Air pipe connecting joint forming structure and forming method thereof
By designing a tracheal connection node forming structure including a connector head and sealed inner liner, using welded pipe sheets and reinforcement sheets, the complex and quality problems of tracheal connection node production in the traditional inflatable tent manufacturing process are solved, and the production process is simplified , improve product quality and reduce production costs.
Patent Information
- Application Number
- CN202411569500.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-05
- Publication Date
- 2025-02-07
AI Technical Summary
In the traditional inflatable tent manufacturing process, the production process of the tracheal connection nodes is complicated and it is difficult to achieve automated production. It is prone to quality problems such as product distortion, unsolid node connection, and air leakage, resulting in high rework rate and poor user experience.
A gas pipe connection node molding structure is designed, including a connecting head and sealed inner liner. By welding the pipe sheet and reinforcement sheet, a sealed connecting node is formed, and a simple and efficient process is used to achieve quality and reliable production.
It simplifies the production process, improves product quality, reduces production costs, ensures high practicality and reliability of products, and improves production efficiency and product competitiveness.
Smart Images

Figure CN119393002A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of inflatable products, and in particular to an air pipe connection node forming structure and a forming method thereof. Background Art
[0002] The traditional manufacturing process of inflatable tents faces many challenges in actual production. First, due to the complex structure of the inflatable tent, especially the connection nodes of the air pipe, skilled technicians are usually required to operate manually. The production process is time-consuming and labor-intensive, and it is difficult to achieve large-scale automated production. Secondly, due to the complex process, quality problems such as product distortion, loose node connections, and air leakage are very likely to occur during the production process, resulting in a high product return rate and poor user experience.
[0003] Therefore, it is necessary to further improve and perfect the prior art to overcome these shortcomings, and the present invention is made based on this situation. Summary of the invention
[0004] The purpose of the present invention is to overcome the deficiencies of the prior art and provide a trachea connection node forming structure and a forming method thereof which can simplify the production process, improve product quality and reduce production costs.
[0005] The present invention can be achieved through the following technical solutions:
[0006] In order to solve the above technical problems, the present invention provides a trachea connection node forming structure, including a connecting head, the connecting head includes at least two interconnected tube bodies, and a first welding area for sealingly connecting the two adjacent tube bodies is provided at the butt joint of the adjacent tube bodies, a reinforcement plate is welded on the first welding area, and a sealing liner is provided in the connecting head, the sealing liner includes sealing tubes that are the same in number as the tube bodies and are interconnected, and the edges of the free ends of the sealing tubes are welded together with the inner walls of the corresponding tube bodies.
[0007] In order to further solve the technical problem to be solved by the present invention, the present invention provides a trachea connection node forming structure in which the same reinforcing sheet connects the relative first welding areas together.
[0008] In order to further solve the technical problem to be solved by the present invention, in a gas pipe connection node forming structure provided by the present invention, the pipe body includes a pipe segment and is rolled from the pipe segment, and two long sides of the pipe segment are provided with a second welding area for sealing and connecting the two.
[0009] In order to further solve the technical problem to be solved by the present invention, in a gas pipe connection node forming structure provided by the present invention, a connection port is punched at one end of the pipe segment, and the first welding area is formed by welding the peripheries of the connection ports of adjacent pipe bodies together.
[0010] The present invention can also be implemented by the following technical solutions:
[0011] A method for forming a trachea connection node for manufacturing the above-mentioned trachea connection node forming structure comprises the following steps:
[0012] S1: Take the pipe segment, punch holes on the pipe segment, and punch out the connection port;
[0013] S2: Fold the segment in half along its length;
[0014] S3: stacking the folded tube segments in sequence and aligning the connection ports;
[0015] S4: welding the adjacent segments together along the periphery of the corresponding connection ports, wherein the welding position is the first welding area;
[0016] S5: unfold each segment in sequence, take a number of reinforcement sheets, weld the same reinforcement sheet to the opposite first welding area and connect the two together;
[0017] S6: welding the two long sides of each pipe segment together to form a pipe body, wherein the welding position is the second welding area, and the whole is formed into a two-way or multi-way connector;
[0018] S7: Take a sealing liner, wherein the sealing liner comprises the same number of sealing tubes as the tube body, and the sealing liner is in a two-way or multi-way shape and is adapted to the shape of the connector, insert the sealing liner into the connector, and weld the free end edges of each sealing tube in the sealing liner to the inner wall of the corresponding tube body in the connector, and the welding position is the third welding area;
[0019] The order of steps S1 and S2 can be interchanged.
