Distribution network equipment detection management system
By designing the distribution network equipment inspection and management system and using the power distribution automation module for full-process automation management, the problems of low efficiency and inconsistent data management in the existing inspection management process are solved, and efficient and accurate inspection management and real-time data monitoring are achieved. .
Patent Information
- Application Number
- CN202411588543.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-08
- Publication Date
- 2025-02-14
AI Technical Summary
There are problems such as irregular inspection management, low efficiency and inconsistent data management during the inspection and management of existing distribution network equipment, which affects the accuracy and reliability of the inspection results.
A distribution network equipment inspection and management system is designed, including a distribution automation module, which includes a distribution plan management submodule, a warehousing management submodule, a detection management submodule and a statistical query submodule. The system realizes real-time data statistics and information sharing through automated process management.
It improves the efficiency and accuracy of the detection management of distribution network equipment, realizes real-time monitoring and management of detection data and equipment flow, and solves the problems of irregular management and insufficient real-time information under the traditional offline management model.
Smart Images

Figure CN119444134A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of detection management, and in particular to a distribution network equipment detection management system. Background Art
[0002] Whether the performance of distribution network equipment is up to standard and qualified is crucial for newly built distribution networks and those already in operation. Failure of distribution network equipment will directly lead to failure of the distribution network and affect the safe operation of the distribution network. Therefore, the detection of distribution network equipment is required frequently and is necessary.
[0003] In the current distribution network equipment detection and management process: 1. The detection process adopts an offline management mode, and there are situations where the detection process management is not standardized and inefficient. At the same time, after the detection of the detection station is completed, the detection results are stored by themselves, and the detection data generated during the detection process cannot be uniformly managed, resulting in differences and uncertainties in the detection data, affecting the accuracy and reliability of the results. 2. At present, all statistical work relies entirely on offline manual completion. For example, traditional equipment warehousing is done by manually recording the information of each device offline, and for the purpose of standardized management, it leads to a large workload and is prone to errors. This traditional management method cannot meet the needs of efficient and accurate data processing and information sharing. 3. Although the emergence of subsequent automated detection technology can use sensors and specific detection equipment to realize the detection of distribution network equipment, the detection process still requires manual intervention, and there are delays in the flow of equipment, and real-time monitoring and management cannot be achieved.
[0004] Therefore, how to provide a detection management system that can efficiently and accurately complete the detection management of distribution network equipment and can respond to detection data and equipment flow in real time has become an urgent problem to be solved. Summary of the invention
[0005] In view of the above technical problems, the present invention provides a distribution network equipment detection management system to solve the problems that the existing detection methods cannot reflect the detection data and equipment flow status in real time, and the detection is inefficient and inaccurate.
[0006] In a first aspect, the present invention provides a distribution network equipment detection management system, including a distribution automation module, wherein the distribution automation module includes: The power distribution plan management submodule is used to create or enter the inspection order information, formulate the inspection plan and inspection plan type, and confirm the inspection plan; The warehouse management submodule is used to make offline appointments according to the inspection plan to determine the supplier's delivery time, and to warehouse the delivered equipment, and to move the equipment to be inspected to the inspection table according to the inspection tasks of the equipment to be inspected that has been warehoused, and to ship out qualified equipment to the harvesting site according to the inspection results and confirm whether the receiving site has received the goods, and to return unqualified equipment to the supplier; A detection management submodule, used for allocating the detection task to the device to be detected, and for completing the detection of the device to be detected according to the detection task of the device to be detected and obtaining the detection result; The statistical query submodule is used for real-time statistics of detection information, inventory details and overview information of detected equipment, and is also used to generate daily statistics, weekly statistics and monthly statistics.
[0007] Optionally, a test report is generated corresponding to the test result, and the distribution automation module further includes an approval management submodule; The detection management submodule is also used to initiate the detection result approval process corresponding to the detection report; The approval management submodule is used for the administrator to approve the test report corresponding to the test result approval process, and to regard the approved and qualified equipment as the qualified test equipment, and the approved and unqualified equipment as the unqualified test equipment.
[0008] Optionally, the distribution automation module further includes: My workbench submodule is used to respond to the query instructions of the detection information, inventory details information, overview information of detected equipment, daily statistics, weekly statistics or monthly statistics, and display the query results in real time on the distribution automation large screen.
