Geological mineral exploration device

By designing a geological mineral exploration device with a negative pressure waste cleaning mechanism, the problem of frequent soil discharge during sampling in existing equipment is solved, and a more efficient sampling process is achieved.

CN119434842AActive Publication Date: 2025-02-14WUHAN SURVEYING GEOTECHN RES INST OF MCC
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411769036.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-04
Publication Date
2025-02-14
Estimated Expiration
2044-12-04

AI Technical Summary

Technical Problem

The existing geological and mineral exploration equipment needs to frequently discharge the soil above the target soil layer during sampling, which is complicated in operation, which reduces the overall sampling efficiency.

Method used

A geological mineral exploration device was designed, including a drill rod, a sampling barrel and a waste cleaning mechanism. The waste in the sampling barrel is sucked into the waste box through the channel on the drill rod, and the negative pressure component is used to achieve continuous suction of waste, reducing the frequency of soil discharge.

Benefits of technology

It improves sampling efficiency, simplifies the operation process, reduces the number of artificial soil discharges, and improves the overall work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119434842A_ABST
    Figure CN119434842A_ABST
Patent Text Reader

Abstract

The invention discloses a geological mineral exploration device. The geological mineral exploration device comprises a mobile vehicle, a sampling mechanism and a waste cleaning mechanism, the sampling mechanism comprises a drill rod, a sampling barrel and a driving assembly, the drill rod rotates along the axis in the vertical direction and is movably installed on the moving trolley in the vertical direction, the sampling barrel is arranged at the lower end of the drill rod, a drilling tool is arranged at the lower end of the sampling barrel, the drill rod is provided with a channel extending in the axial direction of the drill rod, the lower end of the channel communicates with the sampling barrel, and the driving assembly is connected with the drill rod; the waste cleaning mechanism comprises a waste box and a negative pressure assembly, the waste box is arranged on the moving trolley and connected with the upper end of the channel, and the negative pressure assembly is connected with the waste box and used for making the waste box generate negative pressure. Waste in the sampling barrel is sucked into the waste box, so that the purpose of continuously sucking out the waste in the sampling barrel is achieved, frequent soil discharging work is not needed, operation is more convenient, and the overall efficiency is higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of geological sampling equipment, and in particular to a geological mineral exploration device. Background Art

[0002] Geological and mineral exploration is a systematic scientific research process that relies on the support of modern geological science theory and combines extensive field investigations and data collection. This process aims to obtain accurate geological and mineral information through a series of comprehensive geological technical means. In the process of geological and mineral exploration, it is mainly necessary to extract samples from the soil layer for testing by drilling.

[0003] Patent CN212716598U discloses a coal mine geological drilling sampling device, including: a vehicle body; a column fixedly arranged on the front side of the vehicle body; a support plate arranged on the front top of the column; a lifting conveyor belt arranged in the inner cavity of the column; and a drilling mechanism arranged at the bottom end of the support plate.

[0004] When sampling samples in the soil layer, the equipment is usually drilled into the ground to a specified depth before collecting the samples. However, during the drilling process of the above-mentioned prior art, the presence of soil in the soil layer before reaching the target soil layer will hinder the drilling work. Therefore, during the process of drilling into the soil layer for sampling, the soil in the sampling tube needs to be repeatedly discharged. This process is repeated, the operation process is relatively complicated, and the overall sampling efficiency is reduced, resulting in low sampling efficiency. Summary of the invention

[0005] The purpose of the present invention is to overcome the above-mentioned technical deficiencies and propose a geological and mineral exploration device to solve the technical problem that the prior art needs to frequently discharge the soil above the target soil layer during sampling, the operation process is relatively cumbersome, and the overall sampling efficiency is reduced, resulting in low sampling efficiency.

[0006] In order to achieve the above technical objectives, the present invention adopts the following technical solutions: The present invention provides a geological and mineral exploration device, comprising: Mobile car; A sampling mechanism, comprising a drill rod, a sampling barrel and a driving assembly, wherein the drill rod rotates along an axis in a vertical direction and is movably mounted on the mobile vehicle in a vertical direction, the sampling barrel is arranged at the lower end of the drill rod, and a drill cutter is arranged at the lower end of the sampling barrel, wherein the drill rod is provided with a channel extending along its axial direction, the lower end of the channel is connected to the sampling barrel, and the driving assembly is connected to the drill rod; and The waste cleaning mechanism comprises a waste box and a negative pressure component. The waste box is arranged on the mobile vehicle and connected to the upper end of the channel. The negative pressure component is connected to the waste box to generate negative pressure in the waste box.