[0020] In order to further solve the technical problem to be solved by the present invention, in a trachea connection node forming method provided by the present invention, the forming steps of the sealed inner liner specifically include: taking a number of sealing sheets, and performing steps S1, S2, S3, S4 and S6 on the sealing sheets to finally form a sealed inner liner.
[0021] In order to further solve the technical problem to be solved by the present invention, in a method for forming a trachea connection node provided by the present invention, if the connecting head is two-way, the two pipe segments can be formed by folding a long pipe segment in half along its width direction, and step S1 punches a hole in the middle of the long pipe segment, and the connection between the two pipe segments is not cut off after punching.
[0022] Compared with the prior art, the present invention has the following advantages:
[0023] The air pipe connection node forming structure of the present invention is simple in design and easy to process and manufacture. This structural design not only reduces the processing cost, but also improves the processing quality of the product, ensuring high practicality and reliability in practical applications.
[0024] The forming method of the air pipe connection node of the present invention effectively improves production efficiency and product competitiveness through a streamlined process flow, a simple and efficient welding process, a firm structural combination and excellent sealing performance. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The specific embodiments of the present invention are further described in detail below with reference to the accompanying drawings, wherein:
[0026] Figure 1 is a schematic diagram of the three-dimensional structure of the first embodiment of the present invention;
[0027] Figure 2 is a schematic diagram of the three-dimensional structure of the second embodiment of the present invention;
[0028] Figure 3 is a schematic diagram of the structure of the pipe segment in the first embodiment;
[0029] Figure 4 is a schematic diagram of the stacking relationship of the pipe segments in the first embodiment;
[0030] Figure 5 is a schematic diagram of the molding process of Example 1;
[0031] Figure 6 is a schematic diagram of the structure of the pipe segment in the second embodiment;
[0032] Figure 7 is a schematic structural diagram of another pipe segment in the second embodiment;
[0033] Figure 8 It is a schematic diagram of the molding process of the second embodiment. DETAILED DESCRIPTION
[0034] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0035] In the present invention, an improved air pipe connection node molding structure is described, and its design and manufacturing process are aimed at improving the sealing performance and structural strength of the connection node.
[0036] like Figures 1 to 8 As shown, the air pipe connection node forming structure includes a connector 3, and the connector 3 is composed of at least two interconnected pipe bodies 13 (such as Figure 1 The four-way shown in Figure 2Each adjacent pipe body 13 is provided with a first welding area 12 for sealing connection at its butt joint to ensure a stable connection and good sealing performance between the two pipe bodies.
[0037] In order to further enhance the strength of the connection, a reinforcing sheet 2 is welded on the first welding area 12. The reinforcing sheet 2 provides additional structural support, effectively preventing the welding part from failing due to external force.
[0038] Inside the connector 3, a sealed inner liner 4 is provided. The sealed inner liner 4 is also in a double-pass or multi-pass shape, and is composed of a plurality of sealed tubes 42, the number of which is the same as the tube body 13, and each sealed tube 42 is interconnected. The free end edge of the sealed tube 42 is welded to the inner wall of the corresponding tube body 13 to ensure complete sealing between each channel. This design ensures that the gas will not leak when passing through the connector 3, thereby enhancing the sealing, safety and reliability of the entire system.
[0039] Furthermore, if Figure 5 As shown in the second figure, the same reinforcing sheet 2 is connected to the opposite first welding area 12, and the two are firmly combined together. This design improves the rigidity and durability of the overall structure.
[0040] In terms of manufacturing the pipe body 13, the pipe body 13 is rolled from the pipe segment 1. The two long sides of the pipe segment 1 are provided with a second welding area 14 for sealing the pipe segment 1 to ensure that the formed pipe body has good sealing performance. A connection port 11 is punched at one end (butt end) of the pipe segment 1, and the first welding area 12 is formed by welding the peripheries of the connection ports 11 of adjacent pipe bodies 13 together. This welding method simplifies the production process and ensures the sealing of the connection node.
[0041] In terms of material selection, the pipe segments 1 and the reinforcement sheets 2 are usually made of mesh coating materials, and the innermost and outermost layers are coatings, usually made of PVC (polyvinyl chloride), TPU (thermoplastic polyurethane) or other polymer materials. The coating can be conveniently welded by hot-melt connection. The middle layer is provided with a cloth layer or a mesh layer (such as a fiber mesh or a woven mesh) to improve the tensile resistance and enhance the durability and stability of the pipe body. The sealing liner 4 is usually made of soft PVC, TPU or other stretchable soft film materials. The selection of these materials ensures that the sealing liner 4 can maintain a good sealing state under various working conditions.
