Method, device and equipment for adjusting transmission limitation and readable storage medium

By adjusting the NR intermediate interval mechanism and scheduling restrictions according to preset rules by terminal and network-side equipment, the problems of data transmission delay and service capacity are solved, and service transmission performance with high data rates and low latency are achieved.

CN119450768APending Publication Date: 2025-02-14VIVO MOBILE COMM CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310990766.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-08-07
Publication Date
2025-02-14

AI Technical Summary

Technical Problem

The various interval mechanisms and scheduling availability/limiting regulations introduced in the new radio (NR) lead to increased data transmission delays, reduced service capacity, and affect communication performance.

Method used

Perform predefined operations through terminal and network side devices according to preset rules, including relaxing or disabling scheduling restrictions within the first time domain unit set, skipping or disabling target interval timing, and adjusting interval pattern parameters of interval timing to release scheduling Limit or interval time.

Benefits of technology

The transmission and reception restrictions brought by the Gap mechanism are achieved and the corresponding scheduling restrictions stipulated by scheduling availability/restrictions are achieved, which reduces data delays, improves service capacity, and ensures the transmission performance of high data rates and low-latency services.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119450768A_ABST
    Figure CN119450768A_ABST
Patent Text Reader

Abstract

Disclosed are a method, apparatus and device for adjusting transmission restriction, and a readable storage medium, which belong to the technical field of communications, the method comprising: a terminal and a network side device determining that there is scheduling restriction or there is an effective target interval opportunity in a first serving cell, and the terminal and the network side device performing a predefined operation according to a preset rule; wherein the first service cell is any service cell configured by the terminal; the preset rule is associated with any one of the following items: first report information related to the channel quality of the serving cell; second reporting information related to an uplink buffer status report (BSR) or a scheduling request (SR); scheduling information related to uplink and downlink scheduling; the predefined operation includes at least one of: relaxing a scheduling limit or disabling the scheduling limit within the first set of time domain cells; skipping or disabling at least one interval opportunity in the target interval opportunities; and adjusting the interval pattern parameter corresponding to at least one interval opportunity in the target interval opportunities.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the field of communication technology, and specifically relates to a method, device, equipment and readable storage medium for adjusting transmission restrictions. Background Art

[0002] In order to support Radio Resource Management measurements (RRM measurements), Positioning, Cell Global Identity reporting (CGI reporting), multi-universal subscriber identity module operation (MUSIM operation), and transmission power management (Tx power management), the New Radio (NR) introduces a variety of gap mechanisms and corresponding data transmission and reception restrictions. At the same time, in order to ensure the performance of RRM measurements, Radio Link Management (RLM), Beam Failure Detection (BFD), etc., many regulations for scheduling availability / restrictions are introduced. The above-mentioned Gap mechanism and its corresponding transmission and reception restrictions, as well as the scheduling restrictions corresponding to the scheduling availability / restrictions regulations, will increase data transmission delay, reduce service capacity, etc., affecting communication performance. Summary of the invention

[0003] The embodiments of the present application provide a method, apparatus, device and readable storage medium for adjusting transmission restrictions, which can reasonably relax the transmission and reception restrictions brought about by the Gap mechanism and the corresponding scheduling restrictions specified by scheduling availability / restrictions to ensure the transmission performance of high data rate and low latency services.

[0004] In a first aspect, a method for adjusting a transmission restriction is provided, comprising:

[0005] The terminal determines that there is a scheduling restriction or a valid target interval timing in the first serving cell;

[0006] The terminal performs a predefined operation according to a preset rule;

[0007] The first serving cell is any serving cell configured by the terminal;

[0008] The preset rule is associated with any of the following:

[0009] First reporting information related to the channel quality of the serving cell;

[0010] Second reporting information related to an uplink buffer status report BSR or a scheduling request SR;

[0011] Scheduling information related to uplink and downlink scheduling;

[0012] The predefined operation includes at least one of the following:

[0013] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0014] skipping or disabling at least one of the target intervals;

[0015] An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

[0016] In a second aspect, a method for adjusting a transmission restriction is provided, comprising:

[0017] The network side device determines that there is a scheduling restriction or a valid target interval timing in the first serving cell;

[0018] The network side device performs a predefined operation according to a preset rule;

[0019] The first serving cell is any serving cell configured by the terminal;

[0020] The preset rule is associated with any of the following:

[0021] First reporting information related to the channel quality of the serving cell;

[0022] Second reporting information related to uplink BSR or SR;

[0023] Scheduling information related to uplink and downlink scheduling;

[0024] The predefined operation includes at least one of the following:

[0025] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0026] skipping or disabling at least one of the target intervals;

[0027] An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

[0028] In a third aspect, a device for adjusting transmission restriction is provided, including:

[0029] A first determination module, used for the terminal to determine whether there is a scheduling restriction or a valid target interval timing in the first serving cell;

[0030] A first execution module, configured for the terminal to execute a predefined operation according to a preset rule;

[0031] The first serving cell is any serving cell configured by the terminal;

[0032] The preset rule is associated with any of the following:

[0033] First reporting information related to the channel quality of the serving cell;

[0034] Second reporting information related to uplink BSR or SR;

[0035] Scheduling information related to uplink and downlink scheduling;

[0036] The predefined operation includes at least one of the following:

[0037] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0038] skipping or disabling at least one of the target intervals;

[0039] An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

[0040] In a fourth aspect, a device for adjusting transmission restriction is provided, including:

[0041] A second determination module is used for the network side device to determine whether there is a scheduling restriction or a valid target interval timing in the first serving cell;

[0042] The second execution module is used for the network side device to execute the predefined operation according to the preset rules;

[0043] The first serving cell is any serving cell configured by the terminal;

[0044] The preset rule is associated with any of the following:

[0045] Reporting information related to the channel quality of the serving cell;

[0046] First reporting information related to uplink BSR or SR;

[0047] Scheduling information related to uplink and downlink scheduling;

[0048] The predefined operation includes at least one of the following:

[0049] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0050] skipping or disabling at least one of the target intervals;

[0051] An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

[0052] In a fifth aspect, a terminal is provided, comprising a processor and a memory, wherein the memory stores a program or instruction that can be run on the processor, and when the program or instruction is executed by the processor, the steps of the method described in the first aspect are implemented.

[0053] In a sixth aspect, a terminal is provided, including a processor and a communication interface, wherein the processor is configured to:

[0054] The terminal determines that there is a scheduling restriction or a valid target interval timing in the first serving cell;

[0055] The terminal performs a predefined operation according to a preset rule;

[0056] The first serving cell is any serving cell configured by the terminal;

[0057] The preset rule is associated with any of the following:

[0058] First reporting information related to the channel quality of the serving cell;

[0059] Second reporting information related to an uplink buffer status report BSR or a scheduling request SR;

[0060] Scheduling information related to uplink and downlink scheduling;

[0061] The predefined operation includes at least one of the following:

[0062] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0063] skipping or disabling at least one of the target intervals;

[0064] An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

[0065] In the seventh aspect, a network side device is provided, which includes a processor and a memory, wherein the memory stores programs or instructions that can be run on the processor, and when the program or instructions are executed by the processor, the steps of the method described in the second aspect are implemented.

[0066] In an eighth aspect, a network side device is provided, including a processor and a communication interface, wherein the processor is used to:

[0067] The network side device determines that there is a scheduling restriction or a valid target interval timing in the first serving cell;

[0068] The network side device performs a predefined operation according to a preset rule;

[0069] The first serving cell is any serving cell configured by the terminal;

[0070] The preset rule is associated with any of the following:

[0071] First reporting information related to the channel quality of the serving cell;

[0072] Second reporting information related to uplink BSR or SR;

[0073] Scheduling information related to uplink and downlink scheduling;

[0074] The predefined operation includes at least one of the following:

[0075] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0076] skipping or disabling at least one of the target intervals;

[0077] An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

[0078] In the ninth aspect, a readable storage medium is provided, on which a program or instruction is stored. When the program or instruction is executed by a processor, the steps of the method described in the first aspect are implemented, or the steps of the method described in the second aspect are implemented.

[0079] In the tenth aspect, a wireless communication system is provided, including: a terminal and a network side device, wherein the terminal can be used to execute the steps of the method described in the first aspect, and the network side device can be used to execute the steps of the method described in the second aspect.

[0080] In the eleventh aspect, a chip is provided, comprising a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is used to run a program or instruction to implement the method described in the first aspect, or to implement the method described in the second aspect.

[0081] In the twelfth aspect, a computer program / program product is provided, wherein the computer program / program product is stored in a storage medium, and the program / program product is executed by at least one processor to implement the method as described in the first aspect, or to implement the method as described in the second aspect.

[0082] In an embodiment of the present application, the terminal side and the network side relax the scheduling restriction or disable the scheduling restriction in the first time domain unit set according to the preset rules associated with any one of the reporting information related to the channel quality of the serving cell, the reporting information related to the uplink BSR or SR, and the uplink and downlink scheduling related information, or skip or disable at least one interval opportunity in the target interval opportunity, or adjust the interval pattern parameters corresponding to at least one interval opportunity in the target interval opportunity, and release the scheduling restriction or interval opportunity as much as possible to reduce data delay, improve service capacity, and ensure timely or as timely as possible data transmission without affecting measurement requirements or reducing the impact on measurement performance, thereby ensuring the transmission performance of the service. BRIEF DESCRIPTION OF THE DRAWINGS

[0083] Figure 1a is a block diagram of a wireless communication system to which the embodiments of the present application can be applied;

[0084] Figure 1b It is a parameter diagram of NCSG;

[0085] Figure 2 This is one of the flow charts of the method for adjusting transmission restrictions provided in an embodiment of the present application;

[0086] Figure 3 A schematic diagram of a scenario in which a predefined operation is started based on an L3 measurement report or an L1 CSI report of a serving cell;

[0087] Figure 4 This is the second flow chart of the method for adjusting transmission restrictions provided in the embodiment of the present application;

[0088] Figure 5 It is one of the schematic diagrams of the structure of the device for adjusting the transmission restriction provided in the embodiment of the present application;

[0089] Figure 6 This is the second schematic diagram of the structure of the device for adjusting the transmission restriction provided in the embodiment of the present application;

[0090] Figure 7is a schematic diagram of the structure of a communication device provided in an embodiment of the present application;

[0091] Figure 8 is a schematic diagram of the structure of a terminal provided in an embodiment of the present application;

[0092] Fig. 9 This is one of the structural diagrams of the network side device provided in the embodiment of the present application;

[0093] Fig.10 This is the second structural diagram of the network side device provided in the embodiment of the present application. DETAILED DESCRIPTION

[0094] The following will be combined with the drawings in the embodiments of the present application to clearly describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of this application.

[0095] The terms "first", "second", etc. of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the terms used in this way are interchangeable where appropriate, so that the embodiments of the present application can be implemented in an order other than those illustrated or described herein, and the objects distinguished by "first" and "second" are generally of one type, and the number of objects is not limited, for example, the first object can be one or more. In addition, "or" in the present application represents at least one of the connected objects. For example, "A or B" covers three schemes, namely, Scheme 1: including A but not including B; Scheme 2: including B but not including A; Scheme 3: including both A and B. The character " / " generally indicates that the objects associated with each other are in an "or" relationship.

[0096] The term "indication" in this application can be a direct indication (or explicit indication) or an indirect indication (or implicit indication). A direct indication can be understood as the sender explicitly informing the receiver of specific information, operations to be performed, or request results in the sent indication; an indirect indication can be understood as the receiver determining the corresponding information according to the indication sent by the sender, or making a judgment and determining the operation to be performed or the request result according to the judgment result.

[0097] It is worth noting that the technology described in the embodiments of the present application is not limited to the Long Term Evolution (LTE) / LTE-Advanced (LTE-A) system, but can also be used in other wireless communication systems, such as Code Division Multiple Access (CDMA), Time Division Multiple Access (TDMA), Frequency Division Multiple Access (FDMA), Orthogonal Frequency Division Multiple Access (OFDMA), Single-carrier Frequency-Division Multiple Access (SC-FDMA) or other systems. The terms "system" and "network" in the embodiments of the present application are often used interchangeably, and the described technology can be used for the systems and radio technologies mentioned above as well as for other systems and radio technologies. The following description describes a New Radio (NR) system for illustrative purposes, and NR terminology is used in most of the following descriptions, but these technologies can also be applied to systems other than NR systems, such as the 6th generation (6 th Generation, 6G) communication system.

[0098] Figure 1aA block diagram of a wireless communication system applicable to an embodiment of the present application is shown. The wireless communication system includes a terminal 11 and a network side device 12. Among them, the terminal 11 can be a mobile phone, a tablet computer (Tablet Personal Computer), a laptop computer (Laptop Computer), a notebook computer, a personal digital assistant (Personal Digital Assistant, PDA), a handheld computer, a netbook, an ultra-mobile personal computer (Ultra-mobile Personal Computer, UMPC), a mobile Internet device (Mobile Internet Device, MID), an augmented reality (Augmented Reality, AR), a virtual reality (Virtual Reality, VR) device, a robot, a wearable device (Wearable Device), an aircraft (flight vehicle), a vehicle-mounted device (Vehicle User Equipment, VUE), a ship-mounted device, a pedestrian terminal (Pedestrian User Equipment, PUE), a smart home (home appliances with wireless communication functions, such as refrigerators, televisions, washing machines or furniture, etc.), a game console, a personal computer (Personal Computer, PC), a teller machine or a self-service machine and other terminal side devices. Wearable devices include: smart watches, smart bracelets, smart headphones, smart glasses, smart jewelry (smart bracelets, smart bracelets, smart rings, smart necklaces, smart anklets, smart anklets, etc.), smart wristbands, smart clothing, etc. Among them, the vehicle-mounted device can also be called a vehicle-mounted terminal, a vehicle-mounted controller, a vehicle-mounted module, a vehicle-mounted component, a vehicle-mounted chip or a vehicle-mounted unit, etc. It should be noted that the specific type of the terminal 11 is not limited in the embodiment of the present application. The network side device 12 may include an access network device or a core network device, wherein the access network device may also be referred to as a radio access network (Radio Access Network, RAN) device, a radio access network function or a radio access network unit. The access network device may include a base station, a wireless local area network (Wireless Local Area Network, WLAN) access point (Access Point, AS) or a wireless fidelity (Wireless Fidelity, WiFi) node, etc.Among them, the base station may be referred to as a Node B (NB), an evolved Node B (eNB), a next generation Node B (gNB), a New Radio Node B (NR Node B), an access point, a Relay Base Station (RBS), a Serving Base Station (SBS), a Base Transceiver Station (BTS), a radio base station, a radio transceiver, a Basic Service Set (BSS), an Extended Service Set (ESS), a Home Node B (HNB), a Home Evolved Node B (home evolved Node B), a Transmission Reception Point (TRP) or other appropriate terms in the relevant field. As long as the same technical effect is achieved, the base station is not limited to specific technical vocabulary. It should be noted that in the embodiment of the present application, only the base station in the NR system is used as an example for introduction, and the specific type of the base station is not limited.

[0099] The core network device may include, but is not limited to, at least one of the following: a core network node, a core network function, a mobility management entity (Mobility Management Entity, MME), an access mobility management function (Access and Mobility Management Function, AMF), a session management function (Session Management Function, SMF), a user plane function (User Plane Function, UPF), a policy control function (Policy Control Function, PCF), a policy and charging rules function unit (Policy and Charging Rules Function, PCRF), an edge application service discovery function (Edge Application Server Discovery Function, EASDF), a unified data management (Unified Data Management, UDM), a unified data storage (Unified Data Repository, UDR), a home user server (Home Subscriber Server, HSS), a centralized network configuration (CNC), a network storage function (Network Repository Function, NRF), a network exposure function (Network Exposure Function, NEF), a local NEF (Local NEF, or L-NEF), and a binding support function (Binding Support Function, BSF), application function (Application Function, AF), etc. It should be noted that in the embodiment of the present application, only the core network device in the NR system is introduced as an example, and the specific type of the core network device is not limited.

[0100] In order to better understand the technical solution of this application, the following contents are first introduced:

[0101] Extended reality (eXtended reality, XR) refers to all real and virtual combined environments and human-computer interactions generated by computer technology and wearable devices. It includes representative forms such as augmented reality (AR), mixed reality (MR), virtual reality (VR), and their intersections. The level of virtual world ranges from partial sensory input to fully immersive virtual reality. A key aspect of XR is the expansion of human experience, especially the experience related to presence (represented by VR) and cognitive acquisition (represented by AR).

[0102] For VR services, the uplink is mainly based on the transmission of relatively dense small data packets. These small data packets can carry information such as gestures and controls, and serve as input and reference for downlink presentation data; the downlink is mainly based on the transmission of multimedia data such as video and audio. Through the timely reception and presentation of these multimedia data, an immersive experience is provided to users. Taking downlink video data as an example, video data can be modeled as video frames based on FPS (frame rate), and the typical value of frames per second (Frames PerSecond, FPS) is 60 or 120. These video frames arrive periodically or quasi-periodically based on the period determined by FPS (1 / FPS second), and the size of the video frame changes dynamically. Each video frame is generally required to be successfully transmitted within 10ms on the air interface, and the transmission success rate is required to be no less than 99% or even 99.9%. In addition, downlink video data generally requires a very high data rate, which can generally reach tens or even hundreds of Mbps (typical value is 30 / 45Mbps)

[0103] For AR services, in addition to the above-mentioned intensive transmission of small data packets, uplink may also transmit multimedia data such as video, audio, scene images, etc. Its service characteristics are similar to those of downlink. Usually the data rate is relatively low, for example, at most tens of Mbps (typical value is 10 / 20Mbps), and the time limit for air interface transmission can also be relaxed. For example, each video frame is generally required to be successfully transmitted within 30ms; the downlink data transmission characteristics are basically consistent with VR services.

[0104] Gap mechanism in NR

[0105] Basic Measurement gap configuration:

[0106] If the UE needs a measurement gap to identify and measure intra-frequency cells and / or inter-frequency cells and / or inter-Radio Access Technology (RAT) Evolved UMTS Terrestrial Radio Access Network (E-UTRAN) cells:

[0107] (1) If the UE does not support independent measurement gap patterns for different frequency ranges, the network must provide a single per-UE measurement gap pattern to concurrently monitor all frequency layers.

[0108] (2) If the UE supports independent measurement gap modes for different frequency ranges, the network must provide: a per-FR measurement gap mode for frequency ranges (where the UE requires a frequency range level measurement gap to concurrently monitor all its frequency layers for each frequency range independently), or a single UE-level measurement gap mode to concurrently monitor all frequency layers of all frequency ranges.

[0109] UE behavior when Measurement gap is configured:

[0110] During the per-UE measurement gap, the UE:

[0111] (1) For E-UTRA-NR dual connectivity, except for the reception of signals for RRM measurement and signals for random access procedures, there is no need to receive / send signals from / to the corresponding E-UTRAN primary cell (PCell), E-UTRAN secondary cell (SCell) and NR serving cell.

[0112] (2) For Standalone Architecture (SA) (configured with a single carrier or carrier aggregation (CA)), except for the reception of signals for RRM measurement, PRS measurement, and signals for random access procedures, there is no need to receive / send from / to the corresponding NR serving cell.

[0113] (3) For NR-E-UTRA dual connectivity, except for the reception of signals for RRM measurement, Positioning Reference Signal (PRS) measurement, and signals for the random access process, there is no need to receive / send from / to the corresponding PCell, SCell and E-UTRAN serving cell.

[0114] (4) For NR-DC, except for the reception of signals for RRM measurement, PRS measurement, and signals for the random access procedure, there is no need to receive / send signals from / to the corresponding NR serving cell.

[0115] During the per-FR measurement gap, the UE:

[0116] (1) For E-UTRA-NR dual connectivity, within the corresponding frequency range, except for the reception of signals for RRM measurement and signals for random access procedures, there is no need to receive / transmit signals from / to the corresponding E-UTRAN PCell, E-UTRAN SCell and NR serving cell.

[0117] (2) For SA (single carrier or CA configured), within the corresponding frequency range, except for the reception of signals for RRM measurement, PRS measurement, and signals for random access process, there is no need to receive / send from / to the corresponding NR serving cell.

[0118] (3) For NR-E-UTRA dual connectivity, within the corresponding frequency range, except for the reception of signals for RRM measurement, PRS measurement, and signals for random access procedures, there is no need to receive / send from / to the corresponding PCell, SCell, and E-UTRAN serving cell.