[0007] In some embodiments, a plurality of spaced-apart connecting beams are provided in the sampling tube, and the connecting beams extend in the radial direction of the sampling tube. The connection between the plurality of connecting beams forms a mounting portion, and the drill rod is connected to the mounting portion. An air inlet hole connected to the channel is provided on the outer periphery of the lower end of the drill rod, and the air inlet hole is located above the connecting beams. A plurality of spaced-apart drill bits are provided on the lower side of each connecting beam.

[0008] In some embodiments, a plurality of crushing knives arranged at intervals are also provided on the upper side of the connecting beam.

[0009] In some embodiments, the upper end of the drill rod is connected to the driving assembly, and a plurality of air outlet holes connected to the channel are provided on the outer periphery of the upper end of the drill rod; The waste cleaning mechanism also includes a guide sleeve, which is rotatably sleeved on the outer periphery of the drill rod and arranged corresponding to the air outlet. A groove connected to the air outlet is provided on the inner side of the guide sleeve, and the groove is connected to the waste box through an air suction pipe.

[0010] In some embodiments, the geological and mineral exploration device further includes a fixing mechanism, which is disposed on the inner wall of the sampling barrel and is used to fix the sample in the sampling barrel.

[0011] In some embodiments, the fixing mechanism includes a ring, a first slip ring, an elastic clamping sleeve and a transmission assembly. The ring is arranged at the upper end of the sampling tube. A first annular cavity is arranged in the ring. The first annular cavity is filled with liquid. The first slip ring is slidably installed in the first annular cavity along the vertical direction. The elastic clamping sleeve is arranged on the inner side wall of the sampling tube. The first annular cavity is connected to the elastic clamping sleeve. The transmission assembly connects the first slip ring and the negative pressure assembly so that when the first slip ring is driven to move downward by the negative pressure assembly, the first slip ring presses the liquid into the elastic sleeve.

[0012] In some embodiments, the collar is further provided in a second annular cavity located below the first annular cavity, and the second annular cavity is in communication with the channel; The transmission assembly includes a second slip ring, a connecting pipe, and a first elastic member. The second slip ring is slidably installed in the second annular cavity along the vertical direction. The connecting pipe connects the first slip ring and the second slip ring, and its upper end is connected to the first annular cavity, and its lower end is connected to the elastic clamping sleeve. The two ends of the first elastic member are respectively connected to the bottom of the second annular cavity and the second slip ring.

[0013] In some embodiments, the second annular cavity is connected to the channel through a connecting pipe, and a valve is provided on the connecting pipe.

[0014] In some embodiments, a liquid sampling mechanism is further provided on the circumference of the sampling tube, and the liquid sampling mechanism is used to collect liquid on the outer circumference of the sampling tube.

[0015] In some embodiments, the side wall of the sampling tube is further provided with a liquid collection cavity, and the outer periphery of the sampling tube is further provided with a collection port connected to the liquid collection cavity; The liquid sampling mechanism includes a piston assembly, which is movably installed in the liquid collection cavity along the vertical direction, and the upper end of the piston assembly extends into the second annular cavity and is connected to the second slip ring, wherein the collection port is located above the piston assembly.

[0016] Compared with the prior art, the geological and mineral exploration device provided by the present invention has a drill rod that can rotate and move vertically, thereby driving the sampling barrel to rotate downward for sampling, and the sampling barrel, the channel, the waste box and the negative pressure component are connected in sequence. When the target soil layer is not drilled, the soil in the sampling barrel is waste and needs to be discharged in time. At this time, the negative pressure component is started to form a negative pressure environment in the waste box, thereby sucking the waste in the sampling barrel into the waste box through the channel, thereby achieving the purpose of continuously sucking out the waste in the sampling barrel, without the need to frequently discharge the soil, more convenient operation, and higher overall efficiency.

[0017] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the preferred embodiments of the present invention are described in detail as follows with reference to the accompanying drawings. The specific implementation of the present invention is given in detail by the following embodiments and their accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a structural schematic diagram of an embodiment of a geological and mineral exploration device provided by the present invention; Figure 2 yes Figure 1 A three-dimensional schematic diagram of a Chinese geological mineral exploration device; Figure 3 yes Figure 1 A three-dimensional schematic diagram of the sampling mechanism; Figure 4 yes Figure 3 A three-dimensional schematic diagram of the second driving mechanism and the waste box; Figure 5 yes Figure 3 A three-dimensional schematic diagram of the second driving mechanism and the waste bin from another perspective; Figure 6 yes Figure 3 A three-dimensional schematic diagram of the sampling tube; Figure 7 yes Figure 6A cross-sectional view of the sampling tube; Figure 8 yes Figure 3 A three-dimensional schematic diagram of another viewing angle of the middle sampling tube; Fig. 9 yes Figure 3 A partial cross-sectional view of the sampling tube; Fig.10 yes Fig. 9 A partial enlarged schematic diagram of part A; Fig.11 yes Fig. 9 A partial enlarged schematic diagram of part B; Fig.12 yes Figure 3 A cross-sectional view of the sampling tube and the collar; Fig.13 yes Fig.12 A partial enlarged schematic diagram of part C in the middle.

