Patrol method and device of distribution network line and electronic equipment

By extracting three-dimensional model data of distribution network lines and dividing patrol units, the problem of low patrol efficiency of distribution network lines is solved, and more efficient patrol task arrangement and execution are achieved.

CN119623786AActive Publication Date: 2025-03-14GUANGDONG POWER GRID CO LTD +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411310279.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-19
Publication Date
2025-03-14
Estimated Expiration
2044-09-19

AI Technical Summary

Technical Problem

The patrol efficiency of distribution network lines is low, and manual patrol planning in the existing technology takes a long time and is inefficient.

Method used

The grid structure data is extracted from the three-dimensional model of the distribution network line, and based on the data and the status data of the power equipment, the patrol path is determined, and the path is divided into multiple patrol units, and the distribution network line is patroled according to these units.

Benefits of technology

The patrol efficiency of distribution network lines has been improved, and the patrol time has been reduced by reasonably arranging patrol tasks, and the reliability of power supply in the power system has been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119623786A_ABST
    Figure CN119623786A_ABST
Patent Text Reader

Abstract

The invention discloses a patrol method and device for a distribution network line and electronic equipment. The method comprises the steps that a three-dimensional model of a distribution network line is extracted, grid structure data are obtained, and the grid structure data are used for representing the topological relation among multiple pieces of power equipment in the distribution network line; based on the grid structure data and the state data of the plurality of power devices, determining a patrol path, the patrol path being used for representing a path for patrolling a plurality of to-be-patrolled devices in the plurality of power devices, and the state data being used for representing whether the plurality of power devices are abnormal; dividing the patrol path based on the grid structure data to obtain a plurality of patrol units; and patrolling the distribution network line according to the plurality of patrolling units. According to the invention, the technical problem of low patrol efficiency of the distribution network line is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power grid and equipment safety, and in particular to a method, device and electronic equipment for inspecting distribution network lines. Background Art

[0002] Since the power equipment in the distribution network is in the wild natural environment for a long time, there are certain safety risks. If the fault of the power equipment in the distribution network is not discovered in time, it will seriously affect the power supply reliability of the power system. Therefore, in order to reduce the occurrence of power outages, it is necessary to inspect the distribution network and discover the hidden faults of the power equipment in the distribution network in time.

[0003] In the related art, the inspection of distribution network lines adopts the method of manually preparing inspection plans, which takes a long time and has low inspection efficiency.

[0004] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention

[0005] The embodiments of the present invention provide a method, a device and an electronic device for inspecting a distribution network line, so as to at least solve the technical problem of low inspection efficiency of the distribution network line.

[0006] According to one aspect of an embodiment of the present invention, there is provided a method for inspecting distribution network lines, comprising: extracting a three-dimensional model of the distribution network lines to obtain grid structure data, wherein the grid structure data is used to characterize the topological relationship between multiple power equipment in the distribution network lines; determining an inspection path based on the grid structure data and status data of multiple power equipment, wherein the inspection path is used to characterize a path for inspecting multiple devices to be inspected among multiple power equipment, and the status data is used to characterize whether there are abnormalities in the multiple power equipment; dividing the inspection path based on the grid structure data to obtain multiple inspection units; and inspecting the distribution network lines according to the multiple inspection units.

[0007] Optionally, the inspection path is divided based on the grid structure data to obtain multiple inspection units, including: based on the grid structure data, determining the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected, wherein the movement time is the time required to move from any device to be inspected to another device to be inspected adjacent to the device to be inspected, and the inspection time is the time required to inspect the corresponding device to be inspected; based on the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected, the inspection path is divided using preset inspection times to obtain multiple inspection units.

[0008] Optionally, based on the grid structure data, the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected are determined, including: based on the device coordinates of the multiple devices to be inspected, determining the distance between two adjacent devices to be inspected; based on the distance between two adjacent devices to be inspected, determining the movement time between multiple devices to be inspected; based on the device types of the multiple devices to be inspected, determining the inspection time of the multiple devices to be inspected.

[0009] Optionally, based on the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected, the inspection path is divided using a preset inspection time to obtain multiple inspection units, including: starting from the starting point of the inspection path, according to the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected, the inspection path is divided into multiple inspection units according to the preset inspection time.

