Design method of cable connection mode in photovoltaic power generation project and related product

Through the automated photovoltaic power generation project design method, the photovoltaic panel design scheme is obtained, the number of photovoltaic units connected in the photovoltaic group string is determined, and the connection scheme is generated and optimized. The problem of low manual operation efficiency in the existing technology is solved, and efficient and automatic cable connection design is achieved, which improves the power generation efficiency and design accuracy.

CN119598649APending Publication Date: 2025-03-11HAIER ENERGY TECHNOLOGY CO LTD

Patent Information

Application Number
CN202411412178.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2025-03-11

AI Technical Summary

Technical Problem

In the existing photovoltaic power generation projects, the cable connection method mainly relies on manual operation, is inefficient and has human factors that cannot meet the requirements of efficient design.

Method used

By obtaining the photovoltaic panel design scheme of the photovoltaic power generation project, reading the specifications, number, arrangement mode and inverter parameters of the photovoltaic units in the photovoltaic array, determining the number of photovoltaic units connected in series in each photovoltaic group string, generating a connection scheme to be selected, and selecting the optimal scheme through simulation to form the overall solution of the photovoltaic power generation project.

Benefits of technology

The automatic design of cable connection methods in photovoltaic power generation projects has been realized, the design efficiency has been improved, the cable connection methods have been optimized, the cost has been reduced, and the power generation efficiency has been improved to meet user needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119598649A_ABST
    Figure CN119598649A_ABST
Patent Text Reader

Abstract

The invention provides a design method of a cable connection mode in a photovoltaic power generation project and a related product. The design method of the cable connection mode in the photovoltaic power generation project comprises the steps of obtaining a photovoltaic panel design scheme of the photovoltaic power generation project; reading the specification, number, arrangement mode and accessed inverter parameters of photovoltaic units in a photovoltaic array in the photovoltaic panel design scheme; determining the number of the photovoltaic units connected in series in each photovoltaic string according to the specifications and the number of the photovoltaic units and the parameters of the inverter; generating a to-be-selected wiring scheme according to the arrangement mode and the number of the photovoltaic units connected in series in each photovoltaic string; and simulating the to-be-selected wiring scheme, selecting the to-be-selected wiring scheme with the optimal simulation result, and combining the to-be-selected wiring scheme with the photovoltaic panel design scheme to form an overall scheme of a photovoltaic power generation project. According to the scheme, automatic design of the cable connection mode in a photovoltaic power generation project is achieved, the design efficiency is improved, the power generation efficiency of photovoltaic power generation can be improved, and the requirements of construction owners are met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of photovoltaic design, and in particular to a design method for a cable connection mode in a photovoltaic power generation project. Background Art

[0002] As a new type of clean energy, the photovoltaic industry has been supported and developed by countries around the world due to its clean and renewable characteristics. The photovoltaic industry has also become an emerging industry with national strategic significance in China. Among them, distributed photovoltaic power generation has also become an important part of the photovoltaic industry due to its advantages of adapting to local conditions, nearby power generation and grid connection, and low transmission loss. For residents, especially rural residents with more abundant land and space resources, the combination of household distributed photovoltaic power generation and household energy storage is more advantageous. The household distributed photovoltaic power generation and energy storage system not only has the advantages of adapting to local conditions, self-use power generation, and surplus storage, but also improves energy utilization efficiency, reduces peak power demand, and overcomes grid losses. The development of household distributed photovoltaic power generation and household energy storage systems has an important impact on promoting the development of the photovoltaic industry.

[0003] However, the popularity of household distributed photovoltaic power generation and household energy storage in my country is still in its early stages, and the market still has huge room for growth. How to promote the further popularization of distributed photovoltaic power generation and promote the transformation and upgrading of energy consumption structure has become an important topic in the research of photovoltaic power generation projects.

[0004] Design work is an important task in the early stage of photovoltaic power generation projects. The design of cable connection method is another important design task in photovoltaic power generation projects besides photovoltaic array layout design. Determining the cable connection method (connection method, topology structure) through photovoltaic array layout design can significantly promote the increase of photovoltaic system output power and revenue.

[0005] In order to complete the cable laying between the inverter and the photovoltaic string, manual methods are currently mostly used, which has low work efficiency, large human factors, and cannot meet the requirements of efficient design. Summary of the invention

[0006] An object of the present invention is to improve the design efficiency of photovoltaic power generation projects.

[0007] Another object of the present invention is to optimize the cable connection method in photovoltaic power generation projects and reduce costs.

[0008] Another object of the present invention is to improve the survey accuracy and precision of photovoltaic power generation projects and fully meet customer needs.

[0009] In particular, the present invention provides a method for designing a cable connection method in a photovoltaic power generation project. The method comprises:

[0010] Obtain photovoltaic panel design plans for photovoltaic power generation projects;

[0011] Read the specifications, quantity, arrangement and connected inverter parameters of the photovoltaic units in the photovoltaic array in the photovoltaic panel design plan;

[0012] Determine the number of photovoltaic units connected in series in each photovoltaic string according to the specifications and quantity of the photovoltaic units and the parameters of the inverter;

[0013] Generate a connection scheme to be selected according to the arrangement mode and the number of photovoltaic units connected in series in each photovoltaic string;

[0014] The candidate connection schemes are simulated, and the candidate connection scheme with the best simulation result is selected and combined with the photovoltaic panel design scheme to form an overall plan for the photovoltaic power generation project.

[0015] Optionally, the step of determining the number of photovoltaic units connected in series in each photovoltaic string according to the specifications and number of the photovoltaic units and the parameters of the inverter includes:

[0016] Determine the maximum access voltage and maximum power point tracking voltage range of the inverter from the parameters of the inverter;

[0017] Calculate the maximum open circuit voltage and maximum power point tracking voltage range of the string after connecting different numbers of photovoltaic units in series according to the specifications of the photovoltaic units;

[0018] Determine the number of PV units connected in series in the PV string that meets the requirements. These requirements include: the maximum open circuit voltage of the string is less than the maximum access voltage of the inverter, the maximum power point tracking voltage range of the string is within the maximum power point tracking voltage range of the inverter, and the number of PV units is divisible by the number of PV units connected in series.

[0019] Optionally, the step of generating a connection scheme to be selected according to the arrangement mode and the number of photovoltaic units connected in series in each photovoltaic string includes:

[0020] Setting identification numbers for each photovoltaic unit according to the arrangement;

[0021] A connection model is formed according to the identification numbers, wherein the connection mode between photovoltaic units with different identification numbers is recorded in the connection model;

[0022] Output the connection model as a candidate connection solution.

[0023] Optionally, the step of simulating the selected wiring solution includes:

[0024] Simulate the power generation of each candidate connection scheme under the set irradiation environment one by one;

[0025] The candidate connection scheme with the highest power generation is taken as the candidate connection scheme with the best simulation result.

[0026] Optionally, the step of obtaining a photovoltaic panel design solution for a photovoltaic power generation project includes:

[0027] Obtain basic information on the construction area of ​​the photovoltaic power generation project;

[0028] Control the drone to take photos of the construction area based on the basic information to obtain survey images;

[0029] Generate a 3D model of the construction area based on the survey images;

[0030] Analyze the three-dimensional model to obtain survey characteristic data of the photovoltaic panel laying area;

[0031] The photovoltaic panel laying area is simulated and designed according to the survey characteristic data to obtain one or more photovoltaic panel design solutions.

