Tunnel concrete pouring detection device

By arranging detection strips on the initial support surface of the tunnel and using the stacked structure and detection circuits to monitor the concrete pouring situation in real time, the problems of voids, progress differences and long interruption times during the tunnel's secondary lining concrete pouring process were solved, achieving economical Efficient quality control improves concrete quality.

CN221802956UActive Publication Date: 2024-10-01JIN DIGITAL & CLOUD ENTERPRISE(SHENZHEN) INFORMATION SYST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420050905.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-09
Publication Date
2024-10-01
Estimated Expiration
2034-01-09

AI Technical Summary

Technical Problem

During the concrete pouring process of the secondary lining of the tunnel, there are problems such as voids or lack of density, excessive pouring progress differences, and long pouring interruptions, resulting in poor concrete quality and a lack of economical and fast monitoring methods.

Method used

Design a tunnel concrete pouring detection device, which includes arranging detection strips on the initial support surface of the tunnel. The detection strips are equipped with a stacked structure and detection circuits. The concrete pressure triggers electrical signals and uses ID chips and detection terminals to monitor the pouring conditions in real time. Discard the pressure sensor and reduce production costs.

Benefits of technology

It realizes rapid and accurate monitoring of the concrete pouring status of the secondary lining of the tunnel, reduces detection costs, improves production efficiency, and avoids concrete quality problems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221802956U_ABST
    Figure CN221802956U_ABST
Patent Text Reader

Abstract

The utility model provides a tunnel concrete pouring detection device which comprises a plurality of detection belts arranged on the surface of a tunnel primary support, a first layer and a second layer are arranged in each detection belt, the first layer and the second layer are mutually stacked, a plurality of groups of detection circuits are arranged on one side, close to the second layer, of the first layer, and breakpoints are arranged in the plurality of groups of detection circuits. An insulating layer is arranged between the first layer and the second layer, a digging hole is formed in the insulating layer corresponding to the breakpoint, a copper plating point is arranged on one side, close to the first layer, of the second layer corresponding to the breakpoint, and the detection circuit, the breakpoint and the copper plating point form a detection point. When concrete is poured, the concrete applies pressure to the detection belt mounted on the surface of the tunnel primary support, so that the copper plating point of the second layer is in contact with the power failure in the detection circuit of the first layer, the detection circuit is connected, and an electric signal is sent to the outside of the detection belt to remind a user of the pouring condition of the detection point. According to the scheme, a scheme of adopting a pressure sensor is abandoned, so that the production cost of the detection belt is greatly reduced, and the production efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel construction, in particular to a tunnel concrete pouring detection device. Background Art

[0002] With the rapid development of my country's transportation sector, there are more and more tunnel projects, and the quality of tunnel lining and standardized construction requirements are constantly improving, and the quality requirements for tunnel lining concrete are also getting higher and higher. After the tunnel is excavated, in order to stabilize the surrounding rock and ensure operational safety, a layer of support structure with sufficient strength must be built according to a certain outline size. This tunnel support structure is called tunnel lining. The secondary lining is a cast concrete or reinforced concrete lining constructed on the inner side of the initial support during tunnel construction, which together with the initial support forms a composite lining.

[0003] During the pouring process of tunnel secondary lining concrete, the following three problems often occur, affecting the quality of the secondary lining.

[0004] First, there is a void or lack of density behind the secondary lining. In order to effectively restrict the deformation of the initial support and surrounding rock of the tunnel and ensure the thickness of the secondary lining, the secondary lining should be close to the initial support. However, in actual construction, due to the gravity sinking of concrete, natural shrinkage of concrete, insufficient pumping pressure, too tight laying of waterproof board, and excessive fluctuation of initial support, there is often a void or lack of density behind the secondary lining.

[0005] Second, the difference in pouring progress on both sides of the secondary lining is too large. In order to prevent the secondary lining formwork trolley from deforming or shifting and affecting the quality of concrete, the lining concrete should be poured alternately on both sides, and the progress difference should not be too large. However, the alternating pouring process on both sides is cumbersome and has low efficiency. If it is not strictly controlled in actual construction, there will often be a large difference in pouring progress on both sides, resulting in deformation or shifting of the lining trolley. In severe cases, the concrete that has not reached the demolding strength will deform or even crack and collapse.

[0006] Third, the interruption time of secondary lining concrete pouring is too long. In order to ensure the integrity and uniformity of lining concrete, lining concrete should be poured as continuously as possible, and the interruption time should not exceed the initial setting time of concrete. However, in actual construction, concrete pouring is often interrupted due to problems in concrete mixing, transportation and pumping. Once the interruption time is too long, the first poured concrete may solidify, segregate, and stratify, which will have an adverse effect on the integrity of the lining and easily cause leakage and other problems.

