Core mold floor support plate structure and construction method
By adopting core molded floor bearing plate structure in the floor bearing plate structure and using detachable components and connecting steel bars, the problem of difficult disassembly of existing floor bearing plate structures after local damage is solved, convenient construction and disassembly are achieved, construction difficulty and safety risks are reduced, and the overall stability and applicability of the structure are enhanced.
Patent Information
- Application Number
- CN202411988943.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-31
- Publication Date
- 2025-02-28
AI Technical Summary
The existing floor bearing plate structure is difficult to disassemble easily after partial damage, resulting in high-difficulty and high-risk professional cutting operations when replacing the problematic section, which can easily cause irreversible physical damage to the structure.
The core mold floor bearing plate structure is adopted, including the bearing plate, the large core mold body and the small core mold body. It can easily disassemble and install through detachable components and connecting steel bars, ensuring the stability and convenience of the structure.
It realizes convenient construction and dismantling of hollow floor covers of core molds, reduces construction difficulty and safety risks, enhances the overall stability and applicability of the structure, is suitable for 300mm thick floor slabs, and can be expanded to 250mm~600mm floor thickness.
Smart Images

Figure CN119531539A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building structures, and in particular to a core formwork floor decking structure and a construction method. Background Art
[0002] In the professional field of construction engineering, the core formwork is a very critical internal structural element. It is presented in a specific geometric shape, embedded in the floor system, and cooperates with the surrounding materials to form a core formwork floor deck structure. This innovative structure gives full play to the advantages of the core formwork, and in modern construction projects such as high-rise office buildings and large commercial complexes that have strict requirements on spatial layout and bearing performance, it demonstrates its unique charm and becomes a frontier exploration direction to promote the advancement of construction technology.
[0003] The traditional floor slab structure is mainly composed of steel trusses, corrugated steel plates and concrete. As the core load-bearing component, the steel trusses bear the vertical load from above the floor slab and effectively transfer it to the supporting structure to ensure the stability of the overall structure; the corrugated steel plates provide a temporary operating platform for the construction phase, facilitating the walking of personnel and the stacking of materials; on the other hand, after the concrete is poured, they work together with the concrete to enhance the bending resistance of the floor slab; the concrete is filled on the corrugated steel plates, and after solidification, it forms a solid bearing surface to bear the floor load.
[0004] The above-mentioned existing technologies have deficiencies and shortcomings. When a building is put into long-term use, once the floor decking is partially damaged, it is urgent to replace the problematic panels. Due to the lack of convenient disassembly function, the demolition operation has to use professional cutting tools, which is undoubtedly a difficult and high-risk operation. It not only requires the operator to be skilled and experienced, but also greatly increases the probability of safety accidents. During the operation, the floor decking and surrounding related structures are very susceptible to irreversible physical damage, such as edge damage caused by cutting, structural deformation caused by forced disassembly, etc., which greatly reduces the integrity and stability of the structure. For this reason, a core mold floor decking structure is proposed to solve the above problems. Summary of the invention
[0005] In order to make up for the above shortcomings, the present invention provides a core formwork floor decking structure, aiming to improve the problem of cumbersome construction of a single core formwork hollow floor in the prior art.
