Outer wall screw hole plugging tool
By designing the combined tool of the driving body, discharge pipe, nozzle and scraper, the problem of filling and overflowing of the screw hole in the exterior wall is solved, efficient sealing and reuse are achieved, the production cost is reduced, and it meets the requirements of human body mechanics.
Patent Information
- Application Number
- CN202422080988.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-08-27
AI Technical Summary
Existing external wall screw hole sealing tools can easily cause the filling material to overflow during the filling process, affecting work efficiency, and the recycling and reuse costs are high.
A tool is designed that includes a driving body, a discharge pipe, a nozzle, a storage box and a scraper. The design of the scraper enables simultaneous filling and scraping, and the detachable connecting block and protective pad improve the convenience of use. and cost-effectiveness.
It improves work efficiency, reduces production costs, achieves efficient sealing and reuse of fillers, and meets human body mechanics requirements.
Smart Images

Figure CN221799306U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction equipment, in particular to a tool for plugging screw holes in external walls. Background Art
[0002] During the construction of high-rise buildings, when the concrete shear wall is fixed with formwork, it is necessary to use through-wall screws for tensioning and fixing. In order to save costs, the through-wall screws of the external shear wall are all sleeved to facilitate the recovery of the through-wall screws. The sleeve hole left by the recovery of the through-wall screws is the screw hole. After the construction is completed, the screw hole needs to be blocked.
[0003] When the existing external wall screw hole plugging tool is used to fill and plug the screw hole, a large amount of filler will overflow from the screw hole. At this time, the staff needs to scrape it off with a scraper, which will affect the staff's work efficiency. To this end, we propose an external wall screw hole plugging tool. Utility Model Content
[0004] In view of the deficiencies in the prior art, the utility model provides an external wall screw hole plugging tool to solve the above-mentioned problems.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] A tool for sealing screw holes in exterior walls, comprising a driving body, wherein the driving body is provided with a discharge pipe and connected to a feeding screw rod inside the discharge pipe, a nozzle is connected to one end of the discharge pipe away from the driving body, a storage box for storing filling materials is installed on the driving body, a first connecting block is fixedly connected to the lower part of the discharge pipe, both sides of the first connecting block are connected to a detachable second connecting block, the second connecting block is connected to a storage plate, the storage plate is composed of an arc plate and two symmetrically inclined rectangular plates, the two ends of the arc plate on the storage plate are respectively fixedly connected to two symmetrically inclined rectangular plates, the two rectangular plates of the storage plate are respectively fixedly connected to the bottoms of the two second connecting blocks, the arc plate of the storage plate is connected to a scraper, and the scraper is arranged at one end of the storage plate close to the nozzle.
[0007] Two limit slots are symmetrically provided on the two side walls of the first connection block corresponding to the two second connection blocks, and limit blocks are fixedly installed on the side walls of the two second connection blocks close to each other, and the length of the limit blocks is less than the length of the limit slots.
[0008] The limit slot is a triangular groove with a downward slanting cross section, the limit block is an elastic block with a triangular cross section slanting downward, and the shape and size of the limit block are adapted to the shape and size of the inside of the limit slot, and the limit block can be movably connected to the inside of the corresponding limit slot.
[0009] The scraper is a curved plate.
[0010] A protective pad is fixedly connected to the lower part of the upper outer wall of the discharge pipe. The protective pad is an elastic block with a semicircular cross section. The protective pad is provided with a plurality of grooves with arc cross sections. Compared with the prior art, the utility model provides a plugging tool for screw holes in external walls, which has the following beneficial effects:
[0011] 1. When the utility model is in use, after the screw hole is filled and blocked by the cooperation of the driving body, the discharge pipe, the nozzle and the storage box, since the front end of the scraper is close to the output port of the nozzle, during the filling process, the scraper can receive the filler that accidentally flows out, and after the filling is completed, the filling material overflowing from the screw hole can be scraped off by the front end of the scraper, so that the filling and scraping can be carried out simultaneously, which greatly improves the work efficiency.