[0010] Optionally, starting from the starting point of the patrol path, the patrol path is divided into multiple patrol units according to a preset patrol time based on the movement time between multiple devices to be patrolled and the patrol time of multiple devices to be patrolled, including: starting from the starting point of the patrol path, searching for a first device to be patrolled that can be patrolled within the preset patrol time based on the movement time between multiple devices to be patrolled and the patrol time of multiple devices to be patrolled; constructing a target patrol unit based on the first device to be patrolled; determining a first device to be patrolled from other devices to be patrolled on the patrol path except the first device to be patrolled; starting from the first device to be patrolled, repeatedly executing the steps of searching for the first device to be patrolled that can be patrolled within the preset patrol time based on the movement time between multiple devices to be patrolled and the patrol time of multiple devices to be patrolled, and constructing a target patrol unit based on the first device to be patrolled, until there is no device to be queried on the patrol path; summarizing the target patrol units to obtain multiple patrol units.

[0011] Optionally, the inspection path includes: a main line path, a branch line path, and starting from the starting point of the inspection path, searching for the first device to be inspected that can be inspected within the preset inspection time based on the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected, including: starting from the starting point of the main line path, searching for the first device to be inspected that can be inspected within the preset inspection time based on the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected, wherein when the branch line path is found, the device to be inspected on the branch line path is searched, and after the search is completed, the device to be inspected on the main line path is searched.

[0012] Optionally, based on the grid structure data and the status data of multiple power equipment, the inspection path is determined, including: based on the grid structure data, determining the equipment whose equipment type is a connecting switch; and determining the inspection path according to the location of the equipment whose equipment type is a connecting switch and the status data of the equipment.

[0013] Optionally, the three-dimensional type of the distribution network line is extracted to obtain grid structure data, including: performing graphic model analysis on the three-dimensional model of the distribution network line to extract the grid structure data.

[0014] According to another aspect of an embodiment of the present invention, there is also provided a distribution network line inspection device, comprising: an extraction module, used to extract a three-dimensional model of the distribution network line to obtain grid structure data, wherein the grid structure data is used to characterize the topological relationship between multiple power equipment in the distribution network line; a determination module, used to determine an inspection path based on the grid structure data and status data of multiple power equipment, wherein the inspection path is used to characterize a path for inspecting multiple devices to be inspected among multiple power equipment, and the status data is used to characterize whether there are abnormalities in the multiple power equipment; a division module, used to divide the inspection path based on the grid structure data to obtain multiple inspection units; and an inspection module, used to inspect the distribution network line according to the multiple inspection units.

[0015] According to another aspect of an embodiment of the present invention, there is further provided an electronic device, comprising: a memory storing an executable program; and a processor for running the program, wherein the above method is executed when the program is running.

[0016] In an embodiment of the present invention, the three-dimensional model of the distribution network line is extracted to obtain grid structure data; based on the grid structure data and the status data of multiple power equipment, the inspection path is determined, and the status data is used to characterize whether the multiple power equipment has abnormalities; based on the grid structure data, the inspection path is divided to obtain multiple inspection units; and the distribution network line is inspected according to the multiple inspection units. It is easy to notice that based on the grid structure data obtained by extracting the three-dimensional model of the distribution network line, the inspection path is divided to obtain multiple inspection units, which achieves the purpose of reasonably arranging inspection tasks based on multiple inspection units when inspecting the distribution network line according to multiple inspection units, thereby achieving the technical effect of improving the inspection efficiency of the distribution network line, and then solving the technical problem of low inspection efficiency of the distribution network line. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0018] Figure 1is a flow chart of a distribution network line inspection method according to an embodiment of the present invention;

[0019] Figure 2 Schematic diagram of a distribution network line inspection device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0020] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0021] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0022] Example 1

[0023] According to an embodiment of the present invention, an embodiment of a method for inspecting distribution network lines is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0024] Figure 1 is a flow chart of a method for inspecting a distribution network line according to an embodiment of the present invention. Figure 1 As shown, the method comprises the following steps:

[0025] Step S102, extracting the three-dimensional model of the distribution network line to obtain grid structure data, wherein the grid structure data is used to characterize the topological relationship between multiple power devices in the distribution network line.