[0032] Optionally, the basic information includes: location information, terrain information, and grid access equipment information; and

[0033] The step of obtaining the location information and the terrain information includes: reading the location information and the terrain information from the location of the construction area selected in the preset map;

[0034] The step of acquiring the information of the grid-connected device includes: sending a query request to the grid management device according to the location information, and acquiring the information of the grid-connected device in response to the query request from the grid management device.

[0035] Optionally, the step of controlling the drone to photograph the construction area according to the basic information includes:

[0036] Control the drone to conduct initial survey and photography of the construction area to obtain the initial image;

[0037] Setting marker points on the initial image, dividing the initial image into objects based on the marker points, so as to at least determine the installation object and surrounding environment objects, and estimate the area and terrain characteristics of the installation object;

[0038] Design an aerial photography plan based on the area and terrain characteristics of the installation object. The aerial photography plan includes the flight parameters and shooting parameters of the drone.

[0039] Controlling the UAV to perform a first survey and photography around the installation object according to the aerial photography plan to obtain a survey image of the installation object;

[0040] Controlling the UAV to perform a second survey and shooting of the surrounding environment objects to obtain a survey image of the surrounding environment objects;

[0041] The survey image of the installation object and the survey image of the surrounding environment objects are spliced ​​to obtain a survey image of the construction area.

[0042] Optionally, the step of generating a three-dimensional model of the construction area according to the survey image includes:

[0043] Discretize the survey image using set grid points to generate point cloud data of the construction area;

[0044] Use point cloud data to construct the surface and obtain the surface model;

[0045] Perform object recognition on survey images to determine object boundaries;

[0046] Compare the object boundary with the surface model and perform contour segmentation on the surface model;

[0047] The surface model after contour segmentation is subjected to object entity processing to obtain contour surfaces of multiple objects;

[0048] Collect color and pattern features of multiple objects in survey images;

[0049] Perform appearance processing on the contour surfaces of multiple objects according to color and pattern features to obtain a three-dimensional model of the construction area;

[0050] Data statistics are performed on the three-dimensional model to obtain data information of the three-dimensional model, and attribute information is assigned to multiple objects of the three-dimensional model.

[0051] Optionally, after the step of forming an overall plan for the photovoltaic power generation project, the step further includes:

[0052] Obtain a construction evaluation criteria system for photovoltaic power generation projects, the evaluation criteria system includes multiple evaluation levels, and the bottom layer of the evaluation level is configured with multiple project construction influencing factors;

[0053] Assign values ​​to the lowest evaluation level according to the design plan of the photovoltaic power generation project to be built, and obtain the relationship of influencing factors;

[0054] The relationship between the influencing factors is calculated according to the factor weights corresponding to each project construction influencing factor, and multiple criterion parameters of the middle layer in the evaluation hierarchy are obtained;

[0055] Comprehensively evaluate multiple criteria parameters to obtain decision-making evaluation results for the photovoltaic power generation project to be built;

[0056] Adjust the design plan based on the decision evaluation results.

[0057] According to another aspect of the present invention, there is also provided a computer program product, comprising a computer program, which, when executed by a processor, implements the steps of any of the above-mentioned methods for designing a cable connection mode in a photovoltaic power generation project.

[0058] According to another aspect of the present invention, there is also provided a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of any of the above-mentioned methods for designing a cable connection method in a photovoltaic power generation project.

[0059] According to another aspect of the present invention, a computer device is provided, which includes a memory, a processor and a computer program stored in the memory, and the processor executes the computer program to implement the steps of any of the above-mentioned methods for designing a cable connection method in a photovoltaic power generation project.

[0060] The design method of the cable connection mode in the photovoltaic power generation project of the present invention determines the number of photovoltaic units connected in series in each photovoltaic string according to the specifications and quantity of the photovoltaic units and the parameters of the inverter; generates a connection scheme to be selected according to the arrangement mode and the number of photovoltaic units connected in series in each photovoltaic string; simulates the connection scheme to be selected, selects the connection scheme with the best simulation result and combines it with the photovoltaic panel design scheme to form an overall scheme of the photovoltaic power generation project, thereby realizing the automatic design of the cable connection mode in the photovoltaic power generation project, selecting the best connection mode, and improving the design efficiency. The cable connection mode can improve the power generation efficiency of photovoltaic power generation and meet the needs of users.

[0061] Furthermore, the design method of the cable connection method in the photovoltaic power generation project of the present invention optimizes the design algorithm of the cable connection method, accurately determines the number of photovoltaic units connected in series in each photovoltaic string, improves system efficiency, and thus increases power generation.

[0062] Furthermore, the design method of the cable connection method in the photovoltaic power generation project of the present invention optimizes the evaluation criteria system and the process of using the evaluation criteria system to make decision-making evaluations for the photovoltaic power generation projects to be built, wherein the middle layer criteria include equipment criteria, resource and environmental criteria, ownership criteria, benefit criteria, and risk criteria, which fully consider the influencing factors that affect the design scheme of the photovoltaic power generation project.

[0063] Furthermore, the method for designing cable connection methods in photovoltaic power generation projects of the present invention uses drones to photograph the design area and its surrounding environment. With the help of the drone's flexibility and low cost, the problems of increased survey difficulty and inaccurate survey data caused by harsh on-site environment are solved, and the generation of photovoltaic panel design plans is automatically completed, thereby improving planning efficiency and reducing the workload of surveyors.

[0064] Based on the following detailed description of specific embodiments of the present invention in conjunction with the accompanying drawings, those skilled in the art will become more aware of the above and other objects, advantages and features of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] Hereinafter, some specific embodiments of the present invention will be described in detail in an exemplary and non-limiting manner with reference to the accompanying drawings. The same reference numerals in the accompanying drawings indicate the same or similar components or parts. It should be understood by those skilled in the art that these drawings are not necessarily drawn to scale. In the accompanying drawings:

[0066] Figure 1 is a schematic diagram of a design method for a cable connection mode in a photovoltaic power generation project according to an embodiment of the present invention;

[0067] Figure 2 is a flow chart of determining the number of photovoltaic units connected in series in a photovoltaic string in a method for designing a cable connection method in a photovoltaic power generation project according to an embodiment of the present invention;

[0068] Figure 3 is a flow chart of generating a connection scheme to be selected in a method for designing a cable connection method in a photovoltaic power generation project according to an embodiment of the present invention;

[0069] Figure 4 is a flow chart of obtaining a photovoltaic panel design scheme in a method for designing a cable connection method in a photovoltaic power generation project according to an embodiment of the present invention;

[0070] Figure 5 It is a schematic diagram of the process of using a drone to take aerial photos of a construction project in a method for designing a cable connection method in a photovoltaic power generation project according to an embodiment of the present invention;

[0071] Figure 6 It is a schematic diagram of a process of generating a three-dimensional model in a design method of a cable connection method in a photovoltaic power generation project according to an embodiment of the present invention;

[0072] Figure 7 It is a schematic diagram of the system architecture of drone survey design in a method for designing a cable connection mode in a photovoltaic power generation project using an embodiment of the present invention;

[0073] Figure 8 is a flow chart for evaluating a design scheme in a method for designing a cable connection mode in a photovoltaic power generation project according to an embodiment of the present invention;

[0074] Fig. 9 is a schematic diagram of a process for assigning values ​​to evaluation levels in a method for designing a cable connection mode in a photovoltaic power generation project according to an embodiment of the present invention;

[0075] Fig.10is a schematic diagram of a computer program product according to an embodiment of the present invention;

[0076] Fig.11 is a schematic diagram of a computer-readable storage medium according to an embodiment of the present invention; and

[0077] Fig.12 is a schematic block diagram of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0078] It should be understood by those skilled in the art that the embodiments described below are only some embodiments of the present invention, rather than all embodiments of the present invention, and these embodiments are intended to explain the technical principles of the present invention, rather than to limit the protection scope of the present invention. Based on the embodiments provided by the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should still fall within the protection scope of the present invention.