[0119] (4) For NR-DC, within the corresponding frequency range, except for the reception of signals for RRM measurement, PRS measurement, and signals for the random access process, there is no need to receive / send signals from / to the corresponding NR serving cell.

[0120] Derivation / enhancement mechanism based on Measurement gap:

[0121] Based on the above configuration of per-UE measurement gap or per-FR measurement gap and UE behavior, NR further introduces the following derivative or enhanced mechanisms:

[0122] Measurement gap sharing

[0123] When either Intra-frequency measurement or Inter-frequency measurement needs to occupy the Measurement gap, or affects the use of the Measurement gap (for example, the SSB measurement timing configuration (SMTC) window corresponding to the measurement based on the synchronization signal block (SSB) completely overlaps with the Measurement gap), it is necessary to consider the sharing of the Measurement gap between Intra-frequency measurement and Inter-frequency measurement.

[0124] Specifically, when the following conditions are met based on UE granularity or FR granularity at the same time, Measurement gap sharing for per-UE measurement gap or per-FR measurement gap corresponding to FR is applied:

[0125] Condition 1: Intra-frequency measurement requires the use of the Measurement gap or affects the use of the Measurement gap;

[0126] Condition 2: Inter-frequency / RAT measurement needs to occupy the Measurement gap, or inter-frequency measurement does not need to occupy the Measurement gap but affects the use of the Measurement gap;

[0127] Condition 3: The UE is configured to measure positioning frequency layers.

[0128] Measurement gap sharing is controlled by configuring the RRC parameter MeasGapSharingScheme through the network.

[0129] Pre-configured measurement gap:

[0130] Compared with the basic Measurement gap, an Activation / Deactivation mechanism is introduced. When a pre-configured measurement gap is activated, its operation is exactly the same as the basic Measurement gap.

[0131] The activation / deactivation mechanism can be further divided into the following two mechanisms:

[0132] (1)Autonomous activation / deactivation mechanism

[0133] The UE may autonomously change the Pre-MG state from activated to deactivated, or vice versa, based on any one or any combination of the triggering conditions.

[0134] (2)Network-controlled activation / deactivation mechanism

[0135] The UE determines whether a Pre-configured MG is Activated or Deactivated based on the RRC parameter preConfGapStatus configured on the network side.

[0136] Concurrent measurement gaps:

[0137] Compared with the basic Measurement gap, it is allowed to configure the UE with a Gap combination in which there are Collision of MG occasions.

[0138] When the UE does not support configuration of per-FR MG, the network can configure up to two per-UE MG patterns for the UE; when the UE supports configuration of per-FR MG, the network can configure a Combination of MG patterns for the UE.

[0139] Judgment of Collision of MG occasions: When it is judged that there is a Collision, the process is performed based on the Priority configured for the Measurement gap: the MG occasion corresponding to the Higher priority is applied (valid), and the MG occasion corresponding to the Lower priority is dropped (invalid). It is required that any two MG occasions judged to have a Collision have corresponding Priorities, and the corresponding Priorities are different.

[0140] Other Gap mechanisms (independent of Measurement gap):

[0141] In NR, the following Gap mechanism is further introduced:

[0142] (1)Network controlled small gap(NCSG)

[0143] When NCSG is configured, other MGs cannot be configured at the same time.

[0144] See the schematic diagram of NCSG parameters for details. Figure 1b .

[0145] (a) Visible interruption length (VIL) 1 and VIL 2

[0146] VIL1 is the visible interruption length before ML, and VIL2 is the visible interruption length after ML. During VIL1 and VIL2, the UE does not expect to send or receive any data.

[0147] (b) Measurement length (ML)

[0148] ML is the measured length.

[0149] During ML, whether the UE is expected to send and receive data on the corresponding serving carrier depends on the scheduling restriction requirements.

[0150] (c) Visible interruption repetition period (VIRP)

[0151] VIRP is the Visible Interruption Repetition Period.

[0152] The NCSG Configurations table is different from the Measurement gap configuration table.

[0153] MUSIM gap:

[0154] The MUSIM gap is used for MUSIM operation, such as cell identification and measurement of a target cell in a target network, paging monitoring, system information block (SIB) acquisition and / or on-demand system information (SI) SI request.

[0155] It is currently understood that the data transmission and reception restrictions of the UE in the MUSIM gap follow the same restrictions as the Measurement gap.

[0156] The MUSIM Gap Pattern Configurations table is different from the Measurement gap configuration table.

[0157] UL gap for Tx power management

[0158] UL gap is used for Tx power management of NR FR2, and there are restrictions on some uplink transmissions in the following scenarios.

[0159] When the UL gap overlaps with the uplink transmission in the NR serving cell in the FR2 single CC scenario, the FR2 intra-band CA scenario, or the FR2 inter-band CA scenario where the UE does not support tx-Support-UL-GapFR2-r17, the UE does not need to perform any uplink transmission other than the listed specified uplink transmission on the NR serving cell during the UL gap. The UL GapPattern Configurations table is different from the Measurement gap configuration table.

[0160] Restrictions on scheduling availability in NR

[0161] Considering the RRM operation on the UE side, in addition to the data transmission and reception restrictions on the UE side of the aforementioned Gap mechanism, Restrictions on schedulingavailability are further introduced in the time period (or a subset of symbols therein) when the UE (may) perform RRM operations. Among them, the following cases are all concerned with the Scheduling restrictions when the UE is not in the Measurement gap period (some cases marked with with NCSG are for the Scheduling restrictions during the ML period of the NCSG, when the UE is not allowed to configure other MGs at the same time).

[0162] The considerations for introducing Restrictions on scheduling availability during the period when the UE (may) perform RRM operations generally include:

[0163] Factor 1: Switching between uplink and downlink transmission directions

[0164] (1) Impacts

[0165] At this time, only uplink transmission is affected: the UE does not expect to send PUCCH / PUSCH / SRS;

[0166] (2) Involved cases

[0167] Case I: UE performs measurements in the Time Division Duplexing (TDD) band (on FR1 (Note 11))

[0168] Case 1: NR based on SSB without MG (or using NCSG) co-frequency measurement;

[0169] Symbols involved in scheduling restrictions: SSB symbols within the SMTC window duration, RSSI measurement symbols (only applicable to SS-RSRQ measurement), and some data symbols before / after the aforementioned symbols;

[0170] Extension to other service areas: Note 12; Note 13;

[0171] Case 2: NR based on SSB without MG (or using NCSG) inter-frequency measurement;

[0172] Symbols involved in scheduling restrictions: SSB symbols within the SMTC window duration, RSSI measurement symbols (only applicable to SS-RSRQ measurement), and some data symbols before / after the aforementioned symbols;

[0173] Extension to other service cells: Note 12; Note 13 (applicable only when NCSG is used);

[0174] Case 3: CLI (SRS-RSRP / CLI-RSSI) measurement on FR1 / FR2 (MG is not always required);

[0175] Symbols involved in the scheduling restrictions: OFDM symbols where CLI measurements are performed and some data symbols before these OFDM symbols;

[0176] Extension to other service areas: Note 12;

[0177] Case 4: NR CSI-RS based co-frequency measurement (MG is not always required);

[0178] Symbols of interest: configured CSI-RS resource symbols and some data symbols before / after these symbols;

[0179] Extension to other service areas: Note 12;

[0180] Note 11: For Case 3 and Case 4, not limited to FR1

[0181] Note 12: Scheduling restrictions apply to other service cells in the same frequency band (it is understandable that Note 12 also applies to Case 1 / 2 / 3 / 4 above)

[0182] Specifically, when performing carrier aggregation within the TDD frequency band, the scheduling restrictions for a given service cell should also be applied to all other service cells in the same frequency band, and apply to symbols in other service cells that fully or partially overlap with the symbols involved in the aforementioned Schedulingrestrictions.

[0183] Note 13: When the UE does not support simultaneous RxTxInterBandCA for the frequency pair formed by the current frequency band and the other frequency band, the Scheduling restrictions apply to the serving cell in the other frequency band.

[0184] Specifically, when performing TDD inter-band carrier aggregation, the scheduling restrictions for a given service cell should also be applied to service cells in other frequency bands, and apply to symbols in this service cell that completely or partially overlap with the symbols involved in the aforementioned Scheduling restrictions, if the UE does not have the capability to support simultaneousRxTxInterBandCA for the frequency band pair consisting of the frequency band where the given service cell is located and this other frequency band.

[0185] Factor 2: Switching between different DL SCSs in FR1

[0186] (1) Impacts

[0187] This affects both uplink transmission and downlink reception: the UE does not expect to send PUCCH / PUSCH / SRS or receive PDCCH / PDSCH( / TRS)( / CSI-RS for tracking) / CSI-RS for CQI. The above bracketed items are only valid for the following cases.

[0188] (2) Involved cases

[0189] For UEs that do not support the simultaneousRxDataSSB-DiffNumerology (simultaneous reception of different data and SSB of SCS) capability (this capability involves same-frequency measurement (including cases where MG is not required or NCSG is used), L1-RSRP measurement (including L1-RSRP reporting or L1-RSRP is used for candidate beam detection), L1-SINR measurement, radio link monitoring, beam failure detection, etc.) or do not support the simultaneousRxDataSSB-DiffNumerology-Inter-r16 (simultaneous reception of different data and SSB of SCS on different frequency bands) capability (this capability involves inter-frequency measurement), SSB-based operation;

[0190] Case I: The UE performs measurements in FR1 using a subcarrier spacing different from that of PDSCH / PDCCH (this case is not applicable to CSI-RS);

[0191] Case 1: NR based on SSB without MG (or using NCSG) co-frequency measurement

[0192] Symbols involved in scheduling restrictions: If deriveSSB_IndexFromCell is enabled, then the symbols are the SSB symbols within the SMTC window duration and some data symbols before / after the SSB symbols; if deriveSSB_IndexFromCell is not enabled, then all symbols within the SMTC window duration;

[0193] Extension to other service areas: Note 21;

[0194] Case 2: NR based on SSB without MG (or using NCSG) inter-frequency measurement

[0195] Symbols involved in scheduling restrictions: SSB symbols within the SMTC window duration and some data symbols before / after the SSB symbols;

[0196] Extension to other service areas: Note 21;

[0197] Case 3: NR based on SSB for reporting (or for candidate beam detection) L1-RSRP measurement (MG is not always required)

[0198] Symbols involved in Scheduling restrictions: Symbols corresponding to the SSB index configured for L1-RSRP measurement;

[0199] Extension to other service areas: Note 21; Note 22;

[0200] Case 4: NR L1-SINR measurement based on SSB (MG is not always required)

[0201] Symbols involved in scheduling restrictions: SSB symbols to be measured for L1-SINR measurement;

[0202] Extension to other service areas: Note 21; Note 22;

[0203] CASE II: UE performs radio link monitoring on FR1 using a subcarrier spacing different from that of PDSCH / PDCCH Scheduling restrictions Symbols involved: SSB symbols measured for radio link monitoring;

[0204] Extension to other service areas: Note 21; Note 22;

[0205] Case III: UE performs beam failure detection on FR1 using a different subcarrier spacing than PDSCH / PDCCH

[0206] Symbols involved in scheduling restrictions: SSB symbols measured for beam failure detection;

[0207] Extension to other service areas: Note 21; Note 22;

[0208] Note 21: Scheduling restrictions apply to other service cells in the same frequency band (it is understandable that Note 21 also applies to all the above cases)

[0209] Specifically, when performing intra-band carrier aggregation, the scheduling restrictions for a given service cell should also be applied to all other service cells in the same frequency band, and to symbols in other service cells that fully or partially overlap with the symbols involved in the aforementioned Schedulingrestrictions.

[0210] Note 22: Scheduling restrictions do not apply to service cells in other frequency bands

[0211] Specifically, when inter-FR1 frequency band carrier aggregation is configured, for other FR1 frequency bands other than the frequency band where the service cell with scheduling restrictions is located, there is no scheduling restriction for the FR1 service cells in these other FR1 frequency bands.

[0212] Factor 3: Switching between different analog beams (Beam management) in FR2

[0213] (1) Impacts

[0214] This affects both uplink transmission and downlink reception: the UE does not expect to send PUCCH / PUSCH / SRS or receive PDCCH / PDSCH( / TRS)( / CSI-RS for tracking) / CSI-RS for CQI. The above bracketed items are only valid for the following cases.

[0215] (2) Involved cases

[0216] CASE I: UE performs measurements in FR2;

[0217] Case 1: NR based on SSB without MG (or using NCSG) co-frequency measurement

[0218] Symbols involved in scheduling restrictions: If deriveSSB_IndexFromCell is enabled, then the symbols are the SSB symbols within the SMTC window duration and some data symbols before / after the SSB symbols; if deriveSSB_IndexFromCell is not enabled, then all symbols within the SMTC window duration;

[0219] Extension to other service areas: Note 31; Note 32; Note 33; Note 34;

[0220] Case 2: NR based on SSB without MG (or using NCSG) inter-frequency measurement

[0221] Scheduling restrictions involve symbols: SSB symbols within the SMTC window duration and some data symbols before / after the SSB symbol

[0222] Extension to other service cells: Note 31; Note 35 (applicable only when NCSG is used);

[0223] Case 3: NR L1-RSRP measurement based on CSI-RS / SSB for reporting (or for candidate beam detection) (MG is not always required)

[0224] Scheduling restrictions involve symbols: symbols corresponding to the SSB index or periodic / semi-persistent / aperiodic CSI-RS resources configured for L1-RSRP measurement, and (for FR2-2 and 480 / 960kHz SCS reference symbols, and for HST scenarios) some data symbols before / after these symbols;

[0225] Extension to other service areas: Note 31; Note 32; Note 33;

[0226] Case 4: NR L1-SINR measurement based on CSI-RS / SSB (MG is not always required)

[0227] Scheduling restrictions involve symbols: symbols used to measure L1-SINR, and (for FR2 power class 6 UE configured with highSpeedMeasFlagFR2-r17) some data symbols before / after these symbols;

[0228] Extension to other service areas: Note 31;

[0229] Case 5: NR CSI-RS based co-frequency measurement (MG is not always required)

[0230] Symbols involved in scheduling restrictions: CSI-RS symbols configured in the configured time slots for the CSI-RS resources used for measurement;

[0231] Extension to other service areas: Note 31; Note 32;

[0232] CASE II: UE performs radio link monitoring on FR2

[0233] Scheduling restrictions involve symbols: RLM-RS symbols measured for radio link monitoring, and (for FR2-2 and RLM-RS using 480 / 960kHz SCS) some data symbols before / after the RLM-RS symbols;

[0234] Extension to other service areas: Note 31; Note 32; Note 33;

[0235] CASE III: UE performs beam failure detection on FR2

[0236] Scheduling restrictions involve symbols: reference symbols used for candidate beam detection, and (for FR2-2 and RLM-RS using 480 / 960kHz SCS) some data symbols before / after the reference symbols;

[0237] Extension to other service areas: Note 31; Note 32; Note 33;

[0238] Note 31: Scheduling restrictions apply to other service cells in the same frequency band (it is understandable that Note 31 also applies to all the above cases)

[0239] Specifically, when performing intra-band carrier aggregation in FR2, scheduling restrictions for a given serving cell should also be applied to all other serving cells in the same frequency band, and to symbols in other serving cells that fully or partially overlap with the symbols involved in the aforementioned Schedulingrestrictions.

[0240] Note 32: Scheduling restrictions do not apply to service cells in other frequency bands

[0241] Specifically, when performing inter-band carrier aggregation of FR2, there will be no scheduling restrictions on FR2 service cells in the current FR2 band due to scheduling restrictions on FR2 service cells in other different FR2 bands. It is assumed here that the UE can perform independent beam management for the band pairs consisting of other different FR2 bands and the current FR2 band.

[0242] Note 33: Scheduling restrictions do not apply to the inter-band case where the SSB of one FR2 band is different from the SCS of the data of another FR2 band, assuming that IBM (Independent Beam Management) operation is supported for the band pair consisting of these two FR2 bands.

[0243] Specifically, if the UE configures different SCSs for SSB on one FR2 band and data on another FR2 band, there will be no scheduling restriction, assuming that the UE configures IBM operation for the band pair consisting of the two FR2 bands.

[0244] Note 34: When the UE does not support simultaneous RxTxInterBandCA for the frequency pair formed by the current frequency band and the other frequency band, the Scheduling restrictions apply to the serving cell in the other frequency band.

[0245] Specifically, when performing FR2 inter-band carrier aggregation, the scheduling restrictions for a given service cell should also be applied to service cells in other frequency bands, and apply to symbols in this service cell that completely or partially overlap with the symbols involved in the aforementioned Scheduling restrictions, if the UE does not have the capability to support simultaneousRxTxInterBandCA for the frequency band pair consisting of the frequency band where the given service cell is located and this other frequency band.

[0246] Note 35: For inter-band situations, the applicability of scheduling restrictions for various combinations of IBM capability and simultaneous transmit / receive capability

[0247] Specifically, the following situations A / B / C / D can be distinguished and regulated separately:

[0248] Case A: For the frequency band pair consisting of the target measurement frequency band and the frequency band where the serving cell is located, the UE supports neither IBM nor simultaneousRxTxInterBandCA;

[0249] Case B: For the frequency band pair consisting of the target measurement frequency band and the frequency band where the serving cell is located, the UE does not support IBM but supports simultaneousRxTxInterBandCA;

[0250] Case C: For the frequency band pair consisting of the target measurement frequency band and the frequency band where the serving cell is located, the UE supports IBM but does not support simultaneousRxTxInterBandCA;

[0251] Case D: For the frequency band pair consisting of the target measurement frequency band and the frequency band where the serving cell is located, the UE supports both IBM and simultaneousRxTxInterBandCA: At this time, there is no scheduling restriction for the serving cell.

[0252] Factor 4: Different downlink FDMed measurements and receiving UE capabilities

[0253] (1) Impacts

[0254] At this time, only downlink reception is affected: the UE does not expect to receive PDCCH / PDSCH / CSI-RS for tracking / CSI-RS for CQI.

[0255] (2) Involved cases

[0256] Case I: UE performs CLI measurement and DL reception in FDM mode

[0257] Case 1: CLI (SRS-RSRP / CLI-RSSI) measurement on FR1 / FR2 (MG is not always required)

[0258] Symbols involved in scheduling restrictions: For SRS-RSRP measurement, they are the OFDM symbols for performing SRS-RSRP measurement, as well as some data symbols before these OFDM symbols; for CLI-RSSI measurement, they are the OFDM symbols for performing CLI-RSSI measurement, as well as some data symbols before these OFDM symbols.

[0259] Extension to other service areas: Note 41;

[0260] Note 41: Scheduling restrictions apply to other service cells in the same frequency band (it is understandable that Note 41 also applies to all the above cases)

[0261] Specifically, when carrier aggregation within the TDD frequency band is configured, the scheduling restrictions for the service cell performing CLI measurement are also applied to all other service cells in the same frequency band, and apply to symbols in other service cells that fully or partially overlap with the symbols involved in the aforementioned Schedulingrestrictions.

[0262] The following is a detailed description of the method for adjusting transmission restrictions provided in the embodiment of the present application through some embodiments and their application scenarios in combination with the accompanying drawings.

[0263] See also Figure 2 The present application provides a method for adjusting transmission restrictions, the execution subject of the method is a terminal, and the method includes:

[0264] Step 201: The terminal determines that there is a scheduling restriction or a valid target interval timing in the first serving cell;

[0265] Step 202: The terminal performs a predefined operation according to a preset rule;

[0266] The first serving cell is any serving cell configured by the terminal;

[0267] A preset rule is associated with any of the following:

[0268] (1) first reporting information related to the channel quality of the serving cell, which may be referred to as mode 1;

[0269] (2) second reporting information related to an uplink buffer status report (Buffer Status Report, BSR) or a scheduling request (SchedulingRequest, SR); referred to as mode 2;

[0270] (3) Scheduling information related to uplink and downlink scheduling; referred to as mode 3;

[0271] The predefined operations include at least one of the following:

[0272] (1) relaxing scheduling restrictions or disabling scheduling restrictions within the first time domain unit set;

[0273] (2) skipping or disabling at least one of the target intervals;

[0274] (3) adjusting an interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities;

[0275] It is understandable that the “disable” here can also be understood as “disable”.