[0019] Description of reference numerals: 1-mobile vehicle, 11-mounting frame, 12-cylinder; 2-sampling mechanism, 21-drill rod, 211-channel, 212-connector, 213-rod body, 214-connecting sleeve, 215-air inlet, 22-sampling tube, 221-drill cutter, 222-connecting beam, 223-drill bit, 224-crushing cutter, 225-liquid collection chamber, 23-mounting seat, 24-first driving mechanism, 241-screw rod, 242-first motor, 25-second driving mechanism, 251-second motor; 3-waste cleaning mechanism, 31-waste box, 32-intake pipe, 33-suction pipe, 34-guide sleeve; 4-fixing mechanism, 41-ring, 411-first annular cavity, 412-second annular cavity, 42-first sliding ring, 43-elastic clamping sleeve, 44-second sliding ring, 45-connecting pipe, 46-first elastic member, 47-second elastic member, 48-connecting pipe; 5-liquid sampling mechanism, 51-piston assembly, 52-third elastic member. DETAILED DESCRIPTION

[0020] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0021] In order to solve the technical problem that the prior art needs to frequently discharge the soil above the target soil layer during sampling, which makes the operation process complicated, reduces the overall sampling efficiency, and leads to low sampling efficiency, the present invention provides a geological and mineral exploration device, which sucks the waste in the sampling tube into the waste box through the channel, thereby achieving the purpose of continuously sucking out the waste in the sampling tube, eliminating the need for frequent soil discharge, making the operation more convenient and the overall efficiency higher.

[0022] See also Figure 1 , Figure 1 It is a schematic diagram of the structure of a geological and mineral exploration device in one embodiment of the present invention.

[0023] The present invention provides a geological and mineral exploration device, comprising a mobile vehicle 1, a sampling mechanism 2 and a waste cleaning mechanism 3; the sampling mechanism 2 comprises a drill rod 21, a sampling barrel 22 and a driving assembly, the drill rod 21 rotates along an axis in the vertical direction and is movably installed on the mobile vehicle 1 in the vertical direction, the sampling barrel 22 is arranged at the lower end of the drill rod 21, and a drill cutter 221 is arranged at the lower end of the sampling barrel 22, wherein the drill rod 21 is provided with a channel 211 extending along its axial direction, the lower end of the channel 211 is connected to the sampling barrel 22, and the driving assembly is connected to the drill rod 21; the waste cleaning mechanism 3 comprises a waste box 31 and a negative pressure assembly, the waste box 31 is arranged on the mobile vehicle 1, the waste box 31 is connected to the upper end of the channel 211, and the negative pressure assembly is connected to the waste box 31, so as to generate negative pressure in the waste box 31.

[0024] In this embodiment, the drill rod 21 can rotate and move vertically, so as to drive the sampling barrel 22 to rotate downward for sampling, and the sampling barrel 22, the channel 211, the waste box 31 and the negative pressure component are connected in sequence. When the target soil layer is not drilled, the soil in the sampling barrel 22 is waste and needs to be discharged in time. At this time, the negative pressure component is started, so that a negative pressure environment is formed in the waste box 31, so that the waste in the sampling barrel 22 is sucked into the waste box 31 through the channel 211, so as to achieve the purpose of continuously sucking out the waste in the sampling barrel 22, without the need to frequently discharge the soil, which is more convenient to operate and has higher overall efficiency.

[0025] In this embodiment, the mobile vehicle 1 is a tracked vehicle.

[0026] In this embodiment, a mounting frame 11 is provided at the upper front end of the mobile vehicle 1, and the driving component is installed on the mounting component. The driving component is connected to the drill rod 21 so as to drive the drill rod 21 to rotate and move vertically.

[0027] Specifically, the driving assembly includes a mounting seat 23, a first driving mechanism 24 and a second driving mechanism 25. The mounting seat 23 is movably mounted on the mounting frame 11 in the vertical direction, and the drill rod 21 is rotatably mounted on the mounting seat 23 along an axis in the vertical direction. The first driving mechanism 24 is arranged on the mounting member and connected to the mounting seat 23 to drive the mounting seat 23 to move. The second driving assembly is arranged on the mounting seat 23, and the second driving assembly is connected to the drill rod 21 to drive the drill rod 21 to rotate.

