Transverse moving system and transverse moving method for bridge erecting machine in mountainous area

By assembling temporary support modules and scaffolding support modules between the bridge piers and the second extension section constructed in mountainous areas, the problem that the bridge piers cannot be directly transferred to the bridge piers in the second tunnel is solved, and a more efficient construction process is achieved.

CN119615754APending Publication Date: 2025-03-14CHINA RAILWAY GUANGZHOU ENG GRP CO LTD +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411835842.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-13
Publication Date
2025-03-14

AI Technical Summary

Technical Problem

During construction in mountainous areas, the cross-moving system of the bridge rig cannot directly transfer the bridge rig to the bridge pier outside the second tunnel, resulting in inefficient construction.

Method used

By assembling the temporary support module and the scaffolding support module between the bridge pier and the second extension section, the bridge rig can be moved directly above the bridge pier outside the second tunnel.

Benefits of technology

The transfer time of the bridge builder is greatly saved, and during the transfer, the first tunnel and the second tunnel can serve as transportation channels to improve the overall construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119615754A_ABST
    Figure CN119615754A_ABST
Patent Text Reader

Abstract

The invention discloses a mountainous area bridge girder erection machine transverse moving system and method, and the system comprises a scaffold supporting module which is arranged on the ground and is located between a bridge pier and a second extension section; the temporary supporting modules are detachably connected with the scaffold supporting modules, the multiple temporary supporting modules are arranged in the transverse direction, and the temporary supporting modules are equal to the beam pieces in height and detachably connected with the beam pieces. The bridge erecting machine transverse moving module is arranged on the temporary supporting module; and the bridge girder erection machine transverse moving module moves on the beam pieces and the temporary supporting module so that the bridge girder erection machine can move to the position above a bridge pier located outside the second tunnel. By assembling the temporary supporting module and the scaffold supporting module between the bridge pier and the second extension section, the bridge girder erection machine can directly move to the position above the bridge pier outside the second tunnel, so that the bridge girder erection machine does not need to penetrate through the first tunnel and the second tunnel, time is greatly saved, and during the transfer period of the bridge girder erection machine, the construction efficiency is greatly improved. And the first tunnel and the second tunnel can be used as transportation channels for transporting materials required by construction, so that the overall construction efficiency is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of bridge construction, and in particular to a transverse movement system and a transverse movement method of a bridge erection machine in mountainous areas. Background Art

[0002] During the construction of a bridge, a bridge erection machine is used to place the prefabricated beams onto the prefabricated bridge piers. A bridge erection machine is a crane, and its main function is to lift the beams, transport them to the location, and then lower them.

[0003] The bridge erection machine is very different from the general crane. It requires harsh conditions and needs to travel on the beams for longitudinal or transverse movement. The bridge erection machine is divided into several types, such as highway bridges, conventional railway bridges, and passenger railway bridges.

[0004] When constructing in mountainous areas, it is often necessary to build a bridge between the tunnel and the pier. Figure 1 , including a first tunnel, a second tunnel and a plurality of bridge piers, the first tunnel and the second tunnel are arranged in parallel, the first tunnel and the second tunnel have a first extension section and a second extension section respectively, and the bridge erecting machine is used to build a bridge between the first tunnel or the second tunnel and the bridge piers. During construction, after the bridge erecting machine passes through the first tunnel and reaches the first extension section through its own longitudinal movement system, it first builds a bridge outside the first tunnel. When the beams on the bridge piers outside the first tunnel are all erected, it is necessary to erect the bridge piers outside the second tunnel. However, at this time, since beams have been erected on the bridge piers outside the first tunnel, the height of the beams is higher than the height of the bridge piers outside the second tunnel, resulting in the bridge erecting machine's transverse movement system being unable to directly transfer the bridge erecting machine to the outside of the second tunnel. However, if it returns from the first tunnel and then passes through the second tunnel, it will take a long time, and the bridge erecting machine will occupy the first tunnel, affecting the subsequent construction of the beams outside the first tunnel, further reducing the construction efficiency. Summary of the invention

[0005] The purpose of this application is to provide a transverse movement system and transverse movement method for a bridge erection machine in mountainous areas, so as to improve the problem of low construction efficiency.