[0006] In order to achieve the above-mentioned object, the present invention adopts the following technical scheme: a core formwork floor deck structure, comprising a bearing plate, a large core formwork body and a small core formwork body, the top of the bearing plate is evenly threaded with a plurality of connectors, the interior of the connector is provided with a detachable component for easy disassembly, the interior of the connector is fixedly connected with two connecting steel bars, the top of the bearing plate is fixedly connected with a 310 mm high truss, and the interior of the 310 mm high truss is fixedly connected to the outside of the plurality of connecting steel bars;
[0007] Moreover, the detachable component includes a connecting piece, the front end of the connecting piece is fixedly connected to a front end plug-in plate, the front end plug-in plate is provided with a front end pin hole, the middle of the connecting piece is fixedly connected to a middle end plug-in plate, the middle end plug-in plate is provided with a middle end pin hole, the rear end of the connecting piece is fixedly connected to a terminal plug-in plate, the terminal plug-in plate is provided with a terminal pin hole, and the interior of the connecting piece is slidably connected to a pin;
[0008] Moreover, two placement grooves are provided in the middle of the connecting piece, and two reinforcing convex strips are fixedly connected to the front and rear sides of the middle end insert plate;
[0009] Moreover, the interior of the large core mold body is fixedly connected with the upper part of the large core mold, the interior of the large core mold body is fixedly connected with the lower part of the large core mold, the interior of the small core mold body is fixedly connected with the upper part of the small core mold, the bottom of the small core mold body is fixedly connected with the lower part of the small core mold, the rear side of the upper part of the large core mold is fixedly connected with a plastic hook, and the rear end of the plastic hook is fixedly connected to the front side of the upper part of the small core mold;
[0010] Moreover, a plurality of support tubes are fixedly connected to the bottom of the bearing plate, and a plurality of threaded rods are fixedly connected to the bottom of the bearing plate;
[0011] Moreover, the exteriors of the multiple connecting steel bars are fixedly connected to the upper and lower sides of the large core mold body, the exteriors of the multiple connecting steel bars are fixedly connected to the upper and lower sides of the small core mold body, and the multiple large core mold bodies and the multiple small core mold bodies are connected by multiple connecting steel bars.
[0012] The present invention has the following beneficial effects:
[0013] In the present invention, the construction of a single core mold hollow floor is complicated and does not meet the requirements of assembly. The core mold steel truss floor deck combines the core mold and the steel truss together, which is convenient to construct and does not require on-site formwork. It belongs to an assembled building and uses large and small core molds that are suitable for 300mm thick floors and 250mm to 600mm thick floors. It can be widely used in large-span public buildings such as schools. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 A three-dimensional schematic diagram of the core formwork floor deck structure proposed by the present invention;
[0015] Figure 2 A structural schematic diagram of a plastic hook of a core mold floor deck structure proposed by the present invention;
[0016] Figure 3 The present invention is a schematic structural diagram of the latch of the core formwork floor deck structure proposed by the present invention.
[0017] Legend:
[0018] 1. Load-bearing plate; 2. Connecting parts; 3. Connecting steel bars; 4. Large core mold body; 5. Small core mold body; 6. 310mm high truss; 7. Support pipe; 8. Threaded rod; 9. Plastic hook; 201. Front end insert plate; 202. Front end pin hole; 203. Middle end insert plate; 204. Middle end pin hole; 205. End insert plate; 206. End pin hole; 207. Placement groove; 208. Reinforcement rib; 209. Pin; 401. Upper part of large core mold; 402. Lower part of large core mold; 501. Upper part of small core mold; 502. Lower part of small core mold. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] Reference Figure 1 , Figure 3, an embodiment provided by the present invention: a core mold floor deck structure, including a bearing plate 1, which plays the role of supporting and bearing other components, a large core mold body 4, connected to a small core mold body 5 by a plastic hook 9, forming a complete core mold system, jointly participating in the force and work of the floor deck, the large core mold size (length × width × height): 400 × 340 × 240, the small core mold body 5, connected to the large core mold body 4 by a plastic hook 9, forming a complete core mold system, jointly participating in the force and work of the floor deck, the small core mold size (length × width × height): 400 × 140 × 240, the top of the bearing plate 1 is evenly threaded with a plurality of connectors 2, connecting and fixing the connecting steel bars 3, the interior of the plurality of connectors 2 is provided with a detachable component that is easy to disassemble, the interior of the connector 2 is fixedly connected with two connecting steel bars 3, connecting and fixing components, the top of the bearing plate 1 is fixedly connected with a 310mm high truss 6, which mainly bears the vertical load and transfers it to the bearing plate 1 and the supporting structure, and at the same time can enhance the overall stability of the floor deck. , to prevent local deformation, the inside of the 310mm high truss 6 is fixedly connected to the outside of multiple connecting steel bars 3, and the detachable component includes a connecting piece 2, the front end of the connecting piece 2 is fixedly connected with a front end plug plate 201, a fixed latch 209, and a front end pin hole 202 is opened inside the front end plug plate 201, through the latch 209, the middle of the connecting piece 2 is fixedly connected with a middle end plug plate 203, a fixed latch 209, and a middle end pin hole 204 is opened inside the middle end plug plate 203, through the latch 209, the rear end of the connecting piece 2 The end plug disc 205 and the fixing pin 209 are fixedly connected. The end plug disc 205 is provided with an end pin hole 206. The pin 209 is slidably connected to the inside of the connector 2 to fix the connecting steel bar 3 inside the placement groove 207. Two placement grooves 207 are provided in the middle of the connector 2 for fixing the connecting steel bar 3. Two reinforcing ridges 208 are fixedly connected to the front and rear sides of the middle plug disc 203 to enhance the strength of the middle plug disc 203 and prevent deformation during the force application process.