[0079] This embodiment first provides a design method for a cable connection method in a photovoltaic power generation project, and determines the layout of electrical cables between photovoltaic strings in combination with the demand characteristics of the photovoltaic power generation project and the laying method of photovoltaic modules.

[0080] Figure 1 Schematic diagram of a method for designing a cable connection mode in a photovoltaic power generation project according to an embodiment of the present invention. The method for designing a cable connection mode in the photovoltaic power generation project may generally include:

[0081] Step S101, obtaining a photovoltaic panel design plan for a photovoltaic power generation project. The photovoltaic panel design plan can be intelligently generated in combination with drone automatic survey technology, and includes various information related to the photovoltaic panel laying method, such as the specifications, quantity, arrangement of photovoltaic units, parameters of connected inverters, location, size, terrain of the installation object, etc.

[0082] Step S102, reading the specifications, quantity, arrangement, and connected inverter parameters of the photovoltaic units in the photovoltaic array in the photovoltaic panel design plan.

[0083] Step S103, determining the number of photovoltaic units connected in series in each photovoltaic string according to the specifications and number of the photovoltaic units and the parameters of the inverter.

[0084] Step S104 , generating a connection scheme to be selected according to the arrangement mode and the number of photovoltaic units connected in series in each photovoltaic string.

[0085] Step S105 , simulating the connection schemes to be selected, selecting the connection scheme with the best simulation result and combining it with the photovoltaic panel design scheme to form an overall scheme of the photovoltaic power generation project.

[0086] The above method selects the best candidate connection scheme with the best simulation result and combines it with the photovoltaic panel design scheme to form an overall plan for the photovoltaic power generation project, thereby realizing the automatic design of the cable connection method in the photovoltaic power generation project, selecting the best connection method, and improving the design efficiency. The cable connection method can improve the power generation efficiency of photovoltaic power generation and meet the needs of users.

[0087] Figure 2 The present invention is a flow chart of determining the number of photovoltaic units connected in series in a photovoltaic string in a method for designing a cable connection mode in a photovoltaic power generation project according to an embodiment of the present invention. The step of determining the number of photovoltaic units connected in series in each photovoltaic string according to the specifications and quantity of the photovoltaic units and the parameters of the inverter may include:

[0088] Step S201, determining the maximum access voltage and maximum power point tracking voltage range of the inverter from the parameters of the inverter;

[0089] Step S202, calculating the maximum open circuit voltage and the maximum power point tracking voltage range of the string after different numbers of photovoltaic units are connected in series according to the specifications of the photovoltaic units;

[0090] Step S203, determining the number of photovoltaic units connected in series in the photovoltaic string that meets the requirements. These requirements may include: the maximum open circuit voltage of the string is less than the maximum access voltage of the inverter, the maximum power point tracking voltage range of the string is within the maximum power point tracking voltage range of the inverter, and the number of photovoltaic units is divisible by the number of photovoltaic units connected in series.

[0091] Among the above requirements, requirement one is: the maximum open-circuit voltage of the string is less than the maximum access voltage of the inverter. If the maximum open-circuit voltage of the PV modules connected in series exceeds the maximum access voltage of the inverter, the inverter will be over-voltage and may even burn out.

[0092] Requirement 2: The maximum power point tracking voltage range of the string is within the maximum power point tracking voltage range of the inverter, which can improve the maximum power point tracking (MPPT) requirements, obtain the maximum power output, and increase power generation.

[0093] Requirement 3: The number of photovoltaic units can be divided by the number of photovoltaic units connected in series, which can ensure that the number of photovoltaic units in each string is consistent, making it easier to use the same inverter. Therefore, the photovoltaic units of the photovoltaic power generation project are preferably a large number of divisors such as 12, 24, and 36, so as to more flexibly select the number of photovoltaic units connected in series in the photovoltaic strings. In addition, the more units connected in series in the photovoltaic string, the fewer the number of parallel branches, which can reduce the amount of junction boxes and the amount of cables from the components to the junction boxes. In the case where there are multiple peak points in the output characteristic curve of the photovoltaic string, the MPPT needs to be able to search and obtain the global maximum power point in a timely and accurate manner. Different models of photovoltaic inverters have different abilities to identify the peak points of the multi-peak curve as the global maximum power point. The above requirements enable the photovoltaic strings to match the characteristics of the photovoltaic inverter.

[0094] Therefore, the above process optimizes the design algorithm of the cable connection method, accurately determines the number of photovoltaic units connected in series in each photovoltaic string, improves system efficiency, and thus increases power generation.

[0095] Figure 3 The present invention is a flowchart of generating a candidate wiring scheme in a method for designing a cable connection method in a photovoltaic power generation project according to an embodiment of the present invention. The step of generating a candidate wiring scheme according to an arrangement method and the number of photovoltaic units connected in series in each photovoltaic string may include:

[0096] Step S301, setting an identification number for each photovoltaic unit according to the arrangement mode;

[0097] Step S302, forming a connection model according to the identification numbers, wherein the connection model records the connection mode between photovoltaic units with different identification numbers;

[0098] Step S303: outputting the connection model as a connection solution to be selected.

[0099] In order to improve the efficiency of generating connection plans, combined with the specific engineering requirements of cable connections in specific engineering construction, the following connection rules can be pre-set:

[0100] (1) PV strings are formed by connecting adjacent PV units in series, and interleaved PV units are not allowed to be bridged;

[0101] (2) In order to avoid crossing of lines, the lines between photovoltaic cells are not allowed to be connected obliquely, that is, only horizontal or vertical connections are allowed;

[0102] (3) The wiring within the photovoltaic array must be arranged neatly and beautifully.

[0103] Different connection methods have an impact on the output power of the photovoltaic system. The connection points on the photovoltaic array can be freely selected. In order to meet the above connection rules as much as possible and facilitate the subsequent maintenance of the photovoltaic system, the connection scheme of this embodiment can be connected by connecting the middle points of the photovoltaic array. When forming a connection method, the analysis can be performed on a photovoltaic string basis, and possible connection methods can be enumerated through detailed simulation to obtain a most efficient photovoltaic connection scheme (the candidate connection scheme with the best simulation result).

[0104] In order to facilitate the generation of connection methods, the photovoltaic array can be numbered (each photovoltaic unit is assigned an identification number), for example, from left to right and from top to bottom. When performing simulation, the connection method of the array is imported into the simulation circuit according to the connection relationship between the numbers (for example, 1 indicates that the two photovoltaic units are connected, and 0 indicates that they are not connected), and subsequent simulation calculations can be performed to ultimately determine the optimal photovoltaic connection method (the connection method with the largest power generation can be used as the optimal candidate connection scheme). That is, the steps of simulating the candidate connection schemes can include: simulating the power generation of each candidate connection scheme under the set irradiation environment one by one; the candidate connection scheme with the highest power generation is used as the candidate connection scheme with the best simulation result.