[0276] In an embodiment of the present application, the terminal side and the network side perform predefined operations according to preset rules associated with any one of the reporting information related to the channel quality of the serving cell, the reporting information related to the uplink BSR or SR, and the uplink and downlink scheduling related information, to implement a scheme for adjusting transmission restrictions based on rules, and reasonably relax the transmission and reception restrictions brought by the Gap mechanism and the scheduling restrictions corresponding to the scheduling availability / restrictions by ensuring that the measurement requirements are not affected or the impact on the measurement performance is reduced, ensuring timely or as timely as possible data transmission, etc., so as to ensure the transmission performance of high data rate and low latency services.

[0277] Optionally, the above predefined operations may also be referred to as predefined behaviors.

[0278] For the above predefined operations:

[0279] (1) Relaxing or disabling scheduling restrictions within the first time domain unit set. The time domain unit may correspond to a unit divided in a predefined manner in the time domain, such as a time slot or a symbol. In the following, the time domain unit is described as a symbol, and the first time domain unit set is described as a set of symbols. Relaxing or disabling scheduling restrictions is Relax / disable scheduling restrictions.

[0280] Here, a set of symbols can correspond to a set of symbols for Scheduling restrictions within one or more Windows or Window groups, or within a time period / time sub-segment, or within the duration or extended duration corresponding to the transmission corresponding to / triggered by the scheduled DCI. For the set of symbols for Scheduling restrictions, please refer to the corresponding description in the previous text. For the NCSG mechanism, the Window here can be ML.

[0281] The Relax / disable scheduling restrictions here can be understood as closing / removing the Scheduling restrictions corresponding to the symbol set, so that the channels / signals that were not allowed to be sent or received before closing / removal are allowed to be sent or received within this symbol set, or partially closing / removing the Scheduling restrictions corresponding to the symbol set, so that the channels / signals that were not allowed to be sent or received before closing / removal are allowed to be sent or received within this symbol set and meet one or more pre-set conditions (see below for the specific description of the conditions), thereby ensuring more timely data scheduling and transmission, so as to ensure or improve the transmission performance of high data rate and low latency services.

[0282] (2) skipping a gap occasion or disabling a gap occasion, wherein the gap occasion is a Gap occasion;

[0283] The Gap occasion can be understood as a (for example, single) Gap window corresponding to a certain Gap mechanism in NR after configuration / activation. For the NCSG mechanism, the Gap occasion here can be a Window composed of VIL1, ML and VIL2, or only the time portion corresponding to VIL1 and VIL2. The Skip / disable here can be understood as closing / removing the transmission and reception restrictions in the Gapoccasion (that is, treating this Gap occasion as invalid, or as not existing), or closing / removing the transmission and reception restrictions in the Gap occasion for reception / transmission that meets the predefined conditions (that is, only for reception / transmission that meets the predefined conditions, this Gap occasion is treated as invalid, or as not existing). Accordingly, after closing / removing the above-mentioned transmission and reception restrictions, it is possible to allow data to be scheduled and transmitted during the Gap occasion (or data that meets one or more pre-set conditions (for a specific description of the conditions, see below)), or to allow the scheduled and transmitted data (or data that meets one or more pre-set conditions (for a specific description of the conditions, see below)) to overlap with the Gapoccasion in the time domain, thereby ensuring more timely data scheduling and transmission to ensure or improve the transmission performance of high data rate and low latency services.

[0284] (3) adjusting the gap pattern parameters corresponding to the gap timing, wherein the gap pattern parameters are gap pattern parameters;

[0285] Adjusting the Gap pattern parameters includes adjusting (eg, extending / shortening) the Gap period length (eg, the value of the parameter mgrp), the Gap offset (eg, the value of the parameter gapOffset), the Gap length (eg, the value of the parameter mgl), etc.

[0286] The adjustment here can be understood as adjusting the corresponding parameters for the target Gap occasion(s) or the Gap occasion(s) within the target time period / time sub-segment. For example, the Gap period length can be extended or shortened to control the frequency or probability of the transceiver restriction corresponding to the Gap occasion in the time domain, so as to reduce the impact of the transceiver restriction on data scheduling and transmission, thereby ensuring or improving the transmission performance of high data rate and low latency services.

[0287] "There is a target gap occasion in effect in the first serving cell" can be understood as that the serving cell set in which the target gap occasion is effective or applied includes the first serving cell. The serving cell set in which the target gap occasion is effective or applied is generally based on the protocol provisions, the serving cell or the serving cell set in which the gap occasion or scheduling restrictions are applied. For details, please refer to the corresponding description below. Optionally, the serving cell set in which the target gap occasion is effective or applied can be configured by high-level signaling.

[0288] It should be noted that the scope of the target Serving cell of the above-mentioned predefined operation defaults to the Serving cell or Serving cell set to which the Gap occasion or Scheduling restrictions apply based on the protocol provisions. For example, for the Gap occasion corresponding to the UE-level measurement gap (per-UE measurement gap), the target Serving cell can be understood as all the serving cells configured by the UE, including the NR serving cell or the E-UTRAN serving cell; for the Gap occasion corresponding to the FR-level measurement gap (per-FR measurement gap), the target Serving cell can be understood as all the serving cells configured by the UE in the corresponding FR (FR1 or FR2), including the NR serving cell or the E-UTRAN serving cell. For another example, for Scheduling restrictions, in addition to the Serving cells that directly introduce Scheduling restrictions based on RRM measurement, CLI measurement, L1-RSRP measurement, L1-SINR measurement, RLM, BFD and other behaviors, it also includes other Serving cells in the same frequency band or in other frequency bands that are extended and determined based on the capabilities of being located in the same frequency band, or located in other frequency bands but the UE does not support simultaneous transmission and reception or IBM of the corresponding frequency band pair (for specific extension rules, see the corresponding description in the previous text). Optionally, the target Serving cell corresponding to the predefined operation can be determined based on other rules for different modes. For example, for mode 1: based on the channel quality-related reporting information of the Serving cell, the applied Serving cell is the Serving cell corresponding to the channel quality; for mode 3: based on the uplink and downlink scheduling-related information, it is determined whether each Serving cell performs the predefined operation based on the uplink and downlink scheduling-related information of each Serving cell, and when the predefined operation is performed, the target Serving cell is this Serving cell. Optionally, when determining to perform a predefined operation in each mode, the target Serving cell or the target Serving cell list / set can be explicitly configured by high-level signaling.

[0289] It can be understood that the target Serving cells of the above predefined operation must include the first serving cell.

[0290] It should be noted that the above-mentioned preset rules can be understood as continuing to use the existing semi-static / dynamic signaling and processes, without introducing / adding new semi-static configuration / dynamic indication information to explicitly indicate whether the UE performs a predefined operation (the specific method to be adopted, and the relevant parameters involved when a certain method is adopted, can be specified by the protocol or configured by high-level signaling), but introducing new rules so that both parties can reach an agreement on the above-mentioned determination of the operation (including start and end time).

[0291] The following is a detailed description of the technical solution of this application based on the above preset rules:

[0292] Method 1: Based on the channel quality related reporting information of the serving cell (corresponding to the measurement requirements).

[0293] In a possible implementation, when the preset rule is associated with the reporting information related to the channel quality of the serving cell, the terminal performs a predefined operation according to the preset rule, including:

[0294] When the channel quality of the serving cell is higher than or equal to the first threshold, the terminal performs a predefined operation according to the reporting information related to the channel quality of the serving cell.

[0295] It can be understood that the better the channel quality of the Serving cell, the less necessary it is for the UE to perform neighboring cell measurements and prepare for handover and other mobility processes, and thus the less demand for occupying the Gap for measurement, etc., and the actually occupied Gap can be less, or it can be more sparse in the time domain. Accordingly, the configured Gap does not need to be used in full, and a part of the interval opportunities can be skipped or disabled as needed, or the Gap parameters can be adjusted as needed to reduce the frequency of the interval opportunities in the time domain or shorten the time domain length of each interval opportunity, etc., so as to avoid or reduce the performance related to the measurement and the Gap occupation, and try to ensure the performance of data transmission delay, capacity, etc. Similarly, the better the channel quality of the Serving cell, the less necessary it is for the UE to perform neighboring cell measurements and prepare for handover and other mobility processes, and the less demand for introducing scheduling restrictions for measurement, etc., and the actual need to restrict scheduling can be less, or it can be more sparse in the time domain, and accordingly, the scheduling restrictions can be relaxed or disabled in some cases or at some times, so as to avoid or reduce the performance related to the measurement and the Schedulingrestrictions, and try to ensure the performance of data transmission delay, capacity, etc. When the channel quality of the Serving cell is higher than or not lower than the predefined threshold (ie, the first threshold mentioned above), both sides may consider that they can temporarily lift scheduling restrictions or close the Measurement gap, etc., that is, perform predefined operations.

[0296] Optionally, when the channel quality of the serving cell is higher than or equal to the first threshold, and the occupied interval is used to perform non-serving cell measurements, or the scheduling restriction is introduced to perform non-serving cell detection, the terminal performs a predefined operation according to the reporting information related to the channel quality of the serving cell.

[0297] It is understandable that if occupying the Gap or introducing scheduling restrictions is for measuring the Serving cell, for example, occupying the Gap to measure the SSB of the Serving cell outside the active bandwidth part (Active Bandwidth Part, Active BWP), or introducing scheduling restrictions to perform RLM / BFD of SSB based on SCS different from PDSCH / PDCCH in FR1 or RLM / BFD of FR2, then when the channel quality of the Serving cell is good enough, the predefined operation still cannot be performed. Therefore, "performing predefined operations when the channel quality of the Serving cell is good enough" is only applicable to some scenarios, that is, occupying the Gap or introducing scheduling restrictions is for performing measurements or detection on non-serving cells.

[0298] The Serving cell here can be only SpCell, only SCell, or any Serving cell. It can be understood that there is an association between the Serving cell here and the first serving cell. In some embodiments, the Serving cell here is the first serving cell. In other embodiments, the Serving cell here and the first serving cell are different serving cells; optionally, the two are located in the same frequency domain range (FR1 or FR2), or in the same Cell group, or in a Serving cell group or list specified by the protocol or configured by high-level signaling.

[0299] Specifically, the above method 1 is as follows:

[0300] In a possible implementation manner, the terminal performs a predefined operation according to the channel quality related reporting information of the serving cell, including any one of the following:

[0301] Method 1-1: The terminal performs a predefined operation based on the L3 measurement reporting information of the serving cell;

[0302] Method 1-2: The terminal performs a predefined operation based on the CSI reporting information of the serving cell.

[0303] That is, the channel quality of the serving cell can be determined by the existing layer 3 (L3) measurement report or layer 1 (L1) channel state information (CSI) report, for example, see Figure 3Accordingly, the terminal performs a predefined operation according to the L3 measurement report or the L1 CSI report.

[0304] Specifically, method 1-1 is as follows:

[0305] In a possible implementation manner, the first reporting information includes a measurement report based on L3 measurement, and the terminal performs a predefined operation according to the first reporting information, including any one of the following:

[0306] Mode 1-1-1: When sending a measurement report based on L3 measurement, the terminal performs a predefined operation, and the measurement report based on L3 measurement is triggered based on a measurement reporting event;

[0307] Method 1-1-2: The terminal performs a predefined operation based on the channel quality information in the measurement report of L3 measurement.

[0308] With respect to the above-mentioned manner 1-1-1, in a possible implementation manner, the terminal performs a predefined operation according to the measurement reporting event, including:

[0309] (1) After the terminal sends a measurement report based on L3 measurement based on the first event, the terminal performs a predefined operation starting from a first predefined time;

[0310] (2) after the terminal sends a measurement report based on L3 measurement based on the second event, the terminal stops performing the predefined operation at a second predefined time;

[0311] The first predefined time is determined based on the transmission time of the measurement report of the layer 3 measurement sent by the first event, and the second predefined time is determined based on the transmission time of the measurement report of the layer 3 measurement sent by the second event.

[0312] In an embodiment of the present application, after the UE reports a measurement report for a specific event for one or more specific Serving cells, both sides may consider that the UE does not need or needs to perform intra-frequency / inter-frequency / inter-RAT measurements, and thus performs or stops performing predefined operations.

[0313] The first predefined time is determined based on the transmission time of the measurement report of the layer 3 measurement sent by the first event, and the second predefined time is determined based on the transmission time of the measurement report of the second event, which can be specifically as follows:

[0314] The first predefined moment is the HARQ-ACK feedback moment corresponding to the transport block (Transport Block, TB) where the response (ACK) corresponding to the radio link control service data unit (Radio Link Control Service Data Unit, RLC SDU) carrying the measurement report of the layer 3 measurement sent by the first event is located plus the first time interval, the HARQ-ACK feedback moment is the start moment or end moment of the physical uplink control channel PUCCH transmission carrying the HARQ-ACK information (generally, it may be required to be the HARQ-ACK information corresponding to the transport block and having the value of ACK), or the HARQ-ACK feedback moment is the start moment or end moment of the time unit (such as Slot or Sub-slot) where the PUCCH transmission carrying the HARQ-ACK information is located, and the first time interval is specified by the protocol or configured by high-level signaling; by determining the first predefined moment, the terminal and the network can have a consistent understanding of the moment when the predefined operation is started, and the predefined operation can be started as early as possible to ensure or improve the performance of data transmission;

[0315] The second predefined moment is the HARQ-ACK feedback moment corresponding to the TB where the ACK corresponding to the RLC SDU carrying the measurement report of the second event is located plus the second time interval, the HARQ-ACK feedback moment is the start moment or end moment of the PUCCH transmission carrying the HARQ-ACK information (generally, it may be required to be the HARQ-ACK information corresponding to the transmission block and having the value of ACK), or the HARQ-ACK feedback moment is the start moment or end moment of the time unit (such as Slot or Sub-slot) where the PUCCH transmission carrying the HARQ-ACK information is located, and the second time interval is specified by the protocol or configured by high-level signaling; by determining the second predefined moment, the terminal and the network can have a consistent understanding of the moment to stop executing the predefined operation, and stop executing the predefined operation as soon as possible to avoid affecting the measurement and other performance.

[0316] For example: after the UE reports the A1 event measurement report for SpCell, both sides may consider that the UE performs a predefined operation starting from predefined time 1 (for example, the HARQ-ACK feedback time corresponding to the TB (downlink direction) where the ACK corresponding to the RLC SDU carrying the (uplink) Measurement report is located + delta1; the HARQ-ACK feedback time may be the start / end time of the PUCCH transmission carrying the HARQ-ACK information, or the start / end time of the Slot where the PUCCH transmission is located; delta1 may be specified by the protocol or configured by high-level signaling); after the UE reports the A2 event measurement report for SpCell, both sides may consider that the UE stops performing the predefined operation starting from predefined time 2 (its definition refers to predefined time 1, only the referenced Measurement report is different).

[0317] With respect to the above-mentioned manner 1-1-2, in a possible implementation manner, the terminal performs a predefined operation according to the channel quality information in the measurement report, including:

[0318] (1) when the channel quality information in the first measurement report is higher than or equal to the second threshold, the terminal performs the predefined operation starting from the third predefined time;

[0319] (2) when the channel quality information in the second measurement report is lower than or equal to the third threshold, the terminal stops performing the predefined operation at a fourth predefined time;

[0320] The third predefined time is determined based on the transmission time of the first measurement report, and the fourth predefined time is determined based on the transmission time of the second measurement report.

[0321] The L3 measurement and channel quality information here can be the cell-level reference signal received power (RSRP) / reference signal received quality (RSRQ) / signal to interference plus noise ratio (SINR) corresponding to the serving cell, or the RSRP / RSRQ / SINR of the strongest beam or one or more predefined beams.

[0322] Specifically, whether to execute or stop executing the predefined operation is determined based on the RSRP / RSRQ / SINR reported for one or more specific Serving cells in the Measurement report. For example, when the RSRP / RSRQ / SINR corresponding to one or more Serving cells is higher than or not lower than the predefined threshold, both sides may consider that the UE (starts or continues) to execute the predefined operation; when the RSRP / RSRQ / SINR corresponding to one or more Serving cells is lower than or not higher than the predefined threshold, both sides may consider that the UE stops / no longer executes the predefined operation.

[0323] The Measurement report here may be a Measurement report including all Serving cells or at least one or N Serving cells in the above-mentioned specific one or more Serving cells. Optionally, the reportType corresponding to the Measurement report is required to be periodical and / or eventTriggered.

[0324] For a certain Measurement report, the effective time of RSRP / RSRQ / SINR contained therein may refer to the definition of predefined time 1 / 2 in the above method 1-1-1.

[0325] The third predefined time is determined based on the transmission time of the first measurement report, and the fourth predefined time is determined based on the transmission time of the second measurement report, which may be specifically as follows:

[0326] The third predefined moment is the HARQ-ACK feedback moment corresponding to the TB where the ACK corresponding to the RLC SDU carrying the first measurement report is located plus the third time interval, the HARQ-ACK feedback moment is the start moment or end moment of the PUCCH transmission carrying the HARQ-ACK information (generally, it may be required to be the HARQ-ACK information corresponding to the transmission block and having the value of ACK), or the HARQ-ACK feedback moment is the start moment or end moment of the time unit (for example, Slot or Sub-slot) where the PUCCH transmission carrying the HARQ-ACK information is located, and the third time interval is specified by the protocol or configured by high-level signaling; by determining the third predefined moment, the terminal and the network can have a consistent understanding of the moment when the predefined operation is started, and the predefined operation can be started as early as possible to ensure or improve the performance of data transmission;

[0327] The fourth predefined moment is the HARQ-ACK feedback moment corresponding to the TB where the ACK corresponding to the RLC SDU carrying the second measurement report is located plus the fourth time interval, the HARQ-ACK feedback moment is the start moment or end moment of the PUCCH transmission carrying the HARQ-ACK information (generally, it may be required to be the HARQ-ACK information corresponding to the transmission block and having the value of ACK), or the HARQ-ACK feedback moment is the start moment or end moment of the time unit (for example, Slot or Sub-slot) where the PUCCH transmission carrying the HARQ-ACK information is located, and the fourth time interval is specified by the protocol or configured by high-level signaling; by determining the fourth predefined moment, the terminal and the network can have a consistent understanding of the moment to stop executing the predefined operation, and stop executing the predefined operation as soon as possible to avoid affecting measurement and other performance.

[0328] Specifically, method 1-2 is as follows:

[0329] In a possible implementation manner, the terminal performs a predefined operation according to the CSI reporting information of the serving cell, including any one of the following:

[0330] (1) when the channel quality information in the first CSI report is higher than or equal to the fourth threshold, the terminal performs the predefined operation starting from the fifth predefined time;

[0331] (2) when the channel quality information in the second CSI report is lower than or equal to the fifth threshold, the terminal stops performing the predefined operation at a sixth predefined time;

[0332] The fifth predefined time is determined based on the transmission time of the first CSI report, and the sixth predefined time is determined based on the transmission time of the second CSI report.

[0333] Specifically, it can be determined whether to execute or stop executing the predefined operation based on the reported information in the CSI report, such as L1-RSRP / L1-SINR or Channel Quality Indicator (CQI). For example, when the reported information is higher than or not lower than the predefined threshold, both sides can consider that the UE (starts or continues) executes the predefined operation for the Serving cell corresponding to the CSI report; when the reported information is lower than or not higher than the predefined threshold, both sides can consider that the UE stops / no longer executes the predefined operation for this Serving cell.

[0334] Optionally, the CSI report here can introduce certain restrictions for its corresponding CSI-ReportConfig. For example, its reportConfigType must be one or more of the following:

[0335] periodic(Periodic CSI on PUCCH);

[0336] semiPersistentOnPUCCH(Semi-persistent CSI on PUCCH);

[0337] semiPersistentOnPUSCH(Semi-persistent CSI on PUSCH);

[0338] aperiodic (Aperiodic CSI on PUSCH);

[0339] Or must be reported via PUCCH or PUSCH;

[0340] And / or, limit its reportQuantity, which must be one or more of the following:

[0341] cri-RI-PMI-CQI;

[0342] cri-RI-i1-CQI;

[0343] cri-RI-CQI;

[0344] cri-RSRP;

[0345] ssb-Index-RSRP;

[0346] cri-RI-LI-PMI-CQI;

[0347] Or the reported amount must include L1-RSRP and / or L1-SINR and / or CQI;

[0348] and / or, limiting its Frequency granularity, for example, it must be Wideband frequency-granularity, or the reported amount must include the Wideband CQI;

[0349] And / or, limit its measurement bandwidth, for example, the percentage of the measurement frequency domain resources corresponding to the csi-ReportingBand relative to the DLactive BWP or the Serving cell bandwidth is higher than or not lower than a predefined threshold.