[0006] The present application provides a mountain bridge erection machine transverse movement system and transverse movement method, which adopts the following technical solutions: A transverse movement system for a bridge erection machine in mountainous areas comprises a scaffolding support module, which is arranged on the ground and located between a bridge pier and a second extension section; a temporary support module, which is detachably connected to the scaffolding support module and is arranged in multiple numbers in the transverse direction, wherein the temporary support modules are at the same height as the beam pieces and are detachably connected to the beam pieces; a transverse movement module for the bridge erection machine, which is arranged on the temporary support module; the transverse movement module for the bridge erection machine moves on the beam pieces and the temporary support module so as to move the bridge erection machine to above the bridge pier outside a second tunnel.

[0007] By adopting the above technical solution, by assembling temporary support modules and scaffolding support modules between the pier and the second extension section, the bridge-building machine can be directly moved to the top of the pier outside the second tunnel, so that the bridge-building machine does not need to pass through the first tunnel and the second tunnel, which greatly saves time. At the same time, during the transfer of the bridge-building machine, the first tunnel and the second tunnel can be used as transportation channels to transport materials required for construction, further improving the overall construction efficiency.

[0008] Optionally, the top surface of the scaffolding support module is lower than the bottom surface of the pier.

[0009] Through the above technical solution, the top surface of the scaffolding support module is lower than the bottom surface of the pier, so that the erection of the beam is not affected after the temporary support module is dismantled.

[0010] Optionally, the temporary support module includes a support plate and four support legs arranged below the support plate, and the scaffolding support module is provided with docking legs corresponding to the support legs, and the support legs and the docking legs are detachably connected via a connecting assembly.

[0011] Through the above technical solution, the supporting legs and the docking legs are detachably connected through the connecting assembly, which facilitates the detachable connection between the temporary supporting module and the scaffolding supporting module.

[0012] Optionally, the connecting assembly includes a first flange, a second flange, a sleeve and a compression sleeve, the first flange is fixedly connected to the supporting leg, the second flange is fixedly connected to the docking leg, the first flange and the second flange are abutted, the sleeve is hinged on the docking leg, the sleeve is simultaneously sleeved on the first flange and the second flange, the compression sleeve is threadedly connected to the supporting leg, and the bottom surface of the compression sleeve is pressed against the top surface of the sleeve.

[0013] Through the above technical solution, the first flange and the second flange are clamped by the jacket, and then the jacket is compressed by the compression sleeve, so as to fix the first flange and the second flange, and finally the temporary support module and the scaffold support module are fixed.

[0014] Furthermore, the jacket comprises a bottom plate, side plates and a top plate which are connected to each other, the bottom plate is hinged to the docking legs, the side plates are in contact with the side walls of the first flange and the second flange, and the bottom surface of the top plate abuts against the top surface of the first flange.

[0015] Optionally, the top surface of the first flange is an inclined conical surface, the height of the inclined conical surface gradually decreases from the center to the edge of the first flange, and the bottom surface of the top plate is adapted to the inclined conical surface.

[0016] Through the above technical solution, the bottom surface of the top plate cooperates with the inclined conical surface, which facilitates improving the fit between the first flange and the jacket and improving the stability of clamping.

[0017] Optionally, the clamping sleeve includes a spiral seat and a rotating ring, the rotating ring is rotatably connected to the bottom of the spiral seat, a pressure rod is passed through the rotating ring along the axial direction of the first flange, the bottom of the pressure rod is fixedly connected to a pressure plate, a compression spring is sleeved on the pressure rod, one end of the compression spring abuts against the top surface of the pressure plate, and the other end abuts against the bottom surface of the rotating ring.

