diagram of the installation operation of step four according to an embodiment of the present invention is shown.
[0051] Figure 13-14 A schematic diagram of the installation operation of step five according to an embodiment of the present invention is shown.
[0052] Fig.15 A schematic diagram of the installation operation of step six according to an embodiment of the present invention is shown.
[0053] Figure 16-17 A schematic diagram of the installation operation of step seven according to an embodiment of the present invention is shown.
[0054] Figure 18-19 A schematic diagram of the installation operation of step eight according to an embodiment of the present invention is shown.
[0055] Fig. 20 A schematic diagram of the installation operation of step eight according to an embodiment of the present invention is shown.
[0056] In the figure: curtain wall unit 1, force hanging weight 21, safety hanging weight 22, temporary hanging weight 23, adjusting bolt 211, fixing part 212, adjusting weight 213, adapter 3, vertical plate 31, flat plate 32, end plate 33, lifting device 4, lifting pole 41, vertical hand chain hoist 42, lifting equipment 43, installation inclination angle real-time measuring device 5, angle measuring plate 51, rotating shaft 52, pointer 53, lifting ball 54, horizontal hand chain hoist 6, upper horizontal hand chain hoist 61, lower horizontal hand chain hoist 62, and limit block 7. DETAILED DESCRIPTION
[0057] Various embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. In each of the accompanying drawings, the same elements are represented by the same or similar reference numerals. For the sake of clarity, the various parts in the accompanying drawings are not drawn to scale.
[0058] like Figures 1 to 20 As shown, the present invention provides a method for installing a lower inward-inclined trapezoidal or parallelogram unit curtain wall, comprising the following steps:
[0059] Step 1: Arrange hanging accessories on the curtain wall unit 1 to be installed, wherein the hanging accessories include a force-bearing hanging weight 21 and a temporary hanging weight 23;
[0060] In this step, two load-bearing hanging brackets 21 are installed on the upper part of the curtain wall unit 1 to be installed, and a temporary hanging bracket 23 is installed on the lower part.
[0061] Two of the force-bearing hanging weights 21 are installed on the upper part of the curtain wall unit 1 to be installed. The load-bearing capacity of the force-bearing hanging weights 21 is based on the standard that a single force-bearing hanging weight 21 can bear the load of the entire curtain wall unit 1, so that it meets the force requirements after hoisting and installation.
[0062] A temporary hanging code 23 is provided on the upper bevel side of the lower part of the curtain wall unit 1 to be installed, which is used as a temporary hanging point;
[0063] The end plate 33 of each adapter 3 is enlarged to serve as a thin jack base;
[0064] Increase the adjustment stroke of the aluminum alloy load-bearing hanging weight 21 to a standard greater than the depth of the slot provided on the building structure, and adjust it to the bottom of the stroke before installation.
[0065] In this embodiment, the load-bearing hanging weight 21 and the temporary hanging weight 23 are both made of aluminum alloy, and the depth of the slot is +10 mm.
[0066] refer to Figure 4The force-bearing hanging weight 21 includes an adjusting bolt 211, a fixing member 212 and an adjusting weight 213. The fixing member 212 is used to fix the force-bearing hanging weight 21 on the curtain wall unit 1. The fixing member 212 is provided with a threaded hole. The adjusting bolt 211 is screwed into the threaded hole. The adjusting weight 213 and the fixing member 212 can slide up and down relatively. The bottom of the adjusting bolt 211 acts on the supporting adjusting weight 213, and the adjusting bolt 211 is supported on the adjusting weight 213 by gravity. Specifically, the fixing member 212 is provided with a sliding groove that passes through from top to bottom. The end of the adjusting weight 213 is provided with an 8-shaped terminal. When in use, the adjusting weight 213 slides in from the top of the fixing member 212. A threaded hole used in conjunction with the adjusting bolt 211 is provided on each side of the sliding groove. After the adjusting weight 213 is hung on the adapter 3, the fixing member 212 slides up and down relative to the adjusting weight 213 by rotating the adjusting bolt 211, thereby realizing the up and down adjustment of the curtain wall unit 1.
[0067] Step 2: hoisting the curtain wall unit 1 into the air through the load-bearing hanging weight 21 and the temporary hanging weight 23, and adjusting the posture in the air;
[0068] This step also includes the steps of:
[0069] 1. After the curtain wall unit 1 to be installed is processed in the factory, it is transported to the site and lifted by a lifting device 43 through a lifting pole 41 and three vertical hand chain hoists 42. The lifting points are respectively set on the lifting holes on the two force-bearing hanging brackets 21 and the temporary hanging brackets 23;
[0070] 2. The aerial posture of the curtain wall unit 1 to be installed is adjusted by the vertical hand chain hoist 42 so that the upper side and the lower side of the curtain wall unit 1 to be installed are parallel to the horizontal plane.