[0350] When determined based on the CQI in the CSI report, it can be based only on the CQI in the single codeword CSI report; or, for a single codeword CSI report, based on the CQI of this single codeword, for a dual codeword CSI report, based on the CQI of a predefined codeword (e.g., the first codeword / the second codeword / the codeword with a larger CQI / the codeword with a smaller CQI) or the average CQI of the two codewords. The CQI here can be a wideband CQI, and / or one or more subband CQIs with the minimum / maximum values.

[0351] For a certain CSI report, the effective time of the reporting information contained therein (i.e., the start time that can be used to determine whether to execute or stop executing the predefined operation) can be the end time of the PUCCH / PUSCH carrying this CSI report + delta2; wherein delta2 can be specified by the protocol or configured by high-level signaling, mainly considering the decoding delay of the CSI report.

[0352] The fifth predefined time is determined based on the transmission time of the first CSI report, and the sixth predefined time is determined based on the transmission time of the second CSI report, which may be specifically as follows:

[0353] The fifth predefined time is the end time of the PUCCH or PUSCH carrying the first CSI reporting information plus the fifth time interval, and the fifth time interval is specified by the protocol or configured by high-level signaling; by determining the fifth predefined time, the terminal and the network can have a consistent understanding of the time when the predefined operation starts to be executed, and the predefined operation can be executed as early as possible to ensure or improve the performance of data transmission;

[0354] The sixth predefined moment is the end moment of the PUCCH or PUSCH carrying the second CSI reporting information plus the sixth time interval, and the sixth time interval is specified by the protocol or configured by high-level signaling; by determining the sixth predefined moment, the terminal and the network can have a consistent understanding of the moment to stop executing the predefined operation, and stop executing the predefined operation as soon as possible to avoid affecting measurement performance.

[0355] Method 2: Based on uplink BSR / SR related reporting information (corresponding to uplink data transmission requirements).

[0356] In a possible implementation manner, when the preset rule is associated with the relevant reporting information of the uplink BSR or SR, the terminal performs the predefined operation according to the preset rule, including at least one of the following:

[0357] Processing criterion 1: when the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the terminal performs a predefined operation on the target serving cell;

[0358] Processing criterion 2: When the SR reporting information or uplink BSR reporting information of the target logical channel or target logical channel group meets the second condition, the terminal performs a predefined operation on the target serving cell;

[0359] The first condition includes at least one of the following:

[0360] (1) The waiting time of the data to be transmitted on the target logical channel or target logical channel group is longer than or equal to the sixth threshold; that is, the data to be transmitted in the uplink direction of the specific Logical channel / LCG has been waiting for a long time;

[0361] (2) The remaining packet delay budget (PDB) of the data to be transmitted on the target logical channel or target logical channel group is shorter than or equal to the seventh threshold; that is, the data to be transmitted in the uplink direction of the specific Logical channel / LCG is about to time out or is likely to be discarded, which is more urgent;

[0362] (3) The amount of data to be transmitted on the target logical channel or target logical channel group is greater than or equal to the eighth threshold; that is, the amount of data to be transmitted in the uplink direction of the specific Logical channel / LCG is relatively large;

[0363] The second condition includes at least one of the following:

[0364] (1) The terminal triggers and actually sends an SR PUCCH for the target logical channel or at least one logical channel in the target logical channel group;

[0365] (2) The uplink BSR reporting information indicates that there is an amount of data to be transmitted for the target logical channel or the target logical channel group.

[0366] Regarding the above processing principle 1:

[0367] When there are more / more concentrated / more urgent data transmission requirements in the uplink direction of a specific Logical channel / LCG, Gap or scheduling restrictions can be temporarily ignored to prioritize data transmission requirements, that is, data transmission requirements have a higher priority than measurement. This processing principle only sacrifices RAN4 performance such as RRM measurement when necessary, and has relatively little impact on RAN4 performance.

[0368] Specifically, when the reporting information for a specific Logical channel / LCG in the uplink Buffer reporting information (for example, information in a BSR report or an enhanced BSR report) satisfies at least one of the following (ie, the first condition above), both sides may determine that the UE performs a predefined operation for all Serving cells (or, all Serving cells of FR1 / FR2, or, all Serving cells of MCG / SCG, or, each Serving cell in a Serving cell list specified by the protocol or configured by high-level signaling) (start or continue):

[0369] (a) The amount of data to be transmitted on a specific Logical channel / LCG is higher or not lower than the predefined threshold

[0370] (b) The waiting time of data to be transmitted on a specific Logical channel / LCG is longer or not shorter than the predefined threshold

[0371] The waiting time of the data to be transmitted here may be the maximum value / minimum value / average value of the waiting time of all the data to be transmitted.

[0372] (c) The Remaining PDB of the data to be transmitted for a specific Logical channel / LCG is shorter or not longer than the predefined threshold

[0373] The Remaining PDB of the data to be transmitted here may be a maximum value / minimum value / average value of the Remaining PDB of all the data to be transmitted.

[0374] The above-mentioned specific Logical channel / LCG corresponds to at least one Logical channel / LCG, which can be determined by any of the following methods:

[0375] (a) Implicit determination based on rules (protocol provisions)

[0376] The specific Logical channel / LCG may be the Logical channel / LCG corresponding to the RB mapped with the specific service type or QoS flow with specific attributes (for example, XR service, or Video stream of XR service, or IFrame of Video stream of XR service), or the configuration of the Logical channel / LCG or its mapped RB meets the predefined requirements (for example, the Discard Timer configured for the RB is shorter than or not longer than the predefined threshold).

[0377] (b) Explicit configuration by higher-level signaling

[0378] For example, adopt UE specific RRC signalling explicit configuration.

[0379] In a possible implementation manner, when the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the terminal performs a predefined operation on the target serving cell, including:

[0380] The terminal starts or continues to perform the predefined operation for the target serving cell from the seventh predefined time;

[0381] It should be noted that if the current UE has started to execute the predefined operation, then based on the uplink BSR reporting information, the UE continues to execute the predefined operation.

[0382] The seventh predefined time is determined based on the transmission time of the uplink BSR reporting information.

[0383] The seventh predefined time is determined based on the transmission time of the uplink BSR reporting information, and may be specifically as follows:

[0384] The seventh predefined time is any one of the following:

[0385] (1) The start time or end time of the first PUSCH transmission of the TB carrying the uplink BSR reporting information plus the seventh time interval, where the seventh time interval is specified by the protocol or configured by high-level signaling;

[0386] The start / end time of the first PUSCH transmission of the TB carrying the above uplink buffer reporting information + delta3; delta3 can be specified by the protocol or configured by high-level signaling, mainly considering the delay of HARQ transmission, decoding and decapsulation of the TB.

[0387] (2) For the HARQ process occupied by the TB transmission carrying the uplink BSR reporting information, the start time or end time of the PDCCH transmission corresponding to the uplink grant UL grant received by the terminal indicating the new transmission plus the eighth time interval, which is specified by the protocol or configured by the high-level signaling

[0388] For the HARQ process occupied by the TB transmission carrying the above-mentioned uplink buffer reporting information, the UE receives the start / end time of the PDCCH transmission corresponding to the UL grant indicating the new transmission + delta4; where delta4 can be specified by the protocol or configured by high-level signaling, mainly considering the PDCCH decoding delay.

[0389] By determining the seventh predefined time as described above, the terminal and the network can have a consistent understanding of the time to start executing the predefined operation, and can start executing the predefined operation as early as possible to ensure or improve data transmission performance.

[0390] In a possible implementation manner, when the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the terminal performs a predefined operation for the target serving cell, further comprising:

[0391] When the third condition is met, the terminal stops executing the predefined operation;

[0392] The third condition includes any of the following:

[0393] (1) Starting from the time when the terminal determines to start or continue to perform a predefined operation, a first preset time period is reached;

[0394] (2) The reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information does not meet the first condition.

[0395] After both parties determine to execute the predefined operation for all or specific Serving cells (start or continue), they can stop executing the predefined operation based on any of the following:

[0396] (a) Each time a predefined operation is determined (started or continued), a timer is started or restarted. When the timer times out, both parties determine to stop executing the predefined operation, that is, determine whether the first preset time length is reached through the timer.

[0397] (b) When the reporting information for a specific Logical channel / LCG in the uplink buffer reporting information no longer satisfies the above-mentioned specified items (i.e., determining one or more items that are satisfied when performing a predefined operation (starting or continuing) for all or specific Serving cells) or any one of the items, both sides determine to stop performing the predefined operation.

[0398] Regarding the above processing principle 2:

[0399] As long as there is data transmission demand in the uplink direction of a specific Logical channel / LCG, consider temporarily ignoring Gap or scheduling restrictions and give priority to data transmission demand. This processing principle can be understood as the uplink data transmission demand of a specific Logical channel / LCG is absolutely prioritized, which has a relatively large impact on RAN4 performance.

[0400] Specifically, when at least one of the following conditions is met (that is, the second condition above), both sides may determine that the UE performs a predefined operation for all Serving cells (or, all Serving cells of FR1 / FR2, or, all Serving cells of MCG / SCG, or, each Serving cell in the Serving cell list specified by the protocol or configured by high-level signaling) (start or continue):

[0401] (a) The UE triggers and actually sends an SR PUCCH for a specific Logical channel or at least one Logical channel in a specific LCG

[0402] Here, it is considered that for a specific Logical channel, or a Logical channel in a specific LCG, an associated SR Config can be configured for it. When the LCG where this specific Logical channel is located, or this specific LCG, triggers a Regular BSR, when the UE does not have available UL-SCH initial transmission resources, the corresponding SR PUCCH can be sent based on this associated SR Config.

[0403] (b) Uplink Buffer reporting information indicates that there is a certain amount of data to be transmitted for a specific Logical channel / LCG (or, the amount of data to be transmitted > 0)

[0404] The determination of a specific Logical channel / LCG refers to the relevant description in Processing Criteria 1.

[0405] In a possible implementation manner, when the SR reporting information or uplink BSR reporting information of the target logical channel or the target logical channel group meets the second condition, the terminal performs a predefined operation on the target serving cell, including:

[0406] The terminal starts or continues to perform the predefined operation for the target serving cell from an eighth predefined time;

[0407] The eighth predefined time is determined based on the transmission time of the SR reporting information or the uplink BSR reporting information.

[0408] The eighth predefined time is any one of the following:

[0409] (1) The terminal adds the ninth time interval to the start time or end time of the first SR PUCCH transmission after triggering the SR, where the ninth time interval is specified by the protocol or configured by high-level signaling;

[0410] (2) The start time or end time of the first PUSCH transmission of the TB carrying the uplink BSR reporting information plus the tenth time interval, where the tenth time interval is specified by the protocol or configured by high-level signaling;

[0411] (3) For the HARQ process occupied by the TB transmission carrying the uplink BSR reporting information, the start time or end time of the PDCCH transmission corresponding to the uplink grant UL grant received by the terminal indicating the new transmission plus the eleventh time interval, where the eleventh time interval is specified by the protocol or configured by high-level signaling.

[0412] When based on the uplink buffer reporting information, the time for determining (starting or continuing) to execute the predefined operation may be any one of the above items.

[0413] When based on SR PUCCH transmission, the time for determining (starting or continuing) to perform the predefined operation may be: the start / end time of the first SR PUCCH transmission of the UE after triggering SR + delta5; wherein delta5 may be specified by the protocol or configured by high-level signaling, mainly considering possible delays such as multiple SR PUCCH transmissions and decoding.

[0414] By determining the eighth predefined time as described above, the terminal and the network can have a consistent understanding of the time for starting to execute the predefined operation, and can start executing the predefined operation as early as possible to ensure or improve data transmission performance.

[0415] In a possible implementation manner, when the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the second condition, the terminal performs a predefined operation for the target serving cell, further comprising:

[0416] When the fourth condition is met, the terminal stops executing the predefined operation;

[0417] The fourth condition includes any of the following:

[0418] (1) From the time the terminal determines to start or continue to perform the predefined operation, a second preset time period is reached;

[0419] (2) The uplink BSR reporting information indicates that the amount of data to be transmitted for the target logical channel or the target logical channel group is zero.

[0420] After both parties determine to (start or continue) perform the predefined operation on all or specific Serving cells, they may determine to stop performing the predefined operation based on any of the following (i.e., the fourth condition above):

[0421] (a) Each time a predefined operation is determined (started or continued), a timer is started or restarted, and when the timer times out, both parties determine to stop executing the predefined operation, that is, whether the second preset time length is reached is determined by the timer.

[0422] (b) When the amount of data to be transmitted for a specific Logical channel / LCG is 0 (for example, the uplink buffer reporting information indicates that the amount of data to be transmitted for a specific Logical channel / LCG is 0, or the UE reports an End of video frame indication (which can be indicated by physical layer dynamic signaling or by MAC CE)), both sides determine to stop executing the predefined operation.

[0423] Mode 3: Based on uplink and downlink scheduling information or scheduling conditions (corresponding to uplink and downlink data transmission requirements).

[0424] In a possible implementation manner, when the preset rule is associated with the uplink and downlink scheduling related information, the terminal performs a predefined operation according to the preset rule, including:

[0425] Mode 3-1: The terminal performs a predefined operation according to the transmission position of the physical downlink shared channel (PDSCH), channel state information reference signal (CSI-RS), physical uplink shared channel (PUSCH), physical uplink control channel (PUCCH) or sounding reference signal (SRS) corresponding to the scheduling downlink control information (DCI);

[0426] Mode 3-2: The terminal performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI, where the transmission attribute information is related to the size of the TB or the physical layer priority;

[0427] Method 3-3: The terminal performs predefined operations based on data scheduling related information.

[0428] Specifically, method 3-1 is as follows:

[0429] In a possible implementation manner, the terminal performs a predefined operation according to a location of a PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI, including:

[0430] It is assumed that the UE does not perform PDCCH detection for CORESET instances that overlap with Gap occasion(s) or Symbols with scheduling restrictions.

[0431] For a Gap occasion or Window with scheduling restrictions (which can be understood as some or all Symbols contained in the configured Window have scheduling restrictions, such as SMTCwindow), you can use any of the following methods:

[0432] (1) When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window in the time domain, or the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to the ninth threshold, the terminal performs a predefined operation for the interval opportunity or the first window; wherein the first window is a predefined window with scheduling restrictions;

[0433] When the PDSCH / CSI-RS or PUSCH / PUCCH / SRS transmission corresponding to / triggered by the scheduled DCI overlaps in the time domain with this Gapoccasion or Window with scheduling restrictions (i.e., the first window), or the time domain interval between any Symbols occupied by the two is less than or not greater than the predefined threshold, both sides consider that a predefined operation is performed on this Gapoccasion or Window with scheduling restrictions, such as disabling this Gapoccasion, or disabling Schedulingrestrictions within this Window with scheduling restrictions.

[0434] (2) when the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window, the terminal performs a predefined operation for the area of ​​time domain overlap;

[0435] (3) when the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to the tenth threshold, the terminal performs a predefined operation for the area of ​​extended time domain overlap, and the area of ​​extended time domain overlap is determined based on the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the tenth threshold;

[0436] When the PDSCH / CSI-RS or PUSCH / PUCCH / SRS transmission corresponding to / triggered by the scheduled DCI overlaps in time domain with this Gapoccasion or Window with scheduling restrictions, or the time domain interval between any Symbols occupied by the two is less than or not greater than the predefined threshold (it can be understood that the duration corresponding to any Symbol occupied by the PDSCH / CSI-RS or PUSCH / PUCCH / SRS transmission corresponding to / triggered by this scheduled DCI, and the extended duration corresponding to the union formed by the duration constituted by the predefined threshold durations before and after this Symbol, overlaps in time domain with this Gapoccasion or Window with scheduling restrictions, which can be called "extended time domain overlap"), both sides consider that only predefined operations are performed on the time domain overlapping area of ​​this Gap occasion or Window with scheduling restrictions, or the extended time domain overlapping area, such as lifting the data sending and receiving restrictions in the time domain overlapping area / extended time domain overlapping area of ​​this Gap occasion, or lifting the restrictions on data transmission and reception in this Window with Scheduling restrictions within the time domain overlapping area / extended time domain overlapping area of ​​schedulingrestrictions.

[0437] Similarly, when a Symbol with scheduling restrictions does not correspond to any Window, or is not further organized in a Window manner, you can use any of the following methods:

[0438] (4) the terminal performs a predefined operation for all time domain units with scheduling restrictions within a first time period, where the first time period is determined by the transmission of a PDSCH, CSI-RS, PUSCH, PUCCH or SRS corresponding to the scheduling DCI;

[0439] Perform predefined operations for all symbols with Scheduling restrictions within a period of time determined by the PDSCH / CSI-RS or PUSCH / PUCCH / SRS transmission corresponding to / triggered by the scheduling DCI. For example, this period of time is the time period corresponding to the specified duration starting from the earliest corresponding / triggered PDSCH / CSI-RS or PUSCH / PUCCH / SRS transmission or the start time of the slot where the transmission is located (or the duration / number of symbols corresponding to the predefined threshold). The specified duration here can be specified by the protocol or configured by high-level signaling, or directly indicated in the scheduling DCI.

[0440] (5) The terminal performs a predefined operation for all time domain units that have time domain overlap or extended time domain overlap with the second time period and have scheduling restrictions, and the second time period is determined by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI.

[0441] Predefined operations are performed only for all Symbols that have time domain overlap with PDSCH / CSI-RS or PUSCH / PUCCH / SRS transmission corresponding to / triggered by the scheduling DCI, or extended time domain overlap (based on the extended duration, see the corresponding description in the previous text for details), and there are scheduling restrictions.

[0442] Optionally, the priority of the PUCCH / PUSCH scheduled by the above DCI meets predefined requirements, such as a high priority, or the priority of the HARQ-ACK corresponding to the PDSCH scheduled by the above DCI meets predefined requirements, such as a high priority. When PHY priority is further introduced in the downlink direction, optionally, the priority of the PDSCH scheduled by the above DCI meets predefined requirements, such as a high priority.

[0443] Specifically, method 3-2 is as follows:

[0444] In a possible implementation manner, the terminal performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI, including:

[0445] When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, the terminal performs a predefined operation on the target serving cell, where N is specified by the protocol or configured by high-level signaling;

[0446] The fifth condition includes at least one of the following:

[0447] (1) The size of TB is greater than or equal to the eleventh threshold;

[0448] (2) The physical layer priority is a predefined priority.

[0449] Specifically, when the transmission attribute information indicated in the N (N>=1) consecutive (new transmission) scheduling DCIs recently detected by the UE in the specified transmission direction (downlink or uplink) satisfies at least one of the following (ie, the fifth condition above), both sides may determine that the UE performs a predefined operation for all Serving cells (or, all Serving cells of FR1 / FR2, or, all Serving cells of MCG / SCG, or, each Serving cell in the Serving cell list specified by the protocol or configured by high-level signaling) (start or continue):

[0450] (a) TB Size is greater than or not less than the predefined threshold;

[0451] (b) PHY priority is a predefined priority, such as a higher priority;

[0452] Based on the existing protocol regulations, only the uplink direction supports PHY priority. In fact, the downlink direction can also introduce PHY priority as needed, for example, indicating the PHY priority corresponding to the scheduled PDSCH in the DCI to distinguish the priority of the data carried by the PDSCH (which can be independently indicated from the existing HARQ-ACK priority corresponding to the scheduled PDSCH).

[0453] In a possible implementation manner, when the terminal detects in the target transmission direction that the transmission attribute information indicated in N consecutive scheduling DCIs satisfies the fifth condition, the terminal performs a predefined operation on the target serving cell, including:

[0454] When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, the terminal starts or continues to perform the predefined operation for the target serving cell from a ninth predefined time;

[0455] The ninth predefined time is determined based on the transmission time of N consecutive scheduled DCIs.

[0456] The ninth predefined time is determined based on the transmission time of N consecutive scheduled DCIs, and may be specifically as follows:

[0457] The ninth predefined time is the latest start time or the latest end time of the PDCCH transmission corresponding to N consecutive scheduled DCIs plus a twelfth time interval, and the twelfth time interval is specified by the protocol or configured by high-level signaling.

[0458] The above-mentioned time for determining (starting or continuing) executing the predefined operation can be: the latest start / end time of PDCCH transmission corresponding to N consecutive (newly transmitted) scheduled DCIs + delta6; wherein delta6 can be specified by the protocol or configured by high-level signaling, mainly considering the PDCCH decoding delay.

[0459] By determining the ninth predefined time as described above, the terminal and the network can have a consistent understanding of the time to start executing the predefined operation, and can start executing the predefined operation as early as possible to ensure or improve data transmission performance.

