Iron tower applied to infrared monitoring and intelligent early warning system for oil field gas leakage

Through integrated design and the adoption of an adjustable top equipment platform, the existing towers have been solved, the construction time, large area and the equipment cannot operate from multiple angles, and the construction efficiency improvement, cost saving and flexibility of equipment operation are achieved.

CN119434745APending Publication Date: 2025-02-14SHANGHAI POSTS & TELECOMM DESIGNING CONSULTING INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411749920.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-02
Publication Date
2025-02-14

AI Technical Summary

Technical Problem

The existing towers have a long time during construction and cover a large area, and the equipment platform cannot meet the needs of multi-angle operation.

Method used

The integrated design is adopted, and the platform fence, anti-crawl and tower body are bolted to simplify the installation process, and an adjustable design is adopted on the top equipment platform to adjust the direction and height of the ceiling to avoid equipment signal occlusion.

Benefits of technology

It shortens construction time, reduces floor area, saves manpower and material costs, and ensures that the equipment can operate from multiple angles, meeting the multi-dimensional operation needs of precision instruments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119434745A_ABST
    Figure CN119434745A_ABST
Patent Text Reader

Abstract

The iron tower applied to the infrared monitoring and intelligent early warning system for oil field gas leakage comprises an iron tower body, two pieces of transverse iron tower transverse material connecting angle steel are arranged at the bottom of the iron tower body in the vertical direction at intervals, and a plurality of mounting holes are formed in the two pieces of iron tower transverse material connecting angle steel in the length direction at intervals; a platform fence is connected between the two iron tower transverse material connecting steel angles and composed of a plurality of vertical rods arranged in parallel at intervals, the two ends of each vertical rod are connected with mounting holes of the two iron tower transverse material connecting steel angles through bolts and nuts respectively, a door is arranged on the platform fence, and the side face of the door is connected with the vertical rods through hinges. Anti-climbing net support angle steel is outwards arranged on the side face of the bottom of the iron tower body, and an anti-climbing net is wound around the anti-climbing net support angle steel. The integrated design is adopted, the platform fence, the anti-climbing net and the iron tower body are connected into a whole through bolts, installation is flexible and convenient, and operation is convenient; meanwhile, the overall occupied area of the iron tower can be reduced, a concrete fence foundation does not need to be poured, and the construction requirements of the iron tower with the small planned occupied area and the fence can be met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of buildings, in particular to an iron tower, and in particular to an iron tower used in infrared monitoring and intelligent early warning systems for oilfield gas leakage. Background Art

[0002] An infrared monitoring and intelligent early warning system for oilfield gas leakage is installed on the platform surface of the tower body to monitor and warn of oilfield gas leakage. The existing technology of this iron tower adopts a design that is separated from the main body of the iron tower in terms of fences and anti-climbing nets, and requires additional pouring of fence concrete foundations, which takes a long time to construct and consumes a lot of manpower and material resources. It also increases the overall footprint of the iron tower, greatly increasing the overall construction cost of the iron tower. In addition, the existing technology of the iron tower equipment platform adopts a fixed design for the ceiling, and the ceiling support rods are prone to block the specific operating angles of the equipment installed in the equipment platform, which cannot meet the multi-angle and all-round operation requirements of the equipment on the tower. Summary of the invention

[0003] The purpose of the present invention is to provide an iron tower applied to infrared monitoring and intelligent early warning system for oilfield gas leakage. The iron tower applied to infrared monitoring and intelligent early warning system for oilfield gas leakage can solve the technical problems in the prior art that the iron tower takes a long time to construct, occupies a large area, and the equipment on the tower cannot operate at multiple angles.

