Industrial furnace with preheating utilization structure

By installing a transmission pipe, a gas impurity filter cartridge, a particle filter cartridge, an air extraction pump and a preheating box in the industrial furnace, and using the inner layer of glass fiber insulation to store the waste heat of the flue gas, the energy waste and waste caused by the lack of preheating utilization structure of the industrial furnace is solved. The problem of increased cost is achieved, and the efficient use of flue gas filtration and material preheating is achieved.

CN221802503UInactive Publication Date: 2024-10-01HUBEI HONGCHENG ECOLOGICAL ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323669753.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-30
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing industrial furnaces lack a preheating utilization structure, resulting in energy waste and increased production costs, requiring more fuel to be consumed for heating and waste gas treatment.

Method used

An industrial furnace structure including a transmission pipe, a gas impurity filter cartridge, a particle filter cartridge, an air extraction pump and a preheating box is designed. The flue gas is extracted for filtration and waste heat recovery, and the glass fiber insulation inner layer is used to store and reuse the flue gas. The waste heat is used to preheat the material.

Benefits of technology

Effectively filters impurities in flue gas, reduces energy waste, lowers production costs, and improves production efficiency and corporate profitability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221802503U_ABST
    Figure CN221802503U_ABST
Patent Text Reader

Abstract

The utility model provides an industrial furnace with a preheating utilization structure, which comprises an industrial furnace main body, furnace doors and an exhaust valve, the two furnace doors are arranged on the front side of the industrial furnace main body, the exhaust valve is arranged on the right side above the industrial furnace main body, and a transmission pipe is connected above the exhaust valve. Compared with the prior art, the industrial furnace flue gas purification device has the advantages that by arranging the conveying pipe, the gas impurity filter cylinder, the particle filter cylinder, the fixed circular plate, the hexagonal hole, the glass fiber filter plate, the exhaust pipe and the exhaust pump, flue gas generated by an industrial furnace can be extracted, impurities such as smoke dust and particles in the flue gas can be filtered, flue gas pollution is prevented, waste heat in the filtered flue gas is convenient to recycle, and the industrial furnace flue gas purification device is suitable for industrial production. Through the arrangement of the preheating box and the heat preservation inner layer, waste heat recovered by flue gas can enter the preheating box, the heat preservation inner layer can slow down the speed of temperature loss, heat preservation is conducted on the interior of the preheating box, and then a material needing to be preheated can be placed in the preheating box to be preheated through the recovered flue gas waste heat.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of industrial furnaces, and particularly relates to an industrial furnace with a preheating utilization structure. Background Art

[0002] An industrial furnace is a device used to produce, process or handle raw materials and finished products, usually using high temperatures to achieve thermal processing, melting, solidification, etc. However, under current technical conditions, industrial furnaces do not have a preheating utilization structure, which makes the problem of energy waste very serious.

[0003] Energy waste: Since some industrial furnaces do not have a preheating utilization structure, part of the heat generated by the industrial furnace during the combustion process is discharged into the exhaust gas, resulting in energy waste. In many production processes, the materials in the furnace need to reach a certain temperature before subsequent processing, and industrial furnaces without a preheating utilization structure need to consume more fuel to heat the materials, resulting in energy waste.

[0004] Increased production costs: For some high-temperature materials required by some production processes, if the industrial furnace does not have a preheating utilization structure, the cost of the production process will increase. Because more energy costs need to be consumed, and the cost of treating waste gas will also increase, which will reduce the cost of production and have an adverse impact on the company's profitability.

[0005] In summary, the disadvantages of the industrial furnace in the prior art that does not have a preheating utilization structure mainly include energy waste and increased production costs. In order to solve this problem, we have developed an industrial furnace with a preheating utilization structure. Utility Model Content

[0006] In view of the deficiencies in the prior art, the utility model aims to provide an industrial furnace with a preheating utilization structure to solve the problems raised in the above-mentioned background technology.