[0105] The above photovoltaic panel design can be automatically generated to serve as the basis for the design of the cable connection method. Figure 4 The present invention is a flowchart of obtaining a photovoltaic panel design scheme in a method for designing a cable connection method in a photovoltaic power generation project according to an embodiment of the present invention. The steps of obtaining a photovoltaic panel design scheme for a photovoltaic power generation project may include:

[0106] Step S401, obtain the basic information of the construction area of ​​the photovoltaic power generation project to be built. The basic information may include: location information, terrain information, and grid access equipment information. The location information includes the geographical coordinates (latitude and longitude) of the construction area, the address of the administrative area (administrative divisions, road numbers), the distance to surrounding markers, etc. The terrain information includes the altitude, slope and slope direction (the degree of inclination and inclination direction of the ground), the type of foundation layout (roof, wall, ground, other supports), landform type, and infrastructure information (foundation surface flatness, foundation surface covering type). The grid access equipment information includes the capacity of the access transformer, the inverter type, the PCS specifications, etc.

[0107] The step of obtaining the position information and terrain information may include: reading the position information and terrain information from the position of the construction area selected in the preset map. The map may be a digital map, which is obtained by digitally processing geographic information using computer technology, and in addition to graphics, may also include relevant data such as terrain data, vector data, and description information. In actual application, the method of this embodiment may determine the position of the construction area on the digital map through the selection operation of the surveyor on the map or according to the input selection information, and read the corresponding position information and terrain information. The position information and terrain information are used as positioning information for surveying on the one hand, and can also be used as basic data for surveying on the other hand.

[0108] The step of obtaining the information of the equipment connected to the grid includes: sending a query request to the grid management device according to the location information, and obtaining the information of the equipment connected to the grid in response to the query request from the grid management device. The grid management device can find the corresponding equipment information connected to the grid according to the grid deployment data of the construction area. The equipment information connected to the grid can be used to limit the technical indicators and economic indicators of the photovoltaic system, such as providing the capacity limit parameters of the photovoltaic system, the consumable cost of the photovoltaic equipment connected to the grid (cable specifications and quantity, transformer and PCS expansion cost, etc.), and the grid's restriction conditions for absorbing microgrid power transmission (whether to operate reverse transmission to the grid, and the grid electricity price).

[0109] Step S402: Control the drone to take photos of the construction area according to the basic information to obtain a survey image. The survey image can be multiple images at different angles, reflecting the conditions of the construction area at different angles.

[0110] Step S403: Generate a three-dimensional model of the construction area based on the survey image.

[0111] Step S404: Analyze the three-dimensional model to obtain survey feature data of the photovoltaic panel laying area. The survey feature data includes: shape, area, inclination, orientation, height, etc. of the photovoltaic panel laying area.

[0112] Step S405 , performing simulation design on the photovoltaic panel laying area according to the survey characteristic data to obtain one or more photovoltaic panel design solutions.

[0113] The above process uses drones to take pictures of the construction area to obtain survey images. With the help of the drone's flexibility and low cost, the field survey results can be obtained quickly and efficiently. A three-dimensional model of the construction area is further generated based on the survey image; the three-dimensional model is analyzed to obtain the survey feature data of the photovoltaic panel laying area. The survey process is fast and efficient, reducing the workload of survey personnel and solving the problems of increased survey difficulty and inaccurate survey data caused by the harsh on-site environment.

[0114] Figure 5The present invention is a schematic diagram of a process of using a drone to take aerial photos of a construction site in a method for designing a cable connection method in a photovoltaic power generation project according to an embodiment of the present invention. The steps of controlling the drone to take photos of the construction site based on basic information include:

[0115] Step S501, control the drone to perform initial survey and photography of the construction area to obtain an initial image. The initial survey and photography can be performed using the drone's default cruise mode, for example, the drone photographs the construction area at a certain height in a preset scanning photography mode (such as reciprocating along a straight line). The initial image obtained is used to gain a general understanding of the construction area.

[0116] Step S502, set marker points for the initial image, and divide the initial image into objects based on the marker points to at least determine the installation object and the surrounding environment objects, and estimate the regional area and terrain characteristics of the installation object. The marker points can be obtained by analyzing the initial image, for example, by finding obvious marker points using pixel threshold segmentation, edge detection, regional growth clustering, machine learning model classification, etc. The marker points may include points such as demarcation points, edge points, feature intensity change points, cluster centers or representative points. In addition to the installation objects (installation roofs, installation walls, vacant ground, etc.), the objects obtained by object division may also include the basic objects of the installation objects (installed building objects, walls, supports, etc.). The estimated regional area and terrain characteristics of the installation object are used for the formulation of the aerial photography plan, not the final survey results.

[0117] Step S503, design an aerial photography plan according to the area and terrain characteristics of the installation object. The aerial photography plan includes the flight parameters and shooting parameters of the drone. The flight parameters may include calculating the navigation altitude, speed, route length, flight time and other data. To ensure the accuracy of the measurement, the same target position can be photographed from at least three directions. The aerial photography plan requires that the captured images have a certain degree of overlap to facilitate subsequent stitching. The aerial photography plan can shoot in multiple directions and at multiple heights for the installation object.

[0118] Step S504, control the drone to perform a first survey and shooting around the installation object according to the aerial photography plan to obtain a survey image of the installation object. The shooting point can be arranged in an open, unobstructed location with a large shooting range. After the first survey and shooting is completed, the shooting quality of the survey image (such as clarity, overlap, occlusion status, etc.) can be checked. If an image that does not meet the requirements appears, repeat the shooting. The survey image of the installation object may include images taken from multiple directions and multiple heights from multiple shooting points.

[0119] Step S505, control the drone to perform a second survey and photography of the surrounding environment objects to obtain a survey image of the surrounding environment objects. The second survey and photography photographs the periphery of the installation object to obtain an image reflecting the overall state of the construction area.

[0120] Step S506, stitching the survey image of the installation object and the survey image of the surrounding environment object to obtain the survey image of the construction area. An optional survey image stitching method includes: performing angle matching on the survey image of the installation object and the survey image of the surrounding environment object to find multiple pairs of matching images; performing grayscale histogram equalization processing and geometric distortion elimination on the multiple pairs of matching images to obtain multiple groups of images to be stitched; extracting feature information from the multiple groups of images to be stitched, stitching and fusing the images according to the feature information, and obtaining survey images of the construction area from multiple angles.

[0121] Angle matching can be done by searching for images with similar shooting directions and shooting ranges through the flight records of drones. The matching images found have similar angles, which can reduce the image calculations (including image translation, scaling, and twisting) in the stitching process and improve processing efficiency. Grayscale histogram equalization and geometric distortion elimination can eliminate the problems caused by geometric distortion and color brightness differences in image processing.

[0122] Feature information is extracted from multiple groups of images to be spliced, and an image transformation model can be established based on the matched features, and finally transformation mapping is performed. The transformation mapping of the method of this embodiment first uses point, line and angle features to estimate the homography matrix of the global transformation, and pre-aligns the spliced ​​images; then the image is gridded, and the grid deformation is constrained by the energy function to achieve grid refinement alignment. Since the shooting angle is matched in advance, the complexity of the image transformation model can be reduced. The image alignment process can use a feature-based image registration method. Alignment is performed by adding feature line segments and feature points of the shooting angle, which greatly reduces the amount of calculation. For example, the scale-invariant feature transformation algorithm (ScaleInvariant Feature Transform, referred to as SIFT) can be used to determine the feature points of the image and the angle information of the feature points; for example, the line segment detector (LSD) can be used to extract the straight line characteristics of the image.

[0123] Image stitching and fusion are performed based on feature information to convert each pixel of the transformed image into the same image, and then the image fusion method is used to perform pixel fusion on the transition area of ​​the stitched image to optimize the image stitching quality.

[0124] The survey images of the construction area obtained in the above steps reflect the characteristics of the installation object and the surrounding environment objects from different angles. Compared with the prior art in which surveyors manually set up markers and aerial photography points for the construction area, the method of this embodiment uses three aerial photography to complete the entire survey task, designs the aerial photography plan with the help of the initial images obtained by the initial survey, and automatically completes the aerial photography task, which has a higher accuracy rate and reduces the dependence on the operation of the surveyors.

