Construction process for secant piles of fish collecting tank

By using prestressed steel pipe support combined with cross beam groove and water-absorbing cushion in the fish collecting duct construction, the problem of cement pad solidification waiting for curing is solved, and efficient fish collecting duct excavation construction is achieved.

CN119553687APending Publication Date: 2025-03-04HUADIAN JINSHAJIANG UPSTREAM HYDROPOWER DEV CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202510036579.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-09
Publication Date
2025-03-04

AI Technical Summary

Technical Problem

When the prior art uses cement pads to support the cast piles, the solidification process needs to wait for the stress to be applied, which affects the construction efficiency of the fish-collection tank excavation downward.

Method used

Prestressed steel pipes are used to support the beam groove composed of prefabricated with steel plates. By laying a water-absorbing cushion layer in the beam groove and pouring concrete, the beam is formed to support the choke piles to avoid affecting the downward excavation construction of the fish-collection groove.

Benefits of technology

The effective stress of the prestressed steel pipe supports on the bite pile is achieved. The concrete curing of the beam trough later does not affect the excavation of the fish collecting trough, which improves the construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119553687A_ABST
    Figure CN119553687A_ABST
Patent Text Reader

Abstract

The invention discloses a construction technology of a fish collecting tank secant pile. The construction technology comprises the construction process of constructing a fish collecting tank secant pile supporting structure. After the inner sides of the secant piles are excavated downwards to the designed depth, the prestressed steel pipe supports can be stressed to support the secant piles through the cross beam grooves prefabricated by the steel plates, in the later process of pouring concrete into the cross beam grooves and solidifying to form the cross beams, downward excavation construction of the fish collecting grooves is not affected, the construction efficiency is improved, and the construction cost is reduced. The problem that when a cement cushion block is constructed on a cast-in-place pile to be solidified, solidification stress needs to be waited, and the downward excavation construction efficiency of a fish collecting groove is easily affected is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a construction process for bite piles of fish collecting troughs, and belongs to the technical field of water conservancy facility construction. Background Art

[0002] When the construction site is excavated downward to construct a fish collecting trough, in order to cope with the lateral pressure of the earth, it is necessary to construct bite piles at the construction site, and then support the bite piles before continuing to excavate downward.

[0003] The existing pile support technology is shown in Chinese Patent Publication No. CN220013704U. Although the prestressed steel pipe support can support the cast-in-place pile through the cement pad, the cement pad needs to wait for a period of time to solidify and bear the force during the solidification process on the cast-in-place pile, which is easy to affect the construction efficiency of the downward excavation of the fish collecting trough. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a construction process for bite piles in a fish collecting tank.

[0005] The present invention is achieved through the following technical solutions.

[0006] The invention provides a construction process for a fish collecting tank bite pile, comprising:

[0007] The construction process of constructing the bite pile support structure of the fish collecting tank.

[0008] The construction process is specifically as follows:

[0009] The bite piles are drilled and cast in the rock and soil layer of the construction site. The bite piles enclose the fish collecting tank area, and then the inner side of the bite piles is excavated downward. When the set depth is reached, the support angle bracket is fixed on the bite piles;

[0010] Then install the crossbeam groove on the support angle frame, a pad is installed on the inner side of the crossbeam groove relative to the prestressed steel pipe support, the prestressed steel pipe support is installed on the support angle frame to obtain support, and the end of the prestressed steel pipe support supports the crossbeam groove through the pad;

[0011] A water-absorbing cushion layer is laid inside the beam groove, the cushion layer absorbs water, and then concrete is poured into the cushion layer in the beam groove to form a beam after solidification. The beam is spaced from the inner side of the beam groove by the cushion layer.

[0012] The fish collecting tank bite pile support structure comprises:

[0013] Snap piles formed by pouring reinforced concrete;

[0014] A supporting angle bracket fixedly mounted on the snap pile, with a crossbeam slot provided on the supporting angle bracket;

[0015] A prestressed steel pipe support is installed on the support angle frame, and the prestressed steel pipe support contacts the inner side surface of the support beam groove through a pad.

[0016] The interlocking pile is composed of a plurality of pile bodies interlaced, solidified and interlocked with each other; the interlocking pile is fixed with a supporting angle bracket by expansion bolts.

[0017] The number of the support angle brackets is two and spaced apart, and the two support angle brackets correspondingly support the bottom surface of the end of a prestressed steel pipe support.