[0071] Step 3: Installing a real-time tilt angle measuring device 5 on the panel of the curtain wall unit 1 to be installed, for real-time observation of the tilt angle of the curtain wall unit 1 in a direction perpendicular to the panel;
[0072] In this step, the real-time tilt angle measuring device includes an angle measuring plate 51, a rotating shaft 52, a pointer 53 and a hanging ball 54. The angle measuring plate 51 can be rotatably arranged on the rotating shaft 52, the pointer 53 can be rotatably arranged on the rotating shaft 52, and the hanging ball 54 is fixedly connected to the pointer 53 and can be rotatably arranged on the rotating shaft 52.
[0073] In this embodiment, the panel is a glass panel, and a mounting frame is provided on the panel. The real-time inclination angle measuring device is installed on the mounting frame through its rotating shaft 52. The hanging ball 54 drives the pointer 53 to always point vertically downward due to the action of gravity. When the curtain wall unit 1 to be installed is tilted, the angle measuring plate 51 is tilted accordingly, so that the inclination angle of the curtain wall unit 1 to be installed is measured by the pointer 53.
[0074] Step 4: hoist the curtain wall unit 1 to be installed to the pre-installation height, move it closer to the pre-installation position, and then adjust the curtain wall unit 1 to be installed to a preset aerial posture;
[0075] This step also includes the following steps:
[0076] Step 1: Lift the curtain wall unit 1 to be installed to the pre-installation height and as close to the intended installation position as possible;
[0077] Step 2: Connect the load-bearing hanging code 21 of the curtain wall unit 1 to be installed to the upper horizontal hand chain hoist 616, and fix the other end of the upper horizontal hand chain hoist 616 to the building structure;
[0078] Step 3: The lower part of the curtain wall unit 1 to be installed is connected to the lower horizontal hand chain hoist 626 through a suction cup, and the other end of the lower horizontal hand chain hoist 626 is fixed to the building structure;
[0079] Step 4: By pulling the upper horizontal hand winch 616 and the lower horizontal hand winch 626, the aerial posture of the curtain wall unit 11 is adjusted so that the inward inclination angle of the lower part of the curtain wall unit 11 in the direction perpendicular to the enclosure surface is consistent with the design angle with an error of no more than ±1°. The actual angle can be measured and read in real time by a real-time inclination angle measuring device.
[0080] Step 5: Hang the curtain wall unit 1 to be installed on the building structure and perform a pre-positioning;
[0081] This step also includes:
[0082] By means of the cooperation of the hoisting equipment 43 and the hand hoists, the curtain wall unit 1 to be installed is slowly moved closer to the intended installation position;
[0083] The U-shaped groove of the force-bearing hanging weight 21 is hung on the corresponding vertical plate 3131 of the adapter 3, and the lower end of the curtain wall unit 1 to be installed is aligned with the lower card groove, thereby realizing a one-time pre-positioning of the curtain wall unit 1 to be installed.
[0084] Step 6: Move and adjust the curtain wall unit 1 to be installed downward along the enclosure surface, thereby realizing secondary pre-positioning of the curtain wall unit 1 to be installed;
[0085] This step also includes the following steps:
[0086] The lifting equipment is unloaded, and the hook is still kept hanging for safety reasons, so that the load of the curtain wall unit 1 to be installed is completely applied to the corresponding adapter 3 through the load-bearing hanging weight 21;
[0087] The adjusting bolt 211 on the force-bearing hanging weight 21 is adjusted so that the curtain wall unit 1 to be installed moves downward along the enclosure surface, and the lower end of the curtain wall unit 1 to be installed is inserted into the lower slot on the building structure, and stops when a preset distance is reserved from the bottom intended installation position, thereby realizing the secondary pre-positioning of the curtain wall unit 1 to be installed. In this embodiment, the preset distance is 2 cm.
[0088] Step 7: Horizontally move the curtain wall unit 1 to be installed onto the adjacent curtain wall unit 1 that has been installed;
[0089] This step also includes the following steps:
[0090] Install the limit stopper 7 at the corner of the adjacent curtain wall unit 1 that has been installed, and place a thin jack between the force-bearing hanging code 21 and the end plate 33 of the corresponding adapter 3, wherein the thin jack is arranged horizontally;
[0091] Through the thin jack, the external top force hanging code 21 moves horizontally, so that the curtain wall unit 1 to be installed is driven by the force hanging code 21 to move to the limited position of the limit block 7, that is, the curtain wall unit 1 stops in the horizontal direction.