[0009] Optionally, completing the detection of the device to be detected according to the detection task of the device to be detected includes: A daily inspection plan is initiated according to the inspection task of the equipment to be inspected, and the inspection of the equipment to be inspected is completed daily according to the daily inspection plan and the inspection result is generated.
[0010] Optionally, the allocating the detection task to the device to be detected includes: The stored equipment to be inspected is scheduled according to the busyness of the inspection station, the inspection date of each equipment to be inspected is determined, and the inspection task allocation for the equipment to be inspected is completed.
[0011] Optionally, the inspection order information includes: purchase order number, purchase list, entrusting unit, supplier, and equipment type.
[0012] Optionally, the inspection plan types include planned arrival, re-inspection and random inspection.
[0013] Optionally, the method of warehousing is to scan the code of each item and put it into the warehouse through a barcode scanner.
[0014] Optionally, the distribution network equipment detection and management system further includes a real-type test field module, and the real-type test field module includes: The test plan management submodule is used to create or enter the test registration information, confirm the test registration information, and conduct a secondary acceptance review after the first acceptance review is passed. It is also used to confirm the test data of the test equipment that has passed the secondary acceptance review and the acceptance, and allocate the test plan according to the confirmed test data, and then enter the test results to determine whether the test is qualified according to the test results; The warehouse management submodule is used for the acceptance of arrival, and re-submitting the acceptance information and updating it synchronously when the first acceptance review or the second acceptance review fails, and for returning the test equipment that has passed the review but failed the acceptance or the manufacturer has abandoned the test after the second acceptance review, and for sending the qualified test equipment out of the warehouse and the unqualified test equipment out of the warehouse; The arrival management submodule is used to perform the acceptance review after the arrival acceptance.
[0015] Optionally, the warehouse management submodule is further used to determine whether to receive samples, and then to perform the arrival acceptance of the equipment to be tested that has received samples, and to re-submit sample receipt information and update it synchronously when the first or second sample delivery review fails; The arrival management submodule is further used to conduct the overdue sample delivery review when the sample is not received within the time limit; The test plan management submodule is further used to perform the second overdue sample submission review after the first overdue sample submission review is passed, and to end the real-type test when the second overdue sample submission review is passed.
[0016] The above scheme has the following beneficial effects: The distribution network equipment detection management system of the present invention at least includes a distribution automation module, which includes a distribution plan management submodule, a warehouse management submodule, a detection management submodule and a statistical query submodule. The functions of each submodule cooperate with each other. According to the actual business settings of distribution automation, it can automatically create a delivery plan based on the detection order information and complete the whole process of receiving, testing and warehouse delivery management of the equipment to be tested. In addition, the information is acquired in real time and multi-type statistics are used to realize the whole process information exchange, providing more comprehensive and accurate data support for the management. Based on the distribution network equipment detection management system of the present invention, the problem that the current detection work mostly adopts the offline mode, resulting in irregular management, insufficient real-time management information, inefficient and inaccurate management is solved. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a data flow diagram of a distribution network equipment detection management system provided in one embodiment of the present invention; Figure 2 is a functional block diagram of a power distribution automation module provided in other embodiments of the present invention; Figure 3 is a functional block diagram of a real-type test field module provided in other embodiments of the present invention; Figure 4 It is a schematic diagram of a distribution automation business process provided in other embodiments of the present invention; Figure 5 It is a schematic diagram of a real-type test business process provided in other embodiments of the present invention. DETAILED DESCRIPTION
[0018] In order to make the technical problems, technical solutions and beneficial effects solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.
[0019] It should be understood that the embodiments set forth below represent the necessary information to enable those skilled in the art to implement the embodiments and illustrate the best mode for implementing the embodiments. After reading the following description in light of the accompanying drawings, those skilled in the art will understand the concepts of the present disclosure and will recognize applications of these concepts not specifically mentioned herein. It should be understood that these concepts and applications fall within the scope of the present disclosure and the appended claims.
[0020] It should also be understood that, although the terms first, second, etc. may be used herein to describe various elements, these elements should not be limited by these terms. These terms are only used to distinguish one element from another element. For example, the first element may be referred to as the second element, and similarly, the second element may be referred to as the first element without departing from the scope of the present disclosure. As used herein, the term "and / or" includes any and all combinations of one or more related listed items.
[0021] It should also be understood that when an element is referred to as being "connected" or "coupled" to another element, it can be directly connected or coupled to the other element, or intervening elements may be present. Conversely, when an element is referred to as being "directly connected" or "directly coupled" to another element, there are no intervening elements.