[0026] The three-dimensional model in the above steps is a model that can describe the characteristics of the distribution network line. It can be a CIM (Common Information Model) model, a GIS (Geographic Information System) model, or a BIM (Building Information Modeling) model, but is not limited to these.

[0027] The grid structure data in the above steps may include but are not limited to the device name, device type, device geographical coordinates, topological relationship between devices, etc. of the power equipment in the distribution network line.

[0028] In an optional embodiment, the information of the power equipment in the distribution network line, the characteristics of the distribution network line and other data can be exported from the CIM corresponding to the distribution network line through the CIM standard interface, and then data cleaning is performed to extract the data related to the grid structure, such as the device name, device type, device geographical coordinates, and the topological relationship between devices from the data exported by the CIM. Subsequently, the data such as the device name, device type, device geographical coordinates, and the topological relationship between devices are formatted and standardized to obtain the grid structure data.

[0029] In another optional embodiment, the GIS model corresponding to the distribution network line can be extracted from the GIS system, and then the GIS model can be parsed using graph parsing technology to obtain grid structure data including device name, device type, device geographic coordinates, and topological relationships between devices.

[0030] Step S104, determining a patrol path based on the grid structure data and the status data of the plurality of power devices, wherein the patrol path is used to characterize a path for patrolling the plurality of devices to be patrolled among the plurality of power devices, and the status data is used to characterize whether the plurality of power devices have abnormalities.

[0031] The status data in the above steps may include but are not limited to electrical parameters, temperature data, humidity data, vibration data, etc.

[0032] The inspection path in the above steps is a path determined for the equipment to be inspected in the distribution network line. When determining the inspection path, it is necessary to consider the topological relationship between the power equipment, whether there are abnormalities in the status data of multiple power equipment, etc., in order to improve the rationality of the inspection route.

[0033] In an optional embodiment, the status data of multiple power equipment can be collected, including the operating status, electrical parameters, temperature data, vibration data, environmental data and other information of the equipment, to determine whether the equipment has abnormal conditions. It is also possible to determine the equipment with higher importance based on the equipment type of the electrical equipment in the grid structure data. Equipment with abnormal conditions and equipment with higher importance are taken as equipment to be inspected, and then based on the topological relationship between the power equipment in the grid structure data, multiple paths that can cover all the equipment to be inspected are determined, and the one with the shortest path length is selected from the multiple paths as the inspection path. Step S106, the inspection path is divided based on the grid structure data to obtain multiple inspection units.

[0034] The inspection units in the above steps are units with similar inspection workloads, and can be regarded as detailed divisions of the inspection tasks for the entire inspection path.

[0035] In an optional embodiment, the distance between two adjacent devices to be inspected in the patrol path is determined based on the device geographic coordinates in the grid structure data. Starting from the first device to be inspected at the starting point of the patrol path, the devices to be inspected at a preset distance are divided into a patrol unit according to the topological relationship between the devices to be inspected in the patrol path, and then starting from the first patrol device among the remaining devices to be inspected in the patrol path, the devices to be inspected at a preset distance are divided into a patrol unit according to the topological relationship between the devices to be inspected in the patrol path, and so on, to obtain multiple patrol units. The preset distance is a pre-set distance, which can be 5000 meters or 3000 meters, but is not limited thereto.

[0036] In another optional embodiment, the distance between two adjacent devices to be inspected in the inspection path is determined based on the device geographic coordinates in the grid structure data. Then, based on the means of transportation selected during the inspection and the speed of the means of transportation, the time from one device to be inspected to another adjacent device to be inspected can be determined. Starting from the first device to be inspected at the starting point of the inspection path, the devices to be inspected that can be inspected within the preset time are divided into an inspection unit based on the topological relationship between the devices to be inspected in the inspection path, and then starting from the first inspection device among the remaining devices to be inspected in the inspection path, the devices to be inspected that can be inspected within the preset time are divided into an inspection unit based on the topological relationship between the devices to be inspected in the inspection path, and so on, to obtain multiple inspection units. Among them, the preset time is a pre-set time, which can be 5 hours or 3 hours, but is not limited to this.

[0037] The inspection path is divided into multiple inspection units, which refines the granularity of the inspection tasks and divides the inspection tasks of the inspection path into smaller task packages, thus enhancing the flexibility of task assignment and scheduling. The inspection tasks of different inspection units are assigned to different staff members, which realizes the reasonable allocation of human resources. By having staff members perform the inspection tasks of the inspection units in parallel, the inspection efficiency of the entire inspection path can be improved.

