Fabricated continuous beam side span cast-in-place section support structure

Through the structure of the prefabricated continuous beam edge-span cast-in-place section bracket and the welding-free connection of the I-beam distribution beam and the steel pipe column, the safety risks and poor recycling rate of the traditional steel pipe column bracket in high-speed railway construction are solved, and the problem is achieved. for a more efficient, safe construction process and cost savings.

CN221798127UActive Publication Date: 2024-10-01SHANGHAI CIVIL ENG GRP SIXTH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323451651.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-18
Publication Date
2024-10-01
Estimated Expiration
2033-12-18

AI Technical Summary

Technical Problem

Traditional steel pipe column supports have problems such as welding burns, high safety risks, poor recycling rates, and long construction cycles during high-speed railway construction. It is difficult to meet the needs of convenient transportation, installation, cost reduction and efficiency improvement.

Method used

It adopts the structure of prefabricated continuous beam edge-span cast-in-place section support. It uses I-beam distribution beams, steel pipe columns, intelligent hydraulic systems and monitoring points, combined with high-strength bolt connections and rubber washers, to reduce welding requirements and improve safety and reusability. .

Benefits of technology

It realizes the welding-free connection of steel pipe columns, reduces the risk of high-altitude operations, improves construction safety and efficiency, and the brackets can be reused, saving construction costs and time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221798127U_ABST
    Figure CN221798127U_ABST
Patent Text Reader

Abstract

The utility model relates to an assembly type continuous beam side span cast-in-place section support structure which comprises an I-shaped steel distribution beam, a plurality of I-shaped steel longitudinal beams are longitudinally arranged below the I-shaped steel distribution beam, a steel guardrail is installed on the top of the I-shaped steel distribution beam, a wood formwork is erected on the top of the I-shaped steel distribution beam, and the wood formwork is used for pouring a side span cast-in-place section beam body. Steel pipe stand columns are connected to the bottoms of the I-shaped steel longitudinal beams, a positioning mechanism is arranged at the end, extending to the upper portion of a bridge pier column, of each I-shaped steel distribution beam, and a transverse parallel connection structure is arranged between every two adjacent steel pipe stand columns. The steel pipe stand columns and the steel hoops belong to turnover materials and can be used in a turnover mode, in addition, the steel hoops can be installed on the steel pipe short columns firstly, then the steel pipe short columns are assembled, the hoops are installed on the ground, the high-altitude operation frequency of workers is reduced, and safety is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of continuous beam supports, and in particular to a support structure for a cast-in-place section of a side span of an assembled continuous beam. Background Art

[0002] As bridge construction technology becomes more and more sophisticated, the installation of continuous beams across rivers, railways and other large structures has become the norm. The issue of safe, green and environmentally friendly construction of bridge projects has also led many scholars to apply and explore the improvement of bridge construction technology.

[0003] The cast-in-place section of the continuous beam side span is usually constructed by the full-span support method, the falsework method, and the bracket method. This technology is mature, safe and reliable. However, in response to the construction environment of high-speed railways, how to facilitate transportation, installation, recycling, and cost reduction and efficiency improvement has become a difficult problem in the current construction. The use of traditional steel pipe column supports for welding, first, is prone to welding burns on the column section, affecting the structural force, and the recycling rate is poor; second, the high-altitude welding construction has a high safety risk, and the welding quality and accuracy are difficult to meet the design requirements, which is easy to cause the column to tilt; third, the construction period is long, and the high-altitude cutting work efficiency is low during the installation and welding of the horizontal connecting components on site and the removal.

[0004] Therefore, those skilled in the art provide a prefabricated continuous beam side span cast-in-place section support structure to solve the problems raised in the above background technology. Utility Model Content

[0005] In order to solve the problems raised in the above background technology, the present application provides a cast-in-place bracket structure for the side span of an assembled continuous beam.

