Construction method of large-span large-section steel box girder

Through the combination of temporary piles and lifting systems, the difficulty and safety problems in the construction of large-span and high-section steel box girders are solved, and an efficient and stable construction process is achieved, and the project quality and service life are improved.

CN119640693AActive Publication Date: 2025-03-18HUBEI ROAD & BRIDGE GRP CO LTD +1
10 Cites 0 Cited by

Patent Information

Application Number
CN202411988360.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-31
Publication Date
2025-03-18
Estimated Expiration
2044-12-31

AI Technical Summary

Technical Problem

When traditional bridge construction methods face large span and high-section steel box girders, there are problems such as high construction difficulty, long construction period and safety hazards.

Method used

Temporary piles are used to form a temporary support structure, and efficient lifting and positioning of steel box beams is achieved through the lifting system, and existing bridge plates are used as construction platforms to simplify construction steps.

Benefits of technology

Ensure the stability of steel box girders during construction, reduce safety hazards, improve construction efficiency, optimize the stability and bearing capacity of the overall structure, thereby improving the quality and service life of the project.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention relates to a construction method of a large-span large-section steel box girder, which is characterized in that temporary piles are combined with square columns to form an effective temporary support structure, so that the stability of the steel box girder in the construction process is ensured, and the potential safety hazard of construction is reduced; the lifting system is provided with a lifting rod, so that the efficient hoisting and positioning of the steel box girder can be realized, the spliced steel box girder can be smoothly lifted under the large-span condition through the design, and the smooth construction is ensured; the existing bridge plate is adopted as a construction platform, and the temporary support and the fixed base are combined, so that the construction steps are simplified, and the construction efficiency is improved; by ensuring the reliable connection between the No.0 steel box girder and the assembled steel box girder, the stability and the bearing capacity of the whole structure are optimized, so that the engineering quality of the whole bridge is improved, and the service life of the whole bridge is prolonged.