[0018] By adopting the above technical solution, the jacket is pressed by the pressure plate, and pressure is provided by the compression spring, thereby improving the stability of the clamping force of the jacket; when the jacket needs to be compressed, the pressure rod abuts against the spiral seat, thereby compressing the jacket, and when the jacket needs to be loosened, the spiral seat moves up so that the pressure rod and the spiral seat are no longer in contact, and the jacket is compressed by the elastic force of the compression spring at this time, and this elastic force can be overcome when the temporary support module moves up, and then before disassembling the temporary support module, the compression spring, the pressure plate and the pressure rod are relied on to ensure that the temporary support module still has a certain stability after the spiral seat moves up to avoid falling.

[0019] Optionally, a rolling ball is connected to the bottom of the first flange, and the bottom of the rolling ball is located in the inner hole of the second flange; a limiting rod is connected to the top surface of the second flange, and a limiting hole for inserting the limiting rod is provided on the first flange.

[0020] By adopting the above technical solution and setting the rolling ball, it is convenient for the temporary support module to move in the second tunnel after being transferred to the second tunnel; through the cooperation between the limit rod and the limit hole, the reliability of the fixation of the temporary support module and the scaffolding support module is further improved.

[0021] Optionally, a connecting block is connected to the side wall of the support plate, and a connecting groove adapted to the connecting block is provided on the side wall of the support plate away from the connecting block.

[0022] Through the above technical solution, the connection block facilitates improving the reliability of the connection between adjacent support plates.

[0023] A transverse movement method, based on the above-mentioned transverse movement system of a bridge erection machine in mountainous area, comprises the following steps: S1, building a scaffolding support module between the bridge pier and the second extension section, and building a temporary support module on the scaffolding support module; S2, laying the guide rail of the transverse movement module of the bridge erection machine on the scaffolding support module, and then moving the transverse movement module of the bridge erection machine on the guide rail, so that the bridge erection machine moves to above the bridge pier outside the second tunnel; S3, the bridge erection machine moves the transverse movement module to the second extension section through the longitudinal movement module, and then transfers the temporary support module to the second tunnel in multiple times through the bridge erection machine. During the transfer, the beam pieces transported to the second tunnel are synchronously erected on the second extension section and the first bridge pier. When the beam pieces on the second extension section and the first bridge pier are all erected, the temporary support modules are also all transferred to the second tunnel.

[0024] In summary, the present application includes at least one of the following beneficial technical effects: 1. By assembling temporary support modules and scaffolding support modules between the bridge pier and the second extension section, the bridge erection machine can be directly moved to the top of the bridge pier outside the second tunnel, so that the bridge erection machine does not need to pass through the first tunnel and the second tunnel, which greatly saves time. At the same time, during the transfer of the bridge erection machine, the first tunnel and the second tunnel can be used as transportation channels to transport materials required for construction, further improving the overall construction efficiency; 2. The jacket is pressed by the pressure plate, and pressure is provided by the compression spring, thereby improving the stability of the clamping force of the jacket; when the jacket needs to be compressed, the pressure rod abuts against the spiral seat, thereby compressing the jacket. When the jacket needs to be loosened, the spiral seat moves up so that the pressure rod and the spiral seat are no longer in contact. At this time, the jacket is compressed by the elastic force of the compression spring, and this elastic force can be overcome when the temporary support module moves up. Then, before disassembling the temporary support module, the compression spring, pressure plate and pressure rod are relied upon to ensure that the temporary support module still has a certain stability after the spiral seat moves up to avoid falling. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the arrangement of the first tunnel and the second tunnel in the prior art in the present invention.

[0026] Figure 2 It is a schematic diagram of a scaffold support module and a temporary support module in the present invention.

[0027] Figure 3 It is a cross-sectional schematic diagram of the connection component embodied in the present invention.