[0021] Reference Figure 1 , Figure 2The interior of the large core mold body 4 is fixedly connected with the large core mold upper part 401, the interior of the large core mold body 4 is fixedly connected with the large core mold lower part 402, the interior of the small core mold body 5 is fixedly connected with the small core mold upper part 501, the bottom of the small core mold body 5 is fixedly connected with the small core mold lower part 502, and the rear side of the large core mold upper part 401 is fixedly connected with a plastic hook 9, which is used to connect with the small core mold body 5 to ensure that the large core mold body 4 and the small core mold body 5 form a whole in the floor deck structure. The rear end of the plastic hook 9 is fixedly connected to the small core mold upper part 501. On the front side, a plurality of support tubes 7 are fixedly connected to the bottom of the load-bearing plate 1, which can provide stable vertical support for the load-bearing plate 1; a plurality of threaded rods 8 are fixedly connected to the bottom of the load-bearing plate 1, and the threaded rods 8 have a threaded structure, which can be used to adjust the height and levelness of the load-bearing plate 1 to adapt to different construction and use requirements; a plurality of connecting steel bars 3 are externally fixedly connected to the upper and lower sides of the large core mold body 4; a plurality of connecting steel bars 3 are externally fixedly connected to the upper and lower sides of the small core mold body 5; and a plurality of large core mold bodies 4 and a plurality of small core mold bodies 5 are connected via a plurality of connecting steel bars 3.
[0022] The present invention also provides a construction method of a core formwork floor deck structure, comprising the following contents:
[0023] When the load-bearing plate 1 is to be repaired or replaced, the multiple holes of the connecting member 2 provide a moving space for the latch pin 209, and in a normal connection state, the latch pin 209 passes through the front pin hole 202 of the front plug plate 201, the middle pin hole 204 of the middle plug plate 203, and the end pin hole 206 of the end plug plate 205, thereby tightly fixing the connecting steel bar 3 in the placement groove 207, ensuring a stable connection of the entire structure;
[0024] When disassembling, the operator manually pushes the latch 209 to slide along the inside of the connector 2 and gradually withdraw from the front pin hole 202, the middle pin hole 204 and the end pin hole 206. As the latch 209 withdraws, the front plug disc 201, the middle plug disc 203 and the end plug disc 205 lose the fastening constraint of the latch 209, and the originally tightly connected state is released, and the fixed connection with the connecting steel bar 3 is loosened. At this time, the connector 2 can be detached from the connecting steel bar 3, achieving the purpose of being detachable.
[0025] When installing the connector 2, the operation process is the opposite. First, pass the latch 209 through the connector 2 so that the latch 209 wraps the corresponding position of the connecting steel bar 3, and then pass the latch 209 through the front pin hole 202, the middle pin hole 204 and the end pin hole 206 in sequence to complete the locking of the connecting steel bar 3, ensure that the connector 2 is firmly installed between the bearing plate 1 and other components, and rebuild a reliable connection system to ensure that the core formwork floor decking structure functions normally. The two reinforcing ridges 208 fixedly connected on the front and rear sides of the middle plug plate 203 not only effectively enhance the strength of the middle plug plate 203 when the connector 2 is working normally and bearing loads, but also prevent it from being deformed by force, thereby ensuring that the latch 209 plays a fixing role.
[0026] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A core formwork floor deck structure, comprising a bearing plate (1), a large core formwork body (4) and a small core formwork body (5), characterized in that: The top of the bearing plate (1) is evenly threaded with a plurality of connecting pieces (2), the interior of the connecting piece (2) is provided with a detachable component for easy disassembly, the interior of the connecting piece (2) is fixedly connected to two connecting steel bars (3), the top of the bearing plate (1) is fixedly connected to a 310 mm high truss (6), the interior of the 310 mm high truss (6) is fixedly connected to the outside of the plurality of connecting steel bars (3).
