Water removing device for multiple times of water separation of sludge for port channel construction

By designing a multiple-water separation water removal device combining precipitation layered water removal and heating and drying technology, the problems of poor water removal effect on low-temperature sludge and easy damage to the filter equipment in the prior art are solved, and efficient Sludge removes water and cures.

CN119409398AInactive Publication Date: 2025-02-11DALIAN MARITIME UNIVERSITY +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202510022423.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-07
Publication Date
2025-02-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When removing moisture from sludge, a single filtration process is not effective on low-temperature sludge and relies heavily on filtration equipment, which is prone to damage and inconvenient to use.

Method used

A multi-water separation water removal device was designed, combining precipitation layered water removal and heating and drying technology, and secondary water removal is achieved through the combination of retention tube and heating chamber, and a curing agent is added to the stirring chamber to accelerate curing. process.

Benefits of technology

The secondary water removal of the sludge is achieved, especially under low temperature conditions, the water removal effect is significantly improved by heating, and the curing time is shortened through the curing process of the stirring chamber, and the moisture removal curing efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119409398A_ABST
    Figure CN119409398A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of sludge-water separation, and particularly relates to a multiple-water-separation device for sludge for port and channel construction, which comprises a rack, a straight barrel, a hopper and a stirring structure, sludge is fished from a port channel or conveyed into a hopper through a pump body, the sludge is subjected to standing treatment in the hopper, so that sludge water and fixed sludge are layered, and layered water in the hopper is pumped away through a water suction pipeline in the prior art, so that a first sludge water removal procedure is formed; a plurality of first electromagnetic valves are opened, so that the fixed sludge flows into the retention pipe, a heating rod is driven to start to work, and the heating rod heats heating oil in a heating cavity, so that the retention pipe can be quickly heated, the sludge flows in the retention pipe, and the heated retention pipe heats the sludge; and after the sludge in the retention pipe is heated to a certain temperature, water is discharged from the top of the retention pipe, so that a second sludge dewatering process is formed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of sludge water separation and dewatering, and in particular to a multiple water separation and dewatering device for sludge used in port and waterway construction. Background Art

[0002] During the construction of port channels, channel silt needs to be centrally processed. If the silt is directly discarded, it will cause serious environmental pollution. After processing, the silt can be applied to other fields, such as building materials, turning waste into treasure.

[0003] When treating channel silt, the basic steps include silt dewatering, that is, removing water from the silt by sedimentation or filtration to make the silt water content below a certain threshold, which is convenient for subsequent transportation, storage and reprocessing. For example, in the prior art patent publication number: CN 217661717 U-China Utility Model Patent A dredging and solidification device for port channel construction, a device is disclosed, which realizes the basic dredging, dewatering and solidification technology.

[0004] However, the existing equipment also has certain problems: first, the water removal process is single, and the water removal effect on low-temperature sludge is poor, and the residual moisture is high; second, it is heavily dependent on filtering equipment. Due to the characteristics of sludge, the filtering equipment is easily damaged during application, and the filter core needs to be replaced frequently, which is inconvenient to use. Summary of the invention

[0005] Therefore, the present invention aims to solve the problem that the prior art relies on filtering equipment to remove water and is not suitable for removing water in a low temperature environment.

[0006] In order to achieve the above-mentioned purpose, the present invention provides a multiple water separation and dewatering device for sludge used in port and waterway construction, comprising a frame, a straight cylinder, a hopper and a stirring structure; A straight cylinder is fixedly arranged on the frame, and a hopper is fixedly arranged on the top of the straight cylinder; The straight cylinder includes a heating chamber, a dividing chamber, a driving chamber and a stirring chamber from top to bottom; The heating chamber is provided with a plurality of retention tubes along the circumference of the axis of the straight cylinder. The vertically arranged retention tubes penetrate and are fixed on the bottom wall of the dividing chamber. The bottom of the retention tubes is located in the driving chamber. The retention tubes sequentially pass through the driving chamber, the heating chamber and are connected with the hopper. The bottom end of the retention tubes is connected with the stirring chamber through the bending tube. Fill the heating chamber with heating oil and arrange the heating rods; A stirring structure for stirring sludge is arranged in the stirring chamber, and a discharge pipe is arranged in communication with the stirring chamber; Wherein, a first solenoid valve is arranged at the top of each retention tube, and a second solenoid valve is arranged at the connection between each bending tube and the retention tube.