[0092] Step 8: Move the curtain wall unit 1 to be installed downward along the enclosure surface for a second time to adjust the curtain wall unit 1 to be installed so that the curtain wall unit 1 to be installed moves downward to the intended installation position.
[0093] In this step, the adjusting bolts 211 on the load-bearing hanging brackets 21 are adjusted again, so that the curtain wall unit 1 to be installed is moved downward along the enclosure surface for a second time until it reaches the intended installation position.
[0094] Step nine: After step eight, remove the lifting parts and auxiliary parts, that is, remove the hand winches, the real-time measuring device for the inclination angle, the limit block 7, etc., and install the safety hanging code 22 on the curtain wall unit 1 to be installed so that it is hung on the corresponding adapter 3.
[0095] In this embodiment, the structures of the safety hanging weight 22 and the temporary hanging weight 23 may refer to the structure of the force-bearing hanging weight 21, which will not be described in detail here.
[0096] The present invention provides a method for installing a lower inward-inclined trapezoidal or parallelogram unit curtain wall, which mainly achieves the installation purpose through four aspects:
[0097] 1. By increasing the bearing capacity of the aluminum alloy load-bearing hanging weight 21 and adding an aluminum alloy temporary hanging weight 23, and adopting the form of hoisting pole 41 and 3-point hand chain hoist to bear the force, the upper and lower frames of the curtain wall unit 1 can be adjusted in the air to be parallel to the ground;
[0098] 2. By setting the upper and lower hand chain hoists, the lower part of the curtain wall unit 1 perpendicular to the enclosure surface is tilted inward to the designed angle in the air; the tilt angle is controlled throughout the process by the real-time tilt angle measuring device, and the tilt angle of the curtain wall unit 1 is kept within the allowable error range with the designed angle;
[0099] 3. By increasing the area of the end plate 33 of the adapter 3 to provide a force-bearing base, after the aluminum alloy force-bearing hanging weight 21 is hung on the adapter 3 to bear the force, a thin jack is used to realize the horizontal movement of the curtain wall unit 1 along the enclosure surface;
[0100] 4. By increasing the adjustment stroke of the aluminum alloy load-bearing hanging weight 21, after the aluminum alloy load-bearing hanging weight 21 is hung on the adapter 3 to bear the force, the curtain wall unit 1 is moved up and down along the enclosure surface by adjusting the bolts 211 on the aluminum alloy load-bearing hanging weight 21.
[0101] The installation method of the lower inward-inclined trapezoidal or parallelogram unit curtain wall in the present invention is easy to implement and has the advantages of high installation accuracy, fast installation efficiency, orderly installation operation steps and high safety factor. The optimization of the unit curtain wall components can be easily achieved in the processing plant and can be achieved by only using common equipment and tooling on the market, and has great universal applicability.
[0102] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0103] Finally, it should be noted that: Obviously, the above embodiments are only examples for clearly explaining the present invention, and are not intended to limit the implementation methods. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from this are still within the scope of protection of the present invention.
Claims
1. A method for installing a lower inward-inclined trapezoidal or parallelogram unit curtain wall, characterized in that: include: Step 1: Arrange hanging accessories on the curtain wall unit to be installed, wherein the hanging accessories include a force-bearing hanging weight and a temporary hanging weight; Step 2: hoisting the curtain wall unit into the air through the load-bearing hanging hooks and the temporary hanging hooks, and adjusting the aerial posture; Step 3: Install a real-time tilt angle measuring device on the panel of the curtain wall unit to be installed, so as to observe the tilt angle of the curtain wall unit in a direction perpendicular to the panel in real time; Step 4: Lift the curtain wall unit to be installed to the pre-installation height, move it closer to the pre-installation position, and then adjust the curtain wall unit to be installed to a preset aerial posture; Step 5: Hang the curtain wall unit to be installed on the building structure and perform a pre-positioning; Step 6: Move and adjust the curtain wall unit to be installed downward along the enclosure surface, so as to achieve secondary pre-positioning of the curtain wall unit to be installed; Step 7: Horizontally move the curtain wall unit to be installed onto the adjacent curtain wall unit that has been installed; Step 8: Move the curtain wall unit to be installed downward along the enclosure surface for a second time to adjust the curtain wall unit to be installed so that the curtain wall unit to be installed moves downward to the intended installation position.
