Tunnel arrangement structure for accelerating construction progress of factory roof construction adit
By setting up a construction connection hole in the middle of the construction branch tunnel on the factory roof for two-way excavation, and using the factory exploration tunnel as a passage, the problem of long construction period caused by one-way excavation was solved, and the construction progress of the factory roof was accelerated and the underground factory was advanced. It was completed and produced significant economic benefits.
Patent Information
- Application Number
- CN202420573665.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-03-22
AI Technical Summary
In the existing technology, the one-way excavation method for supporting tunnels on the roof of the plant results in a long construction period for the underground powerhouse, which affects the power generation schedule and economic benefits.
Design a tunnel layout structure, including the plant exploration adit and construction connecting hole. Two-way excavation is carried out through the intersection of the construction connecting hole and the middle part of the plant roof construction branch tunnel to increase the construction surface. The plant exploration adit is used as a construction channel and slag discharge. For the passage, the city gate hole-shaped section should be set appropriately to withstand the pressure of the surrounding rock.
It effectively accelerated the progress of the construction of branch holes on the roof of the plant, completed the construction of the underground plant ahead of schedule, saved 3 to 6 months of construction period, advanced the power generation period and produced significant economic benefits. At the same time, the exploration adit was used to achieve multiple uses in one hole, saving investment.
Smart Images

Figure CN221799791U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy and hydropower, in particular to a tunnel arrangement structure for accelerating the construction progress of a branch tunnel on a plant roof. Background Art
[0002] The power plant in the water conservancy and hydropower industry is the central mechanism for energy conversion. Due to the limitations of terrain and geological conditions, the underground plant solution is a common choice. The construction of the underground plant is usually located on the key route of the entire power station construction period. The advance of the construction progress of the underground plant can advance the power generation period. For large and medium-sized power stations, if the construction period is advanced by one month, it can generate tens of millions of revenues, and the economic benefits are very obvious. It is usually necessary to excavate the plant roof construction branch tunnel first, and then construct the underground plant after the plant roof construction branch tunnel is excavated. However, at present, the excavation of the plant roof construction branch tunnel mostly adopts a one-way excavation from one end of the plant roof construction branch tunnel to the other end, which leads to a longer construction period for the underground plant. Utility Model Content
[0003] The technical problem to be solved by the utility model is: in view of the above existing problems, a tunnel arrangement structure is provided to accelerate the construction progress of the branch tunnel on the factory roof.
[0004] The technical solution adopted by the utility model is: a tunnel arrangement structure for accelerating the construction progress of the plant roof construction branch tunnel, characterized in that it includes:
[0005] The factory building exploration adit is used to provide a construction channel for excavation and slag removal;
[0006] At least one construction connection hole is provided between the plant roof construction branch hole and the plant building exploration flat hole, and two ends of the construction connection hole are respectively connected to the side wall of the plant building exploration flat hole and the side wall of the middle part of the plant roof construction branch hole.
[0007] Through the above-mentioned technical means, the two ends of the construction connecting tunnel are respectively connected to the plant roof construction branch tunnel and the factory building exploration flat tunnel. The construction connecting tunnel forms an intersection at the connection between it and the middle part of the plant roof construction branch tunnel. Bidirectional excavation is carried out along the axis of the plant roof construction branch tunnel at the intersection. The idle factory building exploration flat tunnel is used as the construction connection tunnel and the plant roof construction branch tunnel excavation and slag discharge construction channel. With the help of the construction connecting tunnel, the construction surface of the plant roof construction branch tunnel is increased, and the excavation progress of the plant roof construction branch tunnel is accelerated. The early completion of the plant roof construction branch tunnel means that the excavation progress of the underground factory building is further accelerated, so that the underground factory building can be put into use as soon as possible to generate economic benefits.
[0008] In some embodiments, the cross-sections of the factory building exploration tunnel and the construction connection tunnel are both in the shape of a city gate tunnel.