[0028] The mounting seat 23 is slidably mounted on the mounting frame 11, and the mounting seat 23 is provided with a threaded hole; the first driving mechanism 24 includes a screw rod 241 and a first motor 242, the screw rod 241 is rotatably mounted on the mounting frame 11 along an axis in the vertical direction, and the screw rod 241 is threadedly matched with the mounting seat 23, the first motor 242 is arranged at the upper end of the mounting frame 11, and the main shaft of the first motor 242 is connected to the upper end of the screw rod 241, so that the screw rod 241 is driven to rotate by the first motor 242, and then the mounting seat 23, the drill rod 21 and the sampling tube 22 are driven to move in the vertical direction through the rotation of the screw rod 241.

[0029] The second driving mechanism 25 includes a second motor 251 , which is mounted on the mounting seat 23 and has a main shaft extending downward. The main shaft of the second motor 251 is connected to the upper end of the drill rod 21 , thereby driving the drill rod 21 to rotate.

[0030] The drill rod 21 includes a connector 212, a rod body 213 and a connecting sleeve 214 which are connected in sequence, wherein the connector 212 is located at the upper end of the rod body 213, the connector 212 is connected to the main shaft of the second motor 251, the connecting sleeve 214 is located at the lower end of the rod body 213, the connecting sleeve 214 is connected to the sampling tube 22, wherein the connector 212, the rod body 213 and the connecting sleeve 214 are all hollow, thereby forming the channel 211.

[0031] There is no restriction on the connection form of the connecting head 212, the rod body 213 and the connecting sleeve 214. In the present embodiment, the outer periphery of the lower end of the connecting head 212 is provided with an external thread, the upper end of the rod body 213 is provided with an internal thread, the outer periphery of the lower end of the rod body 213 is provided with an external thread, the upper end of the connecting sleeve 214 is provided with an internal thread, the connecting head 212 is threadedly connected to the rod body 213, and the rod body 213 is threadedly connected to the connecting sleeve 214.

[0032] Furthermore, the number of the rod bodies 213 is not limited and can be set according to the sampling depth. When the number of the rod bodies 213 is multiple, two adjacent rod bodies 213 are threadedly connected.

[0033] In this embodiment, in order to facilitate transportation and storage, the lower end of the mounting frame 11 is rotatably installed on the mobile vehicle 1 along the axis in the horizontal direction. A cylinder 12 is also provided in the middle of the mobile vehicle 1. The push rod of the cylinder 12 is connected to the mounting piece so as to drive the mounting frame 11 to rotate through the cylinder 12. During specific use, after the mobile vehicle 1 is moved to the required survey position, the cylinder 12 drives the mounting frame 11 to rotate upward so that the mounting frame 11 is vertically arranged, and then the connecting head 212, the rod body 213, the connecting sleeve 214 and the sampling tube 22 are connected in sequence, and then the drill rod 21 and the sampling tube 22 are driven by the driving assembly to move and rotate downward for sampling. After the sampling is completed, the rod body 213 is disassembled from the connecting head 212, and the cylinder 12 drives the mounting frame 11 to rotate downward for storage.

[0034] In this embodiment, two waste boxes 31 are provided, and the waste boxes 31 are provided on the mounting base 23 and located on opposite sides of the second motor 251. The waste boxes 31 are connected to the channel 211 through the air intake pipe 32. The waste boxes 31 are connected to the negative pressure component through the air intake pipe 33, and a filter net is provided at the end of the air intake pipe 33 to prevent waste from being sucked into the negative pressure component.

[0035] In this embodiment, the negative pressure component is an air suction pump.

[0036] In one embodiment, a plurality of spaced connection beams 222 are provided in the sampling tube 22, and the connection beams 222 extend in the radial direction of the sampling tube 22. The connection between the plurality of connection beams 222 forms a mounting portion, and the drill rod 21 is connected to the mounting portion. An air inlet hole 215 connected to the channel 211 is provided on the outer periphery of the lower end of the drill rod 21, and the air inlet hole 215 is located above the connection beams 222. A plurality of spaced drill bits 223 are provided on the lower side of each connection beam 222.