[0038] Step S108: inspect the distribution network lines according to multiple inspection units.

[0039] In an optional embodiment, the allocation of multiple inspection units can be pushed to the team leader of the inspection personnel, and the team leader assigns the inspection tasks of different inspection units to different inspection personnel through the system, so that different inspection personnel perform the inspection of the distribution network line in parallel. After the inspection personnel determine the inspection unit, they start to inspect the inspection unit. During the inspection process, every time they arrive at the location of a device to be inspected, they check in and locate through the mobile terminal APP (Application) to ensure that the inspection personnel are in place. When it is found that the equipment to be inspected has defects and hidden dangers, the operating status, defect hidden dangers, defect photos, etc. of the equipment to be inspected are uploaded to the system through the mobile terminal APP, and the system generates a problem list and pushes the problem list to the defect elimination personnel, who promptly eliminate the defects of the line equipment to ensure the power supply reliability of the distribution network line. When the inspection personnel finish the inspection, the inspection tasks of the inspection unit are archived through the mobile terminal APP to achieve closed-loop management of the entire inspection task plan.

[0040] In another optional embodiment, the inspection robot can assign the inspection tasks of different inspection units to different inspectors according to the inspectors' work schedules, ensure the workload of each inspector is balanced, and generate an inspection task allocation table. The inspection robot sends the inspection task allocation table to each inspector and collects the actual inspection situation and feedback information of the inspectors in performing the inspection tasks, so as to adjust the allocation of inspection tasks in a timely manner and ensure the efficient implementation of the inspection work.

[0041] In an embodiment of the present invention, the three-dimensional model of the distribution network line is extracted to obtain grid structure data; based on the grid structure data and the status data of multiple power equipment, the inspection path is determined, and the status data is used to characterize whether the multiple power equipment is abnormal; the inspection path is divided based on the grid structure data to obtain multiple inspection units; and the distribution network line is inspected according to the multiple inspection units. It is easy to notice that the three-dimensional model of the distribution network line is extracted to obtain the grid structure data, which can improve the efficiency of obtaining the grid structure data, and the grid structure data is used as the basis for determining the inspection path. Based on the grid structure data and the status data of multiple power equipment, the inspection path is determined, and a reasonable inspection path can be determined according to whether the power equipment is abnormal and the topological relationship between the multiple power equipment. Based on the grid structure data, the inspection path is divided to obtain multiple inspection units, and the distribution network line is inspected according to the multiple inspection units. The multiple inspection units can be used as inspection tasks that can be executed in parallel. By inspecting the multiple inspection units in parallel, the purpose of improving the inspection efficiency of the distribution network line is achieved, thereby solving the technical problem of low inspection efficiency of the distribution network line.

[0042] Optionally, the inspection path is divided based on the grid structure data to obtain multiple inspection units, including: based on the grid structure data, determining the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected, wherein the movement time is the time required to move from any device to be inspected to another device to be inspected adjacent to the device to be inspected, and the inspection time is the time required to inspect the corresponding device to be inspected; based on the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected, the inspection path is divided using preset inspection times to obtain multiple inspection units.

[0043] The preset inspection time in the above steps is a pre-set time, which can be preset according to actual application conditions, and no restriction is imposed on the specific value of the preset inspection time.

[0044] In an optional embodiment, the moving time between multiple devices to be inspected can be estimated based on the device coordinates of the multiple devices to be inspected in the grid structure data, and the inspection time of the multiple devices to be inspected can be determined based on the device types of the multiple devices to be inspected in the grid structure data. Then, based on the moving time and the inspection time, it can be determined which devices to be inspected can be inspected within the preset inspection time, so that the inspection path can be divided into multiple inspection units according to the preset inspection time. When the inspection path is divided into multiple inspection units according to the preset inspection time, the devices to be inspected that can be inspected within the preset inspection time can be divided into the same inspection unit to ensure that there are no duplicate devices to be inspected in different inspection units, and each device to be inspected on the inspection path is included in one inspection unit.