[0004] The iron tower used for infrared monitoring and intelligent early warning system of oilfield gas leakage of the present invention comprises an iron tower body, wherein two horizontal iron tower crossbar connecting angle steels are arranged at vertical intervals at the bottom of the iron tower body, and a plurality of mounting holes are arranged at intervals along the length direction on the two iron tower crossbar connecting angle steels, and a platform fence is connected between the two iron tower crossbar connecting angle steels, and the platform fence is composed of a plurality of vertical rods arranged at intervals in parallel, and the two ends of the vertical rods are respectively connected to the mounting holes of the two iron tower crossbar connecting angle steels by bolts and nuts, and a door is arranged on the platform fence, and the side of the door is connected to the vertical rod by hinges, and an anti-climbing net bracket angle steel is arranged outwardly on the side of the bottom of the iron tower body, and an anti-climbing net is wound around the anti-climbing net bracket angle steel;

[0005] The top of the iron tower body is connected to the platform diagonal brace by bolts and nuts, the upper sides of the iron tower body and the platform diagonal brace are connected to the platform panel by bolts and nuts, the upper side of the platform panel is connected to the platform vertical brace by bolts and nuts, the upper side of the platform vertical brace is connected to the platform annular channel steel bracket by bolts and nuts, the circumference of the platform annular channel steel bracket is connected with a bolt connecting plate by screws and nuts, the platform annular channel steel bracket is provided with a plurality of groups of installation adjustment holes matched with the bolt connecting plate, the bolt connecting plate is respectively connected to the ceiling pillar by U-bolts, the two ends of the U-bolts are respectively connected to the bolt connecting plate by nuts, the upper side of the ceiling pillar is connected to the ceiling by bolts and nuts, the upper side of the ceiling is connected to the diagonal brace of the lightning rod bracket by bolts and nuts, the upper side of the lightning rod bracket diagonal brace and the ceiling pillar is connected to the lightning rod bracket by bolts and nuts.

[0006] Furthermore, a ladder is connected to the tower body via bolts and nuts.

[0007] Furthermore, the lightning rod bracket is connected to the ceiling support via a flange.

[0008] Compared with the prior art, the present invention has a positive and obvious effect. The present invention adopts an integrated design, and the platform fence, anti-climbing net and the main body of the iron tower are connected together by bolts, which is flexible and convenient to install and easy to operate; at the same time, the overall footprint of the iron tower can be reduced, and there is no need to cast a concrete fence foundation, which shortens the construction period, saves manpower and material costs, and can meet the construction needs of iron towers with a small planned footprint and requiring fences. The installation holes on the angle steel are connected by horizontal bars, and the orientation of the vertical rods and doors can be adjusted and installed at any time. The top equipment platform of the present invention adopts an adjustable design, which can adjust the direction and height of the ceiling at the same time. The position of the bolt connection plate on the platform annular channel steel bracket can be changed by using multiple sets of installation adjustment holes, thereby adjusting the direction of the ceiling, and the height of the ceiling can be adjusted by adjusting the relative position of the ceiling pillar and the U-bolt, avoiding the signal of the equipment installed on the top of the iron tower from being blocked, ensuring that the equipment can operate at multiple angles, and meeting the multi-directional operation requirements of the precision instruments installed on the top equipment platform. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] Figure 1 The present invention is a schematic diagram of an iron tower used in an infrared monitoring and intelligent early warning system for oilfield gas leakage.

[0010] Figure 2 This is a first schematic diagram of a platform fence in an iron tower used in an infrared monitoring and intelligent early warning system for oilfield gas leakage according to the present invention.

[0011] Figure 3 This is a second schematic diagram of a platform fence in an iron tower used in an infrared monitoring and intelligent early warning system for oilfield gas leakage according to the present invention.

[0012] Figure 4 The diagram is a schematic diagram of the top structure of an iron tower used in an infrared monitoring and intelligent early warning system for oilfield gas leakage according to the present invention.

[0013] Figure 5 The present invention is a schematic diagram of a connection structure between a ceiling support and a platform annular channel steel support in an iron tower used in an infrared monitoring and intelligent early warning system for oilfield gas leakage. DETAILED DESCRIPTION

[0014] The present invention is further described below in conjunction with an embodiment, but the present invention is not limited to the embodiment, and any similar variation of the present invention should be included in the protection scope of the present invention. The use of directions such as up, down, front, back, left, right, middle, inside, and outside in the present invention is only for the convenience of clear description, and is not a limitation of the technical solution of the present invention.