[0037] In this embodiment, four connecting beams 222 are provided in the sampling barrel 22 near its upper end. The four connecting beams 222 are evenly arranged, and the four connecting beams 222 extend to the middle of the sampling barrel 22 to form a mounting platform, which constitutes the mounting portion. The mounting platform is provided with a threaded hole, and the outer periphery of the lower end of the connecting sleeve 214 is provided with an external thread. The connecting sleeve 214 is threadedly connected to the mounting platform. The lower side surface of each connecting beam 222 is installed with a drill bit 223 arranged at intervals along its length direction, and the position of the air inlet 215 is located above the connecting beam 222. When the sampling barrel 22 rotates, the soil and gravel in the sampling barrel 22 can be crushed by driving the drill bit 223, thereby ensuring that the waste in the sampling barrel 22 can be smoothly sucked into the waste box 31.

[0038] In this embodiment, a plurality of air inlet holes 215 are provided, and the plurality of air inlet holes 215 are arranged at intervals along the circumference of the drill rod 21 .

[0039] In one embodiment, a plurality of crushing knives 224 are disposed at intervals on the upper side of the connecting beam 222 .

[0040] In this embodiment, in order to further crush the waste, a plurality of crushing knives 224 are installed at intervals along the length direction of the upper side of the connecting beam 222. The crushing knives 224 are arranged corresponding to the air inlet holes 215. The crushing knives 224 can further crush the waste, thereby preventing the waste from blocking the channel 211.

[0041] In one embodiment, the upper end of the drill rod 21 is connected to the driving assembly, and the outer periphery of the upper end of the drill rod 21 is provided with a plurality of air outlets connected to the channel 211; the waste cleaning mechanism 3 also includes a guide sleeve 34, the guide sleeve 34 is rotatably sleeved on the outer periphery of the drill rod 21 and is arranged corresponding to the air outlet, and the inner side of the guide sleeve 34 is provided with a groove connected to the air outlet, and the groove is connected to the waste box 31 through the suction pipe 33.

[0042] In this embodiment, since the connecting head 212 is connected to the main shaft of the second motor 251, in order to avoid interference, the air outlet holes are located on the periphery of the connecting head 212 and are evenly arranged. A guide sleeve 34 is also provided on the periphery of the connecting head 212. The guide sleeve 34 can be rotatably arranged relative to the connecting head 212, and the guide sleeve 34 is sealed with the connecting head 212. The groove is arranged in an annular shape, and the groove corresponds to the air outlet hole. The suction pipe 33 is connected to the groove and the waste box 31. With such an arrangement, when the connecting head 212 rotates, the guide sleeve 34 rotates relatively, thereby ensuring the normal operation of the drill rod 21 and the waste cleaning mechanism 3.

[0043] In one embodiment, the geological and mineral exploration device further includes a fixing mechanism 4 , which is disposed on the inner wall of the sampling tube 22 , and is used to fix the sample in the sampling tube 22 .

[0044] In this embodiment, in order to prevent the sample in the sampling cylinder 22 from accidentally falling out when the sampling cylinder 22 moves upward after completing sampling, the inner wall of the sampling cylinder 22 is also provided with a fixing mechanism 4, and the fixing mechanism 4 can fix the sample, thereby ensuring that the sample is always in the sampling cylinder 22 when the sampling cylinder 22 moves upward.

[0045] In one embodiment, the fixing mechanism 4 includes a ring 41, a first slip ring 42, an elastic clamping sleeve 43 and a transmission assembly. The ring 41 is arranged at the upper end of the sampling tube 22. A first annular cavity 411 is arranged in the ring 41. The first annular cavity 411 is filled with liquid. The first slip ring 42 is slidably installed in the first annular cavity 411 along the vertical direction. The elastic clamping sleeve 43 is arranged on the inner side wall of the sampling tube 22. The first annular cavity 411 is connected to the elastic clamping sleeve 43. The transmission assembly connects the first slip ring 42 and the negative pressure assembly so that when the first slip ring 42 is driven downward by the negative pressure assembly, the first slip ring 42 presses the liquid into the elastic clamping sleeve.

[0046] In this embodiment, the collar 41 is adapted to the sampling barrel 22, and the collar 41 is fixedly installed on the upper end of the sampling barrel 22. The first slip ring 42 is adapted to the first annular cavity 411 and is sealed with the first annular cavity 411. In the initial state, the first slip ring 42 is located at the top of the first annular cavity 411, and the space between the first slip ring 42 and the bottom of the first annular cavity 411 is filled with liquid. The elastic clamping sleeve 43 is arranged at the middle and lower part of the side wall of the sampling barrel 22, and the elastic clamping sleeve 43 can be elastically expanded and retracted. The transmission assembly can The suction force generated by the negative pressure component is converted into the movement of the first slip ring 42 in the vertical direction. During specific use, when the sampling tube 22 completes sampling, the negative pressure component can be started, and the negative pressure component drives the first slip ring 42 to move downward through the transmission component. The first slip ring 42 squeezes the liquid downward, thereby pressing the liquid into the elastic clamping sleeve 43. As the liquid is injected, the elastic clamping sleeve 43 expands inwardly, thereby clamping the sample to prevent the sample from accidentally falling. When the sample needs to be taken out, it is only necessary to drive the first slip ring 42 to move upward, and then suck the liquid back into the first annular cavity 411.