[0007] The utility model is realized by the following technical scheme: an industrial furnace with a preheating utilization structure, comprising: an industrial furnace body, a furnace door and an exhaust valve, two furnace doors are installed on the front of the industrial furnace body, an exhaust valve is installed on the right side above the industrial furnace body, and a transmission pipe is connected above the exhaust valve;

[0008] An air filter cartridge is arranged above the right side of the transmission pipe, a particle filter cartridge is arranged on the right side of the air filter cartridge, an air extraction pipe is arranged on the right side of the particle filter cartridge, an air extraction pump is connected to the lower right side of the air extraction pipe, a preheating box is installed below the air extraction pump, and a heat-insulating inner layer is installed around the inside of the preheating box;

[0009] A fixed circular plate is installed inside the air-impurity filter cartridge, and a plurality of hexagonal holes are formed on the left and right surfaces of the fixed circular plate. A glass fiber filter plate is installed inside the particle filter cartridge. Under the action of the vacuum pump, the flue gas inside the industrial furnace body can enter the air-impurity filter cartridge through the transmission pipe, and then the flue gas passes through the plurality of hexagonal holes to filter out larger impurities and particles therein. The filtered flue gas enters the particle filter cartridge and passes through the glass fiber filter plate to finely filter smaller particles and impurities mixed in the flue gas.

[0010] As a preferred embodiment, a connecting hole is opened through the middle of the left side of the air filter cartridge, a connecting inner ring is installed in the middle of the right side of the particle filter cartridge, and a movable outer ring is arranged on the left side of the upper end of the exhaust pipe.

[0011] As a preferred embodiment, the outer wall of the right end of the transmission pipe, the outer wall of the left end of the particle filter cartridge and the outer wall of the right end of the connecting inner ring are all provided with threads, and the inner wall of the connecting hole, the inner wall of the right end of the air filter cartridge and the inner wall of the movable outer ring are all provided with internal thread grooves.

[0012] As a preferred embodiment, a limiting ring is arranged inside the movable outer ring, the limiting ring is fixed to the air extraction pipe, and the diameter length of the limiting ring is greater than the diameter length of the right side of the movable outer ring.

[0013] As a preferred embodiment, the movable outer ring is connected to the connecting inner ring by a threaded rotation, the left end of the transmission pipe is connected to the connecting hole by a threaded rotation, and the left ends of the air filter cartridge and the particle filter cartridge are connected by a threaded rotation. The threaded rotation connection method can facilitate the disassembly and installation of the air filter cartridge and the particle filter cartridge.

[0014] As a preferred embodiment, three legs are installed under the main body of the industrial furnace, the exhaust pipe of the vacuum pump is connected to the inside of the preheating box, the insulation inner layer is made of glass fiber, the waste heat of the flue gas can enter the preheating box and be stored through the insulation inner layer, and the glass fiber material has good thermal insulation effect.

[0015] As a preferred embodiment, a central placement plate is installed in the middle of the preheating box, and a plurality of ventilation holes are opened through the upper and lower surfaces of the central placement plate. A box door is installed on the front of the preheating box through a hinge.

[0016] After adopting the above technical scheme, the beneficial effects of the utility model are as follows: by arranging a transmission pipe, an air filter cartridge, a particle filter cartridge, a fixed circular plate, a hexagonal hole, a glass fiber filter plate, an exhaust pipe and an exhaust pump, the flue gas generated by the industrial furnace can be extracted, and the smoke, particulate matter and other impurities therein can be filtered and treated to prevent flue gas pollution. The waste heat in the filtered flue gas is convenient for reuse. By arranging a preheating box and an insulating inner layer, the waste heat recovered from the flue gas can enter the preheating box. The insulating inner layer can slow down the rate of temperature loss and keep the preheating box warm. Then, the material to be preheated can be placed inside the preheating box to preheat the material by the recovered flue gas waste heat. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0018] Figure 1 The utility model is a schematic diagram of the overall structure of an industrial furnace with a preheating and utilization structure.

[0019] Figure 2 It is a schematic diagram of the front view of the inside of a gas impurity filter cartridge and a particle filter cartridge in an industrial furnace with a preheating utilization structure according to the utility model.

[0020] Figure 3 The utility model is a structural schematic diagram of a fixed circular plate in an industrial furnace with a preheating utilization structure.