[0460] In a possible implementation manner, the terminal performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI, further comprising:

[0461] When the sixth condition is met, the terminal stops executing the predefined operation;

[0462] The sixth condition includes any of the following:

[0463] (1) starting from when the terminal determines to start or continue to perform the predefined operation, a third preset time period is reached;

[0464] (2) The terminal detects in the target transmission direction that the transmission attribute information indicated by at least one scheduling DCI in N consecutive scheduling DCIs does not meet the fifth condition.

[0465] After both parties determine to (start or continue) perform the predefined operation on all or specific Serving cells, they may determine to stop performing the predefined operation based on any of the following (i.e., the sixth condition above):

[0466] (a) Each time a predefined operation is determined (started or continued), a timer is started or restarted, and when the timer times out, both parties determine to stop executing the predefined operation. That is, the timer is used to determine whether the third preset time has been reached.

[0467] (b) When the information indicated in the N consecutive (new transmission) scheduling DCIs recently detected by the UE in the specified transmission direction no longer satisfies the above-mentioned specified items (i.e., one or more items satisfied when determining to (start or continue) performing a predefined operation for all or specific Serving cells) or any one of the items, both sides determine to stop performing the predefined operation.

[0468] Specifically, method 3-3 is as follows:

[0469] In a possible implementation, the terminal performs a predefined operation according to the data scheduling related information, including:

[0470] When the amount of data scheduled by the terminal in the third time period in the specified transmission direction or the amount of data actually scheduled for the target logical channel or the target logical channel group is greater than or equal to the eleventh threshold, the terminal performs a predefined operation on the target serving cell;

[0471] The third time period is specified by a protocol or configured by high-level signaling.

[0472] Specifically, it can be determined whether to (start or continue) perform the predefined operation according to the amount of data scheduled by the specified UE in the specified transmission direction (downlink or uplink) within the most recent period of time, or the amount of data actually scheduled for a specific RB / Logical channel. For example, when the above data amount is greater than or not less than the predefined threshold, both sides can determine that the UE (or, all Serving cells of FR1 / FR2, or, all Serving cells of MCG / SCG, or, the Serving cells specified by the protocol or configured by high-level signaling or each Serving cell in the Serving cell list) (start or continue) perform the predefined operation.

[0473] The above duration may be specified by the protocol or configured by high-level signaling.

[0474] The amount of data scheduled as described above may be considered to be the sum of the TB Sizes indicated by the (new transmission) scheduling DCI detected by the UE for the specified transmission direction within the time period.

[0475] The amount of data actually scheduled for the specific RB / Logical channel mentioned above can be directly determined based on the data assembly in the MAC PDU (the corresponding Logical channel can be identified based on the LCID field in the MAC subheader corresponding to each MAC SDU). The specific RB / Logical channel here can be a RB / Logical channel that maps a QoS flow corresponding to a specific service type or having specific attributes (such as XR service, or Video stream of XR service, or I Frame of Videostream of XR service), or the configuration of the RB / Logical channel meets the predefined requirements (for example, the Discard Timer configured for the RB is shorter than or not longer than the predefined threshold).

[0476] The above-mentioned most recent duration can be determined by a sliding window method, and its end time can be the start / end time of the PDCCH transmission corresponding to the scheduling DCI of the specified transmission direction received by the UE; its start time can be implicitly determined based on the end time and duration.

[0477] In a possible implementation manner, the terminal performs a predefined operation on the target serving cell, including:

[0478] The terminal starts or continues to perform the predefined operation for the target serving cell from the tenth predefined time;

[0479] The tenth predefined time is the end time of the third time period plus a preset time interval, and the preset time interval is specified by the protocol or configured by high-level signaling.

[0480] The above-mentioned time for determining (starting or continuing) executing the predefined operation can be: the end time of the most recent period + delta7; wherein delta7 can be specified by the protocol or configured by high-level signaling, mainly considering the delays of TB's HARQ transmission, decoding and decapsulation.

[0481] By determining the tenth predefined time as described above, the terminal and the network can have a consistent understanding of the time to start executing the predefined operation, and can start executing the predefined operation as early as possible to ensure or improve data transmission performance.

[0482] In a possible implementation manner, the terminal performs a predefined operation according to the data scheduling related information, further comprising:

[0483] When the seventh condition is met, the terminal stops executing the predefined operation;

[0484] The seventh condition includes any of the following:

[0485] (1) from the time when the terminal determines to start executing or continuing the predefined operation, a fourth preset time period is reached;

[0486] (2) The amount of data scheduled by the terminal in the third time period of the specified transmission direction or the amount of data actually scheduled for the target logical channel or the target logical channel group is less than the eleventh threshold.

[0487] After both parties determine to (start or continue) perform the predefined operation on all or specific Serving cells, they may determine to stop performing the predefined operation based on any of the following (i.e., the seventh condition above):

[0488] (a) Each time a predefined operation is determined (started or continued), a timer is started or restarted. When the timer times out, both parties determine to stop executing the predefined operation.

[0489] (b) When the information indicated in the N consecutive (new transmission) scheduling DCIs recently detected by the UE in the specified transmission direction no longer satisfies the above-mentioned specified items (i.e., one or more items satisfied when determining to (start or continue) performing a predefined operation for all or specific Serving cells) or any one of the items, both sides determine to stop performing the predefined operation.

[0490] In a possible implementation manner, the first object targeted by the predefined operation satisfies a predefined condition;

[0491] Among them, the first object includes a first time domain unit set or interval opportunity. For one or more of the above-mentioned methods (methods 1 / 2 / 3), it is determined to execute a predefined operation, or it is determined that the Window (such as Gap occasion or SMTC window, etc.) or Symbol with scheduling restrictions in which the predefined operation can be executed requires to meet the predefined conditions.

[0492] The predefined conditions include at least one of the following:

[0493] (1) The first object is applied to a scenario other than a first scenario, where the first scenario is specified by a protocol or configured by high-level signaling;

[0494] Window / Symbol with scheduling restrictions is not used for predefined purposes or scenarios 1, such as Radio Link Monitoring (RLM) and / or Beam Failure Detection (BFD).

[0495] (2) The first object is only applied to the second scenario, and the second scenario is specified by the protocol or configured by high-level signaling;

[0496] Window / Symbol with scheduling restrictions is only used for predefined purposes or scenarios 2, such as intra / inter-frequency measurement, and / or Positioning, etc. The predefined purposes or scenarios 2 here can be specified by the protocol or configured by high-level signaling.

[0497] (3) The priority of the first object meets the predefined priority requirement;

[0498] The priority corresponding to the Window meets predefined requirements, including absolute value requirements and / or relative requirements. Here, it is considered that only Windows with lower or sufficiently lower priorities are allowed to execute predefined operations, so as to avoid affecting the use of Windows with higher priority or more important functions as much as possible.

[0499] For absolute value requirements, for example, the corresponding priority is required to be lower or not higher than a predefined threshold, or the gapPriority-r17 corresponding to the GapConfig-r17 corresponding to the Gap occasion is required to be greater than or not less than a predefined threshold. The predefined threshold here can be specified by the protocol or configured by high-level signaling.

[0500] For relative requirements, for example, the corresponding priority is the lowest or one of the lowest N priorities among all configured GapConfig-r17s (or, the corresponding gapPriority-r17 is the largest or one of the largest N priorities among all configured GapConfig-r17s), or, the corresponding priority is the lowest or one of the lowest M priorities among the GapConfig-r17 corresponding to the Gap occasion that exists within a period of time (given by the period of time for determining whether to perform the predefined operation in each specific method) (or, the corresponding gapPriority-r17 is the largest or one of the largest M priorities among the GapConfig-r17 corresponding to the Gap occasion that exists within this period of time).

[0501] Currently, it is believed that there is no concept of priority for Symbols with scheduling restrictions.

[0502] (4) The period or length of the first object meets predefined requirements.

[0503] The period or length of the Window meets predefined requirements, for example, the period is not longer than a predefined threshold, and / or the length is not shorter than a predefined threshold. The predefined threshold here can be specified by the protocol or configured by high-level signaling.

[0504] It is currently believed that Symbol with scheduling restrictions does not involve concepts such as period and length.

[0505] In a possible implementation, when the predefined operation is to relax scheduling restrictions or disable scheduling restrictions within the first symbol time domain unit set, or to skip gap occasions or disable gap occasions, the predefined operation is performed, that is, for one or more of the above-mentioned modes (modes 1 / 2 / 3), when it is determined to perform a predefined operation for a certain Window or Symbol with scheduling restrictions, if the predefined operation is Relax / disable scheduling restrictions during a set of symbols or Skip / disable Gap occasion(s), any of the following is performed:

[0506] (1) The terminal expects to be scheduled, and the priorities of uplink transmission or downlink reception within the time range corresponding to the first object meet the specified priority requirements;

[0507] (2) The terminal expects to be scheduled, and the priorities corresponding to the uplink transmission or downlink reception overlapping with the time range corresponding to the first object meet the specified priority requirements;

[0508] For the above (1) and (2), the UE expects to be within the Window or Symbol with scheduling restrictions (including the situation where the scheduled uplink transmission / downlink reception is partially or completely within the Window or Symbol with scheduling restrictions; when the scheduled uplink transmission / downlink reception is only partially within the Window or Symbol with scheduling restrictions, it can also be understood that the scheduled uplink transmission / downlink reception overlaps with the Window or Symbol with scheduling restrictions in the time domain), only the uplink transmission / downlink reception whose priority meets specific requirements is scheduled, such as high-priority PUSCH / PUCCH / SRS transmission, or the corresponding HARQ-ACK is a high-priority PDSCH reception, or a high-priority PDSCH reception.

[0509] (3) The terminal does not expect to be scheduled, and the priorities corresponding to the uplink transmission or downlink reception within the time range corresponding to the first object do not meet the specified priority requirements;

[0510] (4) The terminal does not expect to be scheduled, and the priorities corresponding to the uplink transmission or downlink reception that overlaps with the time range corresponding to the first object do not meet the specified priority requirements.

[0511] For the above (3) and (4), the UE does not expect to be scheduled only for uplink transmission / downlink reception whose priority does not meet specific requirements within the Window or Symbol with scheduling restrictions (including the situation that the scheduled uplink transmission / downlink reception is partially or completely within the Window or Symbol with scheduling restrictions; when the scheduled uplink transmission / downlink reception is only partially within the Window or Symbol with scheduling restrictions, it can also be understood that the scheduled uplink transmission / downlink reception overlaps with the Window or Symbol with scheduling restrictions in the time domain), such as high-priority PUSCH / PUCCH / SRS transmission, or the corresponding HARQ-ACK is a high-priority PDSCH reception, or high-priority PDSCH reception. It can be understood that the UE expects to be scheduled for at least one uplink transmission or downlink reception whose priority meets specific requirements within the Window or Symbol with scheduling restrictions, and at this time, scheduling of other uplink transmissions or downlink receptions whose priorities do not meet specific requirements is also allowed (or without restriction).

[0512] See also Figure 4 , the embodiment of the present application provides a method for adjusting transmission restrictions, the execution subject of the method is a network side device, and the method includes:

[0513] Step 401: The network side device determines that there is a scheduling restriction or an effective target interval timing in the first serving cell;

[0514] Step 402: The network side device performs a predefined operation according to a preset rule;

[0515] The first serving cell is any serving cell configured by the terminal;

[0516] A preset rule is associated with any of the following:

[0517] (1) First reporting information related to the channel quality of the serving cell;

[0518] (2) Second reporting information related to uplink BSR or SR;

[0519] (3) Scheduling information related to uplink and downlink scheduling;

[0520] The predefined operations include at least one of the following:

[0521] (1) relaxing scheduling restrictions or disabling scheduling restrictions within the first time domain unit set;

[0522] (2) skipping or disabling at least one of the target intervals;

[0523] (3) Adjusting the interval pattern parameters corresponding to at least one interval opportunity among the target interval opportunities.

[0524] It should be noted that the relevant content in the network side method can be directly understood by referring to the relevant content in the terminal side method. In the method for adjusting the transmission restriction provided in the present application, the terminal side and the network side perform predefined operations based on the same preset rules, so that the terminal side and the network side have a consistent understanding.

[0525] In an embodiment of the present application, the terminal side and the network side perform predefined operations according to preset rules associated with any one of the reporting information related to the channel quality of the serving cell, the reporting information related to the uplink BSR or SR, and the uplink and downlink scheduling related information, to implement a scheme for adjusting transmission restrictions based on rules, and reasonably relax the transmission and reception restrictions brought by the Gap mechanism and the scheduling restrictions corresponding to the scheduling availability / restrictions by ensuring that the measurement requirements are not affected or the impact on the measurement performance is reduced, ensuring timely or as timely as possible data transmission, etc., so as to ensure the transmission performance of high data rate and low latency services.

[0526] In a possible implementation manner, when the preset rule is associated with the reporting information related to the channel quality of the serving cell, the network side device performs the predefined operation according to the preset rule, including:

[0527] When the channel quality of the serving cell is higher than or equal to the first threshold, the network side device performs a predefined operation according to the reporting information related to the channel quality of the serving cell.

[0528] In a possible implementation manner, the first reporting information includes a measurement report based on layer 3 measurement, and the network side device performs a predefined operation according to the first reporting information, including any one of the following:

[0529] In case of receiving a measurement report based on L3 measurement, the network side device performs a predefined operation, and the measurement report based on L3 measurement is triggered based on a measurement reporting event;

[0530] The network side device performs a predefined operation according to the channel quality information in the measurement report of the layer 3 measurement.

[0531] In a possible implementation manner, the network side device performs a predefined operation according to the measurement reporting event, including:

[0532] After the network side device receives the measurement report based on the L3 measurement reported based on the first event, the network side device performs the predefined operation from the first predefined time;

[0533] After the network side device receives the measurement report based on the L3 measurement reported based on the second event, the network side device stops performing the predefined operation at a second predefined time;

[0534] The first predefined time is determined based on the transmission time of the measurement report of the layer 3 measurement reported by the first event, and the second predefined time is determined based on the transmission time of the measurement report of the layer 3 measurement reported by the second event.

[0535] In a possible implementation manner, the network side device performs a predefined operation according to the channel quality information in the measurement report, including:

[0536] When the channel quality information in the first measurement report is higher than or equal to the second threshold, the network side device performs the predefined operation from a third predefined time;

[0537] When the channel quality information in the second measurement report is lower than or equal to the third threshold, the network side device stops performing the predefined operation at a fourth predefined time;

[0538] The third predefined time is determined based on the transmission time of the first measurement report, and the fourth predefined time is determined based on the transmission time of the second measurement report.

[0539] In a possible implementation manner, the network side device performs a predefined operation according to the CSI reporting information of the serving cell, including any one of the following:

[0540] When the channel quality information in the first CSI report is higher than or equal to the fourth threshold, the network side device performs the predefined operation from the fifth predefined time;

[0541] When the channel quality information in the second CSI report is lower than or equal to the fifth threshold, the network side device stops performing the predefined operation at a sixth predefined time;

[0542] The fifth predefined time is determined based on the transmission time of the first CSI report, and the sixth predefined time is determined based on the transmission time of the second CSI report.

[0543] In a possible implementation manner, when the preset rule is associated with the relevant reporting information of the uplink BSR or SR, the network side device performs the predefined operation according to the preset rule, including at least one of the following:

[0544] When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the network side device performs a predefined operation on the target serving cell;

[0545] When the SR reporting information or uplink BSR reporting information of the target logical channel or target logical channel group meets the second condition, the network side device performs a predefined operation on the target serving cell;

[0546] The first condition includes at least one of the following:

[0547] The waiting time of the data to be transmitted of the target logical channel or the target logical channel group is longer than or equal to the sixth threshold;

[0548] The remaining packet delay budget PDB of the to-be-transmitted data of the target logical channel or the target logical channel group is shorter than or equal to the seventh threshold;

[0549] The amount of data to be transmitted on the target logical channel or the target logical channel group is greater than or equal to an eighth threshold;

[0550] The second condition includes at least one of the following:

[0551] The network side device actually receives the SR PUCCH for the target logical channel or at least one logical channel in the target logical channel group;

[0552] The uplink BSR reporting information indicates that there is an amount of data to be transmitted for the target logical channel or the target logical channel group.

[0553] In a possible implementation manner, when the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the network side device performs a predefined operation on the target serving cell, including:

[0554] The network side device starts or continues to perform the predefined operation for the target serving cell from the seventh predefined time;

[0555] The seventh predefined time is determined based on the transmission time of the uplink BSR reporting information.

[0556] In a possible implementation manner, when the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the network side device performs a predefined operation for the target serving cell, further comprising:

[0557] When the third condition is met, the network side device stops executing the predefined operation;

[0558] The third condition includes any of the following:

[0559] Starting from when the network side device determines to start or continue to perform the predefined operation, a first preset time length is reached;

[0560] The reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information does not meet the first condition.

[0561] In a possible implementation manner, when the SR reporting information or uplink BSR reporting information of the target logical channel or the target logical channel group meets the second condition, the network side device performs a predefined operation on the target serving cell, including:

[0562] The network side device starts or continues to perform the predefined operation for the target serving cell from the eighth predefined time;

[0563] The eighth predefined time is determined based on the transmission time of the SR reporting information or the uplink BSR reporting information.

[0564] In a possible implementation manner, when the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the second condition, the network side device performs a predefined operation for the target serving cell, further comprising:

[0565] When the fourth condition is met, the network side device stops executing the predefined operation;

[0566] The fourth condition includes any of the following:

[0567] Starting from when the network side device determines to start or continue to perform the predefined operation, a second preset time period is reached;

[0568] The uplink BSR reporting information indicates that the amount of data to be transmitted for the target logical channel or the target logical channel group is zero.

[0569] In a possible implementation manner, when the preset rule is associated with the uplink and downlink scheduling related information, the network side device performs a predefined operation according to the preset rule, including:

[0570] The network side device performs a predefined operation according to the location of the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduled DCI;

[0571] The network side device performs the predefined operation according to the transmission attribute information indicated in the scheduling DCI;

[0572] The network side device performs predefined operations based on the data scheduling related information.

[0573] In a possible implementation manner, the network side device performs a predefined operation according to the location of the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI, including any one of the following:

[0574] When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window in the time domain, or the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to the ninth threshold, the network side device performs a predefined operation for the interval opportunity or the first window; wherein the first window is a predefined window with scheduling restrictions;

[0575] When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window, the network side device performs a predefined operation on the area of ​​time domain overlap;

[0576] When the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to the tenth threshold, the network side device performs a predefined operation on the area of ​​extended time domain overlap, and the area of ​​extended time domain overlap is determined based on the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the tenth threshold;

[0577] The network side device performs a predefined operation for all time domain units with scheduling restrictions within a first time period, where the first time period is determined by the transmission of a PDSCH, CSI-RS, PUSCH, PUCCH or SRS corresponding to the scheduling DCI;

[0578] The network side device performs predefined operations for all time domain units that have time domain overlap or extended time domain overlap with the second time period and have scheduling restrictions. The second time period is determined by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI.

[0579] In a possible implementation manner, the network side device performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI, including:

[0580] When the network side device detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, the network side device performs a predefined operation on the target serving cell, where N is specified by the protocol or configured by high-level signaling;

[0581] The fifth condition includes at least one of the following:

[0582] The size of TB is greater than or equal to the eleventh threshold;

[0583] The physical layer priority is a predefined priority.

[0584] In a possible implementation manner, when the network side device detects that the transmission attribute information indicated in N consecutive scheduling DCIs satisfies the fifth condition in the target transmission direction, the network side device performs a predefined operation on the target Serving cell, including:

[0585] When the network side device detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, the network side device starts or continues to perform the predefined operation for the target serving cell from the ninth predefined time;

[0586] The ninth predefined time is determined based on the transmission time of N consecutive scheduled DCIs.

[0587] In a possible implementation manner, the network side device performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI, further comprising:

[0588] When the sixth condition is met, the network side device stops executing the predefined operation;

[0589] The sixth condition includes any of the following:

[0590] Starting from when the network side device determines to start or continue to perform the predefined operation, a third preset time period is reached;

[0591] The network side device detects in the target transmission direction that the transmission attribute information indicated by at least one scheduling DCI in N consecutive scheduling DCIs does not meet the fifth condition.

[0592] In a possible implementation, the network side device performs a predefined operation according to the data scheduling related information, including:

[0593] When the amount of data scheduled by the network side device in the third time period in the specified transmission direction or the amount of data actually scheduled for the target logical channel or the target logical channel group is greater than or equal to the eleventh threshold, the network side device performs a predefined operation on the target serving cell;

[0594] The third time period is specified by a protocol or configured by high-level signaling.