[0125] Figure 6 The present invention is a schematic diagram of a process for generating a three-dimensional model in a method for designing a cable connection method in a photovoltaic power generation project according to an embodiment of the present invention. The steps of generating a three-dimensional model of a construction area according to a survey image include:

[0126] Step S601, discretize the survey image using set grid points to generate point cloud data of the construction area. One discretization method is: discretize using three-dimensional space grid points, and then sample a point in each grid point. Each small grid contains several points, and the point closest to the center point of the grid is taken as the discrete sampling point.

[0127] Step S602, using the point cloud data to construct a surface to obtain a surface model. The data captured by the drone can be processed to obtain sufficient point cloud data. Through surface construction, a surface model in the form of a point cloud can be obtained.

[0128] Step S603: perform object recognition on the survey image to determine the object boundary. The object recognition results include: installation objects (installation roofs, installation walls, vacant ground, etc.), basic objects of installation objects (installed building objects, walls, supports, etc.), surrounding environment objects, etc.

[0129] Step S604: compare the object boundary with the surface model and perform contour segmentation on the surface model.

[0130] Step S605 , performing object entity processing on the surface model after contour segmentation to obtain contour surfaces of multiple objects.

[0131] Step S606: collecting color and pattern features of multiple objects in the survey image.

[0132] Step S607, performing appearance processing on the contour surfaces of the multiple objects according to the color and pattern features to obtain a three-dimensional model of the construction area.

[0133] Step S608, perform data statistics on the three-dimensional model to obtain data information of the three-dimensional model, and assign attribute information to multiple objects of the three-dimensional model. The data information of the three-dimensional model includes: coordinates, elevation data, area, length, height, slope, direction, etc., which can be read from the three-dimensional model.

[0134] The process of simulating and designing the photovoltaic panel laying area according to the survey feature data to obtain one or more photovoltaic panel design schemes may include: calculating the optimal inclination angle of a single photovoltaic unit and the horizontal unit spacing and vertical unit spacing according to the declination angle and slope of the area to be designed. When laying photovoltaic modules with fixed inclination angles, the method of this embodiment can give priority to ensuring that the photovoltaic unit with the optimal inclination angle can obtain the most total solar radiation. According to the solar radiation data, the solar radiation of different inclined surfaces can be calculated according to the solar altitude angle (corresponding to the declination angle), and the optimal inclination angle is determined based on the maximum total solar radiation received per unit area at different inclination angles. Under the optimal inclination state, the spacing between photovoltaic units in the horizontal state and the photovoltaic units in the vertical state without blocking each other can be calculated to obtain the horizontal unit spacing and the vertical unit spacing. Those skilled in the art can obtain the horizontal unit spacing and the vertical unit spacing through geometric calculations through the above slope and optimal inclination angle. According to the optimal inclination angle of the photovoltaic unit, the horizontal unit spacing and the vertical unit spacing, the projection of the space occupied by a single photovoltaic unit to be laid in the horizontal arrangement state and the vertical arrangement state on the area to be designed is determined. The projection reflects the area of ​​the photovoltaic unit to be designed. The photovoltaic panel layout design is carried out in the photovoltaic panel laying area to determine the layout method that can arrange the largest number of photovoltaic units.

[0135] Figure 7 The system architecture diagram of the UAV survey design in the cable connection method design method of a photovoltaic power generation project using an embodiment of the present invention is shown in FIG. The system may include: a UAV 10, a wireless communication device 20, a data processing device 30, and an interactive terminal 40.

[0136] The drone 10 may include: a flight control system, a positioning system, an aerial photography system, and a measurement system. The flight control system is used to adjust the flight attitude (including altitude, speed, and direction) of the drone, and the positioning system is used to obtain the location information of the drone 10, which may use positioning devices such as GPS and Beidou. The aerial photography system is used to photograph the target during flight. In order to realize the functions of the method of this embodiment, the aerial photography system uses a camera with adjustable focal length and shooting parameters that meet the design requirements. The measurement system is used to record the flight process of the drone 10 and collect status data such as flight altitude, flight attitude, and shooting parameters.

[0137] The drone 10 exchanges data with the data processing device 30 through the wireless communication device 20, and transmits its own flight data and the data of the airborne equipment (positioning system, aerial photography system, and measurement system) to the data processing device 30. The data processing device 30 collects and processes the data provided by the drone 10 to complete the flight control of the drone 10. With the characteristics of the drone's flexibility and low cost, it completes the functions that cannot be achieved by traditional manual surveys, greatly improving the processing efficiency.

[0138] The wireless communication device 20 can select a communication method according to actual communication conditions, such as 5G, Wi-Fi, Bluetooth, etc. The interactive terminal 40 is data-connected to the drone 10 and the data processing device 30, respectively, and can display the interface generated by the drone 10 and the data processing device 30, and serve as an interactive device with survey and design personnel to provide manual instructions to the drone 10 and the data processing device 30, and adjust the operating status and processing results of the drone 10 and the data processing device 30. The interactive terminal 40 may include a personal computer, a smart phone, a tablet computer, or other dedicated electronic client devices with a survey application installed.

[0139] The final three-dimensional model of the construction area is similar to the actual visual state of the construction area, which is convenient for the owners of the photovoltaic system to intuitively understand the situation of the construction area. By performing data statistics on the three-dimensional model, the data information of the three-dimensional model can be obtained, thereby conveniently assigning values ​​to the lowest evaluation level, obtaining the relationship between influencing factors, and conducting subsequent decision-making evaluations.

[0140] When the drone survey automatically designs multiple schemes, after evaluating the multiple design schemes, the design scheme with the best evaluation result can be selected. Another way is to eliminate unqualified design schemes, and the owner or relevant personnel of the construction unit will select from the qualified design schemes and give the final decision to the owner and relevant personnel.

[0141] If the drone survey automatically designs a single design plan, if the design plan passes the evaluation, it is confirmed that the design plan is feasible; if the design plan passes the evaluation, some design data can be manually modified and re-evaluated.

[0142] Figure 8 This is a flow chart for evaluating a design scheme in a method for designing a cable connection mode in a photovoltaic power generation project according to an embodiment of the present invention. After the step of forming an overall scheme of the photovoltaic power generation project, the following steps may also be included:

[0143] Step S801, obtaining a construction evaluation criterion system for a photovoltaic power generation project, the evaluation criterion system including multiple evaluation levels, the bottom layer of the evaluation level being configured with multiple project construction influencing factors;

[0144] Step S802, assigning values ​​to the lowest evaluation level according to the design plan of the photovoltaic power generation project to be built, and obtaining an influencing factor relationship;

[0145] Step S803, calculating the influencing factor relationship according to the factor weight corresponding to each project construction influencing factor, and obtaining multiple criterion parameters of the middle layer in the evaluation hierarchy;

[0146] Step S804, comprehensively evaluating multiple criterion parameters to obtain a decision evaluation result of the photovoltaic power generation project to be built;

[0147] Step S805: adjust the design solution according to the decision evaluation result.

[0148] In some optional embodiments, the evaluation criteria system includes three evaluation levels. Table 1 shows the construction evaluation criteria system of the three evaluation levels applied to the design method of the cable connection mode in the photovoltaic power generation project of this embodiment.