[0006] The present application provides a prefabricated continuous beam side span cast-in-place section support structure adopts the following technical solution:

[0007] A cast-in-place bracket structure for a side span of an assembled continuous beam comprises an I-beam distribution beam, a plurality of I-beam longitudinal beams are arranged longitudinally below the I-beam distribution beam, a steel guardrail is installed on the top of the I-beam distribution beam and a wooden formwork is set up, the wooden formwork is used to cast the side span cast-in-place beam body, a steel pipe column is connected to the bottom of the I-beam longitudinal beam, a positioning mechanism is arranged on one end of the I-beam distribution beam extending above the bridge pier, and a transverse parallel connection structure is arranged between two adjacent steel pipe columns;

[0008] The positioning mechanism includes an I-beam shoulder beam clamped on the upper and lower sides of the I-beam distribution beam, and a double-jointed I-beam cross beam is also transversely arranged between the I-beam shoulder beam and the I-beam distribution beam, and a fine-rolled threaded steel vertical suspension rod for suspension is arranged between the two ends of the I-beam shoulder beam and the two double-jointed I-beam cross beams, and the fine-rolled threaded steel vertical suspension rod is also arranged through the I-beam distribution beam, and the fine-rolled threaded steel vertical suspension rod is used to fix one end of the I-beam distribution beam close to the bridge pier on the bridge pier;

[0009] The transverse parallel connection structure includes a steel clamp sleeved on a steel pipe column, a rubber gasket is wrapped between the steel clamp and the steel pipe column, and a parallel connection scissors brace is installed between two adjacent steel clamps to facilitate assembly and turnover.

[0010] Furthermore, the steel hoop is made of steel plates processed into two round steel plates that match the size of the steel pipe column, and stiffening ribs are attached to the round steel plates. The two round steel plates are connected by high-strength bolts, and the steel hoop close to the bridge pier is also connected to an I-beam wall attachment fixed to the side of the bridge pier.

[0011] Furthermore, the steel pipe column is composed of a plurality of steel pipe short columns, and the upper and lower steel pipe short columns are connected by a flange.

[0012] Furthermore, an intelligent hydraulic system is installed on the top of the steel pipe column, and a plurality of transverse double I-beam support beams are arranged at the bottom of the I-beam longitudinal beam. The double I-beam support beams are erected on the top of the intelligent hydraulic system, and the number of the double I-beam support beams is the same as the number of horizontal rows of steel pipe columns.

[0013] Furthermore, a monitoring point is provided on the top of the steel pipe column for detecting whether the steel pipe column is subjected to abnormal stress.

[0014] In summary, this application includes the following beneficial technical effects:

[0015] 1. The utility model steel pipe column is composed of a plurality of steel pipe short columns and flange plates, and the flange plates are connected by high-strength bolts. There is no need to weld the steel pipe column, thereby avoiding damage to the steel pipe column. The steel pipe column and the steel clamp are turnover materials and can be used in rotation. In addition, the steel clamp can be installed on the steel pipe short column first, and then the steel pipe short column can be assembled. The clamp is installed on the ground, which reduces the number of workers' high-altitude operations and is safer. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the side structure of the present application;

[0017] Figure 2 It is a schematic diagram of the front structure of this application;

[0018] Figure 3 It is a schematic diagram of the horizontal parallel structure of this application.

[0019] Explanation of the reference numerals in the accompanying drawings: 1. Vertical hanger of fine-rolled threaded steel; 2. I-beam shoulder beam; 3. Double-jointed I-beam crossbeam; 4. I-beam distribution beam; 5. I-beam longitudinal beam; 6. Double-jointed I-beam support beam; 7. Intelligent hydraulic system; 8. Monitoring point; 9. Steel pipe column; 10. Flange; 11. Steel clamp; 12. Flat-jointed scissors brace; 13. I-beam wall attachment; 14. Steel guardrail; 15. Side span cast-in-place section beam. DETAILED DESCRIPTION

[0020] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0021] Embodiment 1

[0022] Reference Figure 1-3 As shown, the present application discloses a support structure for the cast-in-place section of the side span of an assembled continuous beam, comprising an I-beam distribution beam 4, a plurality of I-beam longitudinal beams 5 are arranged longitudinally below the I-beam distribution beam 4, a steel guardrail 14 is installed on the top of the I-beam distribution beam 4 and a wooden formwork is set up, the wooden formwork is used to cast the beam body 15 of the cast-in-place section of the side span, a steel pipe column 9 is connected to the bottom of the I-beam longitudinal beam 5, the steel pipe column 9 is composed of a plurality of steel pipe short columns, and the upper and lower steel pipe short columns are connected by a flange 10, a positioning mechanism is arranged on one end of the I-beam distribution beam 4 extending above the bridge pier, and a transverse parallel connection structure is arranged between two adjacent steel pipe columns 9;