[0595] In a possible implementation manner, the network-side device performs a predefined operation on the target serving cell, including:

[0596] The network side device starts or continues to perform the predefined operation for the target serving cell from the tenth predefined time;

[0597] The tenth predefined time is the end time of the third time period plus a preset time interval, and the preset time interval is specified by the protocol or configured by high-level signaling.

[0598] In a possible implementation manner, the network side device performs a predefined operation according to the data scheduling related information, further comprising:

[0599] When the seventh condition is met, the network side device stops executing the predefined operation;

[0600] The seventh condition includes any of the following:

[0601] Starting from when the network side device determines to start executing or continuing the predefined operation, a fourth preset time length is reached;

[0602] The amount of data scheduled by the network side device in the third time period of the specified transmission direction, or the amount of data actually scheduled for the target logical channel or the target logical channel group, is less than the eleventh threshold.

[0603] In a possible implementation manner, the first object targeted by the predefined operation satisfies a predefined condition;

[0604] The first object includes a first time domain unit set or an interval opportunity, and the predefined condition includes at least one of the following:

[0605] The first object is applied to a scenario other than a first scenario, where the first scenario is specified by a protocol or configured by a high-level signaling;

[0606] The first object is only applied to the second scenario, where the second scenario is specified by the protocol or configured by high-level signaling;

[0607] The priority of the first object meets the predefined priority requirement;

[0608] The period or length of the first object meets predefined requirements.

[0609] In a possible implementation manner, when the predefined operation is to relax scheduling restrictions or disable scheduling restrictions, or skip interval opportunities or disable interval opportunities within the first symbol time domain unit set, performing the predefined operation includes any one of the following:

[0610] (1) The network side device ensures that the priorities of the uplink transmission or downlink reception within the time range corresponding to the first object meet the specified priority requirements for the terminal scheduling;

[0611] (2) The network side device ensures that the priorities corresponding to the uplink transmission or downlink reception that overlaps with the time range corresponding to the first object for the terminal scheduling meet the specified priority requirements;

[0612] (3) The network side device ensures that the terminal is scheduled, and the priority corresponding to at least one of the uplink transmissions or downlink receptions within the time range corresponding to the first object meets the specified priority requirement;

[0613] (4) The network side device ensures that the terminal is scheduled, and at least one of the uplink transmissions or downlink receptions that overlaps with the time range corresponding to the first object has a priority level that meets the specified priority requirement.

[0614] With respect to the above (3) and (4), it can be understood that, corresponding to the terminal side, the terminal does not expect the scheduled uplink transmission or downlink reception to have the following situation: the priorities corresponding to the uplink transmission or downlink reception within the time range corresponding to the first object do not meet the specified priority requirements, or the priorities corresponding to the uplink transmission or downlink reception overlapping with the time range corresponding to the first object do not meet the specified priority requirements. Therefore, on the network side, the uplink transmission or downlink reception scheduled by the network side device for the terminal requires that: among the uplink transmission or downlink reception within the time range corresponding to the first object, at least one of the priorities corresponding to the uplink transmission or downlink reception meets the specified priority requirements, or at least one of the priorities corresponding to the uplink transmission or downlink reception overlapping with the time range corresponding to the first object meets the specified priority requirements.

[0615] The method for adjusting transmission restrictions provided in the embodiment of the present application can be executed by a device for adjusting transmission restrictions. In the embodiment of the present application, the device for adjusting transmission restrictions performing the method for adjusting transmission restrictions is taken as an example to illustrate the device for adjusting transmission restrictions provided in the embodiment of the present application.

[0616] See also Figure 5 , an embodiment of the present application provides a device for adjusting transmission restriction, which can be applied to a terminal, and includes:

[0617] A first determination module 501, configured for the terminal to determine whether there is a scheduling restriction or a valid target interval timing in the first serving cell;

[0618] The first execution module 502 is used for the terminal to execute a predefined operation according to a preset rule;

[0619] The first serving cell is any serving cell configured by the terminal;

[0620] The preset rule is associated with any of the following:

[0621] First reporting information related to the channel quality of the serving cell;

[0622] Second reporting information related to uplink BSR or SR;

[0623] Scheduling information related to uplink and downlink scheduling;

[0624] The predefined operation includes at least one of the following:

[0625] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0626] skipping or disabling at least one of the target intervals;

[0627] An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

[0628] Optionally, when the preset rule is associated with first reporting information related to the channel quality of the serving cell, the first execution module is specifically configured to:

[0629] In a case where the channel quality of the serving cell is higher than or equal to the first threshold, the terminal performs the predefined operation according to the reporting information related to the channel quality of the serving cell.

[0630] Optionally, the first reporting information includes a measurement report based on layer 3 measurement, and the first execution module is specifically used for any of the following:

[0631] In case of sending a measurement report based on L3 measurement, the terminal performs the predefined operation, and the measurement report based on L3 measurement is triggered based on a measurement reporting event;

[0632] The terminal performs the predefined operation according to the channel quality information in the measurement report of the layer 3 measurement.

[0633] Optionally, the first execution module is specifically configured to:

[0634] After the terminal sends a measurement report based on L3 measurement based on the first event, the terminal performs the predefined operation from a first predefined time;

[0635] After the terminal sends the measurement report based on the L3 measurement based on the second event, the terminal stops performing the predefined operation at a second predefined time;

[0636] The first predefined time is determined based on a transmission time of a measurement report of layer 3 measurement sent by the first event, and the second predefined time is determined based on a transmission time of a measurement report of layer 3 measurement sent by the second event.

[0637] Optionally, the first execution module is specifically configured to:

[0638] When the channel quality information in the first measurement report is higher than or equal to the second threshold, the terminal performs the predefined operation from a third predefined time;

[0639] When the channel quality information in the second measurement report is lower than or equal to a third threshold, the terminal stops performing the predefined operation at a fourth predefined time;

[0640] The third predefined time is determined based on the transmission time of the first measurement report, and the fourth predefined time is determined based on the transmission time of the second measurement report.

[0641] Optionally, the first reporting information includes a channel state information CSI report, and the first execution module is specifically used for any one of the following:

[0642] When the channel quality information in the first CSI report is higher than or equal to a fourth threshold, the terminal performs the predefined operation starting from a fifth predefined time;

[0643] When the channel quality information in the second CSI report is lower than or equal to a fifth threshold, the terminal stops performing the predefined operation at a sixth predefined time;

[0644] The fifth predefined time is determined based on the transmission time of the first CSI report, and the sixth predefined time is determined based on the transmission time of the second CSI report.

[0645] Optionally, when the preset rule is associated with the second reporting information related to the uplink BSR or SR, the first execution module is specifically used for at least one of the following:

[0646] When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the terminal performs the predefined operation for the target serving cell;

[0647] When the SR reporting information or uplink BSR reporting information for the target logical channel or target logical channel group meets the second condition, the terminal performs the predefined operation for the target serving cell;

[0648] The first condition includes at least one of the following:

[0649] The waiting time of the data to be transmitted of the target logical channel or the target logical channel group is longer than or equal to the sixth threshold;

[0650] The remaining packet delay budget PDB of the to-be-transmitted data of the target logical channel or the target logical channel group is shorter than or equal to the seventh threshold;

[0651] The amount of data to be transmitted on the target logical channel or target logical channel group is higher than or equal to an eighth threshold;

[0652] The second condition includes at least one of the following:

[0653] The terminal triggers and actually sends an SR PUCCH for the target logical channel or at least one logical channel in the target logical channel group;

[0654] The uplink BSR reporting information indicates that there is an amount of data to be transmitted for the target logical channel or the target logical channel group.

[0655] Optionally, when reporting information for a target logical channel or a target logical channel group in the uplink BSR reporting information satisfies a first condition, the first execution module is specifically configured to:

[0656] The terminal starts or continues to perform the predefined operation for the target serving cell from a seventh predefined time;

[0657] The seventh predefined time is determined based on the transmission time of the uplink BSR reporting information.

[0658] Optionally, when reporting information for a target logical channel or a target logical channel group in the uplink BSR reporting information satisfies a first condition, the first execution module is specifically configured to:

[0659] When a third condition is met, the terminal stops executing the predefined operation;

[0660] The third condition includes any one of the following:

[0661] Starting from when the terminal determines to start or continue to perform the predefined operation, a first preset time length is reached;

[0662] The reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information does not meet the first condition.

[0663] Optionally, when the SR reporting information or uplink BSR reporting information of the target logical channel or the target logical channel group meets the second condition, the first execution module is specifically used to:

[0664] The terminal starts or continues to perform the predefined operation for the target serving cell from an eighth predefined time;

[0665] The eighth predefined time is determined based on the transmission time of the SR reporting information or the uplink BSR reporting information.

[0666] Optionally, when reporting information for a target logical channel or a target logical channel group in the uplink BSR reporting information satisfies a second condition, the first execution module is specifically configured to:

[0667] When the fourth condition is met, the terminal stops executing the predefined operation;

[0668] The fourth condition includes any one of the following:

[0669] Starting from when the terminal determines to start or continue to perform the predefined operation, a second preset time period is reached;

[0670] The uplink BSR reporting information indicates that the amount of data to be transmitted for the target logical channel or the target logical channel group is zero.

[0671] Optionally, when the preset rule is associated with uplink and downlink scheduling related information, the first execution module is specifically configured to:

[0672] The terminal performs a predefined operation according to a location of a PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI;

[0673] The terminal performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI;

[0674] The terminal performs a predefined operation according to the data scheduling related information.

[0675] Optionally, the first execution module is specifically used for any of the following:

[0676] When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window in the time domain, or the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to a ninth threshold, the terminal performs the predefined operation for the interval opportunity or the first window; wherein the first window is a predefined window with the scheduling restriction;

[0677] When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window in the time domain, the terminal performs the predefined operation for the area of ​​the time domain overlap;

[0678] In a case where the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to the tenth threshold, the terminal performs the predefined operation for the area of ​​extended time domain overlap, and the area of ​​extended time domain overlap is determined based on the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the tenth threshold;

[0679] The terminal performs the predefined operation for all time domain units within the scheduling restriction within a first time period, where the first time period is determined by the transmission of a PDSCH, a CSI-RS, a PUSCH, a PUCCH or an SRS corresponding to the scheduling DCI;

[0680] The terminal performs predefined operations for all time domain units that have time domain overlap or extended time domain overlap with a second time period and have the scheduling restriction, and the second time period is determined by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI.

[0681] Optionally, the first execution module is specifically configured to:

[0682] When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction all meets the fifth condition, the terminal performs the predefined operation for the target serving cell, where N is specified by the protocol or configured by high-layer signaling;

[0683] The fifth condition includes at least one of the following:

[0684] The size of TB is greater than or equal to the eleventh threshold;

[0685] The physical layer priority is a predefined priority.

[0686] Optionally, when the terminal detects in the target transmission direction that the transmission attribute information indicated in N consecutive scheduling DCIs satisfies the fifth condition, the first execution module is specifically configured to:

[0687] When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, the terminal starts or continues to perform the predefined operation for the target serving cell from a ninth predefined time;

[0688] The N is specified by a protocol or configured by high-level signaling, and the ninth predefined time is determined based on the transmission time of the N consecutive scheduled DCIs.

[0689] Optionally, the first execution module is specifically configured to:

[0690] When the sixth condition is met, the terminal stops executing the predefined operation;

[0691] The sixth condition includes any one of the following:

[0692] Starting from when the terminal determines to start or continue to perform the predefined operation, a third preset time period is reached;

[0693] The terminal detects in the target transmission direction that transmission attribute information indicated by at least one scheduling DCI in N consecutive scheduling DCIs does not satisfy the fifth condition.

[0694] Optionally, the first execution module is specifically configured to:

[0695] When the amount of data scheduled by the terminal in the third time period in the specified transmission direction or the amount of data actually scheduled for the target logical channel or the target logical channel group is greater than or equal to the eleventh threshold, the terminal performs the predefined operation for the target serving cell;

[0696] The third time period is specified by a protocol or configured by high-level signaling.

[0697] Optionally, the first execution module is specifically configured to:

[0698] The terminal starts or continues to perform the predefined operation for the target serving cell from a tenth predefined time;

[0699] The tenth predefined time is the end time of the third time period plus a preset time interval, and the preset time interval is specified by a protocol or configured by high-level signaling.

[0700] Optionally, the first execution module is specifically configured to:

[0701] When the seventh condition is met, the terminal stops executing the predefined operation;

[0702] The seventh condition includes any one of the following:

[0703] Starting from when the terminal determines to start executing or continuing the predefined operation, a fourth preset time length is reached;

[0704] The amount of data scheduled by the terminal in a third time period in a specified transmission direction, or the amount of data actually scheduled for a target logical channel or a target logical channel group, is less than an eleventh threshold.

[0705] Optionally, the first object targeted by the predefined operation satisfies a predefined condition;

[0706] The first object includes the first time domain unit set or the interval opportunity, and the predefined condition includes at least one of the following:

[0707] The first object is applied to a scenario other than a first scenario, where the first scenario is specified by a protocol or configured by high-layer signaling;

[0708] The first object is only applied to a second scenario, where the second scenario is specified by a protocol or configured by high-level signaling;

[0709] The priority of the first object meets a predefined priority requirement;

[0710] The period or length of the first object meets a predefined requirement.

[0711] Optionally, when the predefined operation is to relax scheduling restrictions or disable scheduling restrictions, or skip interval opportunities or disable interval opportunities within the first symbol time domain unit set, the first execution module is specifically used for any one of the following:

[0712] The terminal expects to be scheduled, and the priorities corresponding to uplink transmission or downlink reception within the time range corresponding to the first object meet the specified priority requirements;

[0713] The terminal expects to be scheduled, and the priorities corresponding to uplink transmission or downlink reception overlapping with the time range corresponding to the first object meet the specified priority requirements;

[0714] The terminal does not expect to be scheduled, and the priorities corresponding to uplink transmission or downlink reception within the time range corresponding to the first object do not meet the specified priority requirement;

[0715] The terminal does not expect to be scheduled, and the priorities corresponding to uplink transmission or downlink reception overlapping with the time range corresponding to the first object do not meet the specified priority requirements.

[0716] See also Figure 6 , an embodiment of the present application provides a device for adjusting transmission restrictions, the device is applied to a network side device, and the device includes:

[0717] The second determination module 601 is used for the network side device to determine whether there is a scheduling restriction in the target serving cell or there is a sending and receiving restriction corresponding to the target interval timing;

[0718] The second execution module 602 is used for the network side device to execute a predefined operation according to a preset rule;

[0719] The preset rule is associated with any of the following:

[0720] First reporting information related to the channel quality of the serving cell;

[0721] Second reporting information related to uplink BSR or SR;

[0722] Scheduling information related to uplink and downlink scheduling;

[0723] The predefined operation includes at least one of the following:

[0724] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0725] skipping or disabling at least one of the target intervals or disabling the interval;

[0726] An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

[0727] Optionally, when the preset rule is associated with reporting information related to channel quality of the serving cell, the second execution module is configured to:

[0728] When the channel quality of the serving cell is higher than or equal to the first threshold, the network side device performs the predefined operation according to the reporting information related to the channel quality of the serving cell.

[0729] Optionally, the first reporting information includes a measurement report based on layer 3 measurement, and the first execution module is specifically used for any of the following:

[0730] In the case of sending a measurement report based on L3 measurement, the network side device performs the predefined operation, and the measurement report based on L3 measurement is triggered based on a measurement reporting event;

[0731] The network side device performs the predefined operation according to the channel quality information in the measurement report of the layer 3 measurement.

[0732] Optionally, the first execution module is specifically configured to:

[0733] After the network side device receives the measurement report based on the L3 measurement reported based on the first event, the network side device performs the predefined operation from a first predefined time;

[0734] After the network side device receives the measurement report based on the L3 measurement reported based on the second event, the network side device stops performing the predefined operation at a second predefined time;

[0735] The first predefined time is determined based on a transmission time of a measurement report of layer 3 measurement reported by the first event, and the second predefined time is determined based on a transmission time of a measurement report of layer 3 measurement reported by the second event.

[0736] Optionally, the second execution module is used to:

[0737] When the channel quality information in the first measurement report is higher than or equal to the second threshold, the network side device performs the predefined operation from a third predefined time;

[0738] When the channel quality information in the second measurement report is lower than or equal to the third threshold, the network side device stops performing the predefined operation at a fourth predefined time;

[0739] The third predefined time is determined based on the transmission time of the first measurement report, and the fourth predefined time is determined based on the transmission time of the second measurement report.

[0740] Optionally, the first reporting information includes a channel state information CSI report, and the second execution module is used for any one of the following:

[0741] When the channel quality information in the first CSI report is higher than or equal to a fourth threshold, the network side device performs the predefined operation from a fifth predefined time;

[0742] When the channel quality information in the second CSI report is lower than or equal to the fifth threshold, the network side device stops performing the predefined operation at a sixth predefined time;

[0743] The fifth predefined time is determined based on the transmission time of the first CSI report, and the sixth predefined time is determined based on the transmission time of the second CSI report.

[0744] Optionally, when the preset rule is associated with relevant reporting information of an uplink BSR or SR, the second execution module is configured to perform at least one of the following:

[0745] When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the network side device performs the predefined operation for the target serving cell;

[0746] When the SR reporting information or uplink BSR reporting information for the target logical channel or target logical channel group meets the second condition, the network side device performs the predefined operation for the target serving cell;

[0747] The first condition includes at least one of the following:

[0748] The waiting time of the data to be transmitted of the target logical channel or the target logical channel group is longer than or equal to the sixth threshold;

[0749] The remaining packet delay budget PDB of the to-be-transmitted data of the target logical channel or the target logical channel group is shorter than or equal to the seventh threshold;

[0750] The amount of data to be transmitted on the target logical channel or target logical channel group is higher than or equal to an eighth threshold;

[0751] The second condition includes at least one of the following:

[0752] The network side device actually receives the SR PUCCH for the target logical channel or at least one logical channel in the target logical channel group;

[0753] The uplink BSR reporting information indicates that there is an amount of data to be transmitted for the target logical channel or the target logical channel group.

[0754] Optionally, when the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the second execution module is used to:

[0755] The network side device starts or continues to perform the predefined operation for the target serving cell from a seventh predefined time;

[0756] The seventh predefined time is determined based on the transmission time of the uplink BSR reporting information.

[0757] Optionally, when the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the second execution module is used to:

[0758] When the third condition is met, the network side device stops executing the predefined operation;

[0759] The third condition includes any one of the following:

[0760] Starting from when the network side device determines to start or continue to perform the predefined operation, a first preset time length is reached;

[0761] The reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information does not meet the first condition.

[0762] Optionally, when the SR reporting information or uplink BSR reporting information of the target logical channel or the target logical channel group meets the second condition, the second execution module is used to:

[0763] The network side device starts or continues to perform the predefined operation for the target serving cell from an eighth predefined time;

[0764] The eighth predefined time is determined based on the transmission time of the SR reporting information or the uplink BSR reporting information.

[0765] Optionally, when the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the second condition, the second execution module is configured to:

[0766] When the fourth condition is met, the network side device stops executing the predefined operation;

[0767] The fourth condition includes any one of the following:

[0768] Starting from when the network side device determines to start or continue to perform the predefined operation, a second preset time length is reached;

[0769] The uplink BSR reporting information indicates that the amount of data to be transmitted for the target logical channel or the target logical channel group is zero.

[0770] Optionally, when the preset rule is associated with uplink and downlink scheduling related information, the second execution module is configured to:

[0771] The network side device performs a predefined operation according to the location of the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI;

[0772] The network side device performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI;

[0773] The network side device performs a predefined operation according to the data scheduling related information.

[0774] Optionally, the second execution module is used for any of the following:

[0775] When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window in the time domain, or the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to the ninth threshold, the network side device performs the predefined operation for the interval opportunity or the first window; wherein the first window is a predefined window with the scheduling restriction;

[0776] When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduled DCI overlaps with the interval opportunity or the first window in time domain, the network side device performs the predefined operation on the area of ​​the time domain overlap;

[0777] In a case where the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to the tenth threshold, the network side device performs the predefined operation for the area of ​​extended time domain overlap, and the area of ​​extended time domain overlap is determined based on the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the tenth threshold;

[0778] The network side device performs the predefined operation for all time domain units within the scheduling restriction within a first time period, where the first time period is determined by the transmission of a PDSCH, a CSI-RS, a PUSCH, a PUCCH or an SRS corresponding to the scheduling DCI;

[0779] The network side device performs predefined operations for all time domain units that have time domain overlap or extended time domain overlap with a second time period and have the scheduling restriction, and the second time period is determined by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI.