[0021] Figure 4 It is a schematic diagram of a front view of the interior of a preheating box in an industrial furnace with a preheating utilization structure according to the utility model.

[0022] In the figure, 100-industrial furnace body, 200-furnace door, 300-support leg, 400-exhaust valve, 500-transmission pipe, 600-air filter cartridge, 700-particle filter cartridge, 800-exhaust pipe, 900-exhaust pump, 110-preheating box, 120-box door, 130-fixed circular plate, 140-glass fiber filter plate, 150-hexagonal hole, 160-insulation inner layer, 170-center placement plate. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] See also Figures 1 to 4 The utility model provides a technical solution: an industrial furnace with a preheating utilization structure, comprising: an industrial furnace body 100, a furnace door 200 and an exhaust valve 400, two furnace doors 200 are installed on the front of the industrial furnace body 100, an exhaust valve 400 is installed on the right side above the industrial furnace body 100, and a transmission pipe 500 is connected above the exhaust valve 400;

[0025] An air filter cartridge 600 is arranged above the right side of the transmission pipe 500, a particle filter cartridge 700 is arranged on the right side of the air filter cartridge 600, an air extraction pipe 800 is arranged on the right side of the particle filter cartridge 700, an air extraction pump 900 is connected to the lower right side of the air extraction pipe 800, a preheating box 110 is installed below the air extraction pump 900, and a heat-insulating inner layer 160 is installed around the inside of the preheating box 110;

[0026] A fixed circular plate 130 is installed inside the air and impurity filter cartridge 600, and a plurality of hexagonal holes 150 are opened through the left and right surfaces of the fixed circular plate 130. A glass fiber filter plate 140 is installed inside the particle filter cartridge 700. Under the action of the vacuum pump 900, the flue gas inside the industrial furnace main body 100 can enter the air and impurity filter cartridge 600 through the transmission pipe 500, and then the flue gas passes through the plurality of hexagonal holes 150 to filter out larger impurities and particles therein. The filtered flue gas enters the particle filter cartridge 700, and passes through the glass fiber filter plate 140 to finely filter smaller particles and impurities mixed in the flue gas.

[0027] A connecting hole is provided in the middle of the left side of the air filter cartridge 600, a connecting inner ring is installed in the middle of the right side of the particle filter cartridge 700, and a movable outer ring is provided on the left side of the upper end of the exhaust pipe 800.

[0028] The outer wall of the right end of the transmission pipe 500, the outer wall of the left end of the particle filter cartridge 700 and the outer wall of the right end of the connecting inner ring are all provided with threads, and the inner wall of the connecting hole, the inner wall of the right end of the air filter cartridge 600 and the inner wall of the movable outer ring are all provided with internal screw grooves.

[0029] A limiting ring is arranged inside the movable outer ring, the limiting ring is fixed to the air extraction pipe 800, and the diameter length of the limiting ring is greater than the diameter length of the right side of the movable outer ring.

[0030] The movable outer ring is connected to the connecting inner ring by threaded rotation, the left end of the transmission pipe 500 is connected to the connecting hole by threaded rotation, the left ends of the air filter cartridge 600 and the particle filter cartridge 700 are connected by threaded rotation, and the threaded rotation connection method can facilitate the disassembly and installation of the air filter cartridge 600 and the particle filter cartridge 700.

[0031] Three legs 300 are installed under the industrial furnace body 100. The exhaust pipe of the vacuum pump 900 is connected to the inside of the preheating box 110. The insulating inner layer 160 is made of glass fiber. The waste heat of the flue gas can enter the preheating box 110 and be stored in the insulating inner layer 160. The glass fiber material has good thermal insulation effect.

[0032] A central placement plate 170 is installed in the middle of the preheating box 110 , and a plurality of ventilation holes are provided through the upper and lower surfaces of the central placement plate 170 . A box door 120 is installed on the front side of the preheating box 110 via a hinge.