[0149] Table 1

[0150]

[0151] The construction assessment criteria system for photovoltaic power generation projects in this embodiment selects construction influencing factors based on the principles of scientific rationality, relative comprehensiveness, and feasibility. As shown in Table 1, the middle-layer criteria include: equipment criteria, resource and environmental criteria, ownership criteria, income criteria, and risk criteria. Among them, the lower-level project construction influencing factors of the equipment criteria include: photovoltaic unit indicators, energy storage unit indicators, and power grid equipment indicators; the lower-level project construction influencing factors of the resource and environmental criteria include: climate impact and construction impact; the lower-level project construction influencing factors of the ownership criteria include: electricity price impact and adjacent impact; the lower-level project construction influencing factors of the income criteria include: cost impact and profit impact; the lower-level project construction influencing factors of the risk criteria include: weather risk and building safety risk.

[0152] The photovoltaic unit index reflects the performance of the photovoltaic units used in photovoltaic power generation projects, which may include the photovoltaic power conversion efficiency (IPCE). There will be differences in IPCE between different types of photovoltaic units (monocrystalline silicon, polycrystalline silicon, etc.) and between different specifications of the same photovoltaic units.

[0153] The energy storage unit index reflects the performance of the energy storage batteries used in photovoltaic power generation projects, which may include battery energy density and battery attenuation value.

[0154] The grid equipment indicators reflect the performance and capacity of the equipment for photovoltaic power generation projects connected to the grid, which may include access capacity, power transmission loss, shock resistance, etc.

[0155] Climate impact reflects the situation of solar energy resources, which can include the average annual sunshine hours and the average annual solar radiation.

[0156] Construction impact reflects the convenience of construction, which may include building structure conditions, material transportation conditions, and the impact on people's living and work.

[0157] Electricity prices directly affect the economic benefits of photovoltaic power generation projects, which may include grid-connected electricity prices, electricity prices, electricity price subsidies, and electricity price time periods.

[0158] Neighboring impacts reflect the rights and interests of stakeholders in photovoltaic power generation projects, which may include: the complexity of property rights of the construction object, the degree of community support, the degree of support from neighboring units, etc.

[0159] Cost impact reflects the construction and operation costs of photovoltaic power generation projects, which may include capital costs, construction costs, operation and maintenance costs, etc.

[0160] Profit impact reflects the benefits of photovoltaic power generation projects, which can be economic benefits, social benefits, environmental benefits, etc.

[0161] Weather risk reflects the impact of extreme weather on photovoltaic power generation projects, which may include earthquake risk, strong wind risk, hail risk, etc.

[0162] Building safety risks reflect the risks of building load, water leakage and electric leakage, etc.

[0163] The design method of cable connection in the above photovoltaic power generation project has established a construction evaluation criteria system for photovoltaic power generation projects. The evaluation criteria system includes multiple evaluation levels, and the bottom layer of the evaluation level is configured with multiple project construction influencing factors. The evaluation criteria system is used to make decision-making evaluations on the design schemes of the photovoltaic power generation projects to be built, so as to determine that the design schemes fully match the needs of the construction owners, greatly improving the satisfaction of the construction owners.

[0164] Fig. 9 The present invention is a schematic diagram of a flow chart of assigning values ​​to evaluation levels in a method for designing a cable connection mode in a photovoltaic power generation project according to an embodiment of the present invention. The step of assigning values ​​to the lowest evaluation level according to the design scheme of the photovoltaic power generation project to be built may include:

[0165] Step S901, establish an evaluation object factor set according to the construction evaluation criteria system. The evaluation object factor set can be n evaluation object factors from X1, X2, X3, ... to Xn for evaluation, which can be expressed as X = {X1, X2, X3, ..., Xn}, where n is the number of evaluation object factors.

[0166] Step S902, determining the evaluation object grade according to the evaluation object factor set. The evaluation object grade can be, for example, a grade description method of excellent, good, medium, poor, or none. It can be expressed as Y={Y1, Y2, Y3, ..., Ym}, where m is the number of evaluation object grades. The evaluation object grade can be described and scored by relevant experts, for example, an excellent score of 81-100, a good score of 61-80, a medium score of 41-60, a poor score of 21-40, and a no score of 0-20. The proportion of the above-mentioned grade description method can confirm the fuzzy relationship matrix corresponding to the evaluation object grade in the fuzzy evaluation.

[0167] For example, for climate impact, the annual average radiation G satisfies G ≥ 1750 kWh / m 2 In the case of G, it is rated as excellent; 1750kWh / m2>G≥1400kWh / m 2 In the case of 1400kWh / m 2 >G≥1050kWh / m 2 In the case of 2 >G, it is rated as poor.

[0168] Step S903, obtain the quantitative index obtained by grading the lowest evaluation level according to the evaluation object level. Each factor in the evaluation object factor set X has a corresponding relationship with each level in the evaluation object level Y. The corresponding relationship is recorded as Rn, and the corresponding relationship from X to Y is R = {R1, R2, R3, ..., Rn}.

[0169] Step S904: Establish a fuzzy relationship matrix based on the quantitative index. The fuzzy relationship matrix finally obtained can be identified as:

[0170]

[0171] Through the above process, qualitative indicators can be converted into quantifiable quantitative indicators.

[0172] The above-mentioned step of calculating the relationship between influencing factors according to the factor weights corresponding to each project construction influencing factor includes: obtaining a factor weight vector pre-constructed for the project construction influencing factors, the factor weight vector having the factor weights corresponding to each project construction influencing factor as elements; performing a dot product calculation on the fuzzy relationship matrix and the factor weight vector to obtain multiple criterion parameters of the middle layer.

[0173] The process of constructing the factor weight vector may include: selecting any two project construction influencing factors from the construction influencing factors to judge their importance; forming a judgment matrix based on the results of the importance judgment; and performing a consistency check on the judgment matrix. One execution process of the step of performing a consistency check on the judgment matrix may include: calculating the maximum eigenvector of the judgment matrix; calculating the inconsistency index based on the maximum eigenvector; calculating the ratio of the inconsistency index to the preset random consistency index, and if the ratio is less than the preset threshold, the consistency check result is judged to be qualified; normalizing the judgment matrix with a qualified consistency check result to obtain the factor weight vector.

[0174] The judgment matrix is ​​generated by comparing the factors affecting the construction of two types of projects. The importance of factors can be determined by comparing and analyzing the degree of influence. Two factors xi and xj are randomly selected, and aij is used to represent the ratio of the importance of xi to xj to construct a judgment matrix. Assuming there is a judgment matrix A with n elements, then for each element Ai, there is a corresponding judgment value ai, which indicates the importance of the element relative to another element. The judgment matrix A can be represented as an n×n matrix, in which each row and column corresponds to an element, and the position (i, j) of each element indicates the importance of the element Ai relative to Aj. In some embodiments, the 9-scaling method is used to determine the weight of the indicator. The judgment matrix scale is generally represented by 1-9 and their reciprocals. The specific meanings of the numbers are shown in Table 2.

[0175] Table 2

[0176] Calibration definition 1 Factor i is equally important as factor j. 3 Compared with factor i, factor j is slightly more important than factor i. 5 Compared with factor i, factor j is more important than factor i. 7 Factor i is more important than factor j. 9 Factor i is equally important as factor j.

[0177] In Table 2, the larger the calibration score, the greater the importance of factor i relative to factor j. When taking values, 2, 4, 6, and 8 indicate that the importance is between the importance corresponding to the values ​​in the table. Correspondingly, if the calibration score of factor i relative to factor j is n, then the calibration score of factor j relative to factor i is 1 / n, that is, the importance represented by the reciprocal is opposite to that of the integer.