[0042] In summary, the design of the air pipe connection node forming structure is simple and easy to process and manufacture. This structural design not only reduces the processing cost, but also improves the processing quality of the product, ensuring high practicality and reliability in practical applications.
[0043] The present invention also provides a specific process method for manufacturing the above-mentioned air pipe connection node forming structure, aiming to achieve reliable quality air pipe connection node production through simple and efficient steps. The specific method steps are as follows:
[0044] Step S1: First, a tube segment 1 made of a suitable material is selected and punched (e.g. Figure 3 As shown), a connection port 11 of predetermined size and shape is formed (the connection port 11 is preferably as shown in Figure 3 This step can utilize equipment such as laser cutting or punching machine to ensure the accuracy and consistency of the connection port 11.
[0045] Step S2: Fold the tube segment 1 in half along the length direction of the tube segment 1 to make it present a symmetrical half-folded shape. This folding operation provides a basis for welding alignment in subsequent steps.
[0046] Step S3: stack all the folded tube sheets 1 in sequence (such as Figure 5 As shown in the first figure, each connection port 11 is strictly aligned to ensure the accurate position of the connection port 11 in the subsequent welding process. This step can be precisely aligned with the aid of a fixture or a positioning jig.
[0047] Step S4: using heat welding or ultrasonic welding technology, the adjacent pipe segments 1 are welded together in sequence along the periphery of each connection port 11 to form a first welding area 12 .
[0048] For example, if Figure 4 In one embodiment shown, the edges of ports B and C should be aligned and welded together, the edges of ports D and E should be aligned and welded together, the edges of ports F and G should be aligned and welded together, and the edges of ports H and A should be aligned and welded together.
[0049] Step S5: unfold each tube segment 1 in sequence, then take a number of reinforcing sheets 2, weld the reinforcing sheets 2 to the opposite first welding areas 12, and connect the two welding areas (such as Figure 5 The reinforcement sheet 2 is intended to increase the structural strength and durability of the node.
[0050] Step S6: Weld the two long side edges of each tube segment 1 together (such as Figure 5 As shown in the third figure of FIG), it is formed into a tube body 13, and its welding position is a second welding area 14. Through this step, the overall structure forms a two-way or multi-way connector 3 to achieve the connection function of multiple air pipes.
[0051] Step S7: Take the sealed inner container 4 (such as Figure 5 As shown in the fourth figure of FIG. 1 , the sealed inner liner 4 includes the same number of sealed tubes 42 as the tube body 13, and is in a two-way manner (such as Figure 8as shown) or multi-pass shapes (as Figure 5 As shown in the figure, to adapt to the structure of the connector 3. The sealing liner 4 is inserted into the connector 3, and the free end edges of each sealing tube 42 in the sealing liner 4 are welded to the inner wall of the corresponding tube body 13 in the connector 3 to form a third welding area 41. The sealing liner 4 is usually made of soft PVC, TPU or other stretchable soft film materials, which is easy to install and can be directly inserted into the connector 3. The main function of the sealing liner 4 is: it is equivalent to adding a sealing pipe membrane to the innermost layer of the connector 3, forming a complete sealing system in the connector 3, and significantly improving the sealing performance of the connector 3.
[0052] The order of step S1 and step S2 can be interchanged according to actual production needs to improve production flexibility and efficiency.
[0053] Furthermore, the step of forming the sealed inner liner 4 includes: taking a number of sealing sheets, and sequentially performing steps similar to steps S1, S2, S3, S4 and S6, except that the processing object is replaced by the sealing sheet, and finally a sealed inner liner 4 adapted to the connector 3 can be formed.
[0054] like Figure 1 , Figure 3-Figure 5 The embodiment 1 of the present invention is shown. In this embodiment, the final processed connector 3 is a cross.
[0055] In the second embodiment, Figure 2 , Figure 6-Figure 8 As shown, the connector 3 is a two-way design. In this design, the two pipe segments 1 can be two separate pipe segments 1 (such as Figure 6 As shown), a long tube sheet 5 can also be folded in half along its width direction (as shown Figure 7 At this time, step S1 punches holes in the middle of the long tube segment 5 to ensure that the connecting part between the two tube segments 1 is not cut off, thereby ensuring the integrity and stability of the overall structure. This design further simplifies the production process and improves production efficiency.