[0023] The positioning mechanism includes an I-beam shoulder beam 2 clamped on the upper and lower sides of the I-beam distribution beam 4, and a double-jointed I-beam cross beam 3 is also transversely arranged between the I-beam shoulder beam 2 and the I-beam distribution beam 4, and a fine-rolled threaded steel vertical suspension rod 1 for suspension is arranged between the two ends of the I-beam shoulder beam 2 and the two double-jointed I-beam cross beams 3, and the fine-rolled threaded steel vertical suspension rod 1 is also arranged through the I-beam distribution beam 4, and the fine-rolled threaded steel vertical suspension rod 1 is used to fix the end of the I-beam distribution beam 4 close to the bridge pier on the bridge pier;

[0024] The transverse parallel connection structure includes a steel hoop 11 sleeved on the steel pipe column 9, a rubber gasket is wrapped between the steel hoop 11 and the steel pipe column 9, and a parallel connection scissor brace 12 is installed between two adjacent steel hoops 11, which is convenient for assembly and turnover;

[0025] Specifically, the positioning mechanism includes a double-jointed I-beam cross beam 3 on the upper and lower sides of the I-beam distribution beam 4, and an I-beam shoulder beam 2 is installed on the end of the double-jointed I-beam cross beam 3. When a high-quality rolled threaded steel vertical hanger 1 is used to penetrate the two ends of the I-beam shoulder beam 2 and the two double-jointed I-beam cross beams 3, the I-beam distribution beam 4 can be fixed on the bridge pier to maintain the stability of the I-beam distribution beam 4.

[0026] Reference Figure 1 , 3 As shown, the steel hoop 11 is made of steel plates processed into two round steel plates that match the size of the steel pipe column 9, and stiffening ribs are attached to the round steel plates. The two round steel plates are connected by high-strength bolts, and the steel hoop 11 close to the bridge pier is also connected to an I-beam wall attachment 13 fixed to the side of the bridge pier. During installation, the steel hoop 11 can be installed on the steel pipe short column in advance, and then the parallel scissors brace 12 is installed between the stiffening ribs of the two adjacent round steel plates. It can be installed on the ground, reducing the number of workers' high-altitude operations and reducing the risk factor.

[0027] Reference Figure 1 , 2 As shown, the top of the steel pipe column 9 is also equipped with an intelligent hydraulic system 7, and the bottom of the I-beam longitudinal beam 5 is also provided with a plurality of transverse double-I-beam supporting beams 6. The double-I-beam supporting beams 6 are erected on the top of the intelligent hydraulic system 7, and the number of the double-I-beam supporting beams 6 is the same as the number of horizontal rows of steel pipe columns 9. A monitoring point 8 is also reserved on the top of the steel pipe column 9 for detecting whether the steel pipe column 9 is subjected to abnormal stress. The monitoring point 8 can monitor the stress condition of the steel pipe column 9 in real time so as to take timely countermeasures to ensure construction safety.

[0028] The standard parts used in the utility model can all be purchased from the market, and special-shaped parts can be customized according to the instructions and the drawings. The specific connection methods of each part adopt the conventional means such as mature bolts, rivets, welding, etc. in the existing technology. The machinery, parts and equipment all adopt the conventional models in the existing technology, and the circuit connection adopts the conventional connection method in the existing technology, which will not be described in detail here.

[0029] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0030] The implementation principle of the cast-in-place bracket structure of the side span of an assembled continuous beam in this application is:

[0031] First, a transverse parallel connection structure is set up, and a steel hoop 11 sleeved on the steel pipe short column is used as a part of the transverse parallel connection structure. A rubber gasket is wrapped between the steel hoop 11 and the steel pipe column 9 to increase stability. A parallel connection scissor brace 12 is installed between two adjacent steel hoops 11 to facilitate assembly and turnover. Then, multiple steel pipe short columns are butt-jointed and assembled, and the flanges provided on the steel pipe short columns are butt-jointed with high-strength bolts to form a steel pipe column 9;

[0032] Prepare an I-beam distribution beam 4 and a plurality of I-beam longitudinal beams 5, and arrange the I-beam longitudinal beams 5 longitudinally below the I-beam distribution beam 4. A positioning mechanism is provided on one end of the I-beam distribution beam 4 extending above the bridge pier. The positioning mechanism includes a double-jointed I-beam cross beam 3 clamped on the upper and lower side surfaces of the I-beam distribution beam 4, and an I-beam shoulder beam 2 installed at the end of the double-jointed I-beam cross beam 3. A fine-rolled threaded steel vertical hanger 1 for suspension is provided between the two ends of the I-beam shoulder beam 2 and the two double-jointed I-beam cross beams 3. The fine-rolled threaded steel vertical hanger 1 runs through the I-beam distribution beam 4. It is used to fix one end of the I-beam distribution beam 4 close to the bridge pier on the bridge pier. An intelligent hydraulic system 7 is installed on the top of the steel pipe column 9 to enhance the stability of the overall structure and adjust the overall structure to maintain balance. A plurality of transverse double-split I-beam support beams 6 are also arranged at the bottom of the I-beam longitudinal beam 5, which are erected on the top of the intelligent hydraulic system 7, and the number of double-split I-beam support beams 6 is the same as the number of horizontal rows of steel pipe columns 9. When ready, a steel guardrail 14 can be installed on the top of the I-beam distribution beam 4, a wooden formwork can be erected, and the side span cast-in-place section beam body 15 can be cast.