[0178] Then compare the indicators one by one, fill the importance results into the table below, and get the judgment matrix of the hierarchical analysis method. The judgment matrix can be expressed as:

[0179]

[0180] Among them, the element aij represents the relative importance of factor i and factor j.

[0181] The above importance assignment can be obtained by analyzing the previous data, or it can be scored by experts in related fields. After the judgment matrix is ​​constructed, a consistency test is required. After the judgment matrix is ​​constructed, a consistency test is required. Let λmax(A) be the maximum eigenvector in matrix A, then the inconsistency index CI can be set as: The meaning of CI is CI=0, A is completely consistent; the larger the CI, the more serious the inconsistency of A.

[0182] The random consistency index RI is set to a preset value. For an n-order judgment matrix, the setting of the RI value can be shown in Table 3.

[0183] Table 3

[0184] n 1 2 3 4 5 6 7 8 9 10 11 RI 0 0 0.58 0.9 1.12 1.24 1.32 1.41 1.45 1.49 1.51

[0185] Calculate the ratio of the inconsistency index to the preset random consistency index CR = CI / RI. When CR < 0.1, the judgment matrix is ​​judged to meet the consistency (the consistency test result is qualified); if not, the judgment matrix can be modified, and the importance of factors xi and xj can be re-set until the judgment matrix meets the consistency. The above preset ratio threshold of 0.1 can be adjusted according to the evaluation requirements.

[0186] After obtaining a judgment matrix with a qualified consistency test result, the judgment matrix is ​​normalized to obtain the final factor weight vector. The normalization process can be: first normalize the column vector of the matrix, that is, the sum of the values ​​of the elements in each column is 1 (the proportional relationship of each element remains unchanged), then sum each row and normalize again, that is, add up the elements of each row separately, take the accumulated sum as the value of each row, and then normalize so that the sum of the values ​​of each row is 1 (the proportional relationship of the elements in each row remains unchanged). The final factor weight vector is obtained.

[0187] Similarly, the comprehensive weight vector can also be constructed using the above process. First, by comparing the influence of the factors affecting the construction of each project, a judgment matrix is ​​constructed, and after a consistency check, a normalization process is performed to obtain a comprehensive weight vector. Since the construction process of the comprehensive weight vector is similar to the construction process of the factor weight vector, those skilled in the art can realize the construction of the comprehensive weight vector according to the construction method of the factor weight vector.

[0188] Table 4 shows example data of importance judgment of each criterion in the middle layer:

[0189] Table 4

[0190]

[0191] After normalization and a flower test, the weight vector of the weight factors of each criterion in the middle layer is finally obtained:

[0192] ω={1.7227, 0.2709, 2.4770, 0.7369, 0.2353} T

[0193] The above-mentioned weight factor weight vectors are only for illustration purposes, and those skilled in the art can configure them accordingly according to the construction goals and requirements of different projects. Similarly, those skilled in the art can set the weight factor weight vectors for the project construction influencing factors of each intermediate layer criterion accordingly. In combination with the model of the installation environment and the operating characteristics of the photovoltaic components, the optimal distributed photovoltaic power generation design can be determined according to different requirements. In some embodiments, the method of this embodiment can pre-configure a variety of weight factor weight vectors according to different construction requirements, such as the minimum configuration cost requirement, the maximum laying area requirement, the best photovoltaic conversion efficiency requirement, the best economic performance requirement, the minimum installation difficulty requirement, and other different weight vectors.

[0194] The process of comprehensively evaluating multiple criterion parameters can use the maximum membership method or the weighted average method. When the maximum membership method is used, the step of comprehensively evaluating multiple criterion parameters includes: taking the evaluation level with the largest statistical probability value among the multiple criterion parameters as the decision evaluation result; when the evaluation level is lower than the preset level, it is determined that the design scheme needs to be adjusted.

[0195] For example, one fuzzy comprehensive evaluation result is: S = (0.4, 0.25, 0.15, 0.1, 0.1), where the evaluation level with the largest statistical probability value is excellent, and its maximum statistical probability value is 0.4. At this time, the decision evaluation result is considered to be excellent, and the design solution is evaluated to pass. For another example, the fuzzy comprehensive evaluation result is: S = (0.10, 0.40, 0.30, 0.1, 0.1), where the evaluation level with the largest statistical probability value is good, and its maximum statistical probability value is 0.40. At this time, the decision evaluation result is considered to be good. If the preset level is excellent, the design solution needs to be adjusted.

[0196] When the weighted average method is used, the step of comprehensively evaluating multiple criterion parameters includes: performing weighted calculation on the multiple criterion parameters, and using the result of the weighted calculation as the decision evaluation result; when the result of the weighted calculation is less than a preset threshold, determining that the design solution needs to be adjusted.

[0197] For example, a fuzzy comprehensive evaluation result is: S = (0.4, 0.25, 0.15, 0.1, 0.1), the weights are set to (5, 4, 3, 2, 1), and the weighted average is calculated to be: 0.75, which is higher than the preset threshold of 0.7, and the design scheme is evaluated as passed. For another example, the fuzzy comprehensive evaluation result is: S = (0.10, 0.40, 0.30, 0.1, 0.1), and the weighted average is calculated to be: 0.66, which is lower than the preset threshold of 0.7, and the design scheme needs to be adjusted.

[0198] The design method of the cable connection method in the photovoltaic power generation project in the above-mentioned embodiment optimizes the evaluation criteria system and the process of using the evaluation criteria system to make decision-making evaluations for photovoltaic power generation projects to be built, wherein the middle-layer criteria include equipment criteria, resource and environmental criteria, ownership criteria, benefit criteria, and risk criteria, which fully consider the influencing factors that affect the design scheme of the photovoltaic power generation project.

[0199] This embodiment also provides a computer program product 112 , a computer-readable storage medium 113 , and a computer device 114 . Fig.10 is a schematic diagram of a computer program product 112 according to one embodiment of the present invention, Fig.11 is a schematic diagram of a computer-readable storage medium 113 according to an embodiment of the present invention, Fig.12 is a schematic block diagram of a computer device 114 according to one embodiment of the present invention.

[0200] The computer program product 112 includes a computer program 111, which implements the steps of any of the above-mentioned methods for designing cable connection modes in photovoltaic power generation projects when executed by the processor 310. The computer-readable storage medium 113 stores the above-mentioned computer program 111, which implements the steps of any of the above-mentioned methods for designing cable connection modes in photovoltaic power generation projects when executed by the processor 310. The computer device 114 may include a memory 320, a processor 310, and a computer program 111 stored in the memory 320 and running on the processor 310.

[0201] The computer program 111 used to perform the operations of the present invention can be assembly instructions, instruction set architecture (ISA) instructions, machine instructions, machine-related instructions, microcode, firmware instructions, state setting data, configuration data of an integrated circuit, or source code or object code written in any combination of one or more programming languages ​​and procedural programming languages.

[0202] The computer program 111 may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the latter case, the remote computer may be connected to the user's computer via any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider). In some embodiments, in order to perform various aspects of the present invention, electronic circuits including, for example, programmable logic circuits, field programmable gate arrays (FPGAs), or programmable logic arrays (PLAs) may execute computer-readable program instructions by utilizing state information of the computer-readable program instructions to personalize the electronic circuits.

[0203] In the description of this embodiment, the computer program product 112 is a related product including the computer program 111 .

