Beam plate supporting structure at post-cast strip

By using the combined design of PVC concrete columns and flow control sheets at the post-cast belt, the existing technology solves the difficulty in dismantling the support structure of the post-cast belt and the problem of material occupation, achieves a stable support effect and efficient use of materials, and simplifies construction process.

CN221799145UActive Publication Date: 2024-10-01THE THIRD CONSTR CO LTD OF CHINA CONSTR THIRD ENG BUREAU
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323404584.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-14
Publication Date
2024-10-01
Estimated Expiration
2033-12-14

AI Technical Summary

Technical Problem

The existing beam-slab support structure at the post-cast belt requires long-term maintenance when dismantled, and the independent support method of PVC concrete columns leads to problems of material occupation and insufficient strength.

Method used

PVC concrete columns are used as supports, combined with flow control sheets, support frame poles, adjustable jacks, support steel pipes, etc., to form a stable beam-slab support structure in the post-pouring zone. The flow control sheets slow down the concrete flow rate and enhance the support stability. properties, and simplify the structure to facilitate material recycling.

Benefits of technology

It effectively avoids concrete segregation, improves the support stability of PVC concrete columns, reduces material occupation, simplifies the construction process, and ensures the cleanliness and safety of the construction area.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221799145U_ABST
    Figure CN221799145U_ABST
Patent Text Reader

Abstract

The utility model provides a post-cast strip beam plate supporting structure which comprises a beam plate at the post-cast strip and a bottom plate at the post-cast strip, supporting columns are arranged between the beam plate and the bottom plate, one end, close to the post-cast strip, of the beam plate is supported on the bottom plate through a plurality of PVC concrete columns, and the PVC concrete columns are arranged at intervals in the extending direction of the post-cast strip. The PVC concrete column comprises a PVC pipe and a concrete column filled in the PVC pipe, a plurality of flow control pieces for controlling the flow speed of concrete are arranged on the inner wall of the PVC pipe, and the flow control pieces are arranged at intervals in the vertical direction. When concrete falls down along the PVC pipe, particles with large density in the concrete move fast, and the segregation phenomenon occurs, the PVC concrete column is adopted as a post-cast strip support, the flow control sheet is arranged on the PVC pipe, the flow control sheet slows down the flow speed of the concrete, the concrete segregation phenomenon can be avoided, the supporting stability of the PVC concrete column is guaranteed, and the service life of the PVC concrete column is prolonged. And the post-cast strip can be effectively supported.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of design of beam-slab supporting structures at post-casting strips, in particular to a beam-slab supporting structure at post-casting strips. Background Art

[0002] In previous construction projects, the beam-slab support structure at the post-casting joint includes beam-slab support and post-casting joint support. When the beam-slab supports on both sides of the post-casting joint are removed, the post-casting joint support needs to be retained. The post-casting joint needs to be poured 60 days after the main structure is capped. After the pouring of the post-casting joint, it needs to be cured for 28 days before the post-casting joint support can be removed. At present, the post-casting joint support adopts the independent support of steel pipe frame formwork or wheel buckle frame formwork. This support method occupies a large amount of formwork and support materials for a long time, which is not conducive to the turnover of formwork and support materials. The use of PVC concrete columns as post-casting joint supports can solve this problem. However, in actual use, PVC concrete columns often have concrete segregation problems due to the excessive height of concrete falling, which leads to insufficient strength of the PVC independent support column and cannot effectively support the post-casting joint.

[0003] In addition, the beam-slab support design needs to ensure a good support effect on the basis of a simple structure, and cooperate with the post-cast joint support to form a stable beam-slab support structure at the post-cast joint. Utility Model Content

[0004] The purpose of the utility model is to overcome the defects of the prior art and provide a beam and slab supporting structure at a post-casting zone. The utility model at least solves some of the problems in the prior art.