[0028] In the figure, 1. scaffolding support module; 11. docking leg; 2. temporary support module; 21. support plate; 211. connection block; 212. connection groove; 22. support leg; 23. connection assembly; 231. first flange; 2311. limit hole; 2312. inclined cone; 232. second flange; 233. jacket; 2331. bottom plate; 2332. side plate; 2333. top plate; 234. threaded seat; 2341. threaded plate; 2342. side sleeve; 234. rotating ring; 2341. pressure rod; 2342. compression spring; 2343. pressure plate; 235. rolling ball; 3. first tunnel; 31. first extension section; 4. second tunnel; 41. second extension section; 5. bridge pier. DETAILED DESCRIPTION

[0029] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.

[0030] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more. In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be a connection between the two elements. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0031] Embodiment 1 A mountain bridge erection machine transverse movement system, reference Figure 2 and Figure 3 , including a scaffolding support module 1 and a temporary support module 2. The scaffolding support module 1 is arranged on the ground and is located between the pier 5 and the second extension section 41. The temporary support module 2 is detachably connected to the top of the scaffolding support module 1, and multiple temporary support modules are arranged in the transverse direction. The temporary support module 2 is at the same height as the beam piece erected outside the first tunnel 3, and the temporary support module 2 and the beam piece are detachably connected by steel plates and bolts, thereby improving the reliability between the temporary support module 2 and the beam piece. The bridge erecting machine's transverse movement module is installed on the temporary support module 2 corresponding to the guide rail, and the bridge erecting machine's transverse movement module moves on the beam piece and the temporary support module 2 through the guide rail, so that the bridge erecting machine moves to above the pier 5 outside the second tunnel 4. During operation, by assembling the temporary support module 2 and the scaffolding support module 1 between the pier 5 and the second extension section 41, the bridge-building machine can be directly moved to the top of the pier 5 outside the second tunnel 4, so that the bridge-building machine does not need to pass through the first tunnel 3 and the second tunnel 4, which greatly saves time. At the same time, during the transfer of the bridge-building machine, the first tunnel 3 and the second tunnel 4 can be used as transportation channels to transport materials required for construction, further improving the overall construction efficiency.

[0032] Specifically, the top surface of the scaffolding support module 1 is lower than the bottom surface of the pier 5, so that the erection of the beam is not affected after the temporary support module 2 is disassembled.

[0033] The temporary support module 2 includes a support plate 21 and four support legs 22 fixedly connected to the bottom of the support plate 21. A docking leg 11 corresponding to the support leg 22 is fixedly connected to the scaffold support module 1. The support leg 22 and the docking leg 11 are detachably connected through a connection assembly 23. The support leg 22 and the docking leg 11 are detachably connected through the connection assembly 23, which facilitates the detachable connection between the temporary support module 2 and the scaffold support module 1. The scaffold support module 1 can be spliced ​​by a disc-type scaffold.

[0034] Specifically, the connection assembly 23 includes a first flange 231, a second flange 232, a jacket 233 and a compression sleeve. The first flange 231 is fixedly connected to the support leg 22, the second flange 232 is fixedly connected to the docking leg 11, the first flange 231 and the second flange 232 are in contact with each other, the jacket 233 is hinged on the docking leg 11, and two jackets 233 are arranged on each docking leg 11 along its own axis. The jacket 233 can be simultaneously covered on the first flange 231 and the second flange 232 by flipping to clamp the first flange 231 and the second flange 232. The compression sleeve is threadedly connected to the support leg 22, and the bottom surface of the compression sleeve is in contact with the top surface of the jacket 233. The first flange 231 and the second flange 232 are clamped by the jacket 233, and then the jacket 233 is compressed by the compression sleeve, thereby fixing the first flange 231 and the second flange 232, and finally fixing the temporary support module 2 and the scaffold support module 1.

