Toilet zero-leakage construction method

Through an efficient construction method combining fixed frames, beams, drive mechanisms and brushing mechanisms, the problems of low efficiency of bathroom waterproofing construction and uneven coating in the prior art are solved, and the high-quality waterproof layer construction and leakage problems are effectively solved.

CN119553789APending Publication Date: 2025-03-04HANGZHOU QIANFENG CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411800947.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-09
Publication Date
2025-03-04

AI Technical Summary

Technical Problem

In the prior art, the bathroom waterproofing construction efficiency is low and the paint is uneven, which can easily lead to leakage, making it difficult to effectively solve the problems of moisture reflux and water accumulation at the roots of the bathroom wall.

Method used

A construction method including base layer cleaning, waterproof construction equipment installation and waterproof layer construction is adopted. This method realizes efficient and uniform waterproof layer coating by combining a fixed frame, a beam, a driving mechanism and a brushing mechanism. The steps include brushing a polypropylene fiber concrete layer, a fiber coating layer and a glass fiber coating anti-seepage layer on the base layer to ensure the integrity and strength of the waterproof layer.

Benefits of technology

This construction method improves the construction quality of the bathroom waterproof layer, effectively solves the leakage problem, extends the service life of the waterproof layer, and simplifies the construction steps.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119553789A_ABST
    Figure CN119553789A_ABST
Patent Text Reader

Abstract

The invention discloses a zero-leakage construction method for a toilet. The zero-leakage construction method comprises the following steps: S1, cleaning a base layer; s2, waterproof construction equipment is installed; s3, construction of a waterproof layer; s4, waterproof test; and S5, waterproof protection layer construction. The construction method is simple in step, the construction quality of the waterproof layer of the toilet is improved, the leakage problem can be effectively solved, and the service life of the waterproof layer of the toilet is prolonged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a zero-leakage construction method for a toilet. Background Art

[0002] Once the bathroom leaks, it will cause great trouble to the residents and the repair cost is high and difficult. In order to improve the waterproof quality and durability of waterproofing, it is required to take measures to control leakage during the structural construction stage. In addition to the leakage of the bathroom floor, the moisture at the root of the bathroom wall and the water accumulation in the bathroom flowing into the adjacent bedrooms and living rooms are the difficulties and key points of controlling leakage.

[0003] In the prior art, the anti-leakage construction of the bathroom is generally carried out by manually applying the waterproof layer, which is not only inefficient, but also uneven in application and easily causes leakage. Summary of the invention

[0004] The purpose of the present invention is to provide a technical solution for a zero-leakage construction method for a bathroom in view of the deficiencies in the prior art. The construction method has simple steps, which not only improves the construction quality of the bathroom waterproof layer, but also effectively solves the leakage problem and prolongs the service life of the bathroom waterproof layer.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0006] A zero-leakage construction method for a bathroom, characterized by comprising the following steps:

[0007] S1. Base cleaning

[0008] a. Remove the gray skin on the base surface at a height of 30cm at the bottom and sides of the bathroom, and clean up the dust, sand and other debris to make the surface neat;

[0009] b. Then check the location of the pipe root, floor drain and drain outlet, and make a good drainage slope;

[0010] S2. Installation of waterproof construction equipment

[0011] a. First, select the corresponding fixing frame according to the size of the bathroom, and fix the fixing frame on the wall of the bathroom through the corner pieces so that it is 1m above the ground;

[0012] b. Then, a crossbeam is horizontally installed along the top surface of the fixed frame, a guide groove is opened on the crossbeam, and a first driving mechanism is installed along the top of the crossbeam, and the first driving mechanism is connected to the suspension mechanism;

[0013] c. Then, according to the size of the fixed frame, the corresponding L-shaped frame and telescopic plate are installed. The telescopic plate is installed on one side of the L-shaped frame, and a telescopic slot is opened on the other side of the L-shaped frame. The telescopic slot matches the telescopic plate. Each L-shaped frame is connected end to end to form a closed structure, and then connected to the fixed frame through an electric cylinder;

[0014] d. Install the second drive mechanism between the two L-shaped frames along the length direction of the fixed frame, install the third drive mechanism between two adjacent second drive mechanisms, and install a brushing mechanism on the third drive mechanism. Connect the brushing mechanism to the external material supply barrel through the material delivery pipe, and connect the waterproof construction equipment to the external control box.