[0005] The utility model is achieved in this way:

[0006] The utility model provides a beam-slab support structure at a post-casting strip, comprising a beam-slab at the post-casting strip and a bottom plate at the post-casting strip, a support column is arranged between the beam-slab and the bottom plate, one end of the beam-slab close to the post-casting strip is supported on the bottom plate by a plurality of PVC concrete columns, each of the PVC concrete columns is arranged at intervals along the extension direction of the post-casting strip, the PVC concrete column comprises a PVC pipe and a concrete column filled in the PVC pipe, a plurality of flow control sheets for controlling the flow rate of concrete are arranged on the inner wall of the PVC pipe, each of the flow control sheets is arranged at intervals along the vertical direction, a beam-slab support frame is also arranged between the beam-slab and the bottom plate, the The beam and slab support frame includes a plurality of support frame uprights, each of which is connected and fixed by a plurality of support frame horizontal bars. An adjustable top support is provided on the top of the support frame upright, and the adjustable top support corresponds to the support frame upright one by one. A support portion for placing a support steel pipe is provided on the top of the adjustable top support, and the support steel pipe is arranged along the extension direction of the post-cast strip. A threaded rod is provided on the bottom of the adjustable top support, and a support member is threadedly connected to the threaded rod. The support member is supported on the top of the support frame upright, and the wooden formwork at the bottom of the beam and slab is supported on the support steel pipe. The wooden formwork is provided with a matching hole for the top of the PVC pipe to pass through.

[0007] Furthermore, the PVC concrete columns are evenly spaced along the extension direction of the post-cast strip.

[0008] Furthermore, the flow control sheet is a metal disc, and part of the metal disc is located inside the PVC tube and part of it is located outside the PVC tube.

[0009] Furthermore, the metal disc and the PVC tube are integrally formed by injection molding.

[0010] Furthermore, the thickness of the metal disc is 2 mm.

[0011] Furthermore, three flow control sheets are provided on the inner wall of the PVC pipe. Along the radial direction of the PVC pipe, two of the flow control sheets are located on one side of the PVC pipe cylindrical surface, and the other flow control sheet is located on the other side of the PVC pipe cylindrical surface.

[0012] Furthermore, each of the flow control sheets is located on the axis of the PVC pipe.

[0013] Furthermore, the supporting steel pipe is a round steel, and two round steels are placed in each supporting part.

[0014] Furthermore, the top of the concrete column is anchored to the beam slab through a plurality of first positioning steel bars, each of which is evenly spaced around the inner wall of the PVC pipe, and the first positioning steel bars are L-shaped and are arranged close to the inner wall of the PVC pipe.

[0015] Furthermore, the bottom of the concrete column is anchored to the base plate through a plurality of vertical second positioning steel bars, each of which is evenly spaced around the inner wall of the PVC pipe, and the second positioning steel bars are arranged close to the inner wall of the PVC pipe.

[0016] The utility model has the following beneficial effects:

[0017] 1. When concrete falls along the PVC pipe, the high-density particles in the concrete move quickly and segregation will occur. The utility model provides a beam and slab support structure at the post-casting strip, which uses PVC concrete columns as the post-casting strip support, and arranges flow control pieces on the PVC pipe. The flow control pieces slow down the flow rate of concrete, which can avoid the occurrence of concrete segregation, ensure the support stability of the PVC concrete column, and effectively support the post-casting strip.

[0018] 2. The utility model provides a beam-slab support structure at the post-casting strip, which adopts PVC concrete columns as the post-casting strip support, does not occupy a large amount of formwork and supporting materials, and is conducive to the turnover utilization of formwork and supporting materials.

[0019] 3. The beam-slab support structure at the post-casting strip provided by the utility model includes a beam-slab support and a post-casting strip support. The post-casting strip support adopts PVC concrete columns, and the beam-slab support adopts support frame vertical rods, support frame horizontal rods, adjustable top supports, and supporting steel pipes to support the wooden formwork at the bottom of the beam-slab. It not only has a simple structure, but also has a good supporting effect. It cooperates with the PVC concrete columns to form a stable beam-slab support structure at the post-casting strip.