[0045] Optionally, based on the grid structure data, the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected are determined, including: based on the device coordinates of the multiple devices to be inspected, determining the distance between two adjacent devices to be inspected; based on the distance between two adjacent devices to be inspected, determining the movement time between multiple devices to be inspected; based on the device types of the multiple devices to be inspected, determining the inspection time of the multiple devices to be inspected.

[0046] In an optional embodiment, the device coordinates of multiple devices to be inspected can be determined based on the grid structure data, and then the distance between two adjacent devices to be inspected can be determined based on the device coordinates of the multiple devices to be inspected. Then, the transportation tool used for the inspection is selected, and the moving time between the multiple devices to be inspected is determined based on the speed of the transportation tool and the distance between the two adjacent devices to be inspected. For example, if the distance between two patrol devices is short and can be reached in 10 minutes on foot, the moving time can be calculated based on a walking speed of 5 kilometers per hour. If it is not reachable in 10 minutes on foot, the moving time is calculated based on a driving speed of 30 kilometers per hour.

[0047] Based on the equipment types of multiple devices to be inspected in the grid structure data, the inspection duration of the same equipment type is set to the same value, thereby determining the inspection duration of multiple devices to be inspected. For example, if the equipment type is a bench transformer, a box-type substation, a cable junction box, or an outdoor switch box, the inspection duration is determined to be 5 minutes; if the equipment type is a distribution station or a switch room, the inspection duration is determined to be 15 minutes.

[0048] It should be noted that the specific numerical values ​​in the above examples are only examples, and the specific numerical values ​​that can be used in actual applications are not limited to these.

[0049] Optionally, based on the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected, the inspection path is divided using a preset inspection time to obtain multiple inspection units, including: starting from the starting point of the inspection path, according to the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected, the inspection path is divided into multiple inspection units according to the preset inspection time.

[0050] The starting point of the inspection path in the above steps is the first device to be inspected in the inspection path.

[0051] In an optional embodiment, starting from the first device to be inspected in the inspection path, the devices to be inspected that can be inspected within the preset inspection time can be determined based on the movement time between the multiple devices to be inspected and the inspection time of the multiple devices to be inspected, and then the devices to be inspected that can be inspected can be divided into a patrol unit so that the patrol time required for each patrol unit is roughly the same.

[0052] Optionally, starting from the starting point of the patrol path, the patrol path is divided into multiple patrol units according to a preset patrol time based on the movement time between multiple devices to be patrolled and the patrol time of multiple devices to be patrolled, including: starting from the starting point of the patrol path, searching for a first device to be patrolled that can be patrolled within the preset patrol time based on the movement time between multiple devices to be patrolled and the patrol time of multiple devices to be patrolled; constructing a target patrol unit based on the first device to be patrolled; determining a first device to be patrolled from other devices to be patrolled on the patrol path except the first device to be patrolled; starting from the first device to be patrolled, repeatedly executing the steps of searching for the first device to be patrolled that can be patrolled within the preset patrol time based on the movement time between multiple devices to be patrolled and the patrol time of multiple devices to be patrolled, and constructing a target patrol unit based on the first device to be patrolled, until there is no device to be queried on the patrol path; summarizing the target patrol units to obtain multiple patrol units.

[0053] The first device to be inspected in the above steps is found according to the arrangement order of the devices to be inspected on the inspection path, and is the device to be inspected that can be inspected within the preset inspection time.

[0054] The target inspection unit in the above steps is an inspection unit including the first equipment to be inspected that can be inspected within a preset inspection time.

[0055] In an optional embodiment, the search starts from the first device to be inspected in the patrol path, and according to the arrangement order of the devices to be inspected on the patrol path, the movement time between multiple devices to be inspected, and the patrol time of multiple devices to be inspected, the device to be inspected that can complete the patrol within the preset patrol time is determined, and it is used as the first patrol device, and then the patrol unit formed by the first patrol device is used as the target patrol unit.

[0056] Then, starting from the first device to be inspected among the remaining devices to be inspected, the device to be inspected that can be inspected within the preset inspection time is determined according to the arrangement order of the devices to be inspected on the inspection path, the movement time between multiple devices to be inspected, and the inspection time of multiple devices to be inspected, and the device to be inspected is used as the first inspection device, and then the inspection unit formed by the first inspection device is used as the target inspection unit until all devices to be queried are included in the target inspection unit. By summarizing the target inspection units, multiple inspection units can be obtained.