[0035] More specifically, the jacket 233 includes a bottom plate 2331, a side plate 2332 and a top plate 2333 which are connected to each other. The bottom plate 2331 is hinged to the docking leg 11, the side plate 2332 contacts the side walls of the first flange 231 and the second flange 232, and the bottom surface of the top plate 2333 abuts against the top surface of the first flange 231. The top surface of the first flange 231 is an inclined conical surface 2312, the height of which gradually decreases from the center to the edge of the first flange 231, and the bottom surface of the top plate 2333 matches the inclined conical surface 2312. The bottom surface of the top plate 2333 matches the inclined conical surface 2312, which facilitates the improvement of the fit between the first flange 231 and the jacket 233, improves the stability of clamping, and also reduces the possibility of interference between the jacket 233 and the first flange 231 when the jacket 233 is turned over.

[0036] The clamping sleeve includes a spiral seat and a rotating ring 234, the rotating ring 234 is rotatably connected to the bottom of the spiral seat, a pressure rod 2341 is passed through the rotating ring 234 along the axial direction of the first flange 231, and a pressure plate 2343 is fixedly connected to the bottom of the pressure rod 2341. A compression spring 2342 is sleeved on the pressure rod 2341, one end of the compression spring 2342 abuts against the top surface of the pressure plate 2343, and the other end abuts against the bottom surface of the rotating ring 234. The pressure plate 2343 presses the jacket 233, and the pressure is provided by the compression spring 2342, thereby improving the stability of the clamping force on the jacket 233. The spiral seat includes an integrally formed threaded plate 2341 and a side sleeve 2342. The threaded plate 2341 is threadedly connected to the support leg 22, and the side sleeve 2342 is rotatably connected to the rotating ring 234. When the sleeve 233 needs to be compressed, the top of the pressure rod 2341 abuts against the threaded plate 2341, thereby compressing the sleeve 233; when the sleeve 233 needs to be loosened, the threaded plate 2341 moves up, the compression spring 2342 stretches, and the pressure rod 2341 and the threaded plate 2341 are no longer in contact.

[0037] When it is necessary to compress the sleeve 233, the pressure rod 2341 abuts against the spiral plate to compress the sleeve 233. When it is necessary to loosen the sleeve 233, the spiral seat moves upward so that the pressure rod 2341 is no longer in contact with the spiral plate. At this time, the sleeve 233 is compressed by the elastic force of the compression spring 2342, and this elastic force can be overcome when the temporary support module 2 moves upward. Before disassembling the temporary support module 2, the compression spring 2342, the pressure plate 2343 and the pressure rod 2341 can be used to ensure that the temporary support module 2 still has a certain stability after the spiral seat moves upward to avoid falling.

[0038] In addition, a ball 235 is embedded in the bottom of the first flange 231, and the ball 235 can rotate in any direction relative to the first flange 231. The bottom of the ball 235 is located in the inner hole of the second flange 232, which is convenient for improving the stability of the docking between the first flange 231 and the second flange 232. A limiting rod is fixedly connected to the top surface of the second flange 232, and a limiting hole 2311 for inserting the limiting rod is provided on the first flange 231. The setting of the ball 235 facilitates the movement of the temporary support module 2 in the second tunnel 4 after it is transferred to the second tunnel 4. The cooperation between the limiting rod and the limiting hole 2311 further improves the reliability of the fixation between the temporary support module 2 and the scaffolding support module 1.

[0039] A connecting block 211 is fixedly connected to the side wall of the support plate 21, and a connecting groove 212 adapted to the connecting block 211 is provided on the side wall of the support plate 21 away from the connecting block 211. The connecting block 211 facilitates improving the reliability of the connection between adjacent support plates 21, and does not affect the separation of adjacent support plates 21 in the vertical direction. The connecting block 211 can be a dovetail block or a T-block.

[0040] A transverse movement method, based on the above-mentioned transverse movement system of the mountain bridge erection machine, comprises the following steps: S1. Build a scaffolding support module 1 between the bridge pier 5 and the second extension section 41, and build a temporary support module 2 on the scaffolding support module 1. When building the temporary support module 2 on the scaffolding support module 1, first dock the first flange 231 and the second flange 232, so that the limit rod is inserted into the limit hole 2311, and the ball 235 is inserted into the inner hole of the second flange 232, and then flip the jacket 233 so that the bottom surface of the top plate 2333 abuts against the inclined conical surface 2312; then rotate the threaded seat 234 so that the pressure plate 2343 abuts against the jacket 233, and the pressure rod 2341 abuts against the threaded plate 2341, and complete the connection of all the first flanges 231 and the second flanges 232, that is, complete the fixation of the temporary support module 2 and the scaffolding support module 1.

