Movable water drill hole taking device
By designing a mobile water drill hole extraction device and using retractable support plates and rollers to fix the water drill equipment, the problem of unstable hole extraction caused by the curvature of the concrete guardrail was solved, an efficient and safe construction process was achieved, and construction efficiency and hole formation were significantly improved. quality.
Patent Information
- Application Number
- CN202420489670.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2024-09-24
- Estimated Expiration
- 2034-03-14
AI Technical Summary
During the installation process of the sound barrier columns of highway bridges, the curvature of the concrete guardrails and wing walls caused the drilling of water drill holes to be unstable and unable to dig vertically, resulting in low quality and offset hole patterns. In addition, a lot of time was required for leveling during installation, which affected efficiency. and safety.
Design a mobile water drill hole-taking device, including a retractable horizontal support plate and a vertical support plate, both of which are fixed on the guardrail through rollers, reducing manual operation and providing a safe working surface, and the device can be pushed in the direction of the guardrail. Reduce equipment handling and improve efficiency.
Effectively fix water drilling equipment, reduce manual operations, improve hole extraction efficiency, reduce time and labor costs, improve hole forming quality, avoid safety hazards in high-altitude operations, and significantly improve construction efficiency and equipment stability.
Smart Images

Figure CN221761811U
Abstract
Description
Technical Field
[0001] The utility model relates to the field of highway construction, in particular to a mobile water drilling hole extraction device. Background Art
[0002] The installation of sound barrier columns on highway bridges often requires the use of water drilling equipment to drill holes and plant reinforcement on concrete guardrails or wing walls to make the sound barrier columns more firmly connected to the guardrails. However, in actual construction, the facades and top surfaces of the concrete guardrails and wing walls are curved. When drilling holes by manpower or auxiliary nails, it is impossible to dig stably and vertically, resulting in poor hole quality, deformation, and offset. When installing the columns, it is often necessary to waste a lot of time on leveling, and even cause non-standard column spacing. Utility Model Content
[0003] In view of the above problems, the utility model provides a mobile water drilling device, which can effectively fix the concrete guardrail, wing wall and water drilling equipment, freeing up manpower. A pulley is set on the contact surface between the device and the guardrail, which can be pushed along the direction of the guardrail to reduce the time cost of repeated handling. The pedal can provide a safe working surface for the construction workers, avoiding the safety hazards caused by high-altitude operations when drilling holes.
[0004] A mobile water drilling device comprises a retractable horizontal support plate, wherein the left and right ends of the horizontal support plate are respectively connected to a vertical support plate, first rollers are respectively installed on opposite sides of the two vertical support plates, and pedals are respectively installed on opposite sides of the two vertical support plates.
[0005] Preferably, a second roller and a retractable support foot are installed on the lower surface of the horizontal support plate.
[0006] Preferably, the horizontal support plate includes an outer sleeve plate and an inner core plate which are fitted into each other, and positioning screws are arranged on the side of the outer sleeve plate.
[0007] Preferably, the first roller is provided with a limiting device.
[0008] Preferably, the horizontal support plate or the vertical support plate is provided with a handrail and a safety belt hanging hole.
[0009] Preferably, the length of the vertical support plate is adjustable.
[0010] Preferably, the horizontal support plate, the vertical support plate and the pedal form a "J" structure.
[0011] Preferably, both the horizontal support plate and the vertical support plate are provided with long slot holes for installing water drills.
[0012] Preferably, the pedal is connected to the vertical support plate via a hinge, and the angle between the pedal and the horizontal support plate can be switched between 0-90 degrees.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] 1. Install the traditional water drill on the horizontal support plate in the device of the utility model. The two vertical support plates of the device are set on both sides of the wall of the concrete guardrail and wing wall, which can effectively fix the concrete guardrail, wing wall and water drill equipment. It is mainly used for drilling holes in concrete guardrails and wing walls of highways, freeing up manpower.
[0015] 2. Rollers are set on the contact surface between the vertical support plate and the guardrail to form a mobile water drilling device. After a hole is drilled, the device can be pushed along the direction of the guardrail under the action of the roller transmission to reach a new hole-drilling operation point, reducing the time cost of repeated transportation.