2. The core formwork floor deck structure according to claim 1, characterized in that: The detachable component comprises a connecting member (2), wherein the front end of the connecting member (2) is fixedly connected to a front end plug-in disk (201), a front end pin hole (202) is provided inside the front end plug-in disk (201), a middle end plug-in disk (203) is fixedly connected to the middle part of the connecting member (2), a middle end pin hole (204) is provided inside the middle end plug-in disk (203), a terminal plug-in disk (205) is fixedly connected to the rear end of the connecting member (2), a terminal pin hole (206) is provided inside the terminal plug-in disk (205), and a pin (209) is slidably connected inside the connecting member (2).
3. The core formwork floor deck structure according to claim 2, characterized in that: Two placement grooves (207) are provided in the middle of the connecting piece (2), and two reinforcing convex strips (208) are fixedly connected to the front and rear sides of the middle end insert plate (203).
4. The core formwork floor deck structure according to claim 1, characterized in that: The large core mold body (4) is internally fixedly connected to the large core mold upper part (401), the large core mold body (4) is internally fixedly connected to the large core mold lower part (402), the small core mold body (5) is internally fixedly connected to the small core mold upper part (501), the bottom of the small core mold body (5) is fixedly connected to the small core mold lower part (502), the rear side of the large core mold upper part (401) is fixedly connected to a plastic hook (9), and the rear end of the plastic hook (9) is fixedly connected to the front side of the small core mold upper part (501).
5. The core formwork floor deck structure according to claim 1, characterized in that: A plurality of support tubes (7) are fixedly connected to the bottom of the bearing plate (1), and a plurality of threaded rods (8) are fixedly connected to the bottom of the bearing plate (1).
6. The core formwork floor deck structure according to claim 1, characterized in that: The exteriors of the plurality of connecting steel bars (3) are fixedly connected to the upper and lower sides of the large core mold body (4), the exteriors of the plurality of connecting steel bars (3) are fixedly connected to the upper and lower sides of the small core mold body (5), and the plurality of large core mold bodies (4) and the plurality of small core mold bodies (5) are connected via the plurality of connecting steel bars (3).
7. A construction method for a core formwork floor deck structure, characterized in that: It includes the following: When the load-bearing plate (1) is to be repaired or replaced, the multiple holes of the connecting member (2) provide a moving space for the latch pin (209), and in a normal connection state, the latch pin (209) penetrates the front pin hole (202) of the front plug plate (201), the middle pin hole (204) of the middle plug plate (203), and the end pin hole (206) of the end plug plate (205), thereby firmly fixing the connecting steel bar (3) in the placement groove (207), thereby ensuring a stable connection of the entire structure; When performing the disassembly operation, the operator manually pushes the latch (209) to slide along the inside of the connector (2) and gradually withdraw from the front pin hole (202), the middle pin hole (204) and the end pin hole (206). As the latch (209) withdraws, the front plug disc (201), the middle plug disc (203) and the end plug disc (205) lose the fastening constraint of the latch (209), and the originally tightly connected state is released, and the fixed connection with the connecting steel bar (3) is loosened. At this time, the connector (2) can be detached from the connecting steel bar (3), achieving the purpose of being detachable. When installing the connector (2), the operation process is the opposite. First, the latch (209) is passed through the connector (2) so that the latch (209) wraps the corresponding position of the connecting steel bar (3), and then the latch (209) is passed through the front pin hole (202), the middle pin hole (204) and the end pin hole (206) in sequence to complete the locking of the connecting steel bar (3), ensure that the connector (2) is firmly installed between the bearing plate (1) and other components, and reconstruct a reliable connection system to ensure that the core mold floor deck structure functions normally. The two reinforcing convex strips (208) fixedly connected to the front and rear sides of the middle plug plate (203) not only effectively enhance the strength of the middle plug plate (203) when the connector (2) is working normally and bearing loads, but also prevent it from being deformed by force, thereby ensuring that the latch (209) plays a fixing role.