[0009] Through the above-mentioned technical means, the setting of the city gate tunnel type can better withstand the surrounding rock pressure, adapt to the deformation of the surrounding rock, and help reduce problems such as landslides and cracks that may occur during tunnel excavation.
[0010] In some embodiments, the maximum average longitudinal slope of the construction connection hole is 10%.
[0011] The beneficial effects of the utility model are:
[0012] 1. Excavate the middle part of the plant roof construction branch tunnel through the construction connection hole, and form a construction intersection in the middle part of the plant roof construction branch tunnel. The plant roof construction branch tunnel can be excavated in both directions at the intersection. Compared with the traditional plant roof construction branch tunnel that adopts a single working face excavation method from one end to the other end, this technical solution adds two working faces, thereby effectively speeding up the progress of the plant roof construction branch tunnel. The early completion of the plant roof construction branch tunnel can enable the underground plant building connected to it to be constructed in advance. The use of this structure can save 3 to 6 months of construction period, and the early completion of the underground plant building can advance the power generation period and produce greater economic benefits.
[0013] 2. The plant exploration flat tunnel is used as a construction channel and slag discharge channel between the construction connection tunnel and the plant roof construction branch tunnel. The plant exploration flat tunnel is a geological exploration tunnel arranged to ascertain the geological conditions. It has been completed before the project starts. The use of the plant exploration flat tunnel can achieve multiple uses of one tunnel and save investment.
[0014] 3. Flexible construction of the excavation of the plant roof construction branch hole is carried out through the construction connection hole. According to the actual structural conditions, before the plant roof construction branch hole is constructed from the hole mouth to the intersection with the construction connection hole, the construction connection hole is used as a channel to carry out excavation and support construction of the plant roof construction branch hole. The full-section excavation can be selected, or only the guide hole can be excavated. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the plan layout structure of this application.
[0016] Figure 2 yes Figure 1 Schematic cross-sectional view along AA direction.
[0017] Description of reference numerals:
[0018] 1. Construction branch tunnel on the factory roof; 2. Construction connection tunnel; 3. Factory building exploration tunnel; 4. Underground factory building. DETAILED DESCRIPTION
[0019] In order to enable those skilled in the art to better understand the technical solution of the present utility model, the technical solution of the present utility model is further described below in conjunction with specific embodiments.
[0020] Combination Figure 1and Figure 2 As shown, this embodiment is a tunnel arrangement structure for accelerating the construction progress of the plant roof construction branch tunnel, including a plant building exploration flat tunnel 3 and at least one construction connection tunnel 2. The plant roof construction branch tunnel 1 is a necessary passage for the construction of the underground plant building 4. The advance of the construction progress of the plant roof construction branch tunnel 1 can correspondingly bring about the advance of the construction progress of the plant building. One end of the plant roof construction branch tunnel 1 serves as its own excavation entrance, and the other end of the plant roof construction branch tunnel 1 is connected to the underground plant building 4. Specifically, the top arch of the plant roof construction branch tunnel 1 and the top arch of the underground plant building 4 are flatly connected.
[0021] A plant exploration flat tunnel 3 is provided above the top arch of the underground plant 4, and the distance between the plant exploration flat tunnel 3 and the top arch of the underground plant 4 is usually 30m to 40m. Specifically, the structure of the plant exploration flat tunnel 3 is a city gate tunnel type, and the cross-section is generally 3m×3m, which meets the needs of excavation construction and slag discharge. The plant exploration flat tunnel 3 is a geological exploration hole arranged in the feasibility study stage of the underground power plant to ascertain the geological conditions. It has been completed before the start of the project and serves as a construction channel for the construction connection hole 2. One hole has multiple uses, saving investment.