[0015] S3. Waterproof layer construction

[0016] a. First, a polypropylene fiber concrete layer is applied to the bottom layer. The prepared polypropylene fiber concrete is stored in a feed barrel. The polypropylene fiber concrete is pumped to a brushing mechanism through a feed pipe. At this time, the brushing mechanism is located on one side of the ground. The speeds of the first drive mechanism, the second drive mechanism and the third drive mechanism are set through a control box so that the brushing mechanism outputs the polypropylene fiber concrete while brushing the polypropylene fiber concrete along the ground until the entire ground is painted. Through the construction of the polypropylene fiber concrete layer, the tiny cracks formed in the coagulation and curing of the concrete and the later creep of the concrete can be reduced.

[0017] b. Then, a fiber coating layer is brushed on the top of the polypropylene fiber concrete layer, the fiber and coating are mixed together and stored in a second feeding barrel, a feeding pipe is connected to the second feeding barrel, and the fiber coating is delivered to the brushing mechanism through the feeding pipe by a pump. At this time, the brushing mechanism is located on one side of the ground, and the speeds of the first driving mechanism, the second driving mechanism and the third driving mechanism are set through the control box, so that the brushing mechanism outputs the fiber coating while brushing the fiber coating along the polypropylene fiber concrete layer until the entire ground is painted; the fiber coating layer can better prevent the formation of medium cracks;

[0018] c. Then, brush the anti-seepage layer of glass fiber cloth coating along the top of the fiber coating layer, store the prepared glass fiber cloth coating in the third feeding barrel, and deliver the glass fiber cloth coating to the brushing mechanism through the feeding pipe by the pump. At this time, the brushing mechanism is located on one side of the ground. The speeds of the first driving mechanism, the second driving mechanism and the third driving mechanism are set through the control box, so that the brushing mechanism outputs the glass fiber cloth coating while brushing the glass fiber cloth coating along the fiber coating layer until the entire ground is painted; the anti-seepage layer of glass fiber cloth coating can prevent large cracks caused by temperature stress;

[0019] d. Finally, the waterproof layer construction on the side of the bathroom is completed according to the processes a to c in the above step S3. After the waterproof layer reaches the set strength, the waterproof construction equipment is removed;

[0020] S4. Waterproof test

[0021] After the waterproof layer is dry, block the pipes, floor drains and drains, fill the water to a height of 20 to 30 cm, conduct a 24-hour water-tightness test, observe the leakage points, and manually repair the leakage points;

[0022] S5. Waterproof protective layer construction

[0023] Use glue mortar to roughen the floor and sides, and then roll on a layer of waterproof paint.

[0024] This construction method has simple steps and not only improves the construction quality of the bathroom waterproof layer, but also can effectively solve the leakage problem and extend the service life of the bathroom waterproof layer.

[0025] Furthermore, the first driving mechanism in step S2 process b includes a first motor, a first screw and a first baffle. The first motor and the first baffle are arranged on both sides of the top surface of the beam, and the first motor is connected to the first baffle through the first screw. The first motor drives the first screw to rotate, and then drives the suspension mechanism to move horizontally, thereby meeting the guiding requirements for the feed pipe and facilitating the smooth delivery of materials to the brushing mechanism.

[0026] Furthermore, the suspension mechanism in step S2 process b includes a first booster block, a U-shaped frame and a guide wheel. The first booster block is connected to the first driving mechanism, and the guide wheel is connected to the first booster block through the U-shaped frame. The booster block can drive the guide wheel to move horizontally through the U-shaped frame to meet the movement requirements of the conveying pipe and prevent the conveying pipe from being entangled and affecting the normal transportation of materials.

[0027] Furthermore, the second driving mechanism in step S2 process d includes a second motor, a second screw and a second booster block. The second motor is arranged on the inner side of the L-shaped frame on one side, and the second motor is connected to the L-shaped frame on the other side through the second screw. The second booster block is connected to the second screw. Two adjacent second booster blocks are fixedly connected through a horizontal guide plate. The second motor drives the second screw to rotate, and then the second booster block and the horizontal guide plate can drive the brushing mechanism to move horizontally, thereby meeting the requirements for brushing the waterproof layer, ensuring that each layer is evenly brushed, greatly reducing the gap, and improving the anti-leakage effect.