[0015] like Figure 1-Figure 5 As shown, an iron tower used for infrared monitoring and intelligent early warning system of oilfield gas leakage of the present invention comprises an iron tower body 10, two transverse iron tower crossbar connecting angle steels 16 are arranged at vertical intervals at the bottom of the iron tower body 10, and a plurality of mounting holes are arranged at intervals along the length direction on the two iron tower crossbar connecting angle steels 16, a platform fence 12 is connected between the two iron tower crossbar connecting angle steels 16, the platform fence 12 is composed of a plurality of parallel vertical rods 19 arranged at intervals, and the two ends of the vertical rods 19 are respectively connected to the mounting holes of the two iron tower crossbar connecting angle steels 16 by bolts and nuts, a door 17 is arranged on the platform fence 12, and the side of the door 17 is connected to the vertical rod 19 by hinges, and an anti-climbing net bracket angle steel 18 is arranged outwardly on the side of the bottom of the iron tower body 10, and the anti-climbing net bracket angle steel 18 is wound with an anti-climbing net 11;

[0016] The top of the iron tower body 10 is connected to the platform diagonal brace 8 by bolts and nuts, the upper sides of the iron tower body 10 and the platform diagonal brace 8 are connected to the platform panel 7 by bolts and nuts, the upper side of the platform panel 7 is connected to the platform vertical brace 6 by bolts and nuts, the upper side of the platform vertical brace 6 is connected to the platform annular channel steel bracket 5 by bolts and nuts, the circumference of the platform annular channel steel bracket 5 is connected with a bolt connecting plate 15 by screws 13 and nuts, the platform annular channel steel bracket 5 is provided with a plurality of groups of installation adjustment holes matched with the bolt connecting plate 15, the bolt connecting plate 15 is respectively connected to the ceiling pillar 4 by U-bolts 14, the two ends of the U-bolt 14 are respectively connected to the bolt connecting plate 15 by nuts, the upper side of the ceiling pillar 4 is connected to the ceiling 3 by bolts and nuts, the upper side of the ceiling 3 is connected to the lightning rod bracket diagonal brace 2 by bolts and nuts, and the upper sides of the lightning rod bracket diagonal brace 2 and the ceiling pillar 4 are connected to the lightning rod bracket 1 by bolts and nuts.

[0017] Furthermore, a ladder 9 is connected to the tower body 10 via bolts and nuts.

[0018] Furthermore, the lightning rod bracket 1 is connected to the ceiling support 4 via a flange.

[0019] Specifically, the tower body 10, U-bolts 14, lightning rod bracket 1, ladder 9, flange, etc. in this embodiment all adopt well-known solutions in the prior art, which are well understood by those skilled in the art and will not be described in detail here.

[0020] The installation process of this embodiment:

[0021] 1. After the tower body 10 and the ladder 9 are connected into a whole by bolts, the platform fence 12 is directly installed on the tower crossbar connecting angle steel 16 by bolts, and the door 17 is connected to the platform fence 12 to complete the integrated installation of the bottom fence and the tower body 10.

[0022] 2. After the anti-climbing net support angle steel 18 is connected to the tower body 10 by bolt connection, the anti-climbing net 11 is connected to the anti-climbing net support angle steel 18 by winding to complete the installation of the anti-climbing net 11.

[0023] 3. After the platform diagonal brace 8 is connected to the tower body 10 by bolt connection, the platform panel 7 is installed with the platform diagonal brace 8 and the tower body 10 by bolt connection, and then the platform vertical brace 6 is connected to the platform panel 7 by bolt connection, and then the platform annular channel steel bracket 5 is connected to the platform vertical brace 6 by bolt connection, and the tower body 10 is assembled into an overall frame by bolt splicing with the platform diagonal brace 8, platform panel 7, platform vertical brace 6, and platform annular channel steel bracket 5, and then the ceiling support 4 is connected to the platform annular channel steel bracket 5 by U-bolts 14, bolt connection plates 15, and long screws 13, and then the ceiling 3 is connected to the ceiling support 4 by bolts to complete the overall installation of the ceiling. The lightning rod bracket diagonal brace 2 is connected to the ceiling 3 by bolts, and then the lightning rod bracket 1 is connected to the lightning rod bracket diagonal brace 2 and the ceiling 3 by bolt connection to complete the overall installation of the top platform.