[0033] See also Figure 1 , Figure 2 as well as Figure 3 As the first embodiment of the utility model: open the exhaust valve 400, and then start the vacuum pump 900. Under the action of the vacuum pump 900, the flue gas inside the industrial furnace main body 100 can enter the air filter cartridge 600 through the transmission pipe 500, and then the flue gas passes through a plurality of hexagonal holes 150 to filter out larger impurities and particles therein, and the filtered flue gas enters the particle filter cartridge 700, and passes through the glass fiber filter plate 140 to finely filter the smaller particles and impurities mixed in the flue gas, and the residual heat of the filtered flue gas enters the exhaust pipe 800, and then the residual heat of the flue gas can enter the preheating box 110 and be stored in insulation through the thermal insulation inner layer 160. Through the above steps, the final effect is that the flue gas generated by the industrial furnace main body 100 can be extracted, and the impurities such as smoke and particulate matter therein can be filtered and processed, and the residual heat in the flue gas can be recovered.

[0034] See also Figure 1 and Figure 4 As the second embodiment of the utility model: when the material needs to be preheated, the box door 120 can be opened, the material is placed on the central placement plate 170, and then the box door 120 is closed. Since the residual heat in the flue gas remains inside the preheating box 110, the residual heat can increase the temperature of the material to preheat the material.

[0035] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An industrial furnace with a preheating utilization structure, comprising: An industrial furnace body (100), a furnace door (200) and an exhaust valve (400), wherein two furnace doors (200) are installed on the front of the industrial furnace body (100), and an exhaust valve (400) is installed on the upper right side of the industrial furnace body (100), characterized in that a transmission pipe (500) is connected to the upper side of the exhaust valve (400); An air filter cartridge (600) is arranged above the right side of the transmission pipe (500), a particle filter cartridge (700) is arranged on the right side of the air filter cartridge (600), an air extraction pipe (800) is arranged on the right side of the particle filter cartridge (700), an air extraction pump (900) is connected to the lower right side of the air extraction pipe (800), a preheating box (110) is installed below the air extraction pump (900), and a heat-insulating inner layer (160) is installed around the inside of the preheating box (110); A fixed circular plate (130) is installed inside the air filter cartridge (600), and a plurality of hexagonal holes (150) are provided through the left and right surfaces of the fixed circular plate (130). A glass fiber filter plate (140) is installed inside the particle filter cartridge (700).

2. An industrial furnace with a preheating utilization structure as claimed in claim 1, characterized in that: A connecting hole is provided in the middle of the left side of the air filter cartridge (600), a connecting inner ring is installed in the middle of the right side of the particle filter cartridge (700), and a movable outer ring is provided on the left side of the upper end of the air extraction pipe (800).

3. An industrial furnace with a preheating utilization structure as claimed in claim 2, characterized in that: The outer wall of the right end of the transmission pipe (500), the outer wall of the left end of the particle filter cartridge (700) and the outer wall of the right end of the connecting inner ring are all provided with threads, and the inner wall of the connecting hole, the inner wall of the right end of the air filter cartridge (600) and the inner wall of the movable outer ring are all provided with internal thread grooves.

4. An industrial furnace with a preheating utilization structure as claimed in claim 3, characterized in that: A limiting ring is arranged inside the movable outer ring, the limiting ring is fixed to the air extraction pipe (800), and the diameter length of the limiting ring is greater than the diameter length of the right side of the movable outer ring.

5. An industrial furnace with a preheating utilization structure as claimed in claim 4, characterized in that: The movable outer ring is rotationally connected to the connecting inner ring via a thread, the left end of the transmission pipe (500) is rotationally connected to the connecting hole thread, and the air filter cartridge (600) is rotationally connected to the left end of the particle filter cartridge (700) via a thread.

6. The industrial furnace with a preheating utilization structure as claimed in claim 1, characterized in that: Three legs (300) are installed below the industrial furnace body (100); the exhaust pipe of the vacuum pump (900) is connected to the inside of the preheating box (110); and the thermal insulation inner layer (160) is made of glass fiber.

7. An industrial furnace with a preheating utilization structure as claimed in claim 1, characterized in that: A central placement plate (170) is installed in the middle of the preheating box (110), and a plurality of ventilation holes are provided through the upper and lower surfaces of the central placement plate (170). A box door (120) is installed on the front of the preheating box (110) via a hinge.