[0012] 2. The utility model can achieve the effect of installation and disassembly of the material storage plate by setting the second connecting block and the limit block. When in use, the filling material scraped off by the scraper can be stored inside the material storage plate. When the material storage plate is disassembled, the material can be put back into the material storage box for secondary use, which greatly reduces the production cost and saves energy and is environmentally friendly.
[0013] 3. The utility model can facilitate the staff to hold one end of the discharge pipe by installing a protective pad on the discharge pipe and providing a groove on the protective pad, thereby conforming to human ergonomics and making it convenient for the staff to use the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the structure of the utility model;
[0015] Figure 2 It is a partial structure diagram of the utility model Figure 1 (exploded image);
[0016] Figure 3 It is a partial structure diagram of the utility model Figure 2 (Exploded image).
[0017] In the figure: 1. driving body; 2. discharge pipe; 3. nozzle; 4. storage box; 5. first connecting block; 6. limit slot; 7. second connecting block; 8. limit block; 9. storage plate; 10. scraper; 11. protective pad. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] See also Figure 1-Figure 3 A tool for plugging screw holes in exterior walls comprises a driving body 1, the driving body 1 is provided with a discharge pipe 2 and connected to a feeding screw rod inside the discharge pipe 2, a nozzle 3 is connected to the end of the discharge pipe 2 away from the driving body 1, a storage box 4 for storing filling materials is installed on the driving body 1, and the driving body 1, the discharge pipe 2, the feeding screw rod inside the discharge pipe 2, and the storage box 4 are the horizontal screw conveyor structures of the prior art.
[0020] The lower part of the discharge pipe 2 is fixedly connected to a first connecting block 5, and both sides of the first connecting block 5 are connected to a detachable second connecting block 7, and the second connecting block 7 is connected to a storage plate 9, and the storage plate 9 is composed of an arc plate and two symmetrically inclined rectangular plates, and the two ends of the arc plate on the storage plate 9 are respectively fixedly connected to the two symmetrically inclined rectangular plates, and the two rectangular plates of the storage plate 9 are respectively fixedly connected to the bottoms of the two second connecting blocks 7, and the arc plate of the storage plate 9 is connected to a scraper 10, and the scraper 10 is arranged at one end of the storage plate 9 close to the nozzle 3.
[0021] The two second connecting blocks 7 and the material storage plate 9 are both made of elastic materials.
[0022] The width of the opening on the material storage plate 9 is greater than the width of the first connecting block 5 , so the first connecting block 5 can enter the interior of the material storage plate 9 .
[0023] Two limiting slots 6 are symmetrically provided on the two side walls of the first connecting block 5 corresponding to the two second connecting blocks 7, and the limiting blocks 8 are fixedly installed on the side walls of the two second connecting blocks 7 that are close to each other. The length of the limiting block 8 is less than the length of the limiting slot 6. After the second connecting block 7 is connected to the first connecting block 5, the limiting block 8 can slide in the limiting slot 6, so that the second connecting block 7 drives the scraper 10 to move along the axial direction of the discharge pipe 2 through the storage plate 9. When the nozzle 3 sprays the filler into the screw hole, the nozzle 3 sometimes needs to extend into the screw hole for a distance. At this time, the scraper 10 slides backward and presses against the wall to receive the leaked filler; when the nozzle 3 is pulled out and the scraper 10 is needed to scrape off the excess filler at the hole, the scraper 10 can be manually slid flush with the end of the nozzle 3 to perform the scraping action.
[0024] Specifically, the limit slot 6 is a triangular groove with a downward slanting cross section, the limit block 8 is an elastic block with a triangular cross section with a downward slanting cross section, and the shape and size of the limit block 8 are adapted to the shape and size of the inside of the limit slot 6, and the limit block 8 can be movably connected to the inside of the corresponding limit slot 6.
[0025] The scraper 10 is an arc-shaped plate to facilitate flow diversion.
[0026] A protective pad 11 is fixedly connected below the upper outer wall of the discharge pipe 2 . The protective pad 11 is an elastic block with a semicircular ring section. The protective pad 11 is provided with a plurality of grooves with arc-shaped cross sections.