[0028] Furthermore, the third driving mechanism includes a third motor, a second baffle and a third screw. The third motor and the second baffle are arranged on the second booster blocks on both sides. The third motor is connected to the second baffle through the third screw. The third motor drives the third screw to rotate, and then drives the brush mechanism to move horizontally, thereby satisfying the position adjustment of the brush mechanism and realizing comprehensive painting of the bathroom floor.

[0029] Furthermore, the brushing mechanism in step S2 process d includes a moving component, a rotating component, a swing rod and a scraper, the moving component is connected to the third driving mechanism, the rotating mechanism is connected to the moving mechanism, the swing rod is rotatably connected to the rotating mechanism, a horizontal rod is provided at the bottom of the swing rod, the scraper is fixedly connected to the horizontal rod, and side panels are symmetrically provided on the horizontal rod on both sides of the swing rod, and the side panels are evenly distributed with discharge holes, and the discharge holes are connected to the feed pipe through the horizontal rod and the swing rod; the moving component and the rotating component can drive the scraper to move or rotate in the horizontal direction to meet the painting requirements of different positions on the bathroom floor, and the swing rod can rotate along the rotating component to adjust the inclination angle of the scraper to improve the uniformity during brushing, thereby improving the construction quality of the waterproof layer.

[0030] Furthermore, the moving component includes a third booster block, a suspension rod, an upper fixed plate and a lower fixed plate. The lower fixed plate is connected to the bottom of the upper fixed plate through a connecting column. The upper fixed plate and the lower fixed plate cooperate to form a rotation space for accommodating the rotating component. The upper fixed plate is fixed to the bottom of the third booster block through the suspension rod. The third booster block is provided with a positioning groove. The suspension rod can improve the connection stability between the upper fixed plate and the third booster block. The connecting column can improve the connection stability between the upper fixed plate and the lower fixed plate. The positioning groove matches the horizontal guide plate, which can improve the stability and reliability during movement.

[0031] Furthermore, the rotating assembly includes a fourth motor, a driving gear, a driven gear ring, a connecting rod and a cantilever. The fourth motor is arranged on the top surface of the upper fixed plate, the output shaft of the fourth motor is connected to the driving gear, the driven gear ring is rotatably connected to the connecting column, the driven gear ring is connected to the cantilever through the connecting rod, and the driving gear and the driven gear ring are meshed with each other; the driving gear is driven to rotate by the fourth motor, and then the driven gear ring can be driven to rotate, so that the connecting rod drives the cantilever to rotate in the horizontal plane and adjusts the direction of the scraper.

[0032] Furthermore, a slot is provided at the end of the cantilever, and the swing rod is rotatably connected in the slot. A fifth motor is provided on the cantilever, and the output shaft of the fifth motor is connected to the swing rod. The fifth motor can drive the swing rod to rotate along the slot, thereby meeting the angle adjustment requirements of the scraper and improving the painting quality.

[0033] The present invention has the following beneficial effects due to the adoption of the above technical solution:

[0034] 1. The construction method of the present invention has simple steps, which not only improves the construction quality of the bathroom waterproof layer, but also can effectively solve the leakage problem and extend the service life of the bathroom waterproof layer.

[0035] 2. The booster block can drive the guide wheel to move horizontally through the U-shaped frame to meet the movement requirements of the conveying pipe and prevent the conveying pipe from being entangled and affecting the normal transportation of materials.

[0036] 3. The moving component and the rotating component can drive the scraper to move or rotate in the horizontal direction to meet the painting requirements of different positions on the bathroom floor. The swing arm can rotate along the rotating component to adjust the inclination angle of the scraper to improve the uniformity of painting, thereby improving the construction quality of the waterproof layer. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] The present invention will be further described below in conjunction with the accompanying drawings:

[0038] Figure 1 This is a flow chart of a zero-leakage construction method for a bathroom according to the present invention;

[0039] Figure 2 It is a structural schematic diagram of the waterproof construction equipment in the present invention;

[0040] Figure 3 It is a structural schematic diagram of the brushing mechanism in the present invention;

[0041] Figure 4 for Figure 3 Structural schematic diagram of the middle A direction;

[0042] Figure 5 It is a connection diagram of the rotating assembly in the present invention.