[0016] 3. The handrails and safety belt hanging holes can provide construction workers with a safe working surface and avoid the safety hazards caused by high-altitude operations when taking holes.
[0017] 4. The horizontal support plate with adjustable telescopic length can adapt to the installation of concrete guardrails or wing walls of different thicknesses. The vertical support plate with adjustable telescopic length allows construction workers to adjust the operating height within the set range, making it convenient to operate the water drill to drill holes. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solution of the implementation mode of the utility model, the drawings required for use in the implementation mode will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 This is a schematic diagram of the overall structure of the utility model Figure 1 ;
[0020] Figure 2 This is a schematic diagram of the overall structure of the utility model Figure 2 ;
[0021] Figure 3 yes Figure 2 A magnified view of middle;
[0022] In the figure, 1 is a pedal, 2 is a right frame, 3 is a vertical support plate, 4 is a sleeve, 5 is an outer sleeve plate, 6 is a positioning screw, 7 is a first roller, 8 is a retractable support foot, 9 is a second roller, 10 is an inner core plate, 11 is a left frame, and 12 is a water drill. DETAILED DESCRIPTION
[0023] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.
[0024] like Figure 1-3 As shown, the utility model discloses a mobile water drill hole-taking device, which includes a horizontal support plate located in the middle, two vertical support plates 3 symmetrically installed on both sides of the horizontal support plate, and two pedals 1 respectively connected to the vertical support plates 3. The three parts form a "J"-shaped structure. The device is installed on the concrete guardrail or wing wall by utilizing the limiting effect of the two vertical support plates 3 of the "J"-shaped structure. The water drill 12 is installed on the upper surface of the horizontal support plate, and the construction personnel step on the pedal to perform the water drill operation. A connecting plate base is provided between the water drill and the horizontal support plate, and a stiffening plate is welded between the spur rack and the connecting plate base to ensure that the drill is perpendicular to the connecting plate base. The movement of the water drill drill mainly relies on the spiral transmission support rod to drive up and down along the rack. When the drill bit is aligned with the preset hole position, the handle of the drill can be pressed down to vertically drill the concrete guardrail. Among them, the connecting plate base, the spur rack, and the stiffening plate are all standard configurations of existing water drills, which are mature existing technologies.
[0025] As a preferred embodiment, in order to adapt to concrete guardrails or wing walls of different thicknesses, the horizontal support plate is designed as a retractable structure, that is, the distance between the two vertical support plates 3 is adjustable. Specifically, the upper end of the left vertical support plate 3 is connected to the outer plate 5 of the horizontal support plate, and the upper end of the right vertical support plate 3 is connected to the inner core plate 10. The outer plate is mounted on the outside of the inner core plate and can slide left and right within a set range. After sliding to the point where the two vertical support plates are just connected to the outside of the concrete guardrail or wing wall, tighten the set screws 6 set on the side of the outer plate to fix the position of the outer plate 5 and the inner core plate 10.
[0026] As a preferred embodiment, in order to improve the structural firmness, the device is also provided with a saddle-type steel structure bracket, which is composed of a rectangular tube or angle steel or channel steel welded together, and the vertical support plate and the horizontal support plate are welded or screwed to the outer surface of the saddle-type steel structure bracket, and the pedals are respectively welded to the lower ends of both sides of the saddle-type steel structure bracket. The saddle-type steel structure bracket is also designed to have an adjustable span structure, that is, the upper end of the left frame 11 is connected to the sleeve 4, and the upper end transverse tube of the right frame 2 is inserted into the sleeve 4, and the transverse tube can slide along the sleeve 4, and the two parts are fixed with the set screws 6 after the position is determined.
[0027] As a preferred embodiment, in order to improve the efficiency of drilling holes and make the operation convenient and rapid, a first roller 7 is provided on the inner side of the saddle-type steel structure support and the contact surface with the concrete guardrail and the wing wall. The first roller is a rubber pulley, and a limit device is provided on the roller. When the limit device is turned on, the support as a whole cannot move along the bridge direction, which can provide shock absorption for the water drill, increase the friction at the bottom of the support, and reduce the shaking of the support; when the limit device is closed, the mobile water drill drilling device can move along the bridge direction to achieve continuous drilling, avoid repeated handling of equipment, reduce time costs, and minimize the ineffective labor of workers. The roller and limit device here can use the more common universal wheels with brake systems on the market.
