Shield segment connecting bolt corrosion test device in loaded state

By designing a corrosion test device for shield segment connecting bolts under load and combining load and electrochemical accelerated corrosion, the problem of no-load simulation in traditional tests is solved, the measurement accuracy and test authenticity are improved, and the durability of the tunnel structure is ensured. Design accuracy.

CN221803766UActive Publication Date: 2024-10-01CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202322890934.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-10-27
Publication Date
2024-10-01
Estimated Expiration
2033-10-27

AI Technical Summary

Technical Problem

The traditional corrosion simulation test method of connecting bolt threads is conducted under no load conditions and cannot truly simulate the actual working conditions, resulting in large measurement errors, low accuracy, and insufficient research on corrosion rates, which affects the durability design of the tunnel structure.

Method used

A corrosion test device for shield segment connecting bolts under load was designed, including connecting bolts, electrolyte tanks, support frames, hollow hydraulic jacks, pressure sensors, concrete blocks and nuts. The load and electricity are applied through the hydraulic jacks. Chemically accelerates rust, simulating actual working conditions, and uses wire mesh to ensure uniform corrosion.

Benefits of technology

It achieves accurate simulation of the bolt corrosion process under load, improves measurement accuracy and test authenticity, can more accurately predict the durability of the tunnel structure, and accelerates the corrosion process by controlling the start and stop of the electrolyte to shorten the test. time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221803766U_ABST
    Figure CN221803766U_ABST
Patent Text Reader

Abstract

The utility model discloses a shield segment connecting bolt corrosion test device in a loaded state, which comprises a connecting bolt, an electrolyte tank, a support frame, a hollow hydraulic jack, a pressure sensor, a concrete block and a nut, the upper part of the electrolyte tank is opened, electrolyte is filled in the electrolyte tank, and the concrete block is arranged at the bottom in the electrolyte tank; the nut is pre-installed on the upper portion in the concrete block in an embedded mode, the supporting frame is located above the concrete block, the hollow hydraulic jack is located above the supporting frame, and the pressure sensor is located above the hollow hydraulic jack. A screw rod of the connecting bolt sequentially penetrates through the pressure sensor, the hollow hydraulic jack and the supporting frame from top to bottom and then is connected with the nut. According to the utility model, corrosion can be carried out in the process of applying load to the to-be-measured area on the screw rod of the connecting bolt, the actual working state of the connecting bolt is closer to that of the connecting bolt, the measuring error is smaller, the precision is higher, and the durability of the shield tunnel structure can be estimated more accurately.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a shield segment connecting bolt corrosion testing device, in particular to a shield segment connecting bolt corrosion testing device under a load state. Background Art

[0002] In recent years, the shield method has gradually become the preferred construction method for traffic tunnel construction, especially cross-river and cross-sea tunnels, urban subways, integrated pipeline corridors, and cross-river and cross-sea channels, due to its strong adaptability to geological conditions, small impact on surrounding buildings, and high efficiency and safety of construction. Shield tunnels are usually assembled structures made of reinforced concrete segments, namely shield segments, connected by bolts. Since the shield segments are only connected by bolts and the joints are not compacted with other materials such as concrete, there are a large number of joints between the shield segments, which reduces the integrity and rigidity of the lining structure. At the same time, the joint is the weakest part of the entire lining structure. After the failure of the first waterproof seal, the joint bolts will be in the corrosive environment of groundwater for a long time. Long-term exposure to the corrosive environment will cause the bolts to rust, and the rust of the bolts will cause changes in their mechanical properties, resulting in safety hazards at the joints. The performance of the joints will change, which will affect the overall durability of the tunnel. In order to ensure the accuracy of the durability design of the tunnel structure, it is urgent to explore the corrosion rate of the threads of the shield segment connection bolts under load.

[0003] The traditional method of simulating the corrosion of bolt threads is to first use an electrochemical method to corrode the threads and then conduct a mechanical property test on them.

[0004] The above traditional experimental method has the following defects:

[0005] The corrosion process of bolts is carried out when the bolts are not under load, which is inconsistent with the actual situation. The load will cause gaps between the bolt thread and the nut and change the microstructure of the thread. The above factors may change the corrosion rate of the bolt thread. Therefore, the study of the corrosion of the bolt thread under load is indispensable. Utility Model Content

[0006] The utility model aims to solve the above problems and provide a shield segment connecting bolt corrosion test device under load.