[0007] Preferably, the stirring chamber is connected to a dosing pipe.

[0008] Preferably, the stirring structure includes a first motor and a rotating shaft, one end of the rotating shaft is circumferentially fixed with multiple rotating frames, and the other end passes through the stirring chamber and the driving chamber and is fixedly connected to the output shaft of the first motor located in the dividing chamber, and the base of the first motor is fixedly set on the bottom wall of the dividing chamber.

[0009] Preferably, a first auger is axially rotatably arranged in each retention tube, the shaft of the first auger is coaxially connected to the rotating rod, and the rotating rod penetrates into the driving cavity to connect with the driving member.

[0010] Preferably, the driving member comprises a main spur gear and a plurality of auxiliary spur gears, and each rotating rod is fixedly sleeved with a auxiliary spur gear; The main spur gear is sleeved on the rotating shaft, and a limit groove is provided on the inner ring. A limit block is fixedly provided on the rotating shaft, and the limit block is plugged and matched with the limit groove. An annular housing is coaxially fixedly arranged on the top wall of the main spur gear, and an annular groove is provided on the top wall of the annular housing; The main spur gear can mesh with multiple auxiliary spur gears; A plurality of cylinders are arranged along the circumference of the axis of the straight cylinder in the segmentation cavity, and piston rods of the cylinders are sequentially inserted into the driving cavity and a driving block is fixedly arranged in the annular groove.

[0011] Preferably, a horizontal tube is connected to the bottom end of the discharge pipe, a second auger is rotatably arranged in the horizontal tube, a second motor is fixedly arranged at one end of the horizontal tube, an output shaft of the second motor is coaxially connected to the shaft of the second auger, and a detachable container is arranged at the other end of the horizontal tube.

[0012] Preferably, a conical body is coaxially fixedly arranged on the top of the straight cylindrical body, and the conical body is located in the hopper with the closed end facing upward.

[0013] Preferably, the annular wall of the stirring chamber is a sandwich structure, and a heating wire is arranged in the sandwich structure.

[0014] Preferably, the retention tube is made of metal copper.

[0015] The beneficial effects of the present invention are: 1. The silt is salvaged from the port channel or transported to the hopper through a pump body. The silt is left to stand in the hopper to separate the silt water and the fixed silt. The water in the silt layer in the hopper is extracted through the existing water suction pipe, thus forming the first silt dewatering process; Further, multiple first solenoid valves are opened to allow the fixed sludge to flow into the retention tube, driving the heating rod to start working, and the heating rod heats the heating oil in the heating chamber, so that the retention tube can be quickly heated, and the sludge flows in the retention tube. The heated retention tube heats the sludge, and after the sludge in the retention tube is heated to a certain temperature, the water is discharged from the top of the retention tube, thus forming a second sludge dehydration process; finally, the second solenoid valve is opened to discharge the sludge to the next process.

[0016] Through this structure, the sludge sedimentation and stratification dehydration and heating and drying dehydration are combined to achieve a secondary dehydration effect. In addition, the low-temperature sludge is dried by heating, which has a good dehydration effect.

[0017] 2. When the sludge is in the retention pipe, the auger structure in the retention pipe stirs it, which can further improve the drying effect.

[0018] 3. In the preferred embodiment, the sludge after secondary dehydration is connected to the stirring chamber through a bent tube at the bottom of the retention tube, so that the sludge flows into the stirring chamber, driving the stirring structure to work, and the stirring structure stirs the curing agent and the heated sludge to make the two fully mixed, thus forming a third dehydration and curing process, and the sludge is pre-heated, and heating can accelerate the chemical reaction, so that the curing agent reacts with the water and other substances in the sludge faster, thereby shortening the curing time. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0020] Figure 1 It is a schematic diagram of the three-dimensional structure of the device for multiple water separation and dewatering of sludge used for port and waterway construction of the present invention; Figure 2 It is a front structural schematic diagram of a multiple water separation and dewatering device for sludge used in port and channel construction according to the present invention; Figure 3 yes Figure 2 A schematic diagram of a cross-sectional view of the structure; Figure 4 It is a schematic diagram of a three-dimensional structure of a sectional state of a multiple water separation and dewatering device for sludge used in port and waterway construction according to the present invention; Figure 5 yes Figure 4 Schematic diagram of the enlarged structure of region A; Figure 6 yes Figure 5 Schematic diagram of the enlarged structure of region B; Figure 7 It is a partial three-dimensional structural schematic diagram of a multiple water separation and dewatering device for sludge used in port and waterway construction according to the present invention.