[0022] It should also be understood that the terms "upper", "lower", "left", "right", "front", "back", "bottom", "middle", "middle", "top", etc. may be used herein to describe various elements, and the indicated orientation or position relationship is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore these elements should not be limited by these terms.
[0023] These terms are only used to distinguish one element from another element. For example, a first element can be referred to as an "upper" element, and similarly, a second element can be referred to as an "upper" element according to the relative orientation of these elements without departing from the scope of the present disclosure.
[0024] It is further understood that the terms “comprises,” “includes,” “including” and / or “comprising” when used herein specify the presence of stated features, integers, steps, operations, elements and / or components, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or groups thereof.
[0025] Unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art to which the present disclosure belongs. It will be further understood that the terms used herein should be interpreted as having a meaning consistent with their meaning in the context of this specification and the relevant technology, and will not be interpreted in an idealized or overly formal sense unless explicitly defined as such herein.
[0026] In one embodiment, a method is provided as follows Figure 1 and Figure 2 The distribution network equipment detection and management system shown in the figure, although Figure 1 The data flow diagram of the distribution network equipment detection and management system shown also includes some content of the real test field, but the management system in this embodiment only includes the distribution automation module.
[0027] like Figure 2 As shown, in this embodiment, the distribution automation module includes a distribution plan management submodule, a warehouse management submodule, a detection management submodule and a statistical query submodule.
[0028] The functions of each module are as follows: Figure 2As shown, based on the functional configuration of each module, the power distribution automation process of this embodiment is: 1. Based on the inspection order management function of the power distribution plan management submodule, enter the inspection order information (including: purchase order number, procurement sorting, entrusting unit, supplier, equipment type and other information).
[0029] 2. Based on the inspection plan management function of the power distribution plan management submodule, select the offline inspection mode (including: planned arrival, re-inspection, and random inspection) and confirm the inspection plan.
[0030] 3. Based on the offline appointment management function of the warehouse management submodule, the offline supplier delivery time is confirmed.
[0031] 4. The warehouse entry management function based on the warehouse management submodule is used to enter the equipment that has been scheduled for delivery.
[0032] 5. Based on the inspection task allocation function of the inspection management submodule, inspection tasks are allocated to the equipment that has been put into storage and needs to be inspected.
[0033] 6. Based on the warehouse transfer task formulation function of the warehouse management submodule, after the inspection task is assigned, the warehouse specialist receives the information and performs the equipment transfer operation.
[0034] 7. Based on the daily inspection plan management function of the inspection management submodule, the equipment moved to the warehouse is inspected and the inspection results are obtained.
[0035] 8. Based on the warehouse outbound management function of the warehousing management submodule, qualified equipment will be shipped out from the warehouse and distributed by suppliers to local municipal units, where the local municipal units are also the receiving locations.
[0036] 9. Based on the city and prefecture goods receipt management function of the warehousing management submodule, the process ends after the city and prefecture goods receipt is confirmed.
[0037] 10. Based on the warehouse return management function of the warehouse management submodule, unqualified equipment will be returned to the supplier, and the process ends.
[0038] And, if Figure 1 As shown, in the implementation process of the power distribution automation process in this embodiment, various information in the implementation process of the power distribution automation process will be obtained in real time through the intranet switch and the LAN switch, etc. Figure 2 From the functional configuration content of the statistical query submodule, it can be seen that the various information obtained in real time includes but is not limited to detection information, inventory details information and overview information of detected equipment, and is also used to generate daily statistics, weekly statistics and monthly statistics.
[0039] Based on the role played by each sub-module in the implementation of the above distribution automation process, it can be summarized that the role of each sub-module in the distribution automation module is as follows: The power distribution plan management submodule is used to create or enter the inspection order information, formulate the inspection plan and inspection plan type, and confirm the inspection plan; The warehouse management submodule is used to make offline appointments according to the inspection plan to determine the supplier's delivery time, and to warehouse the delivered equipment, and to move the equipment to be inspected to the inspection table according to the inspection tasks of the equipment to be inspected that has been warehoused, and to ship out qualified equipment to the harvesting site according to the inspection results and confirm whether the receiving site has received the goods, and to return unqualified equipment to the supplier; A detection management submodule, used for allocating the detection task to the device to be detected, and for completing the detection of the device to be detected according to the detection task of the device to be detected and obtaining the detection result; The statistical query submodule is used for real-time statistics of detection information, inventory details and overview information of detected equipment, and is also used to generate daily statistics, weekly statistics and monthly statistics.