[0018] The support angle frame is fixed with a crossbeam groove by spot welding, and the crossbeam groove is a U-shaped groove formed by welding steel plates.

[0019] A reinforcing force component rod is welded to the middle part of the cross beam groove, and the reinforcing force component rod reinforces the middle part of the cross beam groove.

[0020] A pad is fixed on the inner side of the beam groove with the reinforcing force component rod, and a prestressed steel pipe support is installed on the support angle frame, and the prestressed steel pipe support contacts the inner side surface of the beam groove through the pad.

[0021] A water-absorbing cushion layer is laid inside the beam groove, and the cushion layer contains a beam formed by solidifying concrete.

[0022] The beneficial effects of the present invention are as follows: after the inner side of the interlocking pile is excavated downward to the designed depth, the prestressed steel pipe support can support the interlocking pile by means of the cross beam groove formed by prefabricated steel plates, and in the later process of pouring concrete into the cross beam groove and solidifying to form the cross beam, the downward excavation construction of the fish collecting trough is not affected, thereby improving the construction efficiency and solving the problem that the cement pad block needs to wait for solidification and stress to solidify on the cast-in-place pile, which easily affects the downward excavation construction efficiency of the fish collecting trough. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the structure of the present invention;

[0024] Figure 2 It is a front view of the distribution of the cushion layer and the beam of the present invention;

[0025] In the figure: 1-interlocking pile; 2-support angle bracket; 3-crossbeam groove; 4-prestressed steel pipe support; 5-pad; 31-reinforcement component rod; 32-pad layer; 33-crossbeam. DETAILED DESCRIPTION

[0026] The technical solution of the present invention is further described below, but the scope of protection claimed is not limited to the description.

[0027] like Figure 1 shown.

[0028] The construction process of the fish collecting tank bite pile of the present application includes the following steps:

[0029] The bite piles 1 are bored and cast in the rock and soil layer of the construction site, and the bite piles 1 enclose a fish collecting trough area. Then the inner side of the bite piles 1 is excavated downward. When the set depth is reached, the support angle brackets 2 are fixedly installed on the bite piles 1. There are two support angle brackets 2 at the same location that are distributed at intervals.

[0030] Then install the cross beam groove 3 on the supporting angle frame 2, and a pad 5 is installed on the inner side of the cross beam groove 3 relative to the prestressed steel pipe support 4. The prestressed steel pipe support 4 is installed on the supporting angle frame 2 to obtain support, and the end of the prestressed steel pipe support 4 supports the cross beam groove 3 through the pad 5. The prestressed steel pipe support 4 corresponds to the reinforcing component rod 31 of the cross beam groove 3.

[0031] A water-absorbing cushion layer 32 is laid inside the beam groove 3. The cushion layer 32 absorbs water, and then concrete is poured into the cushion layer 32 in the beam groove 3 to form a beam 33 after solidification. The beam 33 is separated from the inner side of the beam groove 3 by the cushion layer 32. When the beam 33 is disassembled later, the cushion layer 32 is used to isolate the beam 33, so that the concrete beam 33 will not be adsorbed into the beam groove 3 formed by the steel plate.

[0032] The present invention discloses a support structure for a fish collecting tank bite pile, comprising:

[0033] The interlocking pile 1 is formed by pouring reinforced concrete into the rock and soil layer of the construction site. The interlocking pile 1 is composed of a plurality of pile bodies interlaced, solidified and interlocked with each other.

[0034] The interlocking pile 1 is fixed with a support angle bracket 2 by means of expansion bolts. The support angle brackets 2 are two arranged at intervals. The two support angle brackets 2 support the bottom surface of the end of a prestressed steel pipe support 4 correspondingly.

[0035] A plurality of the support angle brackets 2 are spot-welded and fixed with a cross beam groove 3, and the cross beam groove 3 is a U-shaped groove formed by welding steel plates; a reinforcing force component rod 31 is welded in the middle of the cross beam groove 3, and the reinforcing force component rod 31 reinforces the middle of the cross beam groove 3, and a pad 5 is fixed on the inner side of the cross beam groove 3 with the reinforcing force component rod 31, and a prestressed steel pipe support 4 is installed on the support angle bracket 2, and the prestressed steel pipe support 4 contacts the inner side surface of the cross beam groove 3 through the pad 5.