[0020] 4. The beam and slab support structure at the post-casting zone provided by the utility model has a simple overall structure and provides space for workers and construction machinery to pass through. Construction waste and materials during the construction process can be cleaned up in a timely manner, ensuring the cleanliness and safety of the construction area and making the construction process smoother. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0022] Figure 1 A schematic diagram of a beam-slab support structure at a post-casting zone provided by an embodiment of the utility model;

[0023] Figure 2 The embodiment of the utility model provides Figure 1 Enlarged image in the upper right corner;

[0024] Figure 3 The embodiment of the utility model provides Figure 1 Enlarged image in the lower right corner;

[0025] Figure 4 A schematic diagram of a flow control sheet provided on a PVC pipe according to an embodiment of the utility model;

[0026] Figure 5 A schematic diagram of a flow control sheet provided in an embodiment of the utility model;

[0027] Figure 6 This is a schematic diagram of a flow control sheet provided in an embodiment of the utility model when laid flat.

[0028] In the figure: beam 1, bottom plate 2, support column 3, PVC pipe 4, flow control sheet 5, support frame vertical rod 6, support frame horizontal rod 7, adjustable top support 8, support steel pipe 9, support part 10, one end of the beam close to the post-cast strip 11, threaded rod 12, support member 13, wooden formwork 14, concrete column 15, first positioning steel bar 16, second positioning steel bar 17, wooden beam 18. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0030] In the description of the present invention, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0031] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features; in the description of the present utility model, unless otherwise specified, "several" means two or more.

[0032] like Figure 1-Figure 6The utility model provides a beam-slab support structure at a post-casting strip, including a beam-slab 1 at the post-casting strip and a bottom plate 2 (floor plate) at the post-casting strip, a support column 3 is arranged between the beam-slab 1 and the bottom plate 2, and an end 11 of the beam-slab 1 close to the post-casting strip is supported on the bottom plate 2 by a plurality of PVC concrete columns, and each of the PVC concrete columns is evenly spaced along the extension direction of the post-casting strip, and the extension direction of the post-casting strip is perpendicular to the direction of the computer screen, and the PVC concrete column includes a PVC pipe 4 and a concrete column 15 filled in the PVC pipe 4. According to actual needs, PVC The concrete column can be arranged under the beam of the beam slab 1 or under the board of the beam slab 1. The inner wall of the PVC pipe 4 is provided with a plurality of flow control pieces 5 for controlling the flow rate of concrete. When the concrete falls along the PVC pipe 4, the particles with high density in the concrete move fast and segregation will occur. The flow control pieces 5 are arranged on the PVC pipe 4. The flow control pieces 5 slow down the flow rate of the concrete, which can avoid the occurrence of concrete segregation and ensure the support stability of the PVC concrete column to effectively support the post-casting strip. The flow control pieces 5 are arranged at intervals in the vertical direction. A beam slab support is also arranged between the beam slab 1 and the bottom plate 2. The support frame includes a plurality of support frame uprights 6, each of the support frame uprights 6 is connected and fixed by a plurality of support frame horizontal bars 7, the connection between the support frame uprights 6 and the support frame horizontal bars 7 is connected by a fastener, the top of the support frame uprights 6 is provided with an adjustable top support 8, the adjustable top support 8 corresponds to the support frame uprights 6 one by one, the top of the adjustable top support 8 is provided with a support portion 10 for placing a support steel pipe 9, the support steel pipe 9 is arranged along the extension direction of the post-casting strip (perpendicular to the direction of the computer screen), and along the extension direction of the post-casting strip, the support steel pipe 9 is provided with a plurality of adjustable top supports 8. Support, each of the adjustable top supports 8 is arranged at intervals, a threaded rod 12 is provided at the bottom of the adjustable top support 8, a support member 13 is threadedly connected to the threaded rod 12, the support member 13 is supported on the top of the support frame upright 6, the lower end of the threaded rod 12 extends into the support frame upright 6, and the height of the adjustable top support 8 can be adjusted by adjusting the position of the support member 13 on the threaded rod 12. The structure is simple and the adjustment is convenient. The wooden template 14 at the bottom of the beam 1 is supported on the supporting steel pipe 9, and the wooden template 14 is provided with a matching hole for the top of the PVC pipe 4 to pass through, and the inner diameter of the matching hole is equal to the outer diameter of the PVC pipe 4. A plurality of wooden beams 18 can also be arranged below the wooden template 14, and each of the wooden beams 18 is arranged at intervals along the extension direction of the post-casting strip, and the wooden beams 18 are supported on the supporting steel pipe 9, and the wooden template 14 is supported on the wooden beams 18.