[0027] The working process of the utility model is:
[0028] When the two second connection blocks 7 are in contact with the first connection block 5, the second connection blocks 7 begin to be deformed under the force. When the position of the two limit blocks 8 corresponds to the position of the limit slot 6, the limit blocks 8 enter the limit slot 6 under the influence of the elastic force of the second connection blocks 7. At this time, the material storage plate 9 can be loosened, and the two limit blocks 8 will be engaged with the inside of the limit slot 6 under the influence of the gravity of the material storage plate 9 itself, thereby completing the installation of the material storage plate 9. When it is necessary to disassemble the material storage plate 9, it is only necessary to push the material storage plate 9 upward again until the first connection block 5 enters the inside of the material storage plate 9, and the second connection block 7 is deformed again to make the limit block 8 disengage from the inside of the limit slot 6, and then push the material storage plate 9 toward the direction of the nozzle 3 until the two second connection blocks 7 are separated from the first connection block 5, so as to achieve the disassembly of the material storage plate 9.
[0029] When in use, after the screw hole is filled and sealed by the cooperation of the driving body 1, the discharge pipe 2, the nozzle 3 and the storage box 4, the front end of the sliding scraper 10 is aligned with the output port of the nozzle 3, the device can be lifted up, and the filling material overflowing from the screw hole can be scraped off by the front end of the scraper 10, so that the filling and scraping can be carried out simultaneously, which greatly improves the work efficiency.
[0030] By installing the protective pad 11 on the discharge pipe 2 and the groove formed on the protective pad 11 , it is convenient for the staff to hold one end of the discharge pipe 2 , which conforms to human ergonomics and makes it convenient for the staff to use the device.
Claims
1. A plugging tool for screw holes in external walls, comprising a driving body (1), the driving body (1) being provided with a discharge pipe (2) and connected to a feeding screw rod inside the discharge pipe (2), the discharge pipe (2) being connected to a nozzle (3) at one end thereof away from the driving body (1), the driving body (1) being provided with a storage box (4) for storing filling materials, characterized in that: The lower part of the discharge pipe (2) is fixedly connected to a first connecting block (5), and both sides of the first connecting block (5) are connected to detachable second connecting blocks (7), and the second connecting block (7) is connected to a material storage plate (9), and the material storage plate (9) is composed of an arc plate and two symmetrically inclined rectangular plates, and the two ends of the arc plate on the material storage plate (9) are respectively fixedly connected to the two symmetrically inclined rectangular plates, and the two rectangular plates of the material storage plate (9) are respectively fixedly connected to the bottoms of the two second connecting blocks (7), and the arc plate of the material storage plate (9) is connected to a scraper (10), and the scraper (10) is arranged at one end of the material storage plate (9) close to the nozzle (3).
2. The external wall screw hole plugging tool according to claim 1, characterized in that: Two limit slots (6) are symmetrically provided on the two side walls of the first connection block (5) corresponding to the two second connection blocks (7); a limit block (8) is fixedly mounted on the side walls of the two second connection blocks (7) close to each other; the length of the limit block (8) is less than the length of the limit slot (6).
3. The external wall screw hole plugging tool according to claim 2, characterized in that: The limit slot (6) is a groove with a triangular cross section that is inclined downward, and the limit block (8) is an elastic block with a triangular cross section that is inclined downward. The shape and size of the limit block (8) are compatible with the shape and size of the inside of the limit slot (6), and the limit block (8) can be movably engaged in the inside of the corresponding limit slot (6).
4. The external wall screw hole plugging tool according to claim 1, characterized in that: The scraper (10) is a curved plate.
5. The external wall screw hole plugging tool according to claim 1, characterized in that: A protective pad (11) is fixedly connected below the upper outer wall of the discharge pipe (2); the protective pad (11) is an elastic block with a semicircular ring cross section; and the protective pad (11) is provided with a plurality of grooves with arc-shaped cross sections.