[0043] In the figure: 1-fixed frame; 2-angle piece; 3-crossbeam; 4-first motor; 5-guide groove; 6-first screw; 7-feeding pipe; 8-first booster block; 9-U-shaped frame; 10-guide wheel; 11-L-shaped frame; 12-telescopic plate; 13-electric cylinder; 14-second motor; 15-second screw; 16-second booster block; 17-horizontal guide plate; 18-third motor; 19-second baffle; 20-third Three screws; 21-brush mechanism; 22-upper fixed plate; 23-lower fixed plate; 24-suspender rod; 25-third booster block; 26-positioning slot; 27-fourth motor; 28-cantilever; 29-swing rod; 30-scraper; 31-slot; 32-fifth motor; 33-horizontal rod; 34-side plate; 35-discharging hole; 36-driving gear; 37-driven gear ring; 38-connecting rod; 39-connecting column. DETAILED DESCRIPTION

[0044] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0045] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only embodiments of a part of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0046] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions.

[0047] like Figures 1 to 5 As shown, a zero-leakage construction method for a bathroom according to the present invention comprises the following steps:

[0048] S1. Base cleaning

[0049] a. Remove the gray skin on the base surface at a height of 30cm at the bottom and sides of the bathroom, and clean up the dust, sand and other debris to make the surface neat;

[0050] b. Then check the location of the pipe root, floor drain and drain outlet, and make a good drainage slope;

[0051] S2. Installation of waterproof construction equipment

[0052] a. First, select the corresponding fixing frame 1 according to the size of the bathroom, and fix the fixing frame 1 on the wall of the bathroom through the corner piece 2 so that it is located 1m above the ground;

[0053] b. Then, a crossbeam 3 is horizontally installed along the top surface of the fixed frame 1, a guide groove 5 is opened on the crossbeam 3, and a first driving mechanism is installed along the top of the crossbeam 3, and a suspension mechanism is connected to the first driving mechanism;

[0054] The first driving mechanism includes a first motor 4, a first screw 6 and a first baffle. The first motor 4 and the first baffle are arranged on both sides of the top surface of the beam 3. The first motor 4 is connected to the first baffle through the first screw 6. The first motor 4 drives the first screw 6 to rotate, and then drives the suspension mechanism to move horizontally, which meets the guiding requirements of the feed pipe 7 and is conducive to the smooth delivery of materials to the brushing mechanism 21.

[0055] The suspension mechanism includes a first booster block 8, a U-shaped frame 9 and a guide wheel 10. The first booster block 8 is connected to the first driving mechanism. The guide wheel 10 is connected to the first booster block 8 through the U-shaped frame 9. The booster block can drive the guide wheel 10 to move horizontally through the U-shaped frame 9 to meet the movement requirements of the conveying pipe 7 and prevent the conveying pipe 7 from being entangled and affecting the normal transportation of materials.

[0056] c. Then, according to the size of the fixed frame 1, the corresponding L-shaped frame 11 and the telescopic plate 12 are arranged. The telescopic plate 12 is installed on one side of the L-shaped frame 11. A telescopic groove is opened on the other side of the L-shaped frame 11. The telescopic groove matches the telescopic plate 12. Each L-shaped frame 11 is connected end to end to form a closed structure, and then connected to the fixed frame 1 through the electric cylinder 13;

[0057] d. Install a second drive mechanism between two L-shaped frames 11 along the length direction of the fixed frame 1, install a third drive mechanism between two adjacent second drive mechanisms, and install a brushing mechanism 21 on the third drive mechanism. Connect the brushing mechanism 21 to an external material supply barrel through a material delivery pipe 7, and connect the waterproof construction equipment to an external control box.

[0058] The second driving mechanism includes a second motor 14, a second screw 15 and a second booster block 16. The second motor 14 is arranged on the inner side of the L-shaped frame 11 on one side. The second motor 14 is connected to the L-shaped frame 11 on the other side through the second screw 15. The second booster block 16 is connected to the second screw 15. Two adjacent second booster blocks 16 are fixedly connected via a horizontal guide plate 17. The second motor 14 drives the second screw 15 to rotate, and then the second booster block 16 and the horizontal guide plate 17 can drive the brushing mechanism 21 to move horizontally, thereby meeting the requirements for brushing the waterproof layer, ensuring that each layer is brushed evenly, greatly reducing the gap, and improving the anti-leakage effect.