[0040] Among them, regarding the warehousing in step 4, the preferred warehousing method in this embodiment is to scan the code of each item into the warehousing through a barcode scanner to improve the accuracy of information entry and the precision of overall data management.
[0041] Regarding the detection task allocation in step 5, the preferred method of adding detection task allocation in this embodiment is to schedule the stored devices to be detected according to the busyness of the detection station, determine the detection date of each device to be detected, and complete the detection task allocation for the devices to be detected to maximize the detection efficiency. In other embodiments, any other feasible detection task allocation method can also be used, such as assigning detection tasks according to the distance of each device to be detected from an idle detection station.
[0042] Regarding the inspection of the equipment moved to the warehouse in step 7, in this embodiment, the daily inspection plan management function of the inspection management submodule initiates a daily inspection plan based on the inspection tasks of the equipment to be inspected, completes the inspection of the equipment to be inspected every day according to the daily inspection plan, and generates inspection results. Such a setting can be more convenient for the generation of subsequent daily inspection statistics, and reduces the statistical workload from the source through the planning of the inspection process. In other embodiments, it is also possible not to initiate a daily inspection plan, but to directly perform inspections according to the inspection tasks of each equipment to be inspected in turn and obtain inspection results.
[0043] The distribution network equipment detection and management system of this embodiment sets the functions of each sub-module in the distribution automation module based on the actual business of distribution automation and makes them cooperate with each other, builds an online detection management mode, and can cover the whole process from the generation of detection orders to the final data statistical management. With the help of the "one object, one code" management principle of the warehousing equipment, it ensures the accuracy of the detection information and provides support for detection tracking. It also breaks the information island phenomenon through real-time data collection, realizes data intercommunication and sharing between the system and each detection station, and the real-time interaction, transmission and processing of detection data improves the efficiency and accuracy of detection management, and provides a distribution network equipment detection and management system that can respond to the detection data and equipment circulation in real time, and has efficient and accurate detection management.
[0044] In other embodiments, Figure 2 As shown, the distribution automation module also includes an approval management submodule. After the detection management submodule obtains the detection result, it also generates a detection report corresponding to the detection result.
[0045] Based on the test report generated according to the test results, in the distribution automation process: In step 7, after the detection management submodule detects the equipment transferred to the warehouse and obtains the detection results, the detection management submodule also initiates the detection result approval process corresponding to the detection report based on its process initiation function.
[0046] Then, based on the process approval function of the approval management submodule, the administrator approves the test report corresponding to the test result approval process, and regards the approved and qualified equipment as the qualified test equipment, and the approved and unqualified equipment as the unqualified test equipment.
[0047] The administrator can be a designated technical expert or a management staff member.
[0048] This embodiment can improve the accuracy of detection by setting up an additional test result approval process, so that experts can review the test results; or managers can adaptively adjust the test results according to the actual performance requirements and operating status of the distribution network to improve the rationality of detection.
[0049] In other embodiments, Figure 2 As shown, the distribution automation module also includes my workbench sub-module and the distribution automation large screen.
[0050] The My Workbench submodule can respond to the operator's query instructions regarding the real-time statistics of the detection information, inventory details and the overview of the detected equipment, as well as the daily statistics, weekly statistics and monthly statistics of the statistical query submodule in the above embodiment, and display the query information in the form of Figure 1 The distribution automation large screen shown is displayed in real time.
[0051] This embodiment can realize real-time and comprehensive display of detection data in the distribution automation process by setting a my workbench sub-module that responds to query instructions and a distribution automation large screen for displaying query results.
[0052] Based on the above embodiments, in one embodiment, Figure 4 As shown, a specific example of completing power distribution detection and delivery management between a certain detection center and a certain city company based on the settings of the above embodiments is given, and the specific process corresponding to the above distribution automation process is as follows: A. Take a certain testing center as an example. A local company purchased 10 fault indicators. The planning specialist is responsible for entering the test order information for the purchased fault indicators, including: purchase order number, purchase sorting, entrusting unit, supplier, equipment type and other information.
[0053] B. The planning specialist creates the inspection plan, selects the type of inspection plan, such as planned arrival, and confirms the plan.