[0041] S2. Lay the guide rails of the bridge erecting machine transverse movement module on the scaffolding support module 1, and then move the bridge erecting machine transverse movement module on the guide rails to move the bridge erecting machine to above the bridge pier 5 outside the second tunnel 4.

[0042] S3, the bridge-building machine moves the bridge-building machine's transverse module and guide rails to the second extension section 41 through the bridge-building machine's longitudinal module. At this time, all threaded seats 234 are moved up so that the jacket 233 is no longer compressed. The temporary support module 2 is then transferred to the second tunnel 4 by the bridge-building machine in multiple times. During the transfer, the beams transported to the second tunnel 4 are synchronously erected on the second extension section 41 and the first pier 5. When the beams on the second extension section 41 and the first pier 5 are erected, the temporary support module 2 is also completely transferred to the second tunnel 4. When the bridge-building machine transfers the temporary module, it first lifts the temporary support module 2. At this time, the first flange 231 moves up to overcome the elastic force of the compression spring 2342, so that the jacket 233 is pushed open, and at the same time, the connecting block 211 is separated from the connecting groove 212, and then the temporary support module 2 is moved to the second tunnel 4.

[0043] Working principle: By assembling the temporary support module 2 and the scaffolding support module 1 between the pier 5 and the second extension section 41, the bridge-building machine can be directly moved to the top of the pier 5 outside the second tunnel 4, so that the bridge-building machine does not need to pass through the first tunnel 3 and the second tunnel 4, which greatly saves time. At the same time, during the transfer of the bridge-building machine, the first tunnel 3 and the second tunnel 4 can be used as transportation channels to transport materials required for construction, further improving the overall construction efficiency. The jacket 233 is pressed by the pressure plate 2343, and pressure is provided by the compression spring 2342, thereby improving the stability of the clamping force of the jacket 233; when the jacket 233 needs to be compressed, the pressure rod 2341 abuts against the spiral seat, thereby compressing the jacket 233, and when the jacket 233 needs to be loosened, the spiral seat moves up, so that the pressure rod 2341 and the spiral seat are no longer in contact, and at this time, the jacket 233 is compressed by the elastic force of the compression spring 2342, and this elastic force can be overcome when the temporary support module 2 moves up, and then before disassembling the temporary support module 2, the compression spring 2342, the pressure plate 2343 and the pressure rod 2341 are relied on to ensure that the temporary support module 2 still has a certain stability after the spiral seat moves up, so as to avoid falling.

[0044] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A mountain bridge erection machine transverse movement system, characterized in that: include A scaffolding support module (1) is disposed on the ground and is located between the bridge pier (5) and the second extension section (41); A temporary support module (2) is detachably connected to the scaffold support module (1), and a plurality of temporary support modules (2) are arranged in the transverse direction, the temporary support module (2) is at the same height as the beam, and the temporary support module (2) is detachably connected to the beam; A bridge erection machine transverse movement module is arranged on the temporary support module (2); The bridge erection machine transverse movement module moves on the beam plate and the temporary support module (2) so that the bridge erection machine moves to above the bridge pier (5) located outside the second tunnel (4).

2. A mountain bridge erection machine transverse movement system according to claim 1, characterized in that: The top surface of the scaffolding support module (1) is lower than the bottom surface of the pier (5).

3. The mountain bridge erection machine transverse movement system according to claim 1, characterized in that: The temporary support module (2) comprises a support plate (21) and four support legs (22) arranged below the support plate (21); the scaffold support module (1) is provided with a docking leg (11) corresponding to the support leg (22); the support leg (22) and the docking leg (11) are detachably connected via a connection assembly (23).