[0021] Description of reference numerals: 1. Frame; 2. Straight cylinder; 21. Heating chamber; 22. Splitting chamber; 23. Driving chamber; 24. Stirring chamber; 25. Dosing pipe; 26. Discharging pipe; 240. Sandwich structure; 241. Heating wire; 27. Bending pipe; 3. Hopper; 4. Retention tube; 41. First solenoid valve; 42. Second solenoid valve; 5. stirring structure; 51. first motor; 52. rotating shaft; 53. rotating frame; 520. limiting block; 6. The first auger; 7. driving member; 71. main spur gear; 72. auxiliary spur gear; 710. limiting groove; 73. annular housing; 730. annular groove; 74. cylinder; 75. driving block; 76. rotating rod; 8. horizontal pipe; 81. second auger; 82. second motor; 9. Cone. DETAILED DESCRIPTION

[0022] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0023] First embodiment: like Figures 1 to 7 As shown, this embodiment provides a multiple water separation and dewatering device for sludge used in port and channel construction, comprising a frame 1, a straight cylinder 2, a hopper 3 and a stirring structure 5. The straight cylinder 2 is fixedly arranged on the frame 1, and the hopper 3 is fixedly arranged on the top of the vertically arranged straight cylinder 2. Figure 3 , Figure 4As shown, the straight cylinder 2 includes a heating chamber 21, a split chamber 22, a driving chamber 23 and a stirring chamber 24 from top to bottom. The heating chamber 21 is provided with a plurality of retention tubes 4 along the circumference of the axis of the straight cylinder 2, and the retention tubes 4 are made of metal copper. Metal copper has good thermal conductivity. The vertically arranged retention tubes 4 are fixed on the bottom wall of the split chamber 22, and the bottom of the retention tubes 4 are in the driving chamber 23; and the retention tubes 4 pass through the driving chamber 23 and the heating chamber 21 in turn to be connected with the hopper 3, and the bottom end of the retention tube 4 is connected with the stirring chamber 24 through the bending tube 27. The heating chamber 21 is filled with heating oil (not shown) and a heating rod (not shown) is arranged. The heating rod adopts the existing technology, so it will not be described in detail. The heating rod can heat the heating oil.

[0024] like Figure 3 As shown, a first solenoid valve 41 is arranged at the top of each retention tube 4, and a second solenoid valve 42 is arranged at the connection between each bending tube and the retention tube 4.

[0025] The silt is salvaged from the port channel or transported to the hopper 3 by a pump body. The silt is statically treated in the hopper 3 so that the silt water and the fixed silt are separated into layers. The separated water in the hopper 3 is extracted through the existing water suction pipe, thus forming the first silt dewatering process; Further, multiple first solenoid valves 41 are opened to allow the fixed sludge to flow into the retention tube 4, and the heating rod is driven to start working. The heating rod heats the heating oil in the heating chamber 21, so that the retention tube 4 can be quickly heated. The sludge flows in the retention tube 4, and the heated retention tube 4 heats the sludge. After the sludge in the retention tube 4 is heated to a certain temperature, the moisture is discharged from the top of the retention tube 4, thus forming a second sludge dehydration process. Finally, the second solenoid valve 42 is opened to discharge it to the next process.

[0026] Through this structure, the sludge sedimentation and stratification dehydration and heating and drying dehydration are combined to achieve a secondary dehydration effect. In addition, the low-temperature sludge is dried by heating, which has a good dehydration effect.

[0027] Second embodiment: Preferably, in this embodiment, a stirring structure 5 for stirring sludge is provided in the stirring chamber 24, and a dosing pipe 25 and a discharge pipe 26 are provided in communication with the stirring chamber 24. The discharge pipe 26 is located at the bottom of the stirring chamber 24, and the stirring structure 5 includes a first motor 51 and a rotating shaft 52, a plurality of rotating frames 53 are fixed to one end of the rotating shaft 52, and the other end of the rotating shaft 52 passes through the stirring chamber 24, the driving chamber 23 and is fixedly connected to the output shaft of the first motor 51 located in the segmentation chamber 22, and the base of the first motor 51 is fixedly provided on the bottom wall of the segmentation chamber 22. When the first motor 51 is driven to work, the first motor 51 drives the plurality of rotating frames 53 to rotate through the rotating shaft 52.