[0007] In order to avoid the above problems, it is necessary to closely monitor the pouring process of the secondary lining of the tunnel. However, due to the limitations of the pouring method and process of the secondary lining of the tunnel, the pouring progress and density of the concrete cannot be directly observed, and there is currently a lack of convenient, fast, economical and comprehensive monitoring methods. The current monitoring methods include burying two electrodes in the arch and using concrete to connect the electrodes to monitor the density of the arch concrete. The disadvantage is that as long as the two electrodes are in contact with the concrete, the circuit will be connected, and it cannot reflect whether the concrete between the two electrodes is dense. If a pressure sensor is buried behind the secondary lining for monitoring, a large number of sensors must be deployed. After the lining is poured, most of these sensors cannot be recovered, which is economically unacceptable. Other methods such as electromagnetic waves, ultrasound or optics are also difficult to implement due to the limitations of the steel template of the template trolley. Therefore, it is urgent to design a concrete pouring detection device to solve the above problems. Utility Model Content

[0008] The utility model discloses a tunnel concrete pouring detection device, which is intended to solve the problem raised in the above background technology that the production cost of the existing tunnel secondary lining pouring detection device is too high.

[0009] In order to solve the above technical problems, the following technical solutions are proposed:

[0010] A tunnel concrete pouring detection device comprises a plurality of detection belts arranged on the surface of initial tunnel support, wherein a first layer and a second layer are arranged in the detection belt, the first layer and the second layer are stacked on each other, a plurality of detection circuits are arranged on a side of the first layer close to the second layer, breakpoints are arranged in the plurality of detection circuits, an insulating layer is arranged between the first layer and the second layer, holes are arranged in the insulating layer corresponding to the breakpoints, a copper-plated point is arranged on a side of the second layer close to the first layer corresponding to the breakpoints, and the detection circuits, the breakpoints and the copper-plated point constitute a detection point.

[0011] Preferably, a detection terminal is further included, an ID chip is provided at one end of the detection belt, an end of the detection belt close to the ID chip extends out of the tunnel, the line of the detection point is connected to the ID chip, the ID chip is electrically connected to the detection terminal outside the tunnel, and the detection terminal is used to store and judge detection information. Preferably, an insulating layer is provided between the first layer and the second layer, and a hole is provided in the insulating layer corresponding to the breakpoint.

[0012] Preferably, a protective cover is provided on the periphery of the detection belt.

[0013] Preferably, the first layer and the second layer are both FPC flexible circuit boards.

[0014] Preferably, a plurality of sponge pads are provided on the periphery of the protective cover, and the installation positions of the sponge pads correspond to the detection points.

[0015] Beneficial effects of the utility model: This case provides a tunnel concrete pouring detection device, including several detection belts arranged on the surface of the initial support of the tunnel, a first layer and a second layer are arranged in the detection belt, the first layer and the second layer are stacked on each other, a plurality of detection circuits are arranged on the side of the first layer close to the second layer, breakpoints are arranged in the plurality of detection circuits, an insulating layer is arranged between the first layer and the second layer, holes are arranged at the corresponding breakpoints of the insulating layer, a copper-plated point is arranged at the corresponding breakpoints of the side of the second layer close to the first layer, and the detection circuit, the breakpoints and the copper-plated point constitute the detection point. When concrete is poured into the space between the secondary lining formwork trolley and the initial support of the tunnel, the concrete exerts pressure on the detection belt installed on the surface of the initial support of the tunnel, causing the copper-plated point of the second layer to contact the power-off in the detection circuit of the first layer, so that the detection circuit is connected, and an electrical signal is sent to the outside of the detection belt to prompt the user of the pouring status of this detection point. This scheme abandons the scheme of using pressure sensors, greatly reduces the production cost of the detection belt, and improves production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the appearance of the detection belt of the utility model;

[0017] Figure 2 This is a schematic diagram of the internal structure of the detection belt of the utility model.

[0018] The main component symbols are explained as follows: 1. Detection tape; 2. ID chip; 3. First layer; 4. Second layer; 5. Insulation layer; 6. Copper plating point; 7. Hole; 8. Protective cover; 9. Sponge pad. DETAILED DESCRIPTION

[0019] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.

[0020] The following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] A tunnel concrete pouring detection device includes a plurality of detection belts 1 and a detection terminal arranged on the surface of the initial support of the tunnel. The detection belt 1 is provided with a plurality of detection points, and the detection points are used to identify the pressure generated during the concrete pouring. An ID chip 2 is provided at one end of the detection belt 1, and the end of the detection belt 1 close to the ID chip 2 extends out of the tunnel, and the detection points are connected to the ID chip 2. Each detection point is provided with a separate code in the ID chip 2 to distinguish each detection point. The ID chip 2 is electrically connected to the detection terminal outside the tunnel, and the detection terminal is used to judge and store detection information. When concrete is poured into the space between the secondary lining formwork trolley and the initial support of the tunnel, the concrete exerts pressure on the detection belt 1 installed on the surface of the initial support of the tunnel. Each detection point on the detection belt 1 can identify the pressure of the concrete squeezing the detection belt 1, and transmit it to the detection terminal for storage through the ID chip 2 at one end of the detection belt 1. The user can quickly, intuitively, clearly and safely understand the situation of the secondary lining of the tunnel through the detection terminal.