[0047] In one embodiment, the ring 41 is also arranged in a second annular cavity 412 located below the first annular cavity 411, and the second annular cavity 412 is connected to the channel 211; the transmission assembly includes a second slip ring 44, a connecting pipe 45, and a first elastic member 46, the second slip ring 44 is slidably installed in the second annular cavity 412 along the vertical direction, the connecting pipe 45 connects the first slip ring 42 and the second slip ring 44, and its upper end is connected to the first annular cavity 411, and its lower end is connected to the elastic clamping sleeve 43, and the two ends of the first elastic member 46 are respectively connected to the bottom of the second annular cavity 412 and the second slip ring 44.

[0048] In this embodiment, the second slip ring 44 is adapted to the second annular cavity 412 and is sealed with the second annular cavity 412. The first annular cavity 411, the second annular cavity 412 and the elastic clamping sleeve 43 are arranged at intervals from top to bottom. The upper end of the elastic clamping sleeve 43 is provided with a liquid inlet channel 211. The connecting pipe 45 is penetrated by the first annular cavity 411, the second annular cavity 412 and the liquid inlet channel 211, and the connecting pipe 45 is slidably sealed with the liquid inlet channel 211. The upper end of the connecting pipe 45 is connected to the first slip ring 42. The outer periphery of the upper end of the connecting pipe 45 is provided with a liquid inlet hole connected to the first annular cavity 411. The second slip ring 44 is connected to the middle part of the connecting pipe 45. The lower end of the connecting pipe 45 is movably inserted in The liquid inlet channel 211, the bottom area of ​​the second annular cavity 412 is connected to the channel 211 through the connecting pipe 48. In the initial state, the second slip ring 44 is located at the top of the second annular cavity 412, and the negative pressure component is started. The negative pressure component extracts the air in the second annular cavity 412 through the channel 211 and the connecting pipe 48, so that the second annular cavity 412 is in a negative pressure ring shape, thereby driving the second slip ring 44 to move downward. The second slip ring 44 drives the first slip ring 42 downward through the connecting pipe 45, thereby pressing the liquid into the elastic clamping sleeve 43. When it is necessary to take out the sample from the sampling tube 22, the negative pressure component is closed, and the second slip ring 44 moves upward and returns to the initial position under the drive of the first elastic member 46.

[0049] Furthermore, a second elastic member 47 is sleeved on the outer circumference of the connecting tube 45 , and two ends of the second elastic member 47 are respectively connected to the second sliding ring 44 and the bottom of the second annular cavity 412 , so that the connecting tube 45 is driven to move upward by the second elastic member 47 .

[0050] In this embodiment, a plurality of connecting tubes 45 are provided, and the plurality of connecting tubes 45 are arranged at intervals along the circumference of the sampling tube 22 .

[0051] In one embodiment, the second annular cavity 412 is connected to the channel 211 through a connecting pipe 48 , and a valve is provided on the connecting pipe 48 .

[0052] In this embodiment, since the waste cleaning mechanism 3 and the fixing mechanism 4 share the negative pressure component, in order to avoid mutual influence between the two, a valve is provided on the connecting pipe 48, and the valve can control the opening and closing of the connecting pipe 48. When the fixing mechanism 4 needs to be used, the valve is in an open state.

[0053] Furthermore, the valve is a solenoid valve.

[0054] In this embodiment, a plurality of the connecting pipes 48 are provided, and the plurality of connecting pipes 48 are arranged at intervals along the circumference of the drill rod 21 .

[0055] In one embodiment, a liquid sampling mechanism 5 is further provided on the circumference of the sampling tube 22 , and the liquid sampling mechanism 5 is used to collect the liquid on the outer circumference of the sampling tube 22 .

[0056] In this embodiment, during geological and mineral exploration, sometimes it is necessary not only to sample soil and ore but also to sample underground liquid. Therefore, a liquid sampling mechanism 5 is also provided on the circumference of the sampling tube 22. The liquid sampling mechanism 5 can sample underground liquid to meet the needs of geological and mineral exploration.