[0054] C. The warehouse is responsible for making offline appointments and confirming the inspection plan created, and agreeing on the delivery date with the supplier based on the actual situation of the warehouse.
[0055] D. The warehouse is responsible for the warehousing of the delivered fault indicators, and each item is scanned and put into the warehouse using a barcode scanner.
[0056] E. The inspection specialist will schedule the equipment that has been put into storage according to the busyness of the inspection station, and distribute the tasks online and assign the inspection date for each equipment.
[0057] F. After the task is assigned, the warehouse specialist receives the information of the equipment to be tested and moves the equipment to be tested from the warehouse to the testing table according to the testing date.
[0058] G. The testing specialist shall start the testing of the fault indicator on the assigned date, and the testing station shall start the testing of the fault indicator. After the testing is completed, the test result information and the test report file shall be transmitted to the distribution network equipment testing system through the interface.
[0059] H. Leaders review and approve the test results and test reports of the fault indicators that have been tested. After approval, qualified fault indicators will be transferred to the outbound link, and unqualified fault indicators will be transferred to the return link.
[0060] I. After the qualified fault indicators are shipped out by the warehouse, the supplier will deliver them to the local companies. After the unqualified fault indicators are returned by the warehouse, the supplier will take them back.
[0061] Figure 4In the system, the planning specialist corresponds to the power distribution plan management submodule, the municipal specialist and the warehousing specialist correspond to the warehousing management submodule, the inspection specialist corresponds to the inspection management submodule, and the leader corresponds to the approval management submodule. With the help of the distribution network equipment inspection management system provided by the present invention, the full-process, digital, automatic and standardized distribution automation business process management can be completed.
[0062] In another embodiment, there is provided a Figure 1 and Figure 3 The distribution network equipment detection and management system shown in the figure, in this embodiment, includes a real-type test field module.
[0063] like Figure 3 As shown, the real-type test site module in this embodiment includes a test plan management submodule, a warehouse management submodule and an arrival management submodule.
[0064] The functions of each module are as follows: Figure 3 As shown, based on the functional configuration of each module, the real test process of this embodiment is as follows: 1) Based on the test registration function of the test plan management submodule, enter or import the test registration information and confirm the information.
[0065] 2) Perform the arrival acceptance operation based on the arrival acceptance function of the warehouse management submodule. At the same time, you can correct the information. After the correction, the system automatically updates the correction content in real time.
[0066] 3) In the sample acceptance results, no matter it is passed, failed or the manufacturer gives up the test, these three situations need to be reviewed again. Therefore, based on the acceptance and review function of the arrival management submodule, the accepted samples are subject to an acceptance review. If the review fails (rejected) after the first acceptance review, it will be returned to the arrival acceptance link, and the warehouse management submodule will re-fill in the acceptance information and update it synchronously. After the first acceptance review, if the review passes, it will be transferred to the test plan management submodule for a second acceptance review. After the second acceptance review, if the review fails (rejected), it will be returned to the arrival acceptance link. The warehouse management submodule will also re-fill in the acceptance information and update it synchronously. After the second acceptance review, if the review passes and the sample acceptance passes, it will be transferred to the waiting for testing link. After the second acceptance review, if the review passes but the sample acceptance fails or the manufacturer gives up the test, it will be transferred to the sample return management link.
[0067] 4) Based on the to-be-tested area function of the test plan management submodule, confirm the data to be tested and plan the data that has been confirmed to be tested.
[0068] 5) Based on the test execution management function of the test plan management submodule, enter the test results.
[0069] 6) Based on the sample return management function of the warehouse management submodule, the process ends after the returned equipment is shipped out of the warehouse.
[0070] 7) Based on the test execution management function of the test plan management submodule, the pass or fail of the real test is determined according to the entered test results.
[0071] 8) Based on the qualified outbound delivery function of the warehouse management submodule, the samples that have passed the inspection are transferred to the qualified outbound delivery link, and the qualified outbound delivery operation is carried out, and the process ends.
[0072] 9) Based on the unqualified outbound delivery function of the warehouse management submodule, samples that fail the inspection are transferred to the unqualified outbound delivery link, and the unqualified outbound delivery operation is performed, and the process ends.