[0780] Optionally, the second execution module is used to:

[0781] When the network side device detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction all meets the fifth condition, the network side device performs the predefined operation on the target serving cell, where N is specified by the protocol or configured by high-level signaling;

[0782] The fifth condition includes at least one of the following:

[0783] The size of TB is greater than or equal to the eleventh threshold;

[0784] The physical layer priority is a predefined priority.

[0785] Optionally, when the network side device detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, the second execution module is used to:

[0786] When the network side device detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, the network side device starts or continues to perform the predefined operation for the target serving cell from a ninth predefined time;

[0787] The ninth predefined time is determined based on the transmission time of the N consecutive scheduled DCIs.

[0788] Optionally, the second execution module is used to:

[0789] When the sixth condition is met, the network side device stops executing the predefined operation;

[0790] The sixth condition includes any one of the following:

[0791] Starting from when the network side device determines to start or continue to perform the predefined operation, a third preset time length is reached;

[0792] The network side device detects in the target transmission direction that the transmission attribute information indicated by at least one scheduling DCI in N consecutive scheduling DCIs does not meet the fifth condition.

[0793] Optionally, the second execution module is used to:

[0794] When the amount of data scheduled by the network side device in the third time period in the specified transmission direction or the amount of data actually scheduled for the target logical channel or the target logical channel group is greater than or equal to the eleventh threshold, the network side device performs the predefined operation on the target serving cell;

[0795] The third time period is specified by a protocol or configured by high-level signaling.

[0796] Optionally, the second execution module is used to:

[0797] The network side device starts or continues to perform the predefined operation for the target serving cell from a tenth predefined time;

[0798] The tenth predefined time is the end time of the third time period plus a preset time interval, and the preset time interval is specified by a protocol or configured by high-level signaling.

[0799] Optionally, the second execution module is used to:

[0800] When the seventh condition is met, the network side device stops executing the predefined operation;

[0801] The seventh condition includes any one of the following:

[0802] Starting from when the network side device determines to start executing or continuing the predefined operation, a fourth preset time length is reached;

[0803] The amount of data scheduled by the network side device in the third time period of the specified transmission direction, or the amount of data actually scheduled for the target logical channel or the target logical channel group, is less than the eleventh threshold.

[0804] Optionally, the first object targeted by the predefined operation satisfies a predefined condition;

[0805] The first object includes the first time domain unit set or the interval opportunity, and the predefined condition includes at least one of the following:

[0806] The first object is applied to a scenario other than a first scenario, where the first scenario is specified by a protocol or configured by high-layer signaling;

[0807] The first object is only applied to a second scenario, where the second scenario is specified by a protocol or configured by high-level signaling;

[0808] The priority of the first object meets a predefined priority requirement;

[0809] The period or length of the first object meets a predefined requirement.

[0810] Optionally, when the predefined operation is to relax scheduling restrictions or disable scheduling restrictions, or skip interval opportunities or disable interval opportunities within the first symbol time domain unit set, the second execution module is used for any one of the following:

[0811] The network side device ensures scheduling for the terminal, and the priorities corresponding to uplink transmission or downlink reception within the time range corresponding to the first object meet the specified priority requirements;

[0812] The network side device ensures that the priorities corresponding to the uplink transmission or downlink reception that overlaps with the time range corresponding to the first object for scheduling the terminal meet the specified priority requirements;

[0813] The network side device ensures that the terminal is scheduled, and the priority corresponding to at least one of the uplink transmission or downlink reception within the time range corresponding to the first object meets the specified priority requirement;

[0814] The network side device ensures scheduling for the terminal, and at least one of the uplink transmissions or downlink receptions overlapping with the time range corresponding to the first object has a priority level that meets the specified priority requirement.

[0815] The device for adjusting the transmission restriction in the embodiment of the present application can be an electronic device, such as an electronic device with an operating system, or a component in the electronic device, such as an integrated circuit or a chip. The electronic device can be a terminal, or it can be other devices other than a terminal. Exemplarily, the terminal can include but is not limited to the types of terminals 11 listed above, and other devices can be servers, network attached storage (NAS), etc., which are not specifically limited in the embodiment of the present application.

[0816] The device for adjusting transmission restrictions provided in the embodiment of the present application can achieve Figures 2 to 4 The various processes implemented by the method embodiment and achieving the same technical effect are not described here to avoid repetition.

[0817] like Figure 7 As shown, the embodiment of the present application further provides a communication device 700, including a processor 701 and a memory 702, and the memory 702 stores a program or instruction that can be run on the processor 701. For example, when the communication device 700 is a terminal, the program or instruction is executed by the processor 701 to implement the various steps of the above method embodiment, and can achieve the same technical effect. When the communication device 700 is a network side device, the program or instruction is executed by the processor 701 to implement the various steps of the above method embodiment, and can achieve the same technical effect. To avoid repetition, it will not be repeated here.

[0818] The embodiment of the present application also provides a terminal, including a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is used to run a program or instruction to implement the steps in the terminal side method embodiment. The terminal embodiment corresponds to the above-mentioned terminal side method embodiment, and each implementation process and implementation method of the above-mentioned method embodiment can be applied to the terminal embodiment and can achieve the same technical effect. Specifically, Figure 8 A schematic diagram of the hardware structure of a terminal for implementing an embodiment of the present application.

[0819] The terminal 800 includes but is not limited to: a radio frequency unit 801, a network module 802, an audio output unit 803, an input unit 804, a sensor 805, a display unit 806, a user input unit 807, an interface unit 808, a memory 809 and at least some of the components of a processor 810.

[0820] Those skilled in the art will appreciate that the terminal 800 may also include a power source (such as a battery) for supplying power to various components, and the power source may be logically connected to the processor 810 through a power management system, thereby implementing functions such as managing charging, discharging, and power consumption management through the power management system. Figure 8 The terminal structure shown in the figure does not constitute a limitation on the terminal. The terminal may include more or fewer components than shown in the figure, or combine certain components, or arrange the components differently, which will not be described in detail here.

[0821] It should be understood that in the embodiment of the present application, the input unit 804 may include a graphics processing unit (GPU) 8041 and a microphone 8042, and the graphics processor 8041 processes the image data of a static picture or video obtained by an image capture device (such as a camera) in a video capture mode or an image capture mode. The display unit 806 may include a display panel 8061, and the display panel 8061 may be configured in the form of a liquid crystal display, an organic light emitting diode, etc. The user input unit 807 includes a touch panel 8071 and at least one of other input devices 8072. The touch panel 8071 is also called a touch screen. The touch panel 8071 may include two parts: a touch detection device and a touch controller. Other input devices 8072 may include, but are not limited to, a physical keyboard, function keys (such as volume control keys, switch keys, etc.), a trackball, a mouse, and a joystick, which will not be repeated here.

[0822] In the embodiment of the present application, after receiving downlink data from the network side device, the radio frequency unit 801 can transmit the data to the processor 810 for processing; in addition, the radio frequency unit 801 can send uplink data to the network side device. Generally, the radio frequency unit 801 includes but is not limited to an antenna, an amplifier, a transceiver, a coupler, a low noise amplifier, a duplexer, etc.

[0823] The memory 809 can be used to store software programs or instructions and various data. The memory 809 may mainly include a first storage area for storing programs or instructions and a second storage area for storing data, wherein the first storage area may store an operating system, an application program or instruction required for at least one function (such as a sound playback function, an image playback function, etc.), etc. In addition, the memory 809 may include a volatile memory or a non-volatile memory. Among them, the non-volatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory may be a random access memory (RAM), a static random access memory (SRAM), a dynamic random access memory (DRAM), a synchronous dynamic random access memory (SDRAM), a double data rate synchronous dynamic random access memory (DDRSDRAM), an enhanced synchronous dynamic random access memory (ESDRAM), a synchronous link dynamic random access memory (SLDRAM) and a direct memory bus random access memory (DRRAM). The memory 809 in the embodiment of the present application includes but is not limited to these and any other suitable types of memory.

[0824] The processor 810 may include one or more processing units; optionally, the processor 810 integrates an application processor and a modem processor, wherein the application processor mainly processes operations related to an operating system, a user interface, and application programs, and the modem processor mainly processes wireless communication signals, such as a baseband processor. It is understandable that the modem processor may not be integrated into the processor 810.

[0825] The processor 810 is configured to be used by the terminal to determine whether there is a scheduling restriction or a valid target interval timing in the first serving cell;

[0826] Processor 810, used for the terminal to perform a predefined operation according to a preset rule;

[0827] The first serving cell is any serving cell configured by the terminal;

[0828] The preset rule is associated with any of the following:

[0829] First reporting information related to the channel quality of the serving cell;

[0830] Second reporting information related to uplink BSR or SR;

[0831] Scheduling information related to uplink and downlink scheduling;

[0832] The predefined operation includes at least one of the following:

[0833] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0834] skipping or disabling at least one of the target intervals;

[0835] An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

[0836] Optionally, when the preset rule is associated with first reporting information related to the channel quality of the serving cell, the processor 810 is specifically configured to:

[0837] In a case where the channel quality of the serving cell is higher than or equal to the first threshold, the terminal performs the predefined operation according to the reporting information related to the channel quality of the serving cell.

[0838] Optionally, the first reporting information includes a measurement report based on layer 3 measurement, and the processor 810 is specifically configured to perform any of the following:

[0839] In case of sending a measurement report based on L3 measurement, the terminal performs the predefined operation, and the measurement report based on L3 measurement is triggered based on a measurement reporting event;

[0840] The terminal performs the predefined operation according to the channel quality information in the measurement report of the layer 3 measurement.

[0841] Optionally, the processor 810 is specifically configured to:

[0842] After the terminal sends a measurement report based on L3 measurement based on the first event, the terminal performs the predefined operation from a first predefined time;

[0843] After the terminal sends the measurement report based on the L3 measurement based on the second event, the terminal stops performing the predefined operation at a second predefined time;

[0844] The first predefined time is determined based on a transmission time of a measurement report of layer 3 measurement sent by the first event, and the second predefined time is determined based on a transmission time of a measurement report of layer 3 measurement sent by the second event.

[0845] Optionally, the processor 810 is specifically configured to:

[0846] When the channel quality information in the first measurement report is higher than or equal to the second threshold, the terminal performs the predefined operation from a third predefined time;

[0847] When the channel quality information in the second measurement report is lower than or equal to a third threshold, the terminal stops performing the predefined operation at a fourth predefined time;

[0848] The third predefined time is determined based on the transmission time of the first measurement report, and the fourth predefined time is determined based on the transmission time of the second measurement report.

[0849] Optionally, the first reporting information includes a channel state information CSI report, and the processor 810 is specifically configured to do any one of the following:

[0850] When the channel quality information in the first CSI report is higher than or equal to a fourth threshold, the terminal performs the predefined operation starting from a fifth predefined time;

[0851] When the channel quality information in the second CSI report is lower than or equal to a fifth threshold, the terminal stops performing the predefined operation at a sixth predefined time;

[0852] The fifth predefined time is determined based on the transmission time of the first CSI report, and the sixth predefined time is determined based on the transmission time of the second CSI report.

[0853] Optionally, when the preset rule is associated with second reporting information related to an uplink BSR or SR, the processor 810 is specifically configured to do at least one of the following:

[0854] When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the terminal performs the predefined operation for the target serving cell;

[0855] When the SR reporting information or uplink BSR reporting information for the target logical channel or target logical channel group meets the second condition, the terminal performs the predefined operation for the target serving cell;

[0856] The first condition includes at least one of the following:

[0857] The waiting time of the data to be transmitted of the target logical channel or the target logical channel group is longer than or equal to the sixth threshold;

[0858] The remaining packet delay budget PDB of the to-be-transmitted data of the target logical channel or the target logical channel group is shorter than or equal to the seventh threshold;

[0859] The amount of data to be transmitted on the target logical channel or target logical channel group is higher than or equal to an eighth threshold;

[0860] The second condition includes at least one of the following:

[0861] The terminal triggers and actually sends an SR PUCCH for the target logical channel or at least one logical channel in the target logical channel group;

[0862] The uplink BSR reporting information indicates that there is an amount of data to be transmitted for the target logical channel or the target logical channel group.

[0863] Optionally, when reporting information for a target logical channel or a target logical channel group in the uplink BSR reporting information satisfies a first condition, the processor 810 is specifically configured to:

[0864] The terminal starts or continues to perform the predefined operation for the target serving cell from a seventh predefined time;

[0865] The seventh predefined time is determined based on the transmission time of the uplink BSR reporting information.

[0866] Optionally, when reporting information for a target logical channel or a target logical channel group in the uplink BSR reporting information satisfies a first condition, the processor 810 is specifically configured to:

[0867] When a third condition is met, the terminal stops executing the predefined operation;

[0868] The third condition includes any one of the following:

[0869] Starting from when the terminal determines to start or continue to perform the predefined operation, a first preset time length is reached;

[0870] The reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information does not meet the first condition.

[0871] Optionally, when the SR reporting information or uplink BSR reporting information of the target logical channel or the target logical channel group satisfies the second condition, the processor 810 is specifically configured to:

[0872] The terminal starts or continues to perform the predefined operation for the target serving cell from an eighth predefined time;

[0873] The eighth predefined time is determined based on the transmission time of the SR reporting information or the uplink BSR reporting information.

[0874] Optionally, when reporting information for a target logical channel or a target logical channel group in the uplink BSR reporting information satisfies a second condition, the processor 810 is specifically configured to:

[0875] When the fourth condition is met, the terminal stops executing the predefined operation;

[0876] The fourth condition includes any one of the following:

[0877] Starting from when the terminal determines to start or continue to perform the predefined operation, a second preset time period is reached;

[0878] The uplink BSR reporting information indicates that the amount of data to be transmitted for the target logical channel or the target logical channel group is zero.

[0879] Optionally, when the preset rule is associated with uplink and downlink scheduling related information, the processor 810 is specifically configured to:

[0880] The terminal performs a predefined operation according to a location of a PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI;

[0881] The terminal performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI;

[0882] The terminal performs a predefined operation according to the data scheduling related information.

[0883] Optionally, the processor 810 is specifically configured to perform any of the following:

[0884] When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window in the time domain, or the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to a ninth threshold, the terminal performs the predefined operation for the interval opportunity or the first window; wherein the first window is a predefined window with the scheduling restriction;

[0885] When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window in the time domain, the terminal performs the predefined operation for the area of ​​the time domain overlap;

[0886] In a case where the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to the tenth threshold, the terminal performs the predefined operation for the area of ​​extended time domain overlap, and the area of ​​extended time domain overlap is determined based on the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the tenth threshold;

[0887] The terminal performs the predefined operation for all time domain units within the scheduling restriction within a first time period, where the first time period is determined by the transmission of a PDSCH, a CSI-RS, a PUSCH, a PUCCH or an SRS corresponding to the scheduling DCI;

[0888] The terminal performs predefined operations for all time domain units that have time domain overlap or extended time domain overlap with a second time period and have the scheduling restriction, and the second time period is determined by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI.

[0889] Optionally, the processor 810 is specifically configured to:

[0890] When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction all meets the fifth condition, the terminal performs the predefined operation for the target serving cell, where N is specified by the protocol or configured by high-layer signaling;

[0891] The fifth condition includes at least one of the following:

[0892] The size of TB is greater than or equal to the eleventh threshold;

[0893] The physical layer priority is a predefined priority.

[0894] Optionally, when the terminal detects in the target transmission direction that the transmission attribute information indicated in N consecutive scheduling DCIs satisfies the fifth condition, the processor 810 is specifically configured to:

[0895] When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, the terminal starts or continues to perform the predefined operation for the target serving cell from a ninth predefined time;

[0896] The N is specified by a protocol or configured by high-level signaling, and the ninth predefined time is determined based on the transmission time of the N consecutive scheduled DCIs.

[0897] Optionally, the processor 810 is specifically configured to:

[0898] When the sixth condition is met, the terminal stops executing the predefined operation;

[0899] The sixth condition includes any one of the following:

[0900] Starting from when the terminal determines to start or continue to perform the predefined operation, a third preset time period is reached;

[0901] The terminal detects in the target transmission direction that transmission attribute information indicated by at least one scheduling DCI in N consecutive scheduling DCIs does not satisfy the fifth condition.

[0902] Optionally, the processor 810 is specifically configured to:

[0903] When the amount of data scheduled by the terminal in the third time period in the specified transmission direction or the amount of data actually scheduled for the target logical channel or the target logical channel group is greater than or equal to the eleventh threshold, the terminal performs the predefined operation for the target serving cell;

[0904] The third time period is specified by a protocol or configured by high-level signaling.

[0905] Optionally, the processor 810 is specifically configured to:

[0906] The terminal starts or continues to perform the predefined operation for the target serving cell from a tenth predefined time;

[0907] The tenth predefined time is the end time of the third time period plus a preset time interval, and the preset time interval is specified by a protocol or configured by high-level signaling.

[0908] Optionally, the processor 810 is specifically configured to:

[0909] When the seventh condition is met, the terminal stops executing the predefined operation;

[0910] The seventh condition includes any one of the following:

[0911] Starting from when the terminal determines to start executing or continuing the predefined operation, a fourth preset time length is reached;

[0912] The amount of data scheduled by the terminal in a third time period in a specified transmission direction, or the amount of data actually scheduled for a target logical channel or a target logical channel group, is less than an eleventh threshold.

[0913] Optionally, the first object targeted by the predefined operation satisfies a predefined condition;

[0914] The first object includes the first time domain unit set or the interval opportunity, and the predefined condition includes at least one of the following:

[0915] The first object is applied to a scenario other than a first scenario, where the first scenario is specified by a protocol or configured by high-layer signaling;

[0916] The first object is only applied to a second scenario, where the second scenario is specified by a protocol or configured by high-level signaling;

[0917] The priority of the first object meets a predefined priority requirement;

[0918] The period or length of the first object meets a predefined requirement.

[0919] Optionally, when the predefined operation is to relax scheduling restrictions or disable scheduling restrictions, or skip interval opportunities or disable interval opportunities within the first symbol time domain unit set, the processor 810 is specifically configured to do any one of the following:

[0920] The terminal expects to be scheduled, and the priorities corresponding to uplink transmission or downlink reception within the time range corresponding to the first object meet the specified priority requirements;

[0921] The terminal expects to be scheduled, and the priorities corresponding to uplink transmission or downlink reception overlapping with the time range corresponding to the first object meet the specified priority requirements;

[0922] The terminal does not expect to be scheduled, and the priorities corresponding to uplink transmission or downlink reception within the time range corresponding to the first object do not meet the specified priority requirement;

[0923] The terminal does not expect to be scheduled, and the priorities corresponding to uplink transmission or downlink reception overlapping with the time range corresponding to the first object do not meet the specified priority requirements.

[0924] It can be understood that the implementation process of each implementation method mentioned in this embodiment can refer to the relevant description of the method embodiment and achieve the same or corresponding technical effect. To avoid repetition, it will not be repeated here.

[0925] The embodiment of the present application also provides a network side device, including a processor and a communication interface, the communication interface is coupled to the processor, and the processor is used to run a program or instruction to implement the steps of the network side method embodiment. The network side device embodiment corresponds to the above network side device method embodiment, and each implementation process and implementation method of the above method embodiment can be applied to the network side device embodiment and can achieve the same technical effect.

[0926] Specifically, the embodiment of the present application also provides a network side device. Fig. 9 As shown, the network side device 900 includes: an antenna 91, a radio frequency device 92, a baseband device 93, a processor 94 and a memory 95. The antenna 91 is connected to the radio frequency device 92. In the uplink direction, the radio frequency device 92 receives information through the antenna 91 and sends the received information to the baseband device 93 for processing. In the downlink direction, the baseband device 93 processes the information to be sent and sends it to the radio frequency device 92. The radio frequency device 92 processes the received information and sends it out through the antenna 91.

[0927] The method executed by the network-side device in the above embodiment may be implemented in the baseband device 93, which includes a baseband processor.

[0928] The baseband device 93 may include, for example, at least one baseband board on which a plurality of chips are arranged. Fig. 9 As shown, one of the chips is, for example, a baseband processor, which is connected to the memory 95 through a bus interface to call the program in the memory 95 to execute the network device operations shown in the above method embodiment.