[0057] In one embodiment, the side wall of the sampling tube 22 is further provided with a liquid collection chamber 225, and the outer periphery of the sampling tube 22 is further provided with a collection port connected to the liquid collection chamber 225; the liquid sampling mechanism 5 includes a piston assembly 51, and the piston assembly 51 is movably installed in the liquid collection chamber 225 along the vertical direction, and the upper end of the piston assembly 51 extends into the second annular chamber 412 and is connected to the second slip ring 44, wherein the collection port is located above the piston assembly 51.

[0058] In this embodiment, the liquid collection chamber 225 is located below the second annular chamber 412, and the collection port is located above the liquid collection chamber 225. The piston assembly 51 is adapted to the liquid collection chamber 225. The piston assembly 51 is slidably installed in the liquid collection chamber 225 along the vertical direction and is sealed with the liquid collection chamber 225. The piston assembly 51 is connected to the second slip ring 44. In the initial state, the piston assembly 51 is located above the liquid collection chamber 225. When the second slip ring 44 moves downward, it drives the piston assembly 51 to move downward, so that a negative pressure is formed in the space between the piston assembly 51 and the top of the liquid collection chamber 225, so that the liquid on the periphery of the sampling tube 22 is sucked into the liquid collection chamber 225 through the collection port, so as to complete the liquid sampling. The second slip ring 44 is used to drive the piston assembly 51 to complete the liquid collection, and no additional power source is required. The structure is compact and the cost is reduced.

[0059] In this embodiment, the piston assembly 51 includes a piston and a piston rod. The piston is adapted to the liquid collection chamber 225. The piston is slidably installed in the liquid collection chamber 225 and sealed with the liquid collection chamber 225. The lower end of the piston rod is connected to the piston, and the upper end of the piston rod extends into the second annular chamber 412 and is connected to the second slip ring 44.

[0060] Furthermore, the liquid sampling mechanism 5 also includes a third elastic member 52, which is located in the second annular cavity 412 and is sleeved on the outer periphery of the piston rod. The upper end of the third elastic member 52 is connected to the second slip ring 44, and the lower end of the third elastic member 52 is connected to the bottom of the second annular cavity 412.

[0061] In this embodiment, the liquid collection chamber 225 is provided in plurality, and the plurality of liquid collection chambers 225 are arranged at intervals along the circumference of the sampling tube 22 . Accordingly, the collection port and the piston assembly 51 are both provided in plurality.

[0062] In order to better understand the present invention, the following Figures 1 to 13 The technical solution of the present invention is described in detail: When in use, the mobile vehicle 1 is moved to the desired location for investigation, and then the drill rod 21 and the sampling barrel 22 are assembled, and the suction pipe 33 is connected to the suction end of the suction pump. The first motor 242 drives the screw rod 241 to rotate and drive the mounting seat 23, the drill rod 21 and the sampling barrel 22 to move downward. When the mounting seat 23 moves downward, the second motor 251 drives the drill rod 21 and the sampling barrel 22 to rotate, so that the drill bit 221 drills into the ground, and the soil and gravel enter the sampling barrel. 22, the drill bit 223 and the drill bit 221 can break up the soil and gravel, start the suction pump, and generate negative pressure in the waste box 31 through the suction pipe 33. The negative pressure generated in the waste box 31 can be sucked into the waste box 31 through the air inlet pipe 32 and the channel 211. The excess soil in the drilling process is processed through the waste box 31. When the sampling tube 22 is probed to the required sampling depth, the first motor 242 drives the screw rod 241 to reverse. The second annular cavity 412 is rotated in the direction of rotation, thereby driving the mounting seat 23 to move upward and taking out the sampling tube 22. At the same time, the valve is opened, and the suction pump extracts the air in the second annular cavity 412 through the channel 211 and the connecting pipe 48, so that the second annular cavity 412 is in a negative pressure ring, thereby driving the second slip ring 44 to move downward, and the second slip ring 44 drives the first slip ring 42 downward through the connecting pipe 45, thereby pressing the liquid into the elastic clamping sleeve 43. As the liquid is injected, the elastic clamping sleeve 43 expands inwardly, thereby clamping the sample to prevent the sample from accidentally falling. Then the negative pressure component is closed, and the second slip ring 44 moves upward under the drive of the first elastic member 46 to return to the initial position to complete the sampling work. When the second slip ring 44 moves downward, it drives the piston assembly 51 to move downward, so that the space between the piston assembly 51 and the top of the liquid collection chamber 225 forms a negative pressure, thereby sucking the liquid on the periphery of the sampling tube 22 into the liquid collection chamber 225 through the collection port, thereby completing the liquid sampling.

[0063] The specific implementation of the present invention described above does not constitute a limitation on the protection scope of the present invention. Any other corresponding changes and modifications made based on the technical concept of the present invention should be included in the protection scope of the claims of the present invention.