[0073] Based on the role played by each sub-module in the above-mentioned real-type test process, it can be summarized that the role of each sub-module in the real-type test field module is as follows: The test plan management submodule is used to create or enter the test registration information, confirm the test registration information, and conduct a secondary acceptance review after the first acceptance review is passed. It is also used to confirm the test data of the test equipment that has passed the secondary acceptance review and the acceptance, and allocate the test plan according to the confirmed test data, and then enter the test results to determine whether the test is qualified according to the test results; The warehouse management submodule is used for the acceptance of arrival, and re-submitting the acceptance information and updating it synchronously when the first acceptance review or the second acceptance review fails, and for returning the test equipment that has passed the review but failed the acceptance or the manufacturer has abandoned the test after the second acceptance review, and for sending the qualified test equipment out of the warehouse and the unqualified test equipment out of the warehouse; The arrival management submodule is used to perform the acceptance review after the arrival acceptance.
[0074] The power distribution equipment detection and management system of the present embodiment also specifically includes a real-type test field module, thereby realizing automated detection management and real-time data monitoring of the entire process and all links of the real-type test, thereby improving the efficiency and accuracy of the real-type test.
[0075] In a preferred embodiment, the detection execution management function of the above test plan management submodule also includes: For samples that are tested on schedule, an application for deferred testing will be made. After the application is submitted, the process will be returned to the stage of pending testing. For samples that cannot be tested, an application for sample return will be made. After the application is submitted, the process will flow to the sample return management stage.
[0076] This can improve the flexibility and rationality of detection management of real-type tests.
[0077] In other embodiments, Figure 3 As shown, the real-type test field module also includes the functions of whether to accept samples and reviewing samples that have not been delivered within the deadline. In this embodiment, the arrival acceptance function of the warehouse management submodule in step 2) of the above embodiment can not only accept samples, but also determine whether to accept samples. That is, in this embodiment, the arrival acceptance function specifically first determines whether to accept samples, and then accepts samples of the equipment to be tested that has been accepted after confirming the acceptance of samples.
[0078] When it is determined that the samples have not been received, the arrival management submodule, based on its overdue sample review function, conducts an overdue sample review when the samples are not received on time. After the first overdue sample review is passed, the test plan management submodule, based on its overdue sample review function, conducts a second overdue sample review, and ends the true test process after the second overdue sample review is passed.
[0079] When the first or second overdue sample submission review fails, the process flows back to the arrival acceptance of the warehouse management submodule, and the warehouse management submodule needs to re-fill in the sample receipt information and update it synchronously.
[0080] Based on the set sample collection and overdue sample review functions, this embodiment can accurately judge whether the sample to be tested is actually collected. Only after it is confirmed that the sample has been collected can subsequent sample acceptance and true-type testing be carried out, further improving the accuracy and rationality of the overall true-type testing process.
[0081] Based on the above embodiments, in one embodiment, Figure 5 As shown, a specific example of completing a real-type test between a provincial company customer and a real-type test site in a certain city based on the settings of the above embodiments is given, and the specific process corresponding to the above-mentioned real-type test flow is as follows: a. Taking a real-type test site in a certain city as an example, before supplying goods to a provincial company customer, the supplier entrusts a certain city to conduct a real-type test on the primary and secondary integrated standardized ring network box, and needs to register offline in advance. The provincial company is responsible for entering the registration information online, including the manufacturer's name, ring network box model, terminal model, manufacturer's address, required inspection time, etc. After the entry is completed, click on the registration confirmation, and the data will flow to the arrival acceptance link.
[0082] b. After successful registration, the supplier shall submit samples for inspection according to the inspection time required by the registration. The warehouse personnel in the city warehouse shall receive the samples and inspect whether the samples are intact. After acceptance and review, the data will be transferred to the stage to be tested.
[0083] c. After acceptance, the provincial company will be responsible for the inspection and confirmation of the samples that have passed the acceptance.
[0084] d. After the test is assigned, conduct a real-type test and enter the test results according to the test items.
[0085] e. If the test is qualified, the product will be shipped out and the shipping time will be entered. The process ends.
[0086] f. Products that fail the test will be returned to the warehouse and the process ends.
[0087] Figure 5 In the system, the provincial company is responsible for the test plan management submodule in the real test field module of the distribution network equipment inspection and management system, the prefecture-level city is responsible for the arrival management submodule, and the prefecture-level city warehouse is responsible for the warehouse management submodule. With the help of the distribution network equipment inspection and management system provided by the present invention, the full-process, digital and standardized real-type test business process management can be completed.