[0057] For example, when dividing the target patrol unit, the patrol workload of 1 hour can be used as the division standard. According to the principle of patrolling nearby, the devices to be patrolled that can be patrolled within 1 hour are divided into one target patrol unit. If the remaining patrol workload is less than 1 hour at the end of the division, the devices to be patrolled corresponding to the remaining patrol workload are divided into one target patrol unit. In this way, the patrol path is divided into several 1-hour patrol units and 1 target patrol unit less than or equal to 1 hour.

[0058] It should be noted that the specific numerical values ​​in the above examples are only examples, and the specific numerical values ​​that can be used in actual applications are not limited to these.

[0059] Optionally, the inspection path includes: a main line path, a branch line path, and starting from the starting point of the inspection path, searching for the first device to be inspected that can be inspected within the preset inspection time based on the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected, including: starting from the starting point of the main line path, searching for the first device to be inspected that can be inspected within the preset time based on the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected, wherein when the branch line path is found, the device to be inspected on the branch line path is searched, and after the search is completed, the device to be inspected on the main line path is searched.

[0060] The trunk line path in the above steps is the main transmission line that carries the main power load and connects various substations and important load centers.

[0061] The branch line path in the above steps is an auxiliary transmission line branched from the main line path, which is used to connect the main line path with various load centers or auxiliary equipment.

[0062] In an optional embodiment, when determining the first device to be inspected, first search on the main line path. When encountering a branch line path, switch to the branch line path and search for the device to be inspected on the branch line path. After the search is completed, return to the main line path again and search for the device to be inspected on the main line path.

[0063] Optionally, based on the grid structure data and the status data of multiple power equipment, the inspection path is determined, including: based on the grid structure data, determining the equipment whose equipment type is a connecting switch; and determining the inspection path according to the location of the equipment whose equipment type is a connecting switch and the status data of the equipment.

[0064] The device type of the tie switch in the above steps is a switch used to connect the main line path and the branch line path, and is located at a key position in the distribution network line.

[0065] In an optional embodiment, devices of the interconnecting switch type are screened out based on the grid structure data, and their positions in the distribution network are determined. The status data of the interconnecting switch device is collected, including the operating status, electrical parameters, temperature and other information of the device. If there is an abnormality in the status data of the interconnecting switch device, the branch line path connected to the interconnecting switch device is included in the inspection path. Then, the interconnecting switch device and the power equipment on the branch line path that has been included in the inspection path are excluded, and it is determined whether the status data of other power equipment is abnormal. The other power equipment with abnormalities is included in the power equipment of the inspection path, and the trunk line path and the branch line path are determined based on the topological relationship between the power equipment.

[0066] Optionally, the three-dimensional type of the distribution network line is extracted to obtain grid structure data, including: performing graphic model analysis on the three-dimensional model of the distribution network line to extract the grid structure data.

[0067] In an optional embodiment, the geographic information data corresponding to the GIS model, including the geographic coordinates of the power equipment, etc., can be exported based on the GIS model of the distribution network line in the GIS system. The exported geographic information data is converted into graph model data, that is, the geographic coordinates are converted into nodes and edges on the graph, and the connection relationship between the power equipment is represented by the nodes and edges on the graph. The converted graph model data is parsed using graph model parsing technology to identify the topological relationship between the power equipment, including information such as the equipment name, equipment type, and the connection relationship between the equipment, and obtain the grid structure data.

[0068] Example 2

[0069] According to an embodiment of the present invention, an embodiment of a distribution network line inspection device is provided, and the device can execute the distribution network line inspection method provided in the above-mentioned embodiment 2. The specific implementation method and preferred application scenario are the same as those of the above-mentioned embodiment 2, and will not be repeated here.

[0070] Figure 2 is a schematic diagram of a distribution network line inspection device according to an embodiment of the present invention, such as Figure 2 As shown in the figure, the inspection device for the distribution network line includes:

[0071] The extraction module 20 is used to extract the three-dimensional model of the distribution network line to obtain grid structure data, wherein the grid structure data is used to characterize the topological relationship between multiple power devices in the distribution network line.

[0072] The determination module 22 is used to determine the inspection path based on the grid structure data and the status data of multiple power devices, wherein the inspection path is used to characterize the path for inspecting multiple devices to be inspected among the multiple power devices, and the status data is used to characterize whether there are abnormalities in the multiple power devices.