[0929] The network side device may further include a network interface 96, which is, for example, a Common Public Radio Interface (CPRI).

[0930] Specifically, the network side device 900 of the embodiment of the present invention further includes: instructions or programs stored in the memory 95 and executable on the processor 94, and the processor 94 calls the instructions or programs in the memory 95 to execute. Figure 6 The methods executed by the modules shown achieve the same technical effects, and therefore will not be described here in detail to avoid repetition.

[0931] Specifically, the embodiment of the present application also provides a network side device. Fig.10 As shown, the network side device 1000 includes: a processor 1001, a network interface 1002 and a memory 1003. The network interface 1002 is, for example, a common public radio interface (CPRI).

[0932] Specifically, the network side device 1000 of the embodiment of the present invention further includes: an instruction or program stored in the memory 1003 and executable on the processor 1001, and the processor 1001 calls the instruction or program in the memory 1003 to execute Figure 6 The methods executed by the modules shown achieve the same technical effects, and therefore will not be described here in detail to avoid repetition.

[0933] An embodiment of the present application also provides a readable storage medium, on which a program or instruction is stored. When the program or instruction is executed by a processor, each process of the above-mentioned method embodiment for adjusting the transmission restriction is implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.

[0934] The processor is the processor in the terminal described in the above embodiment. The readable storage medium includes a computer readable storage medium, such as a computer read-only memory ROM, a random access memory RAM, a magnetic disk or an optical disk. In some examples, the readable storage medium may be a non-transient readable storage medium.

[0935] An embodiment of the present application further provides a chip, which includes a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is used to run programs or instructions to implement the various processes of the above-mentioned method embodiment for adjusting the transmission restriction, and can achieve the same technical effect. To avoid repetition, it will not be repeated here.

[0936] It should be understood that the chip mentioned in the embodiments of the present application can also be called a system-level chip, a system chip, a chip system or a system-on-chip chip, etc.

[0937] The embodiments of the present application further provide a computer program / program product, which is stored in a storage medium and is executed by at least one processor to implement the various processes of the above-mentioned method embodiment for adjusting the transmission restriction, and can achieve the same technical effect. To avoid repetition, it will not be described here.

[0938] An embodiment of the present application also provides a wireless communication system, including: a terminal and a network side device, wherein the terminal can be used to execute the steps of the terminal side method as described above, and the network side device can be used to execute the steps of the network side method as described above.

[0939] It should be noted that, in this article, the terms "comprise", "include" or any other variant thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises one..." does not exclude the presence of other identical elements in the process, method, article or device including the element. In addition, it should be pointed out that the scope of the method and device in the embodiment of the present application is not limited to performing functions in the order shown or discussed, and may also include performing functions in a substantially simultaneous manner or in reverse order according to the functions involved, for example, the described method may be performed in an order different from that described, and various steps may also be added, omitted or combined. In addition, the features described with reference to certain examples may be combined in other examples.

[0940] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of a computer software product plus a necessary general hardware platform, and of course, can also be implemented by hardware. The computer software product is stored in a storage medium (such as ROM, RAM, disk, CD, etc.), including several instructions to enable a terminal or a network-side device to execute the methods described in each embodiment of the present application.

[0941] The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms of implementation methods without departing from the purpose of the present application and the scope of protection of the claims, and these implementation methods are all within the protection of the present application.

Claims

1. A method for adjusting transmission restrictions, characterized in that: include: The terminal determines that there is a scheduling restriction or a valid target interval timing in the first serving cell; The terminal performs a predefined operation according to a preset rule; The first serving cell is any serving cell configured by the terminal; The preset rule is associated with any of the following: First reporting information related to the channel quality of the serving cell; Second reporting information related to an uplink buffer status report BSR or a scheduling request SR; Scheduling information related to uplink and downlink scheduling; The predefined operation includes at least one of the following: Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units; skipping or disabling at least one of the target intervals; An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

2. The method according to claim 1, characterized in that: In a case where the preset rule is associated with first reporting information related to the channel quality of the serving cell, the terminal performs a predefined operation according to the preset rule, including: When the channel quality of the serving cell is higher than or equal to a first threshold, the terminal performs the predefined operation according to the first reporting information.

3. The method according to claim 2, characterized in that The first reporting information includes a measurement report based on layer 3 measurement, and the terminal performs the predefined operation according to the first reporting information, including any one of the following: In case of sending a measurement report based on layer 3 measurement, the terminal performs the predefined operation, wherein the measurement report based on layer 3 measurement is triggered based on a measurement reporting event; The terminal performs the predefined operation according to the channel quality information in the measurement report based on the layer 3 measurement.

4. The method according to claim 3, characterized in that In the case of sending a measurement report based on layer 3 measurement, the terminal performing the predefined operation includes: After the terminal sends a measurement report based on layer 3 measurement based on the first event, the terminal performs the predefined operation starting from a first predefined time; After the terminal sends a measurement report based on layer 3 measurement based on the second event, the terminal stops performing the predefined operation at a second predefined time; The first predefined time is determined based on a transmission time of a measurement report of layer 3 measurement sent by the first event, and the second predefined time is determined based on a transmission time of a measurement report of layer 3 measurement sent by the second event.

5. The method according to claim 3, characterized in that: The terminal performs the predefined operation according to the channel quality information in the measurement report based on the layer 3 measurement, including: When the channel quality information in the first measurement report is higher than or equal to the second threshold, the terminal performs the predefined operation from a third predefined time; When the channel quality information in the second measurement report is lower than or equal to a third threshold, the terminal stops performing the predefined operation at a fourth predefined time; The third predefined time is determined based on the transmission time of the first measurement report, and the fourth predefined time is determined based on the transmission time of the second measurement report.

6. The method according to claim 2, characterized in that The first reporting information includes a channel state information CSI report, and the terminal performs the predefined operation according to the first reporting information, including any one of the following: When the channel quality information in the first CSI report is higher than or equal to a fourth threshold, the terminal performs the predefined operation starting from a fifth predefined time; When the channel quality information in the second CSI report is lower than or equal to a fifth threshold, the terminal stops performing the predefined operation at a sixth predefined time; The fifth predefined time is determined based on the transmission time of the first CSI report, and the sixth predefined time is determined based on the transmission time of the second CSI report.

7. The method according to claim 1, characterized in that In a case where the preset rule is associated with the second reporting information related to the uplink BSR or SR, the terminal performs a predefined operation according to the preset rule, including at least one of the following: When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the terminal performs the predefined operation for the target serving cell; When the SR reporting information or uplink BSR reporting information for the target logical channel or target logical channel group meets the second condition, the terminal performs the predefined operation for the target serving cell; The first condition includes at least one of the following: The waiting time of the data to be transmitted of the target logical channel or the target logical channel group is longer than or equal to the sixth threshold; The remaining packet delay budget PDB of the to-be-transmitted data of the target logical channel or the target logical channel group is shorter than or equal to the seventh threshold; The amount of data to be transmitted on the target logical channel or target logical channel group is higher than or equal to an eighth threshold; The second condition includes at least one of the following: The terminal triggers or actually sends a SR physical uplink control channel PUCCH for the target logical channel or at least one logical channel in the target logical channel group; The uplink BSR reporting information indicates that there is an amount of data to be transmitted for the target logical channel or the target logical channel group.

8. The method according to claim 7, characterized in that When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information satisfies the first condition, the terminal performs the predefined operation for the target serving cell, including: The terminal starts or continues to perform the predefined operation for the target serving cell from a seventh predefined time; The seventh predefined time is determined based on the transmission time of the uplink BSR reporting information.

9. The method according to claim 8, characterized in that When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information satisfies the first condition, after the terminal starts or continues to perform the predefined operation for the target serving cell, the further comprising: When a third condition is met, the terminal stops executing the predefined operation; The third condition includes any one of the following: Starting from when the terminal determines to start or continue to perform the predefined operation, a first preset time length is reached; The reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information does not meet the first condition.

10. The method according to claim 7, characterized in that When the SR reporting information or uplink BSR reporting information for the target logical channel or the target logical channel group meets the second condition, the terminal performs the predefined operation for the target serving cell, including: The terminal starts or continues to perform the predefined operation for the target serving cell from an eighth predefined time; The eighth predefined time is determined based on the transmission time of the SR reporting information or the uplink BSR reporting information.

11. The method according to claim 10, characterized in that When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information satisfies the second condition, after the terminal starts or continues to perform the predefined operation for the target serving cell, the further comprising: When the fourth condition is met, the terminal stops executing the predefined operation; The fourth condition includes any one of the following: Starting from when the terminal determines to start or continue to perform the predefined operation, a second preset time period is reached; The uplink BSR reporting information indicates that the amount of data to be transmitted for the target logical channel or the target logical channel group is zero.

12. The method according to claim 1, characterized in that In a case where the preset rule is associated with the uplink and downlink scheduling related information, the terminal performs a predefined operation according to the preset rule, including: The terminal performs a predefined operation according to a transmission position of a physical downlink shared channel PDSCH, a channel state information reference signal CSI-RS, a physical uplink shared channel PUSCH, a PUCCH or a sounding reference signal SRS corresponding to scheduling downlink control information DCI; The terminal performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI, where the transmission attribute information is related to the size of the transport block TB or the physical layer priority; The terminal performs a predefined operation according to the data scheduling related information.

13. The method according to claim 12, characterized in that The terminal performs a predefined operation according to the location of the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI, including any one of the following: When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window in the time domain, or the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to a ninth threshold, the terminal performs the predefined operation for the interval opportunity or the first window; wherein the first window is a predefined window with the scheduling restriction; When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window in the time domain, the terminal performs the predefined operation for the area of ​​the time domain overlap; In a case where the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to the tenth threshold, the terminal performs the predefined operation for the area of ​​extended time domain overlap, and the area of ​​extended time domain overlap is determined based on the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the tenth threshold; The terminal performs the predefined operation for all time domain units within the scheduling restriction within a first time period, where the first time period is determined by the transmission of a PDSCH, a CSI-RS, a PUSCH, a PUCCH or an SRS corresponding to the scheduling DCI; The terminal performs predefined operations for all time domain units that have time domain overlap or extended time domain overlap with a second time period and have the scheduling restriction, and the second time period is determined by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI.

14. The method according to claim 12, characterized in that The terminal performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI, including: When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction all meets the fifth condition, the terminal performs the predefined operation for the target serving cell, where N is specified by the protocol or configured by high-layer signaling; The fifth condition includes at least one of the following: The size of TB is greater than or equal to the eleventh threshold; The physical layer priority is a predefined priority.

15. The method according to claim 14, characterized in that When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction satisfies the fifth condition, the terminal performs the predefined operation for the target serving cell, including: When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, the terminal starts or continues to perform the predefined operation for the target serving cell from a ninth predefined time; The N is specified by a protocol or configured by high-level signaling, and the ninth predefined time is determined based on the transmission time of the N consecutive scheduled DCIs.

16. The method according to claim 15, characterized in that When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, after the terminal starts or continues to perform the predefined operation for the target serving cell, the further comprising: When the sixth condition is met, the terminal stops executing the predefined operation; The sixth condition includes any one of the following: Starting from when the terminal determines to start or continue to perform the predefined operation, a third preset time period is reached; The terminal detects in the target transmission direction that transmission attribute information indicated by at least one scheduling DCI in N consecutive scheduling DCIs does not satisfy the fifth condition.

17. The method according to claim 12, characterized in that The terminal performs a predefined operation according to the data scheduling related information, including: When the amount of data scheduled by the terminal in the third time period in the specified transmission direction or the amount of data actually scheduled for the target logical channel or the target logical channel group is greater than or equal to the eleventh threshold, the terminal performs the predefined operation for the target serving cell; The third time period is specified by a protocol or configured by high-level signaling.

18. The method according to claim 17, characterized in that When the amount of data scheduled by the terminal in the third time period in the specified transmission direction or the amount of data actually scheduled for the target logical channel or the target logical channel group is greater than or equal to an eleventh threshold, the terminal performs the predefined operation for the target serving cell, including: The terminal starts or continues to perform the predefined operation for the target serving cell from a tenth predefined time; The tenth predefined time is the end time of the third time period plus a preset time interval, and the preset time interval is specified by a protocol or configured by high-level signaling.

19. The method according to claim 18, characterized in that When the amount of data scheduled by the terminal in the third time period in the specified transmission direction or the amount of data actually scheduled for the target logical channel or the target logical channel group is greater than or equal to the eleventh threshold, after the terminal starts or continues to perform the predefined operation for the target serving cell, the method further includes: When the seventh condition is met, the terminal stops executing the predefined operation; The seventh condition includes any one of the following: Starting from when the terminal determines to start executing or continuing the predefined operation, a fourth preset time length is reached; The amount of data scheduled by the terminal in a third time period in a specified transmission direction, or the amount of data actually scheduled for a target logical channel or a target logical channel group, is less than an eleventh threshold.

20. The method according to claim 1, characterized in that The first object targeted by the predefined operation satisfies a predefined condition; The first object includes the first time domain unit set or the interval opportunity, and the predefined condition includes at least one of the following: The first object is applied to a scenario other than a first scenario, where the first scenario is specified by a protocol or configured by high-layer signaling; The first object is only applied to a second scenario, where the second scenario is specified by a protocol or configured by high-level signaling; The priority of the first object meets a predefined priority requirement; The period or length of the first object meets a predefined requirement.

21. The method according to claim 20, characterized in that In the case where the predefined operation is relaxing scheduling restrictions or disabling scheduling restrictions, or skipping interval opportunities or disabling interval opportunities within the first symbol time domain unit set, the performing of the predefined operation includes any one of the following: The terminal expects to be scheduled, and the priorities corresponding to uplink transmission or downlink reception within the time range corresponding to the first object meet the specified priority requirements; The terminal expects to be scheduled, and the priorities corresponding to uplink transmission or downlink reception overlapping with the time range corresponding to the first object meet the specified priority requirements; The terminal does not expect to be scheduled, and the priorities corresponding to uplink transmission or downlink reception within the time range corresponding to the first object do not meet the specified priority requirement; The terminal does not expect to be scheduled, and the priorities corresponding to uplink transmission or downlink reception overlapping with the time range corresponding to the first object do not meet the specified priority requirements.

22. A method for adjusting transmission restrictions, characterized in that: include: The network side device determines that there is a scheduling restriction or a valid target interval timing in the first serving cell; The network side device performs a predefined operation according to a preset rule; The first serving cell is any serving cell configured by the terminal; The preset rule is associated with any of the following: First reporting information related to the channel quality of the serving cell; Second reporting information related to uplink BSR or SR; Scheduling information related to uplink and downlink scheduling; The predefined operation includes at least one of the following: Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units; skipping or disabling at least one of the target intervals; An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

23. The method according to claim 22, characterized in that In a case where the preset rule is associated with the reporting information related to the channel quality of the serving cell, the network side device performs a predefined operation according to the preset rule, including: When the channel quality of the serving cell is higher than or equal to a first threshold, the network side device performs the predefined operation according to the first reporting information.

24. The method according to claim 23, characterized in that The first reporting information includes a measurement report based on layer 3 measurement, and the network side device performs the predefined operation according to the first reporting information, including any one of the following: In the case of sending a measurement report based on layer 3 measurement, the network side device performs the predefined operation, and the measurement report based on layer 3 measurement is triggered based on a measurement reporting event; The network side device performs the predefined operation according to the channel quality information in the measurement report of the layer 3 measurement.

25. The method according to claim 23, characterized in that The first reporting information includes a CSI report, and the network side device performs the predefined operation according to the first reporting information, including any one of the following: When the channel quality information in the first CSI report is higher than or equal to a fourth threshold, the network side device performs the predefined operation from a fifth predefined time; When the channel quality information in the second CSI report is lower than or equal to the fifth threshold, the network side device stops performing the predefined operation at a sixth predefined time; The fifth predefined time is determined based on the transmission time of the first CSI report, and the sixth predefined time is determined based on the transmission time of the second CSI report.

26. The method according to claim 22, characterized in that In a case where the preset rule is associated with the second reporting information related to the uplink BSR or SR, the network side device performs a predefined operation according to the preset rule, including at least one of the following: When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the network side device performs the predefined operation for the target serving cell; When the SR reporting information or uplink BSR reporting information for the target logical channel or target logical channel group meets the second condition, the network side device performs the predefined operation for the target serving cell; The first condition includes at least one of the following: The waiting time of the data to be transmitted of the target logical channel or the target logical channel group is longer than or equal to the sixth threshold; The remaining packet delay budget PDB of the to-be-transmitted data of the target logical channel or the target logical channel group is shorter than or equal to the seventh threshold; The amount of data to be transmitted on the target logical channel or target logical channel group is higher than or equal to an eighth threshold; The second condition includes at least one of the following: The network side device actually receives the SR PUCCH for the target logical channel or at least one logical channel in the target logical channel group; The uplink BSR reporting information indicates that there is an amount of data to be transmitted for the target logical channel or the target logical channel group.

27. The method according to claim 22, characterized in that In a case where the preset rule is associated with the uplink and downlink scheduling related information, the network side device performs a predefined operation according to the preset rule, including: The network side device performs a predefined operation according to the location of the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI; The network side device performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI, where the transmission attribute information is related to the size of the TB or the physical layer priority; The network side device performs a predefined operation according to the data scheduling related information.

28. The method according to claim 22, characterized in that The first object targeted by the predefined operation satisfies a predefined condition; The first object includes the first time domain unit set or the interval opportunity, and the predefined condition includes at least one of the following: The first object is applied to a scenario other than a first scenario, where the first scenario is specified by a protocol or configured by high-layer signaling; The first object is only applied to a second scenario, where the second scenario is specified by a protocol or configured by high-level signaling; The priority of the first object meets a predefined priority requirement; The period or length of the first object meets a predefined requirement.

29. The method according to claim 28, characterized in that In the case where the predefined operation is relaxing scheduling restrictions or disabling scheduling restrictions, or skipping interval opportunities or disabling interval opportunities within the first symbol time domain unit set, the performing of the predefined operation includes any one of the following: The network side device ensures scheduling for the terminal, and the priorities corresponding to uplink transmission or downlink reception within the time range corresponding to the first object meet the specified priority requirements; The network side device ensures that the terminal is scheduled, and the priorities corresponding to the uplink transmission or downlink reception overlapping with the time range corresponding to the first object meet the specified priority requirements; The network side device ensures that the terminal is scheduled, and the priority corresponding to at least one of the uplink transmission or downlink reception within the time range corresponding to the first object meets the specified priority requirement; The network side device ensures scheduling for the terminal, and at least one of the uplink transmissions or downlink receptions overlapping with the time range corresponding to the first object has a priority level that meets the specified priority requirement.

30. A device for adjusting transmission restrictions, characterized in that: include: A first determination module, used for the terminal to determine whether there is a scheduling restriction or a valid target interval timing in the first serving cell; A first execution module, configured for the terminal to execute a predefined operation according to a preset rule; The first serving cell is any serving cell configured by the terminal; The preset rule is associated with any of the following: First reporting information related to the channel quality of the serving cell; Second reporting information related to uplink BSR or SR; Scheduling information related to uplink and downlink scheduling; The predefined operation includes at least one of the following: Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units; skipping or disabling at least one of the target intervals; An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

31. A device for adjusting transmission restrictions, characterized in that: include: A second determination module is used for the network side device to determine whether there is a scheduling restriction or a valid target interval timing in the first serving cell; The second execution module is used for the network side device to execute the predefined operation according to the preset rules; The first serving cell is any serving cell configured by the terminal; The preset rule is associated with any of the following: Reporting information related to the channel quality of the serving cell; First reporting information related to uplink BSR or SR; Scheduling information related to uplink and downlink scheduling; The predefined operation includes at least one of the following: Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units; skipping or disabling at least one of the target intervals; An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

32. A terminal, characterized in that: The method comprises a processor and a memory, wherein the memory stores a program or instruction that can be run on the processor, and when the program or instruction is executed by the processor, the steps of the method for adjusting the transmission restriction as claimed in any one of claims 1 to 22 are implemented.

33. A network side device, characterized in that: It comprises a processor and a memory, wherein the memory stores a program or instruction that can be run on the processor, and when the program or instruction is executed by the processor, the steps of the method for adjusting the transmission restriction as claimed in any one of claims 23 to 29 are implemented.

34. A readable storage medium, characterized in that: The readable storage medium stores a program or instruction, and when the program or instruction is executed by the processor, it implements the steps of the method for adjusting the transmission restriction as described in any one of claims 1 to 22, or implements the steps of the method for adjusting the transmission restriction as described in any one of claims 23 to 29.