[0088] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.
Claims
1. A distribution network equipment detection and management system, characterized in that: The invention comprises a distribution automation module, wherein the distribution automation module comprises: The power distribution plan management submodule is used to create or enter the inspection order information, formulate the inspection plan and inspection plan type, and confirm the inspection plan; The warehouse management submodule is used to make offline appointments according to the inspection plan to determine the supplier's delivery time, and to warehouse the delivered equipment, and to move the equipment to be inspected to the inspection table according to the inspection tasks of the equipment to be inspected that has been warehoused, and to ship out qualified equipment to the harvesting site according to the inspection results and confirm whether the receiving site has received the goods, and to return unqualified equipment to the supplier; A detection management submodule, used for allocating the detection task to the device to be detected, and for completing the detection of the device to be detected according to the detection task of the device to be detected and obtaining the detection result; The statistical query submodule is used for real-time statistics of detection information, inventory details and overview information of detected equipment, and is also used to generate daily statistics, weekly statistics and monthly statistics.
2. The distribution network equipment detection and management system according to claim 1, characterized in that: The test result generates a test report accordingly, and the distribution automation module also includes an approval management submodule; The detection management submodule is also used to initiate the detection result approval process corresponding to the detection report; The approval management submodule is used for the administrator to approve the test report corresponding to the test result approval process, and to regard the approved and qualified equipment as the qualified test equipment, and the approved and unqualified equipment as the unqualified test equipment.
3. The distribution network equipment detection and management system according to claim 1, characterized in that: The distribution automation module also includes: My workbench submodule is used to respond to the query instructions of the detection information, inventory details information, overview information of detected equipment, daily statistics, weekly statistics or monthly statistics, and display the query results in real time on the distribution automation large screen.
4. The method according to claim 1, characterized in that: The step of completing the detection of the device to be detected according to the detection task of the device to be detected includes: A daily inspection plan is initiated according to the inspection task of the equipment to be inspected, and the inspection of the equipment to be inspected is completed daily according to the daily inspection plan and the inspection result is generated.
5. The distribution network equipment detection and management system according to claim 1, characterized in that: The allocating the detection task to the device to be detected includes: The stored equipment to be inspected is scheduled according to the busyness of the inspection station, the inspection date of each equipment to be inspected is determined, and the inspection task allocation for the equipment to be inspected is completed.
6. The distribution network equipment detection and management system according to claim 1, characterized in that: The inspection order information includes: purchase order number, purchase list, entrusting unit, supplier, and equipment type.
7. The distribution network equipment detection and management system according to claim 1, characterized in that: The inspection plan types include planned arrival, re-inspection and random inspection.
8. The distribution network equipment detection and management system according to claim 1, characterized in that: The method of warehousing is to scan the code of each item and put it into the warehouse through a barcode scanner.
9. The distribution network equipment detection management system according to any one of claims 1 to 8, characterized in that: The distribution network equipment detection and management system further includes a real-type test field module, and the real-type test field module includes: The test plan management submodule is used to create or enter the test registration information, confirm the test registration information, and conduct a secondary acceptance review after the first acceptance review is passed. It is also used to confirm the test data of the test equipment that has passed the secondary acceptance review and the acceptance, and allocate the test plan according to the confirmed test data, and then enter the test results to determine whether the test is qualified according to the test results; The warehouse management submodule is used for the acceptance of arrival, and re-submitting the acceptance information and updating it synchronously when the first acceptance review or the second acceptance review fails, and for returning the test equipment that has passed the review but failed the acceptance or the manufacturer has abandoned the test after the second acceptance review, and for sending the qualified test equipment out of the warehouse and the unqualified test equipment out of the warehouse; The arrival management submodule is used to perform the acceptance review after the arrival acceptance.
10. The distribution network equipment detection and management system according to claim 9, characterized in that: The warehouse management submodule is also used to determine whether to receive samples, and then to perform the arrival inspection on the equipment to be tested that has received samples, and to re-submit the sample receiving information and update it synchronously when the sample is not submitted for review within the first time limit or the sample is not submitted for review within the second time limit; The arrival management submodule is further used to conduct the overdue sample delivery review when the sample is not received within the time limit; The test plan management submodule is further used to perform the second overdue sample submission review after the first overdue sample submission review is passed, and to end the real-type test when the second overdue sample submission review is passed.