[0036] A water-absorbing cushion layer 32 is laid inside the beam groove 3, and a beam 33 formed by solidified concrete is arranged in the cushion layer 32, and the cushion layer 32 is made of water-absorbing cotton. Before the concrete of the beam 33 is poured, the cushion layer 32 needs to be saturated with water to ensure that the concrete of the beam 33 is hydrothermally heated. When watering the concrete of the beam 33 in the later stage, the cushion layer 32 can also absorb water to ensure the curing effect of the beam 33.

[0037] After the inner side of the interlocking pile 1 is excavated downward to the designed depth, the prestressed steel pipe support 4 can support the interlocking pile 1 through the beam groove 3 formed by the prefabricated steel plate. In the later process of pouring concrete into the beam groove 3 and solidifying to form the beam 33, the downward excavation construction of the fish collecting trough is not affected, the construction efficiency is improved, and the problem that the cement pad construction needs to wait for solidification and stress on the cast-in-place pile to solidify, which is easy to affect the downward excavation construction efficiency of the fish collecting trough is solved.

[0038] During the downward excavation of the fish collecting tank, the concrete of the beam 33 is gradually solidified. After the beam 33 is completely solidified, the beam 33 together in the beam groove 3 resists and supports the lateral load of the bite pile 1.

Claims

1. A construction process for bite piles in fish collecting tanks, characterized in that: include: The construction process of constructing the bite pile support structure of the fish collecting tank.

2. The construction process of the fish collecting tank bite pile according to claim 1, characterized in that: The construction process is specifically as follows: A bite pile (1) is bored and cast in the rock and soil layer of the construction site, the bite pile (1) encloses a fish collecting tank area, and then the inner side of the bite pile (1) is excavated downwards. When a set depth is reached, a support angle bracket (2) is fixedly installed on the bite pile (1); Then, a cross beam groove (3) is installed on the support angle frame (2), a pad (5) is installed on the inner side of the cross beam groove (3) relative to the prestressed steel pipe support (4), the prestressed steel pipe support (4) is installed on the support angle frame (2) to obtain support, and the end of the prestressed steel pipe support (4) is supported against the cross beam groove (3) through the pad (5); A water-absorbing cushion layer (32) is laid inside the beam groove (3), the cushion layer (32) absorbs water, and then concrete is poured into the cushion layer (32) inside the beam groove (3) to form a beam (33) after solidification. The beam (33) is spaced from the inner side surface of the beam groove (3) by the cushion layer (32).

3. The construction process of the fish collecting tank bite pile according to claim 1 or 2, characterized in that: The fish collecting tank bite pile support structure comprises: An interlocking pile (1) formed by pouring reinforced concrete; A support angle frame (2) fixedly mounted on the engagement pile (1), wherein the support angle frame (2) is provided with a crossbeam groove (3); A prestressed steel pipe support (4) is installed on the support angle frame (2), and the prestressed steel pipe support (4) contacts the inner side surface of the support beam groove (3) through a pad (5).

4. The construction process of the fish collecting tank bite pile according to claim 3, characterized in that: The interlocking pile (1) is composed of a plurality of pile bodies interlaced, solidified and interlocked with each other; the interlocking pile (1) is fixedly mounted with a supporting angle bracket (2) via expansion bolts.

5. The construction process of the fish collecting tank bite pile according to claim 3, characterized in that: The supporting angle frames (2) are two spaced apart, and the two supporting angle frames (2) correspondingly support the bottom surface of the end of a prestressed steel pipe support (4).

6. The construction process of the fish collecting tank bite pile according to claim 3, characterized in that: The support angle frame (2) is fixed with a crossbeam groove (3) by spot welding, and the crossbeam groove (3) is a U-shaped groove formed by welding steel plates.

7. The construction process of the fish collecting tank bite pile according to claim 3, characterized in that: A reinforcing force component rod (31) is welded to the middle portion of the cross beam groove (3), and the reinforcing force component rod (31) reinforces the middle portion of the cross beam groove (3).

8. The construction process of the fish collecting tank bite pile according to claim 7, characterized in that: A pad (5) is fixed on the inner side of the cross beam groove (3) with the reinforcing force component rod (31), and a prestressed steel pipe support (4) is installed on the support angle frame (2), and the prestressed steel pipe support (4) contacts the inner side of the cross beam groove (3) through the pad (5).

9. The construction process of the fish collecting tank bite pile according to claim 8, characterized in that: A water-absorbing cushion layer (32) is laid inside the crossbeam groove (3), and a crossbeam (33) formed by solidified concrete is arranged in the cushion layer (32).

Citation Information

Patent Citations

  • Prestressed steel pipe supporting structure of deep foundation pit

    CN220013704U