[0028] The bottom end of the retention tube 4 is connected to the stirring chamber 24 through a bent tube 27, so that the sludge flows into the stirring chamber 24, and a curing agent is added to the stirring chamber through a dosing tube 25, driving the stirring structure 5 to work, and the stirring structure 5 stirs the curing agent and the heated sludge so that the two are fully mixed, thus forming a third dehydration and curing process, and the sludge is pre-heated, and heating can accelerate the chemical reaction, so that the curing agent reacts with the water and other substances in the sludge faster, thereby shortening the curing time. The three curing processes further improve the sludge dehydration and curing efficiency.

[0029] In addition, the present invention is particularly suitable for treating port and waterway sludge in cold seasons.

[0030] Second embodiment: like Figure 4 , Figure 5 As shown, a first auger 6 is axially rotatably arranged in each retention tube 4, and the shaft of the first auger 6 is coaxially connected to a rotating rod 76, and the rotating rod 76 penetrates into the driving cavity 23 to connect with the driving member 7. The driving member 7 includes a main spur gear 71 and a plurality of secondary spur gears 72, and each rotating rod 76 is fixedly sleeved with a secondary spur gear 72. The main spur gear 71 is sleeved on the rotating shaft 52, as shown in FIG. Figure 7 As shown, the inner ring of the main spur gear 71 is provided with a limiting groove 710, such as Figure 5 , Figure 7 As shown, the rotating shaft 52 is fixedly provided with a limit block 520, and the limit block 520 is plugged into and matched with the limit groove 710. The top wall of the main spur gear 71 is coaxially fixedly provided with an annular housing 73, and the top wall of the annular housing 73 is provided with an annular groove 730. The main spur gear 71 can mesh with a plurality of auxiliary spur gears 72. A plurality of cylinders 74 are arranged along the axis circumference of the straight cylinder 2 in the dividing chamber 22, and the piston rods of the cylinders 74 are sequentially inserted into the driving chamber 23 and the driving block 75 is fixedly provided in the annular groove 730.

[0031] This structure is divided into two states: State 1: The main spur gear 71 and the plurality of secondary spur gears 72 are in meshing state, the piston rod of the cylinder 74 is inserted into the annular groove 730 in turn to fix the driving block 75, and the annular housing 73 in the rotating state is in a non-contact state with the driving block 75. In addition, the limit block 520 is plugged into the limit groove 710. The first motor 51 is driven to start working, the output shaft of the first motor 51 drives the rotating shaft 52 to rotate, the rotating shaft 52 drives the plurality of secondary spur gears 72 to rotate through the main spur gear 71, and the secondary spur gear 72 drives the first auger 6 to rotate through the rotating rod 76. The rotation speed of the first auger 6 controls the feeding speed of the sludge into the stirring chamber 24, so that the length of time the sludge stays in the retention tube 4 can be controlled, thereby affecting the heating time of the sludge. At this time, the rotating frame 53 can also stir the sludge in the stirring chamber 24.

[0032] State 2: When enough sludge enters the stirring chamber 24, the multiple cylinders 74 are driven to start working synchronously, and the piston rods of the cylinders 74 begin to contract. The piston rods drive the driving blocks 75 to move upward, and the driving blocks 75 drive the main spur gear 71 to move upward through the annular shell 73, so that the main spur gear 71 and the multiple sub-spur gears 72 are in a separated state, driving the first motor 51 to work, and the first motor 51 drives the multiple rotating frames 53 to rotate through the rotating shaft 52, and the multiple rotating frames 53 stir the curing agent and the heated sludge to make the two fully mixed.

[0033] like Figure 3 , Figure 4 As shown, the bottom end of the discharge pipe 26 is connected to a horizontal pipe 8, a second auger 81 is rotatably arranged in the horizontal pipe 8, a second motor 82 is fixedly arranged at one end of the horizontal pipe 8, the output shaft of the second motor 82 is coaxially connected with the shaft of the second auger 81, and a container (not shown) is detachably arranged at the other end of the horizontal pipe 8. After the sludge is mixed, the second motor 82 drives the second auger 81 to rotate, and the second auger 81 drives the sludge to be pushed out of the container, thus completing the solidification treatment of the sludge dehydration. A conical body 9 is coaxially fixedly arranged at the top of the straight cylinder 2, the conical body 9 is located in the hopper 3, and the closed end of the conical body 9 is arranged upward. The annular wall of the stirring chamber 24 is a sandwich structure 240, and a heating wire 241 is arranged in the sandwich structure 240. The heating wire 241 performs sludge heating treatment on the sludge in the stirring chamber 24.