[0033] The PVC pipe 4 is erected together with the beam and slab support frame. The concrete column 15 is cast and formed integrally with the beam and slab 1. In actual construction, the PVC pipe 4 is first poured, and the concrete in the beam and slab 1 is poured after vibrating and compacting. According to actual needs, the top of the concrete column 15 (the contact position with the beam and slab) can be coated with anti-cracking mortar. After the concrete strength of the beam and slab is reached, the beam and slab support frame and the wooden formwork can be removed, and the PVC concrete column is retained. The post-casting strip is poured 60 days after the main structure is capped. After the post-casting strip is poured, it is cured for 28 days, and then the PVC concrete column is cut. The cut concrete column can be crushed by a crusher to make blocks for reuse.

[0034] The beam-slab support structure at the post-casting strip provided by the utility model includes a beam-slab support and a post-casting strip support. The post-casting strip support adopts PVC concrete columns, and the beam-slab support adopts support frame vertical rods, support frame horizontal rods, adjustable top supports, and support steel pipes to support the wooden formwork at the bottom of the beam-slab. It is not only simple in structure, but also has a good supporting effect. It cooperates with the PVC concrete column to form a stable beam-slab support structure at the post-casting strip. The beam-slab support structure at the post-casting strip provided by the utility model has a simple overall structure and space for workers and construction machinery to pass through. Construction waste and materials during the construction process can be cleaned up in time, ensuring the cleanliness and safety of the construction area, making the construction process smoother.

[0035] In this embodiment, the flow control sheet 5 is a metal disc, which is partially located inside the PVC tube 4 and partially located outside the PVC tube 4. The metal disc and the PVC tube 4 can be integrally formed by injection molding. The thickness of the metal disc is 2 mm. For the existing φ160 PVC tube, a metal disc with a diameter of 180 mm can be used, and for the existing φ225 PVC tube, a metal disc with a diameter of 240 mm can be used. Figure 4 Three flow control pieces 5 are arranged on the inner wall of the PVC pipe 4. Along the radial direction of the PVC pipe 4, two of the flow control pieces 5 are located on one side of the cylindrical surface of the PVC pipe 4, and the other flow control piece 5 is located on the other side of the cylindrical surface of the PVC pipe 4. Each of the flow control pieces 5 is located on the axis of the PVC pipe 4, and the flow control piece 5 occupies a sufficient area on the horizontal cross section of the PVC pipe 4 to ensure that the flow control piece 5 can effectively prevent the rapid fall of concrete.

[0036] In this embodiment, the supporting steel pipe 9 is a round steel, and two round steels are placed in each supporting portion 10. In this embodiment, the top of the concrete column 15 is anchored to the beam slab 1 through a plurality of first positioning steel bars 16, each of which is evenly spaced around the inner wall of the PVC pipe 4, and the first positioning steel bars 16 are L-shaped, and the first positioning steel bars 16 are arranged close to the inner wall of the PVC pipe 4. Figure 2In the embodiment, the horizontal section length of the first positioning steel bar 16 in the beam slab 1 is 150 mm, and the vertical section length of the first positioning steel bar 16 in the PVC pipe 4 is 300 mm. The first positioning steel bar 16 can increase the bending resistance of the top of the PVC concrete column and ensure the stability of the top of the PVC concrete column. The first positioning steel bar 16 can be welded to the steel structure of the beam slab 1 to improve the stability of the first positioning steel bar 16 and further improve the stability of the top of the PVC concrete column. In this embodiment, the bottom of the concrete column 15 is anchored to the base plate 2 through a plurality of vertical second positioning steel bars 17. Each of the second positioning steel bars 17 is evenly spaced around the inner wall of the PVC pipe 4, and the second positioning steel bars 17 are arranged close to the inner wall of the PVC pipe 4. Figure 3 In the figure, the length of the second positioning steel bar 17 in the bottom plate 2 is 100 mm, and the vertical length of the second positioning steel bar 17 extending into the PVC pipe 4 is 150 mm. The second positioning steel bar 17 can position the bottom of the PVC pipe 4, and the second positioning steel bar 17 can be pre-buried when the bottom plate 2 is poured.