[0059] The third driving mechanism comprises a third motor 18, a second baffle 19 and a third screw 20. The third motor 18 and the second baffle 19 are arranged on the second booster blocks 16 on both sides. The third motor 18 is connected to the second baffle 19 through the third screw 20. The third motor 18 drives the third screw 20 to rotate, and then drives the brush mechanism 21 to move horizontally, so as to meet the position adjustment of the brush mechanism 21 and realize comprehensive painting of the bathroom floor.

[0060] The brushing mechanism 21 includes a moving component, a rotating component, a swing rod 29 and a scraper 30. The moving component is connected to the third driving mechanism, the rotating mechanism is connected to the moving mechanism, the swing rod 29 is rotatably connected to the rotating mechanism, a horizontal rod 33 is provided at the bottom of the swing rod 29, and the scraper 30 is fixedly connected to the horizontal rod 33. Side plates 34 are symmetrically provided on the horizontal rod 33 on both sides of the swing rod 29, and discharge holes 35 are evenly distributed on the side plates 34. The discharge holes 35 are connected to the feed pipe 7 through the horizontal rod 33 and the swing rod 29; the moving component and the rotating component can drive the scraper 30 to move or rotate in the horizontal direction to meet the painting requirements of different positions on the bathroom floor. The swing rod 29 can rotate along the rotating component to adjust the inclination angle of the scraper 30, improve the uniformity during brushing, and thereby improve the construction quality of the waterproof layer.

[0061] The moving assembly includes a third booster block 25, a suspension rod 24, an upper fixed plate 22 and a lower fixed plate 23. The lower fixed plate 23 is connected to the bottom of the upper fixed plate 22 through a connecting column 39. The upper fixed plate 22 and the lower fixed plate 23 cooperate to form a rotation space for accommodating the rotating assembly. The upper fixed plate 22 is fixed to the bottom of the third booster block 25 through the suspension rod 24. The third booster block 25 is provided with a positioning groove 26. The suspension rod 24 can improve the connection stability between the upper fixed plate 22 and the third booster block 25. The connecting column 39 can improve the connection stability between the upper fixed plate 22 and the lower fixed plate 23. The positioning groove 26 matches the horizontal guide plate 17, which can improve the stability and reliability during movement.

[0062] The rotating assembly includes a fourth motor 27, a driving gear 36, a driven ring gear 37, a connecting rod 38 and a cantilever 28. The fourth motor 27 is arranged on the top surface of the upper fixed plate 22. The output shaft of the fourth motor 27 is connected to the driving gear 36. The driven ring gear 37 is rotatably connected to the connecting column 39. The driven ring gear 37 is connected to the cantilever 28 through the connecting rod 38. The driving gear 36 and the driven ring gear 37 are meshed with each other. The fourth motor 27 drives the driving gear 36 to rotate, and then drives the driven ring gear 37 to rotate, so that the connecting rod 38 drives the cantilever 28 to rotate in the horizontal plane to adjust the direction of the scraper 30.

[0063] A slot 31 is provided at the end of the cantilever 28, and the swing rod 29 is rotatably connected in the slot 31. A fifth motor 32 is provided on the cantilever 28, and the output shaft of the fifth motor 32 is connected to the swing rod 29; the fifth motor 32 can drive the swing rod 29 to rotate along the slot 31, thereby meeting the angle adjustment requirements of the scraper 30 and improving the painting quality.

[0064] S3. Waterproof layer construction

[0065] a. First, a polypropylene fiber concrete layer is applied to the bottom layer. The prepared polypropylene fiber concrete is stored in a feed barrel. The polypropylene fiber concrete is pumped to the brushing mechanism 21 through the feed pipe 7. At this time, the brushing mechanism 21 is located on one side of the ground. The speeds of the first drive mechanism, the second drive mechanism and the third drive mechanism are set through the control box so that the brushing mechanism 21 outputs the polypropylene fiber concrete while brushing the polypropylene fiber concrete along the ground until the entire ground is painted. Through the construction of the polypropylene fiber concrete layer, the tiny cracks formed in the coagulation and curing of the concrete and the later creep of the concrete can be reduced.