Claims

1. A geological and mineral exploration device, characterized in that: It includes: Mobile car; A sampling mechanism, comprising a drill rod, a sampling barrel and a driving assembly, wherein the drill rod rotates along an axis in a vertical direction and is movably mounted on the mobile vehicle in a vertical direction, the sampling barrel is arranged at the lower end of the drill rod, and a drill cutter is arranged at the lower end of the sampling barrel, wherein the drill rod is provided with a channel extending along its axial direction, the lower end of the channel is connected to the sampling barrel, and the driving assembly is connected to the drill rod; and The waste cleaning mechanism comprises a waste box and a negative pressure component. The waste box is arranged on the mobile vehicle and connected to the upper end of the channel. The negative pressure component is connected to the waste box to generate negative pressure in the waste box.

2. The geological and mineral exploration device according to claim 1, characterized in that: A plurality of spaced connection beams are provided in the sampling tube, and the connection beams extend in the radial direction of the sampling tube. The connection of the plurality of connection beams forms a mounting portion. The drill rod is connected to the mounting portion. An air inlet hole connected to the channel is provided on the outer periphery of the lower end of the drill rod. The air inlet hole is located above the connection beams. A plurality of spaced drill bits are provided on the lower side of each connection beam.

3. The geological and mineral exploration device according to claim 2, characterized in that: The upper side of the connecting beam is also provided with a plurality of crushing knives arranged at intervals.

4. The geological and mineral exploration device according to claim 1, characterized in that: The upper end of the drill rod is connected to the driving assembly, and the outer periphery of the upper end of the drill rod is provided with a plurality of air outlet holes connected to the channel; The waste cleaning mechanism also includes a guide sleeve, which is rotatably sleeved on the outer periphery of the drill rod and arranged corresponding to the air outlet. A groove connected to the air outlet is provided on the inner side of the guide sleeve, and the groove is connected to the waste box through an air suction pipe.

5. The geological and mineral exploration device according to claim 1, characterized in that: The geological and mineral exploration device further comprises a fixing mechanism, which is arranged on the inner side wall of the sampling tube and is used to fix the sample in the sampling tube.

6. The geological and mineral exploration device according to claim 5, characterized in that: The fixing mechanism includes a collar, a first slip ring, an elastic clamping sleeve and a transmission assembly. The collar is arranged at the upper end of the sampling tube. A first annular cavity is arranged in the collar. The first annular cavity is filled with liquid. The first slip ring is slidably installed in the first annular cavity along the vertical direction. The elastic clamping sleeve is arranged on the inner side wall of the sampling tube. The first annular cavity is communicated with the elastic clamping sleeve. The transmission assembly connects the first slip ring and the negative pressure assembly so that when the first slip ring is driven to move downward by the negative pressure assembly, the first slip ring presses the liquid into the elastic clamping sleeve.

7. The geological and mineral exploration device according to claim 6, characterized in that: The collar is also provided in a second annular cavity located below the first annular cavity, and the second annular cavity is communicated with the channel; The transmission assembly includes a second slip ring, a connecting pipe, and a first elastic member. The second slip ring is slidably installed in the second annular cavity along the vertical direction. The connecting pipe connects the first slip ring and the second slip ring, and its upper end is connected to the first annular cavity, and its lower end is connected to the elastic clamping sleeve. The two ends of the first elastic member are respectively connected to the bottom of the second annular cavity and the second slip ring.

8. The geological and mineral exploration device according to claim 7, characterized in that: The second annular cavity is communicated with the channel through a communicating pipe, and a valve is provided on the communicating pipe.

9. The geological and mineral exploration device according to claim 7, characterized in that: The circumference of the sampling tube is also provided with a liquid sampling mechanism, and the liquid sampling mechanism is used to collect the liquid on the outer circumference of the sampling tube.

10. The geological and mineral exploration device according to claim 9, characterized in that: The side wall of the sampling tube is also provided with a liquid collection cavity, and the outer periphery of the sampling tube is also provided with a collection port connected to the liquid collection cavity; The liquid sampling mechanism includes a piston assembly, which is movably installed in the liquid collection cavity along the vertical direction, and the upper end of the piston assembly extends into the second annular cavity and is connected to the second slip ring, wherein the collection port is located above the piston assembly.

Citation Information

Patent Citations

  • Geological exploration drilling sampling device and sampling method for intelligent mine

    CN116256194A

  • One-way negative pressure adsorption sampling and filtering device

    CN116609132A

  • Mixed waste sampling equipment

    CN117007376A

  • Sampling device for ground construction quality detection

    CN117606850A

  • Coal mine geological drilling sampling device

    CN212716598U