[0037] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.

[0038] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A beam-slab support structure at a post-casting strip, comprising a beam-slab at a post-casting strip and a bottom plate at a post-casting strip, wherein a support column is provided between the beam-slab and the bottom plate, and characterized in that: One end of the beam slab close to the post-casting strip is supported on the bottom plate by a plurality of PVC concrete columns, each of which is arranged at intervals along the extension direction of the post-casting strip, and the PVC concrete columns include a PVC pipe and a concrete column filled in the PVC pipe. The inner wall of the PVC pipe is provided with a plurality of flow control sheets for controlling the flow rate of concrete, and each of the flow control sheets is arranged at intervals along the vertical direction. A beam slab support frame is also provided between the beam slab and the bottom plate, and the beam slab support frame includes a plurality of support frame uprights, and each of the support frame uprights is connected and fixed by a plurality of support frame horizontal bars. An adjustable top support is provided at the top of the support frame upright, and the adjustable top support corresponds to the support frame upright one by one. A support portion for placing a supporting steel pipe is provided at the top of the adjustable top support, and the supporting steel pipe is arranged along the extension direction of the post-casting strip. A threaded rod is provided at the bottom of the adjustable top support, and a support member is threadedly connected to the threaded rod, and the support member is supported on the top of the support frame upright, and the wooden formwork at the bottom of the beam slab is supported on the supporting steel pipe, and a matching hole for the top of the PVC pipe to pass through is opened on the wooden formwork.

2. The beam-slab support structure at the post-cast zone according to claim 1, characterized in that: The PVC concrete columns are evenly spaced along the extension direction of the post-cast strip.

3. The beam-slab support structure at the post-cast zone according to claim 1, characterized in that: The flow control sheet is a metal disc, and part of the metal disc is located inside the PVC tube and part of the metal disc is located outside the PVC tube.

4. The beam-slab support structure at the post-cast zone as claimed in claim 3, characterized in that: The metal disc and the PVC tube are integrally formed by injection molding.

5. The beam-slab support structure at the post-cast zone as claimed in claim 3, characterized in that: The thickness of the metal disc is 2 mm.

6. The beam-slab support structure at the post-cast zone according to claim 1, characterized in that: Three flow control sheets are arranged on the inner wall of the PVC pipe. Along the radial direction of the PVC pipe, two of the flow control sheets are located on one side of the PVC pipe cylindrical surface, and the other flow control sheet is located on the other side of the PVC pipe cylindrical surface.

7. The beam-slab support structure at the post-cast zone according to claim 1, characterized in that: Each of the flow control sheets is located on the axis of the PVC pipe.

8. The beam-slab support structure at the post-cast zone according to claim 1, characterized in that: The supporting steel pipe is a round steel pipe, and two round steel pipes are placed in each supporting part.

9. The beam-slab support structure at the post-cast zone according to claim 1, characterized in that: The top of the concrete column is anchored to the beam slab via a plurality of first positioning steel bars, each of which is evenly spaced around the inner wall of the PVC pipe. The first positioning steel bars are L-shaped and are arranged close to the inner wall of the PVC pipe.

10. The beam-slab support structure at the post-cast zone according to claim 1, characterized in that: The bottom of the concrete column is anchored to the base plate through a plurality of vertical second positioning steel bars, each of which is evenly spaced around the inner wall of the PVC pipe, and the second positioning steel bars are arranged close to the inner wall of the PVC pipe.

Citation Information

Cited By

  • Post-cast strip independent supporting system

    CN223190043U