[0022] A construction connection tunnel 2 is provided between the plant roof construction branch tunnel 1 and the plant building exploration flat tunnel 3. The first end of the construction connection tunnel 2 is connected to the side wall at the middle position of the plant building exploration flat tunnel 3. The first end of the construction connection tunnel 2 forms an intersection with the connection of the plant building exploration flat tunnel 3. The second end of the construction connection tunnel 2 is connected to the side wall at the middle position of the plant roof construction branch tunnel 1. The second end of the construction connection tunnel 2 forms an intersection with the connection of the plant roof construction branch tunnel 1. Usually, the intersection at the first end of the construction connection tunnel 2 is the starting point, and the intersection at the second end of the construction connection tunnel 2 is the end point. The maximum average longitudinal slope of the construction connection tunnel 2 is controlled to be about 10% as a whole to facilitate construction and transportation. According to actual conditions, the starting point and end point of the construction connection tunnel 2 are determined according to the height difference between the plant building exploration flat tunnel 3 and the plant roof construction branch tunnel 1. At the same time, the end point of the construction connection tunnel 2 should be as close as possible to the underground plant 4 to make full use of the time difference from the plant roof construction branch tunnel 1 to the intersection section. Specifically, the structure of the construction connection tunnel 2 is a city gate tunnel type, and the cross-section of the construction connection tunnel 2 is consistent with the cross-section of the factory building exploration tunnel 3, which is generally 3m×3m, meeting the needs of excavation construction and slag discharge.
[0023] Through the construction passage of the plant building exploration flat tunnel 3 and the construction connection tunnel 2, it can be excavated before the excavation of the plant roof construction branch tunnel 1. Before the plant roof construction branch tunnel 1 is constructed from the excavation hole to the intersection with the construction connection hole 2, the construction connection hole 2 is used as a channel to excavate and support the plant roof construction branch tunnel 1. It can be a full-section excavation, or it can be a guide hole excavation. With the help of the intersection where the plant roof construction branch tunnel 1 and the construction connection hole 2 are connected, two-way simultaneous construction is carried out along the axis of the plant roof construction branch tunnel 1 at the intersection. Compared with the excavation of the plant roof construction branch tunnel 1 from a single working face at the excavation hole, this method has two additional working faces, which can effectively speed up the progress of the plant roof construction branch tunnel 1, and generally save 3 to 6 months of construction period, thereby speeding up the construction progress of the underground power plant, bringing the power generation period forward, and thus generating significant economic benefits.
[0024] On the one hand, the plant roof construction branch tunnel 1 can be used as a construction passage for the underground power plant roof arch during the construction period. On the other hand, the plant roof construction branch tunnel 1 can be used as a ventilation, smoke exhaust passage and safety exit for the underground power plant during the operation period, effectively improving the air quality of the underground cavern during the construction period, thereby enabling the plant roof construction branch tunnel 1 to achieve a permanent and temporary combination effect.
[0025] The above are all preferred embodiments of the present utility model, and are not intended to limit the protection scope of the present utility model. Therefore, any equivalent changes made based on the structure, shape, and principle of the present utility model should be included in the protection scope of the present utility model.
Claims
1. A tunnel layout structure for accelerating the construction progress of a branch tunnel on a plant roof, characterized in that: include: Plant exploration adit (3) is used to provide a construction channel for excavation and slag removal; At least one construction connection hole (2) is provided between the plant roof construction branch hole (1) and the plant building exploration flat hole (3), and the two ends of the construction connection hole (2) are respectively connected to the side wall of the plant building exploration flat hole (3) and the side wall of the middle part of the plant roof construction branch hole (1).
2. A tunnel arrangement structure for accelerating the construction progress of a branch tunnel on the factory roof according to claim 1, characterized in that: The cross sections of the factory building exploration tunnel (3) and the construction connection tunnel (2) are both in the shape of a city gate tunnel.
3. A tunnel arrangement structure for accelerating the construction progress of a branch tunnel on a plant roof according to any one of claims 1 to 2, characterized in that: The maximum average longitudinal slope of the construction connection hole (2) is 10%.