[0056] The air pipe connection node forming method has many advantages, which make it show high efficiency and reliability in practical applications. Specifically, these advantages include:
[0057] 1. The process is concise and clear: the entire molding method is divided into several steps, each of which is easy to implement, reducing the possibility of errors and improving production efficiency.
[0058] 2. High efficiency: This method adopts the method of folding and stacking multiple layers to significantly improve the efficiency of punching and welding.
[0059] 3. Strong welding: The design of multiple welding, including the first welding area, the second welding area and the third welding area, ensures the overall stability of the structure. Reinforcement sheets are also added to significantly increase the structural strength.
[0060] 4. Excellent sealing performance: A sealing liner is added to the connector, which significantly improves the sealing performance of the connector.
[0061] 5. Modular design: This method allows for flexible design of multi-pass or single-pass connectors, suitable for a variety of application scenarios. The modular design concept not only simplifies the production process, but also improves the versatility and market adaptability of the product.
[0062] 6. Adaptability and scalability: The process is suitable for segments of different materials and specifications and can be adjusted and improved according to specific needs.
[0063] In summary, the air pipe connection node forming method provides an ideal solution for the production of high-quality air pipe connection nodes through a streamlined process, a simple and efficient welding process, a strong structural bond and superior sealing performance, which can effectively improve production efficiency and product competitiveness.
Claims
1. A trachea connection node forming structure, characterized in that: The invention comprises a connector (3), wherein the connector (3) comprises at least two interconnected tube bodies (13), wherein a first welding area (12) for sealingly connecting the two adjacent tube bodies (13) is provided at the butt joint of the adjacent tube bodies (13), wherein a reinforcing sheet (2) is welded to the first welding area (12), wherein a sealing liner (4) is provided in the connector (3), wherein the sealing liner (4) comprises sealing tubes (42) which are the same in number as the tube bodies (13) and are interconnected, wherein the edges of the free ends of the sealing tubes (42) are welded to the inner walls of the corresponding tube bodies (13).
2. The air pipe connection node forming structure according to claim 1, characterized in that: The same reinforcing sheet (2) connects the opposite first welding areas (12) together.
3. The air pipe connection node forming structure according to claim 1, characterized in that: The pipe body (13) comprises a pipe sheet (1) and is formed by rolling the pipe sheet (1), and two long sides of the pipe sheet (1) are provided with a second welding area (14) for sealingly connecting the two sides.
4. The air pipe connection node forming structure according to claim 3, characterized in that: A connection opening (11) is punched out at one end of the pipe segment (1), and the first welding area (12) is formed by welding the peripheries of the connection openings (11) of adjacent pipe bodies (13) together.
5. A method for forming an air pipe connection node for manufacturing an air pipe connection node forming structure according to any one of claims 1 to 4, characterized in that: The following steps are included S1: Take a pipe segment (1), punch a hole on the pipe segment (1), and punch out a connection port (11); S2: folding the tube segment (1) in half along the length direction of the tube segment (1); S3: stacking the folded tube segments (1) in sequence and aligning the connection ports (11); S4: welding the adjacent pipe segments (1) together along the periphery of the corresponding connection openings (11), wherein the welding position is the first welding area (12); S5: unfolding each tube segment (1) in sequence, taking a plurality of reinforcing sheets (2), welding the same reinforcing sheet (2) to the opposite first welding area (12) and connecting the two together; S6: welding the two long sides of each tube segment (1) together to form a tube body (13), wherein the welding position is the second welding area (14), and the whole forms a two-way or multi-way connector (3); S7: Take a sealed inner liner (4), wherein the sealed inner liner (4) comprises the same number of sealing tubes (42) as the tube body (13), and the sealed inner liner (4) is in a two-way or multi-way shape and is adapted to the shape of the connector (3), insert the sealed inner liner (4) into the connector (3), and weld the free end edges of each sealing tube (42) in the sealed inner liner (4) to the inner wall of the corresponding tube body (13) in the connector (3), wherein the welding position is the third welding area (41); The order of steps S1 and S2 can be interchanged.
6. A method for forming a trachea connection node according to claim 5, characterized in that: The steps of forming the sealed inner container (4) specifically include: taking a plurality of sealing sheets, and subjecting the sealing sheets to steps S1, S2, S3, S4 and S6, to finally form the sealed inner container (4).
7. A method for forming a trachea connection node according to claim 5, characterized in that: If the connector (3) is a two-way connector, the two tube segments (1) can be formed by folding a long tube segment (5) in half along its width direction, and in step S1, a hole is punched in the middle of the long tube segment (5), without cutting off the connection between the two tube segments (1) after the hole is punched.