[0033] In addition, a monitoring point 8 is provided on the top of the steel pipe column 9 for detecting whether the steel pipe column 9 is subjected to abnormal stress. Through the monitoring point 8, the stress condition of the steel pipe column 9 can be monitored in real time so that timely countermeasures can be taken to ensure construction safety.

[0034] The support structure of the cast-in-place section of the side span of this assembled continuous beam can be reused, which is convenient for assembly and turnover. Various components such as I-beam distribution beam 4, I-beam longitudinal beam 5, steel pipe column 9, wooden formwork, etc. can be disassembled and assembled as needed, saving construction cost and time.

[0035] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.

Claims

1. A cast-in-place bracket structure for a side span of an assembled continuous beam, comprising an I-beam distribution beam (4), a plurality of I-beam longitudinal beams (5) arranged longitudinally below the I-beam distribution beam (4), a steel guardrail (14) installed on the top of the I-beam distribution beam (4) and a wooden formwork erected, the wooden formwork being used to cast a beam body (15) of the cast-in-place section of the side span, a steel pipe column (9) connected to the bottom of the I-beam longitudinal beam (5), characterized in that: A positioning mechanism is provided on one end of the I-beam distribution beam (4) extending above the bridge pier, and a transverse parallel connection structure is provided between two adjacent steel pipe columns (9); The positioning mechanism comprises an I-beam shoulder beam (2) clamped on the upper and lower side surfaces of an I-beam distribution beam (4), and a double-jointed I-beam cross beam (3) is also transversely arranged between the I-beam shoulder beam (2) and the I-beam distribution beam (4), and a fine-rolled threaded steel vertical suspension rod (1) for suspension is arranged between the two ends of the I-beam shoulder beam (2) and the two double-jointed I-beam cross beams (3), and the fine-rolled threaded steel vertical suspension rod (1) is also arranged through the I-beam distribution beam (4), and the fine-rolled threaded steel vertical suspension rod (1) is used to fix the end of the I-beam distribution beam (4) close to the bridge pier on the bridge pier; The transverse parallel connection structure comprises a steel hoop (11) sleeved on a steel pipe column (9), a rubber gasket is wrapped between the steel hoop (11) and the steel pipe column (9), and a parallel connection scissors brace (12) is installed between two adjacent steel hoops (11), so as to facilitate assembly and turnover.

2. The cast-in-place bracket structure for the side span of an assembled continuous beam according to claim 1 is characterized in that: The steel hoop (11) is made of two round steel plates processed into the size of the steel pipe column (9), and the round steel plates are additionally provided with stiffening ribs. The two round steel plates are connected by high-strength bolts, and the steel hoop (11) close to the bridge pier is also connected to an I-beam wall attachment (13) fixed to the side of the bridge pier.

3. The cast-in-place bracket structure for the side span of an assembled continuous beam according to claim 1 is characterized in that: The steel pipe column (9) is composed of a plurality of steel pipe short columns, and the upper and lower steel pipe short columns are connected by a flange (10).

4. The cast-in-place bracket structure for the side span of an assembled continuous beam according to claim 1 is characterized in that: The top of the steel pipe column (9) is also equipped with an intelligent hydraulic system (7), and the bottom of the I-beam longitudinal beam (5) is also provided with a plurality of transverse double I-beam support beams (6). The double I-beam support beams (6) are erected on the top of the intelligent hydraulic system (7), and the number of the double I-beam support beams (6) is the same as the number of horizontal rows of the steel pipe columns (9).

5. The cast-in-place bracket structure for the side span of an assembled continuous beam according to claim 1 is characterized in that: A monitoring point (8) for detecting whether the steel pipe column (9) is subjected to abnormal force is also provided on the top end of the steel pipe column (9).

Citation Information

Cited By

  • Continuous beam cast-in-place section support auxiliary installation device and method

    CN120700792A