[0028] As a preferred embodiment, a retractable support leg 8 and a second roller 9 are installed on the lower surface of the sleeve 4. When the retractable support leg moves to the shortest distance, it is lower than the diameter of the second roller. The second roller cooperates with the first roller to drive the water drilling device to move along the bridge. After moving to the specified position, the limit device is turned on and the distance of the retractable support leg is adjusted to a level higher than the diameter of the second roller. At this time, the support leg supports the steel structure support on the upper end of the concrete guardrail, and the second roller is suspended in the air, which can effectively prevent the second roller from contacting the bridge deck and being crushed due to the construction workers stepping on the pedal during operation. At the same time, vertical friction can be applied to the concrete guardrail, which can better play a locking role.
[0029] As a preferred embodiment, the horizontal support plate or the vertical support plate is provided with handrails and safety belt hanging holes to provide a safe and reliable working surface and protection for construction workers.
[0030] As a preferred embodiment, the vertical support plate can also be configured as a length-adjustable set structure, which has a structure similar to that of the horizontal support plate.
[0031] As a preferred embodiment, in order to facilitate storage and transfer to another construction site, the pedal can be connected to the vertical support plate by a hinge, and the angle between the pedal and the horizontal support plate can be switched between 0-90 degrees, that is, the pedal can be rotated along the hinge to a position overlapping with the vertical support plate, thereby reducing the volume and occupying a smaller space.
[0032] The mobile water drilling device is easy to operate, has a stable structure and is inexpensive. During construction, the layout is first performed according to the bolt hole spacing of the screen column, and then the device is set up on the concrete guardrail. The drill bit is vertically aligned with the hole sample mark point, and the spiral transmission lever on the rotating water drilling device controls the water drilling body to move up and down along the metal rack slowly and vertically to the device to drill holes in the concrete guardrail. After inspection and comparison at the construction site, this innovation can improve the construction efficiency by 60% compared with the traditional water drilling construction process, and the stability of the equipment greatly improves the quality of the hole, effectively reduces labor costs and time costs, and minimizes the labor intensity of workers.
[0033] The above description is only a preferred implementation method of the utility model and is not intended to limit the utility model. For those skilled in the art, the utility model can be modified and varied in various ways. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A mobile water drilling device, characterized in that: It comprises a retractable horizontal support plate, wherein the left and right ends of the horizontal support plate are respectively connected to a vertical support plate (3), the opposite sides of the two vertical support plates are respectively equipped with a first roller (7), and the opposite sides of the two vertical support plates are respectively equipped with a pedal (1).
2. A mobile water drilling device according to claim 1, characterized in that: A second roller (9) and a retractable support foot (8) are mounted on the lower surface of the horizontal support plate.
3. A mobile water drilling device according to claim 1, characterized in that: The horizontal support plate comprises an outer sleeve plate (5) and an inner core plate (10) which are fitted onto each other, and positioning screws are arranged on the side of the outer sleeve plate.
4. The mobile water drilling device according to claim 1, characterized in that: The first roller is provided with a limiting device.
5. The mobile water drilling device according to claim 1, characterized in that: The horizontal support plate or the vertical support plate is provided with a handrail and a safety belt hanging hole.
6. The mobile water drilling device according to claim 1, characterized in that: The length of the vertical support plate is adjustable.
7. The mobile water drilling device according to claim 1, characterized in that: The horizontal support plate, the vertical support plate and the pedal form a "J" structure.
8. The mobile water drilling device according to claim 1, characterized in that: The horizontal support plate and the vertical support plate are both provided with long slot holes for installing water drills.
9. The mobile water drilling device according to claim 1, characterized in that: The pedal is connected to the vertical support plate through a hinge, and the angle between the pedal and the horizontal support plate can be switched between 0-90 degrees.