[0066] b. Then, a fiber coating layer is brushed on the top of the polypropylene fiber concrete layer, the fiber and coating are mixed together and stored in a second feeding barrel, the feeding pipe 7 is connected to the second feeding barrel, and the fiber coating is delivered to the brushing mechanism 21 through the feeding pipe 7 by a pump. At this time, the brushing mechanism 21 is located on one side of the ground, and the speeds of the first driving mechanism, the second driving mechanism and the third driving mechanism are set by the control box, so that the brushing mechanism 21 outputs the fiber coating while brushing the fiber coating along the polypropylene fiber concrete layer until the entire ground is painted; the fiber coating layer can better prevent the formation of medium cracks;

[0067] c. Then, brush the glass fiber cloth coating anti-seepage layer along the top of the fiber coating layer, store the prepared glass fiber cloth coating in the third feeding barrel, and deliver the glass fiber cloth coating to the brushing mechanism 21 through the feeding pipe 7 by the pump. At this time, the brushing mechanism 21 is located on one side of the ground. The speeds of the first driving mechanism, the second driving mechanism and the third driving mechanism are set by the control box, so that the brushing mechanism 21 outputs the glass fiber cloth coating while brushing the glass fiber cloth coating along the fiber coating layer until the entire ground is painted; the glass fiber cloth coating anti-seepage layer can prevent large cracks caused by temperature stress;

[0068] d. Finally, the waterproof layer construction on the side of the bathroom is completed according to the processes a to c in the above step S3. After the waterproof layer reaches the set strength, the waterproof construction equipment is removed;

[0069] S4. Waterproof test

[0070] After the waterproof layer is dry, block the pipes, floor drains and drains, fill the water to a height of 20 to 30 cm, conduct a 24-hour water-tightness test, observe the leakage points, and manually repair the leakage points;

[0071] S5. Waterproof protective layer construction

[0072] Use glue mortar to roughen the floor and sides, and then roll on a layer of waterproof paint.

[0073] This construction method has simple steps and not only improves the construction quality of the bathroom waterproof layer, but also can effectively solve the leakage problem and extend the service life of the bathroom waterproof layer.

[0074] The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the present invention to achieve basically the same technical effects are all included in the protection scope of the present invention.

Claims

1. A zero-leakage construction method for a bathroom, characterized in that The steps include: S1. Base cleaning a. Remove the gray skin on the base surface at a height of 30cm at the bottom and sides of the bathroom, and clean up the dust, sand and other debris to make the surface neat; b. Then check the location of the pipe root, floor drain and drain outlet, and make a good drainage slope; S2. Installation of waterproof construction equipment a. First, select the corresponding fixing frame according to the size of the bathroom, and fix the fixing frame on the wall of the bathroom through the corner pieces so that it is 1m above the ground; b. Then, a crossbeam is horizontally installed along the top surface of the fixed frame, a guide groove is opened on the crossbeam, and a first driving mechanism is installed along the top of the crossbeam, and the first driving mechanism is connected to the suspension mechanism; c. Then, according to the size of the fixed frame, the corresponding L-shaped frame and telescopic plate are installed. The telescopic plate is installed on one side of the L-shaped frame, and a telescopic slot is opened on the other side of the L-shaped frame. The telescopic slot matches the telescopic plate. Each L-shaped frame is connected end to end to form a closed structure, and then connected to the fixed frame through an electric cylinder; d. Install the second drive mechanism between the two L-shaped frames along the length direction of the fixed frame, install the third drive mechanism between two adjacent second drive mechanisms, and install a brushing mechanism on the third drive mechanism. Connect the brushing mechanism to the external material supply barrel through the material delivery pipe, and connect the waterproof construction equipment to the external control box. S3. Waterproof layer construction a. First, brush the polypropylene fiber concrete layer on the bottom layer, store the prepared polypropylene fiber concrete in a feeding bucket, and use a pump to transport the polypropylene fiber concrete to the brushing mechanism through a feeding pipe. At this time, the brushing mechanism is located on one side of the ground. The speeds of the first driving mechanism, the second driving mechanism and the third driving mechanism are set through the control box, so that the brushing mechanism outputs the polypropylene fiber concrete while brushing the polypropylene fiber concrete along the ground until the entire ground is painted; b. Then, a fiber coating layer is brushed on the top of the polypropylene fiber concrete layer, the fiber and coating are mixed together and stored in a second feeding barrel, a feeding pipe is connected to the second feeding barrel, and the fiber coating is delivered to the brushing mechanism through the feeding pipe by a pump. At this time, the brushing mechanism is located on one side of the ground, and the speeds of the first driving mechanism, the second driving mechanism and the third driving mechanism are set through the control box, so that the brushing mechanism outputs the fiber coating while brushing the fiber coating along the polypropylene fiber concrete layer until the entire ground is painted; c. Then, brush the anti-seepage layer of the glass fiber cloth coating along the top of the fiber coating layer, store the prepared glass fiber cloth coating in the third feeding barrel, and deliver the glass fiber cloth coating to the brushing mechanism through the feeding pipe by the pump. At this time, the brushing mechanism is located on one side of the ground. The speeds of the first driving mechanism, the second driving mechanism and the third driving mechanism are set through the control box, so that the brushing mechanism outputs the glass fiber cloth coating while brushing the glass fiber cloth coating along the fiber coating layer until the entire ground is painted; d. Finally, the waterproof layer construction on the side of the bathroom is completed according to the processes a to c in the above step S3. After the waterproof layer reaches the set strength, the waterproof construction equipment is removed; S4. Waterproof test After the waterproof layer is dry, block the pipes, floor drains and drains, fill the water to a height of 20 to 30 cm, conduct a 24-hour water-tightness test, observe the leakage points, and manually repair the leakage points; S5. Waterproof protective layer construction Use glue mortar to roughen the floor and sides, and then roll on a layer of waterproof paint.