[0073] The division module 24 is used to divide the inspection path based on the grid structure data to obtain multiple inspection units.

[0074] The inspection module 26 is used to inspect the distribution network lines according to multiple inspection units.

[0075] Optionally, the division module includes: a determination unit, used to determine the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected based on the grid structure data, wherein the movement time is the time required to move from any device to be inspected to another device to be inspected adjacent to the device to be inspected, and the inspection time is the time required to inspect the corresponding device to be inspected; a division unit, used to divide the inspection path based on the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected using preset inspection times to obtain multiple inspection units.

[0076] Optionally, the determination unit is also used to determine the distance between two adjacent devices to be inspected based on the device coordinates of the multiple devices to be inspected; determine the movement time between the multiple devices to be inspected based on the distance between two adjacent devices to be inspected; and determine the inspection time of the multiple devices to be inspected based on the device types of the multiple devices to be inspected.

[0077] Optionally, the division unit is further used to divide the inspection path into multiple inspection units according to a preset inspection time starting from the starting point of the inspection path and according to the movement time between the multiple devices to be inspected and the inspection time of the multiple devices to be inspected.

[0078] Optionally, the division unit is also used to start from the starting point of the patrol path, and according to the movement time between multiple patrol devices and the patrol time of multiple patrol devices, find the first device to be patrolled that can be patrolled within the preset patrol time; construct a target patrol unit based on the first device to be patrolled; determine the first device to be patrolled from other devices to be patrolled on the patrol path except the first device to be patrolled; starting from the first device to be patrolled, repeat the steps of starting from the first device to be patrolled, and according to the movement time between multiple patrol devices and the patrol time of multiple patrol devices, find the first device to be patrolled that can be patrolled within the preset patrol time, and construct a target patrol unit based on the first device to be patrolled, until there is no device to be patrolled on the patrol path; summarize the target patrol units to obtain multiple patrol units.

[0079] Optionally, the division unit is also used to start from the starting point of the main line path, and according to the movement time between multiple devices to be inspected and the inspection time of multiple devices to be inspected, search for the first device to be inspected that can be inspected within a preset inspection time, wherein when a branch line path is found, the device to be inspected on the branch line path is searched, and after the search is completed, the device to be inspected on the main line path is searched.

[0080] Optionally, the determination module is further used to determine the equipment whose equipment type is a tie switch based on the grid structure data; and determine the inspection path according to the position of the equipment whose equipment type is a tie switch and the status data of the equipment.

[0081] Optionally, the extraction module performs graphic model analysis on the three-dimensional model of the distribution network line to extract grid structure data.

[0082] Example 3

[0083] An embodiment of the present application further provides an electronic device, comprising: a memory storing an executable program; and a processor for running the program, wherein when the program is running, the method for inspecting distribution network lines in Embodiment 1 of the present invention is executed.

[0084] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0085] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0086] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.

[0087] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0088] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0089] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.

[0090] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for inspecting distribution network lines, characterized in that: include: Extracting the three-dimensional model of the distribution network line to obtain grid structure data, wherein the grid structure data is used to characterize the topological relationship between multiple power devices in the distribution network line; Determine a patrol path based on the grid structure data and the status data of the plurality of electric devices, wherein the patrol path is used to characterize a path for patrolling a plurality of devices to be patrolled among the plurality of electric devices, and the status data is used to characterize whether the plurality of electric devices have abnormalities; Dividing the inspection path based on the grid structure data to obtain a plurality of inspection units; The distribution network lines are inspected according to the multiple inspection units.

2. The inspection method for distribution network lines according to claim 1, characterized in that: The inspection path is divided based on the grid structure data to obtain a plurality of inspection units, including: Based on the grid structure data, determine the movement duration between the multiple devices to be inspected and the inspection duration of the multiple devices to be inspected, wherein the movement duration is the time required to move from any device to be inspected to another device to be inspected adjacent to the device to be inspected, and the inspection duration is the time required to inspect the corresponding device to be inspected; Based on the movement durations between the multiple devices to be inspected and the inspection durations of the multiple devices to be inspected, the inspection path is divided using preset inspection times to obtain the multiple inspection units.