[0204] For the purposes of the description of this embodiment, the computer-readable storage medium 113 is a tangible device capable of retaining and storing the computer program 111, which may be any device that can contain, store, communicate, propagate or transmit the program 111 for use with or in conjunction with an instruction execution system, device or apparatus. More specific examples (a non-exhaustive list) of the computer-readable storage medium 113 include the following: a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), a static random access memory (SRAM), a portable compact disk read-only memory (CD-ROM), a digital versatile disk (DVD), a memory stick, a floppy disk, a mechanical encoding device, and any suitable combination of the foregoing.

[0205] At this point, those skilled in the art should recognize that, although multiple exemplary embodiments of the present invention have been shown and described in detail herein, many other variations or modifications that conform to the principles of the present invention can still be directly determined or derived based on the content disclosed in the present invention without departing from the spirit and scope of the present invention. Therefore, the scope of the present invention should be understood and recognized as covering all these other variations or modifications.

Claims

1. A design method for cable connection in a photovoltaic power generation project, characterized in that include: Obtain photovoltaic panel design plans for photovoltaic power generation projects; Read the specifications, quantity, arrangement, and inverter parameters of the photovoltaic units in the photovoltaic array in the photovoltaic panel design scheme; Determining the number of the photovoltaic units connected in series in each photovoltaic string according to the specifications and quantity of the photovoltaic units and the parameters of the inverter; Generate a connection scheme to be selected according to the arrangement mode and the number of the photovoltaic units connected in series in each photovoltaic string; The candidate connection schemes are simulated, and the candidate connection scheme with the best simulation result is selected to be combined with the photovoltaic panel design scheme to form an overall scheme of the photovoltaic power generation project.

2. The design method of cable connection in photovoltaic power generation project according to claim 1, wherein: The step of determining the number of the photovoltaic units connected in series in each photovoltaic string according to the specifications and number of the photovoltaic units and the parameters of the inverter comprises: Determine the maximum access voltage and maximum power point tracking voltage range of the inverter from the parameters of the inverter; Calculate the maximum open circuit voltage and the maximum power point tracking voltage range of the string after connecting different numbers of photovoltaic units in series according to the specifications of the photovoltaic units; Determine the number of the photovoltaic units connected in series in the photovoltaic string that meets the requirements, the requirements including: the maximum open-circuit voltage of the string is less than the maximum access voltage of the inverter, the maximum power point tracking voltage range of the string is within the maximum power point tracking voltage range of the inverter, and the number of the photovoltaic units is divisible by the number of the photovoltaic units connected in series.

3. The method for designing cable connection in a photovoltaic power generation project according to claim 1, wherein: The step of generating a connection scheme to be selected according to the arrangement mode and the number of the photovoltaic units connected in series in each photovoltaic string comprises: Setting an identification number for each photovoltaic unit according to the arrangement; forming a connection model according to the identification numbers, wherein the connection model records the connection mode between the photovoltaic units with different identification numbers; The connection model is output as the connection solution to be selected.

4. The method for designing cable connection in a photovoltaic power generation project according to claim 1, wherein: The step of simulating the connection scheme to be selected comprises: Simulating the power generation of each of the candidate connection schemes under a set irradiation environment one by one; The candidate connection scheme with the highest power generation is used as the candidate connection scheme with the best simulation result.

5. The method for designing a cable connection method in a photovoltaic power generation project according to any one of claims 1 to 4, wherein: The step of obtaining a photovoltaic panel design solution for a photovoltaic power generation project comprises: Obtaining basic information about the construction area of ​​the photovoltaic power generation project; Controlling the drone to photograph the construction area according to the basic information to obtain a survey image; generating a three-dimensional model of the construction area according to the survey image; Analyzing the three-dimensional model to obtain survey characteristic data of the photovoltaic panel laying area; The photovoltaic panel laying area is simulated and designed according to the survey feature data to obtain one or more photovoltaic panel design solutions.

6. The method for designing cable connection in a photovoltaic power generation project according to claim 5, wherein: The basic information includes: location information, terrain information, and grid access equipment information; and The step of acquiring the position information and the terrain information comprises: reading the position information and the terrain information from the position of the construction area selected in a preset map; The step of acquiring the grid access device information includes: sending a query request to a grid management device according to the location information, and acquiring the grid access device information from the grid management device in response to the query request.

7. The method for designing cable connection in a photovoltaic power generation project according to claim 6, wherein: The step of controlling the drone to photograph the construction area according to the basic information includes: Controlling the UAV to perform initial survey and photography of the construction area to obtain an initial image; Setting marker points on the initial image, and dividing the initial image into objects based on the marker points to at least determine the installation object and surrounding environment objects, and estimating the area and terrain characteristics of the installation object; Designing an aerial photography plan according to the area and terrain characteristics of the installation object, wherein the aerial photography plan includes flight parameters and shooting parameters of the drone; Controlling the unmanned aerial vehicle to perform a first survey and photography around the installation object according to the aerial photography plan to obtain a survey image of the installation object; Controlling the UAV to perform a second survey and photography of the surrounding environment object to obtain a survey image of the surrounding environment object; The survey image of the installation object and the survey image of the surrounding environment object are spliced ​​to obtain a survey image of the construction area.

8. The method for designing cable connection in a photovoltaic power generation project according to claim 7, characterized in that: The step of generating the three-dimensional model of the construction area according to the survey image comprises: discretize the survey image using set grid points to generate point cloud data of the construction area; Using the point cloud data to construct a surface to obtain a surface model; Performing object recognition on the survey image to determine the object boundary; Comparing the object boundary with the surface model, and performing contour segmentation on the surface model; Performing object entity processing on the surface model after the contour segmentation to obtain contour surfaces of multiple objects; collecting color and pattern features of the plurality of objects in the survey image; Performing appearance processing on the contour surfaces of the plurality of objects according to the color and pattern features to obtain a three-dimensional model of the construction area; Data statistics are performed on the three-dimensional model to obtain data information of the three-dimensional model, and attribute information is assigned to multiple objects of the three-dimensional model.

9. The method for designing a cable connection method in a photovoltaic power generation project according to any one of claims 1 to 8, wherein: After the step of forming the overall plan of the photovoltaic power generation project, the following steps are also included: Acquire a construction evaluation criteria system for a photovoltaic power generation project, wherein the evaluation criteria system includes multiple evaluation levels, and the bottom layer of the evaluation level is configured with multiple project construction influencing factors; Assigning values ​​to the bottom evaluation level according to the design plan of the photovoltaic power generation project to be built, and obtaining an influencing factor relationship; Calculating the relationship between the influencing factors according to the factor weight corresponding to each of the project construction influencing factors to obtain a plurality of criterion parameters of the middle layer in the evaluation hierarchy; Comprehensively evaluating the multiple criterion parameters to obtain a decision-making evaluation result of the photovoltaic power generation project to be built; The design solution is adjusted according to the decision evaluation result.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method for designing a cable connection mode in a photovoltaic power generation project according to any one of claims 1 to 9 are implemented.

11. A computer-readable storage medium having a computer program stored thereon, characterized in that When the computer program is executed by a processor, the steps of the method for designing a cable connection mode in a photovoltaic power generation project according to any one of claims 1 to 9 are implemented.

12. A computer device comprising a memory, a processor and a computer program stored in the memory, characterized in that: The processor executes the computer program to implement the steps of the method for designing a cable connection mode in a photovoltaic power generation project according to any one of claims 1 to 9.

Citation Information

Patent Citations

  • Fixed photovoltaic array connection optimization based on BIM

    CN108197371A

  • Roof photovoltaic power station design method and system based on unmanned aerial vehicle

    CN116305487A

  • Method and apparatus for string connecting photovoltaic modules, device, and storage medium

    WO2021107873A1

Cited By

  • Photovoltaic construction scheme generation system and method

    CN120804384A