[0024] This embodiment adopts a precise design for accurately controlling the maximum displacement parameters of the top platform. By repeatedly fine-tuning and compounding the design of the tower body 10, it ensures that under the designed operating conditions, the maximum displacement of the top of the tower does not exceed 17.5 mm, which can meet the requirements of the normal and smooth operation of the demanding precision instruments of the early warning device platform installed on the top of the tower under the designed operating conditions. It is more than 15 times more accurate than the maximum displacement control of 266 mm at the top of a 20-meter tower required by conventional tower design, ensuring the smooth operation of the precision equipment installed on the early warning device platform on the top of the tower.

[0025] The present invention adopts an integrated design, the platform fence 12, the anti-climbing net 11 and the iron tower body 10 are connected together by bolts, which is flexible and convenient to install and easy to operate; at the same time, the overall footprint of the iron tower can be reduced, and there is no need to cast a concrete fence foundation, which shortens the construction period and saves manpower and material costs, and can meet the construction needs of iron towers with a small planned footprint and requiring fences. By connecting the installation holes on the angle steel 16 with the horizontal material, the orientation of the vertical rod 19 and the door 17 can be adjusted and installed at any time.

[0026] The top equipment platform of the present invention adopts an adjustable design, which can adjust the direction and height of the ceiling 3 at the same time. The position of the bolt connecting plate 15 on the platform annular channel steel bracket 5 can be changed by using multiple sets of installation adjustment holes, thereby adjusting the direction of the ceiling 3, and the height of the ceiling 3 can be adjusted by adjusting the relative position of the ceiling support 4 and the U-bolt 14, thereby avoiding blocking the signal of the equipment installed on the top of the tower, ensuring that the equipment can operate at multiple angles, and meeting the multi-directional operation requirements of the precision instruments installed on the top equipment platform.

Claims

1. An iron tower used in infrared monitoring and intelligent early warning system for oilfield gas leakage, characterized in that: The utility model comprises an iron tower body, wherein two horizontal iron tower crossbar connecting angle steels are arranged at vertical intervals at the bottom of the iron tower body, and a plurality of mounting holes are arranged at intervals along the length direction on the two iron tower crossbar connecting angle steels, and a platform fence is connected between the two iron tower crossbar connecting angle steels, and the platform fence is composed of a plurality of vertical rods arranged at parallel intervals, and the two ends of the vertical rods are respectively connected to the mounting holes of the two iron tower crossbar connecting angle steels by bolts and nuts, and a door is arranged on the platform fence, and the side of the door is connected to the vertical rod by a hinge, and an anti-climbing net bracket angle steel is arranged outwardly on the side of the bottom of the iron tower body, and an anti-climbing net is wound around the anti-climbing net bracket angle steel; The top of the iron tower body is connected to the platform diagonal brace by bolts and nuts, the upper sides of the iron tower body and the platform diagonal brace are connected to the platform panel by bolts and nuts, the upper side of the platform panel is connected to the platform vertical brace by bolts and nuts, the upper side of the platform vertical brace is connected to the platform annular channel steel bracket by bolts and nuts, the circumference of the platform annular channel steel bracket is connected with a bolt connecting plate by screws and nuts, the platform annular channel steel bracket is provided with a plurality of groups of installation adjustment holes matched with the bolt connecting plate, the bolt connecting plate is respectively connected to the ceiling pillar by U-bolts, the two ends of the U-bolts are respectively connected to the bolt connecting plate by nuts, the upper side of the ceiling pillar is connected to the ceiling by bolts and nuts, the upper side of the ceiling is connected to the diagonal brace of the lightning rod bracket by bolts and nuts, the upper side of the lightning rod bracket diagonal brace and the ceiling pillar is connected to the lightning rod bracket by bolts and nuts.

2. The iron tower used for infrared monitoring and intelligent early warning system for oilfield gas leakage according to claim 1 is characterized in that: The iron tower body is connected with a ladder via bolts and nuts.

3. The iron tower used for infrared monitoring and intelligent early warning system for oilfield gas leakage according to claim 1 is characterized in that: The lightning rod bracket is connected to the ceiling support through a flange.