2. The method for installing the lower inward-inclined trapezoidal or parallelogram unit curtain wall according to claim 1, characterized in that: The step one comprises: The load-bearing hanging weight is installed on the upper part of the curtain wall unit to be installed, and the temporary hanging weight is installed on the lower part.
3. The method for installing the lower inward-inclined trapezoidal or parallelogram unit curtain wall according to claim 2, characterized in that: The second step comprises: The curtain wall units to be installed are transported to the site after being processed in the factory. They are hoisted by hoisting equipment through hoisting poles and vertical hand chain hoists. The hoisting points are set on the hoisting holes on the two load-bearing hanging brackets and the temporary hanging brackets. The aerial posture of the curtain wall unit to be installed is adjusted by a vertical hand winch so that the upper side and the lower side of the curtain wall unit to be installed are parallel to the horizontal plane.
4. The method for installing the lower inward-inclined trapezoidal or parallelogram unit curtain wall according to claim 1, characterized in that: The real-time tilt angle measuring device comprises an angle measuring plate, a rotating shaft, a pointer and a hanging ball. The angle measuring plate is rotatably arranged on the rotating shaft, the pointer is rotatably arranged on the rotating shaft, and the hanging ball is fixedly connected to the pointer and rotatably arranged on the rotating shaft.
5. The method for installing the lower inward-inclined trapezoidal or parallelogram unit curtain wall according to claim 2, characterized in that: The fourth step comprises: Lift the curtain wall unit to be installed to the pre-installation height and close to the intended installation location; Connect the load-bearing hanging code of the curtain wall unit to be installed to the upper horizontal hand chain hoist, and fix the other end of the upper horizontal hand chain hoist to the building structure; The lower part of the curtain wall unit to be installed is connected to the lower horizontal hand chain hoist through a suction cup, and the other end of the lower horizontal hand chain hoist is fixed to the building structure; By pulling the upper horizontal hand chain hoist and the lower horizontal hand chain hoist, the aerial posture of the curtain wall unit 1 is adjusted so that the inward inclination angle of the lower part of the curtain wall unit 1 in the direction perpendicular to the enclosure surface is consistent with the design angle.
6. The method for installing the lower inward-inclined trapezoidal or parallelogram unit curtain wall according to claim 5, characterized in that: The step five comprises: By using the lifting equipment and various hand hoists, the curtain wall unit to be installed is moved close to the intended installation location; The U-shaped groove of the force-bearing hanging code is hung on the corresponding adapter vertical plate 31, and the lower end of the curtain wall unit to be installed is aligned with the lower card groove, thereby realizing a one-time pre-positioning of the curtain wall unit to be installed.
7. The method for installing the lower inward-inclined trapezoidal or parallelogram unit curtain wall according to claim 6, characterized in that: The step six comprises: Unload the lifting equipment so that the load of the curtain wall unit to be installed is fully applied to the corresponding adapter through the load-bearing hanging weight; The adjusting bolts on the load-bearing hanging brackets are adjusted so that the curtain wall unit to be installed moves downward along the enclosure surface. The lower end of the curtain wall unit to be installed is inserted into the lower slot on the building structure and stops when a preset distance is reserved from the bottom intended installation position, thereby realizing secondary pre-positioning of the curtain wall unit to be installed.
8. The method for installing the lower inward-inclined trapezoidal or parallelogram unit curtain wall according to claim 7, characterized in that: The step seven comprises: Install limit blocks at the corners of the adjacent curtain wall units that have been installed, and place thin jacks between the force-bearing hanging weights and the end plates of the corresponding adapters, wherein the thin jacks are arranged horizontally; Through the thin jack external top, the external top force hanging weight moves horizontally, so that the curtain wall unit to be installed is driven by the force hanging weight to move to the limited position of the limit block.
9. The method for installing the lower inward-inclined trapezoidal or parallelogram unit curtain wall according to claim 7, characterized in that: The step eight comprises: The adjusting bolts on the load-bearing hanging brackets are adjusted again, so that the curtain wall unit to be installed is moved downward along the enclosure surface for a second time until it reaches the intended installation position.
10. The method for installing the lower inward-inclined trapezoidal or parallelogram unit curtain wall according to claim 1, characterized in that: Also includes step nine: After step eight, the hanging parts and auxiliary parts are removed, and the safety hanging code is installed on the curtain wall unit to be installed so that it is hung on the corresponding adapter.