[0022] Specifically, the detection belt 1 is provided with a first layer 3 and a second layer 4, the first layer 3 and the second layer 4 are stacked on each other, a plurality of detection circuits are provided on the side of the first layer 3 close to the second layer 4, and breakpoints are provided in the plurality of detection circuits, a copper-plated point 6 is provided at the corresponding breakpoint on the side of the second layer 4 close to the first layer 3, an insulating layer 5 is provided between the first layer 3 and the second layer 4, for isolating the first layer 3 and the second layer 4, a hole 7 is provided at the corresponding breakpoint of the insulating layer 5, and the detection circuit, the breakpoint and the copper-plated point 6 constitute the detection point. When concrete is poured between the secondary lining formwork trolley and the initial support of the tunnel, the concrete squeezes the first layer 3 and the second layer 4 in the detection belt 1, so that the copper-plated point 6 on the second layer 4 is attached to the breakpoint of the first layer 3 through the hole 7, so that the detection circuit of the second layer 4 is connected, and the ID chip 2 can identify the connection status of each detection point, and store the connection status in the detection terminal outside the tunnel according to the code of each detection point.

[0023] Specifically, a pressure threshold is set on the detection point. Only when the pressure of the concrete on the detection belt 1 exceeds the pressure threshold, the copper-plated point 6 on the second layer 4 in the detection belt 1 can fit and cut off the power, thereby ensuring the density of the concrete.

[0024] Specifically, a protective cover 8 is provided on the periphery of the detection belt 1. The protective cover 8 is made of flexible material. The protective cover 8 can prevent the detection belt 1 from being damaged during transportation, and can also protect the detection belt 1 from being damaged by the squeezing and friction of concrete during the detection process, thereby preventing detection errors.

[0025] Specifically, the first layer 3 and the second layer 4 are both FPC flexible circuit boards, which are simple materials and easy to process, and allow the detection tape 1 to be rolled up for storage, which not only saves storage and transportation space, but also facilitates the laying of the detection tape 1 and improves work efficiency.

[0026] Specifically, in actual situations, when tunnels of different sizes are undergoing secondary lining, there will be differences in the amount of concrete poured, resulting in different pressures on the detection belt 1, affecting the accuracy of the detection belt 1 in different tunnels. To solve this problem, a plurality of sponge pads 9 are provided on the periphery of the protective cover 8. The installation positions of the sponge pads 9 correspond to the detection points. The manufacturer can adjust the pressure threshold by changing the thickness of the sponge pads 9. This adjustment method is quick and low-cost. In actual applications, if the user encounters a procurement error and a tight schedule, the user can also adjust the pressure threshold of the detection belt 1 by changing the thickness of the sponge pad 9.

[0027] The above disclosures are only several specific embodiments of the present invention, but the present invention is not limited thereto, and any changes that can be conceived by those skilled in the art should fall within the protection scope of the present invention.

Claims

1. A tunnel concrete pouring detection device, comprising a plurality of detection belts arranged on the initial support surface of the tunnel, Features: The detection belt is provided with a first layer and a second layer, the first layer and the second layer are stacked on each other, a plurality of detection circuits are provided on a side of the first layer close to the second layer, breakpoints are provided in the plurality of detection circuits, an insulating layer is provided between the first layer and the second layer, holes are provided in the insulating layer corresponding to the breakpoints, a copper-plated point is provided on a side of the second layer close to the first layer corresponding to the breakpoints, and the detection circuits, the breakpoints and the copper-plated points constitute a detection point.

2. A tunnel concrete pouring detection device according to claim 1, Features: It also includes a detection terminal, an ID chip is provided at one end of the detection belt, the end of the detection belt close to the ID chip extends out of the tunnel, the line of the detection point is connected to the ID chip, the ID chip is electrically connected to the detection terminal outside the tunnel, and the detection terminal is used to store and judge the detection information.

3. A tunnel concrete pouring detection device according to claim 2, Features: A protective cover is arranged on the periphery of the detection belt.

4. A tunnel concrete pouring detection device according to claim 2, Features: The detection point is provided with a pressure threshold.

5. A tunnel concrete pouring detection device according to claim 1, Features: The first layer and the second layer are both FPC flexible circuit boards.

6. A tunnel concrete pouring detection device according to claim 3, Features: A plurality of sponge pads are arranged on the periphery of the protective cover, and the installation positions of the sponge pads correspond to the detection points.