4. The mountain bridge erection machine transverse movement system according to claim 2, characterized in that: The connecting assembly (23) comprises a first flange (231), a second flange (232), a jacket (233) and a compression sleeve, wherein the first flange (231) is fixedly connected to the supporting leg (22), the second flange (232) is fixedly connected to the docking leg (11), the first flange (231) and the second flange (232) are abutted against each other, the jacket (233) is hinged on the docking leg (11), the jacket (233) is simultaneously sleeved on the first flange (231) and the second flange (232), the compression sleeve is threadedly connected to the supporting leg (22), and the bottom surface of the compression sleeve is pressed against the top surface of the jacket (233).

5. A mountain bridge erection machine transverse movement system according to claim 4, characterized in that: The jacket (233) includes a bottom plate (2331), a side plate (2332) and a top plate (2333) which are interconnected, wherein the bottom plate (2331) is hinged to the docking leg (11), the side plate (2332) is in contact with the side walls of the first flange (231) and the second flange (232), and the bottom surface of the top plate (2333) is in contact with the top surface of the first flange (231).

6. A mountain bridge erection machine transverse movement system according to claim 5, characterized in that: The top surface of the first flange (231) is an inclined conical surface (2312), the height of the inclined conical surface (2312) gradually decreases from the center to the edge of the first flange (231), and the bottom surface of the top plate (2333) is adapted to the inclined conical surface (2312).

7. The mountain bridge erection machine transverse movement system according to claim 6, characterized in that: The clamping sleeve includes a spiral seat and a rotating ring (234), the threaded seat (234) is threadedly connected to the support leg (22), the rotating ring (234) is rotatably connected to the bottom of the spiral seat, a pressure rod (2341) is passed through the rotating ring (234) along the axial direction of the first flange (231), the bottom of the pressure rod (2341) is fixedly connected to a pressure plate (2343), a compression spring (2342) is sleeved on the pressure rod (2341), one end of the compression spring (2342) abuts against the top surface of the pressure plate (2343), and the other end abuts against the bottom surface of the rotating ring (234).

8. The mountain bridge erection machine transverse movement system according to claim 7, characterized in that: A rolling ball (235) is connected to the bottom of the first flange (231), and the bottom of the rolling ball (235) is located in the inner hole of the second flange (232); A limiting rod is connected to the top surface of the second flange (232), and a limiting hole (2311) for the limiting rod to be inserted is provided on the first flange (231).

9. The mountain bridge erection machine transverse movement system according to claim 3, characterized in that: A connecting block (211) is connected to the side wall of the support plate (21), and a connecting groove (212) adapted to the connecting block (211) is provided on the side wall of the support plate (21) away from the connecting block (211).

10. A transverse movement method, based on the transverse movement system of a mountain bridge erection machine according to any one of claims 1 to 9, characterized in that: The steps include: S1, constructing a scaffolding support module (1) between the bridge pier (5) and the second extension section (41), and constructing a temporary support module (2) on the scaffolding support module (1); S2, laying the guide rail of the bridge erection machine transverse movement module on the scaffolding support module (1), and then moving the bridge erection machine transverse movement module on the guide rail so that the bridge erection machine moves to above the bridge pier (5) outside the second tunnel (4); S3, the bridge-building machine moves the transverse movement module to the second extension section (41) through the longitudinal movement module, and then transfers the temporary support module (2) to the second tunnel (4) in multiple times through the bridge-building machine. During the transfer, the beam pieces transported to the second tunnel (4) are synchronously erected on the second extension section (41) and the first pier (5). When the beam pieces on the second extension section (41) and the first pier (5) are all erected, the temporary support modules (2) are also completely transferred to the second tunnel (4).

Citation Information

Cited By

  • Line changing method of bridge erecting machine and beam piece erecting method of parallel double-line and multi-line bridge

    CN120967831A