2. A zero-leakage construction method for a bathroom according to claim 1, characterized in that: The first driving mechanism in step S2 process b includes a first motor, a first screw and a first baffle, the first motor and the first baffle are arranged on both sides of the top surface of the beam, and the first motor is connected to the first baffle through the first screw.

3. A zero-leakage construction method for a bathroom according to claim 1, characterized in that: The suspension mechanism in step S2 process b includes a first booster block, a U-shaped frame and a guide wheel, wherein the first booster block is connected to the first driving mechanism, and the guide wheel is connected to the first booster block through the U-shaped frame.

4. A zero-leakage construction method for a bathroom according to claim 1, characterized in that: The second driving mechanism in step S2 process d includes a second motor, a second screw and a second booster block. The second motor is arranged on the inner side of the L-shaped frame on one side, and the second motor is connected to the L-shaped frame on the other side through the second screw. The second booster block is connected to the second screw, and two adjacent second booster blocks are fixedly connected by a horizontal guide plate.

5. A zero-leakage construction method for a bathroom according to claim 4, characterized in that: The third driving mechanism comprises a third motor, a second baffle and a third screw. The third motor and the second baffle are arranged on the second booster blocks on both sides. The third motor is connected to the second baffle through the third screw.

6. A zero-leakage construction method for a bathroom according to claim 1, characterized in that: The brushing mechanism in step S2 process d includes a moving component, a rotating component, a swing rod and a scraper, the moving component is connected to the third driving mechanism, the rotating mechanism is connected to the moving mechanism, the swing rod is rotatably connected to the rotating mechanism, a horizontal rod is provided at the bottom of the swing rod, the scraper is fixedly connected to the horizontal rod, the horizontal rod is symmetrically provided with side plates on both sides of the swing rod, the side plates are evenly distributed with discharge holes, and the discharge holes are connected to the conveying pipe through the horizontal rod and the swing rod.

7. A zero-leakage construction method for a bathroom according to claim 6, characterized in that: The moving assembly includes a third booster block, a suspension rod, an upper fixed plate and a lower fixed plate. The lower fixed plate is connected to the bottom of the upper fixed plate through a connecting column. The upper fixed plate and the lower fixed plate cooperate to form a rotation space for accommodating the rotating assembly. The upper fixed plate is fixed to the bottom of the third booster block through the suspension rod. The third booster block is provided with a positioning groove.

8. A zero-leakage construction method for a bathroom according to claim 7, characterized in that: The rotating assembly includes a fourth motor, a driving gear, a driven gear ring, a connecting rod and a cantilever. The fourth motor is arranged on the top surface of the upper fixed plate. The output shaft of the fourth motor is connected to the driving gear. The driven gear ring is rotatably connected to the connecting column. The driven gear ring is connected to the cantilever through the connecting rod. The driving gear and the driven gear ring are meshed with each other.

9. A zero-leakage construction method for a bathroom according to claim 8, characterized in that: A slot is provided at the end of the cantilever, and the swing arm is rotatably connected in the slot. A fifth motor is provided on the cantilever, and an output shaft of the fifth motor is connected to the swing arm.