[0034] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.

Claims

1. A multiple water separation and dewatering device for sludge used in port and waterway construction, characterized in that: include: A frame, a straight cylinder is fixedly arranged on the frame, and a hopper is fixedly arranged on the top of the straight cylinder; The straight cylinder includes a heating chamber, a dividing chamber, a driving chamber and a stirring chamber from top to bottom; The heating chamber is provided with a plurality of retention tubes along the circumference of the axis of the straight cylinder, the vertically arranged retention tubes are fixed on the bottom wall of the segmentation chamber, and the bottom of the retention tubes is located in the driving chamber; the retention tubes sequentially pass through the driving chamber, the heating chamber and are connected with the hopper, and the bottom end of the retention tubes is connected with the stirring chamber through a bent tube; The heating chamber is filled with heating oil and a heating rod is arranged; A stirring structure for stirring sludge is arranged in the stirring chamber, and a discharge pipe is arranged in communication with the stirring chamber; In addition, a first solenoid valve is arranged at the top of each retention tube, and a second solenoid valve is arranged at the connection between each bending tube and the retention tube.

2. The multiple water separation and dewatering device for port and channel construction sludge according to claim 1 is characterized in that: The stirring chamber is connected to a drug adding pipe.

3. The multiple water separation and dewatering device for port and channel construction sludge according to claim 1 is characterized in that: The stirring structure includes a first motor and a rotating shaft, one end of the rotating shaft is circumferentially fixed with multiple rotating frames, and the other end passes through the stirring chamber and the driving chamber and is fixedly connected to the output shaft of the first motor located in the dividing chamber, and the base of the first motor is fixedly arranged on the bottom wall of the dividing chamber.

4. The multiple water separation and dewatering device for port and channel construction sludge according to claim 3 is characterized in that: A first auger is axially rotatably arranged in each retention tube, and the shaft of the first auger is coaxially connected to a rotating rod, and the rotating rod penetrates into the driving cavity to connect with a driving member.

5. The multiple water separation and dewatering device for port and channel construction sludge according to claim 4, characterized in that: The driving member comprises a main spur gear and a plurality of auxiliary spur gears, and each of the rotating rods is fixedly sleeved with one of the auxiliary spur gears; The main spur gear is sleeved on the rotating shaft, and a limiting groove is provided on the inner ring. A limiting block is fixedly provided on the rotating shaft, and the limiting block is plugged and matched with the limiting groove. An annular housing is coaxially fixedly disposed on the top wall of the main spur gear, and an annular groove is provided on the top wall of the annular housing; The main spur gear is capable of meshing with a plurality of the auxiliary spur gears; A plurality of cylinders are arranged in the segmentation cavity along the circumference of the axis of the straight cylinder, and piston rods of the cylinders are sequentially inserted into the driving cavity and a driving block is fixedly arranged in the annular groove.

6. The multiple water separation and dewatering device for port and channel construction sludge according to claim 1, characterized in that: The bottom end of the discharge pipe is connected to a horizontal tube, a second auger is rotatably arranged in the horizontal tube, a second motor is fixedly arranged at one end of the horizontal tube, an output shaft of the second motor is coaxially connected to the shaft of the second auger, and a detachable container is arranged at the other end of the horizontal tube.

7. The multiple water separation and dewatering device for port and channel construction sludge according to claim 1, characterized in that: A conical body is coaxially fixedly arranged on the top of the straight cylinder; the conical body is located in the hopper, and the closed end is arranged upward.

8. The multiple water separation and dewatering device for port and channel construction sludge according to any one of claims 1 to 7, characterized in that: The annular wall of the stirring chamber is a sandwich structure, and a heating wire is arranged in the sandwich structure.

9. The multiple water separation and dewatering device for port and channel construction sludge according to claim 1, characterized in that: The retention tube is made of metal copper.

Citation Information

Patent Citations

  • Dredging and solidifying device for port channel construction

    CN217661717U

  • Marine silt dewatering and solidifying device

    CN109264958A

  • Dry-wet separation device for pig house manure

    CN112960884A

  • Industrial sludge landfill dehydration device

    CN219823978U