3. The inspection method for distribution network lines according to claim 2, characterized in that: Determining the movement duration between the plurality of devices to be inspected and the inspection duration of the plurality of devices to be inspected based on the grid structure data includes: Determine the distance between two adjacent devices to be inspected based on the device coordinates of the multiple devices to be inspected; Determine the moving time between the plurality of devices to be inspected based on the distance between the two adjacent devices to be inspected; Based on the device types of the multiple devices to be inspected, the inspection durations of the multiple devices to be inspected are determined.

4. The inspection method for distribution network lines according to claim 2, characterized in that: Based on the movement duration between the multiple devices to be inspected and the inspection duration of the multiple devices to be inspected, the inspection path is divided using a preset inspection time to obtain the multiple inspection units, including: Starting from the starting point of the inspection path, the inspection path is divided into the plurality of inspection units according to the travel durations between the plurality of devices to be inspected and the inspection durations of the plurality of devices to be inspected and according to the preset inspection time.

5. The inspection method for distribution network lines according to claim 4, characterized in that: Starting from the starting point of the inspection path, according to the moving duration between the multiple devices to be inspected and the inspection duration of the multiple devices to be inspected, the inspection path is divided into the multiple inspection units according to the preset inspection time, including: Starting from the starting point of the inspection path, according to the moving time between the multiple devices to be inspected and the inspection time of the multiple devices to be inspected, searching for the first device to be inspected that can be inspected within the preset inspection time; Based on the first device to be inspected, construct a target inspection unit; Determine a first device to be inspected from other devices to be inspected on the inspection path except the first device to be inspected; Starting from the first device to be inspected, repeatedly performing the steps of searching for the first device to be inspected that can be inspected within the preset inspection time according to the movement duration between the multiple devices to be inspected and the inspection duration of the multiple devices to be inspected, and constructing the target inspection unit based on the first device to be inspected, until there is no device to be queried on the inspection path; The target inspection units are aggregated to obtain the multiple inspection units.

6. The inspection method for distribution network lines according to claim 5, characterized in that: The inspection path includes: a trunk line path and a branch line path. Starting from the starting point of the inspection path, according to the moving time between the multiple devices to be inspected and the inspection time of the multiple devices to be inspected, searching for the first device to be inspected that can be inspected within the preset inspection time includes: Starting from the starting point of the main line path, based on the movement time between the multiple devices to be inspected and the inspection time of the multiple devices to be inspected, search for the first device to be inspected that can be inspected within the preset inspection time, wherein, when the branch line path is found, search for the device to be inspected on the branch line path, and after the search is completed, search for the device to be inspected on the main line path.

7. The inspection method for distribution network lines according to claim 1, characterized in that: Determining an inspection path based on the grid structure data and the status data of the plurality of power devices includes: Based on the grid structure data, determining that the device type is a tie switch device; The inspection path is determined according to the location of the device whose device type is a tie switch and the status data of the device.

8. The inspection method for distribution network lines according to claim 1, characterized in that: Extract the three-dimensional type of the distribution network line to obtain the grid structure data, including: The three-dimensional model of the distribution network line is analyzed to extract the grid structure data.

9. A distribution network line inspection device, characterized in that: include: An extraction module is used to extract the general information model of the distribution network line to obtain grid structure data, wherein the grid structure data includes: device name, device type, device coordinates, and topological relationship between devices, and the device is the power device in the distribution network line; A determination module, used to determine an inspection path based on the grid structure data, wherein the inspection path is a path for inspecting the equipment in the distribution network line, and the inspection path includes equipment that needs to be inspected and the order in which the equipment is inspected; A division module, used for dividing the inspection path to obtain an inspection strategy; A patrol module is used to patrol the patrol path based on the patrol measurement.

10. An electronic device, characterized in that: include: A memory storing an executable program; A processor, configured to run the program, wherein the program executes the method according to any one of claims 1 to 8 when running.

Citation Information

Patent Citations

  • Power transmission line inspection path planning method, device and equipment and storage medium

    CN112418532A

  • Patrol task allocation method and device, electronic equipment and storage medium

    CN113888028A

  • Inspection path planning method and device, electronic equipment and storage medium

    CN116007647A

  • Operation and maintenance management method and system of distribution network area, storage medium and equipment

    CN116384971A

  • Public transformer district load intelligent detection management method and system

    CN118449261A