[0007] The utility model achieves the above-mentioned purpose through the following technical solutions:

[0008] A device for testing the corrosion of shield segment connecting bolts under load, comprising connecting bolts, an electrolyte tank and a support frame, and also comprising a hollow hydraulic jack, a pressure sensor, a concrete block and a nut. The electrolyte tank is open at the top and contains electrolyte, the concrete block is placed at the bottom of the electrolyte tank, the nut is embedded and pre-installed in the upper part of the concrete block, the support frame is located above the concrete block, the support frame and the concrete block are both placed in the electrolyte and the support frame cannot block the electrolyte, the hollow hydraulic jack is located above the support frame and is not placed in the electrolyte, the pressure sensor is located above the hollow hydraulic jack, and the screw of the connecting bolt passes through the central through hole of the pressure sensor, the central through hole of the hollow hydraulic jack and the support frame in sequence from top to bottom and is then connected to the nut.

[0009] Preferably, in order to make the area to be measured on the screw rod of the connecting bolt corrode more evenly during the corrosion process, a wire mesh is further provided in the electrolyte. The wire mesh is cylindrical and surrounds the screw rod of the connecting bolt and is located in the area where the support frame is located.

[0010] The beneficial effects of the utility model are:

[0011] The utility model can corrode the area to be measured on the screw rod of the connecting bolt during the process of applying load, which is closer to the actual working state of the connecting bolt, has smaller measurement error and higher accuracy, and can more accurately estimate the durability of the shield tunnel structure; more specific advantages are as follows:

[0012] 1. The combination of concrete blocks and nuts can restore the constraints of the connecting bolts in actual working conditions as much as possible. The pre-set load value of the test is determined by sorting and analyzing the previous experimental results, and the effect of the load is realized by the hollow hydraulic jack. The combination of the two can satisfy the simulation of the actual conditions of the test as much as possible, making up for the defect of the previous experiment of rust without load, making the test conditions more realistic, and making the test results more accurate, true and reliable;

[0013] 2. In order to avoid the problem that it takes too long to reach the required corrosion rate of the test under natural conditions, the utility model uses electrochemical accelerated corrosion to make the connecting bolts reach the target corrosion rate in a short time; in addition, by controlling the power on and off of the electrolyte, whether to accelerate the corrosion can be controlled according to the actual test conditions, thereby enhancing the flexibility of the test. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the main structure of the shield segment connection bolt corrosion test device under load state described in the utility model. DETAILED DESCRIPTION

[0015] The utility model is further described below in conjunction with the accompanying drawings:

[0016] like Figure 1 As shown, the shield segment connecting bolt corrosion test device under load state described in the utility model comprises a connecting bolt 1, an electrolyte tank 6, a support frame 5, a hollow hydraulic jack 3, a pressure sensor 2, a concrete block 10 and a nut 9. The electrolyte tank 6 is open at the top and contains an electrolyte 7, preferably NaCl with a concentration of 5%. The concrete block 10 is placed at the bottom of the electrolyte tank 6, and the nut 9 is embedded and pre-installed in the upper part of the concrete block 10. The support frame 5 is located above the concrete block 10. The support frame 5 and the concrete block 10 are both placed in the electrolyte 7 and the support frame 5 cannot block the electrolyte 7. The hollow hydraulic jack 3 is located above the support frame 5 and is not placed in the electrolyte 7. The pressure sensor 2 is located above the hollow hydraulic jack 3. The screw 8 of the connecting bolt 1 passes through the central through hole of the pressure sensor 2, the central through hole of the hollow hydraulic jack 3 and the support frame 5 from top to bottom in sequence and is connected to the nut 9. Preferably, in order to make the area to be measured on the screw rod 8 of the connecting bolt 1 rust more evenly during the rusting process, a wire mesh 4 is further provided in the electrolyte 7. The wire mesh 4 is cylindrically shaped and surrounds the screw rod 8 of the connecting bolt 1 and is located in the area where the support frame 5 is located. In order to prevent the steel support frame 5 from being affected by rust and affecting the test, its surface should be treated with anti-rust spray paint.

[0017] like Figure 1 As shown, during the test, first connect the nut of the connecting bolt 1 (not separately marked in the figure) to the positive electrode of the DC power supply (not shown in the figure), connect the wire mesh 4 to the negative electrode of the DC power supply, connect the hollow hydraulic jack 3 to the hydraulic oil port of the hydraulic station or hydraulic press (not shown in the figure), and connect the pressure sensor 2 to the corresponding signal input terminal of the controller (not shown in the figure); then the test can be started, and the following two main functions can be completed as needed:

[0018] 1. Implementation of load-constraint in the test: The hollow hydraulic jack 3 is used to apply pressure, and the pressure is transmitted to the nut of the connecting bolt 1 through the pressure sensor 2, and the support is achieved through the support frame 5 and the concrete block 10. The pressure applied by the hollow hydraulic jack 3 is more accurately controlled in conjunction with the detection pressure of the pressure sensor 2, so that the connecting bolt 1 will bear a certain amount of load before the test. The preset load value is determined by analyzing the statistical results of the working load of the connecting bolts 1 of a large number of shield segments.

[0019] 2. Implementation of accelerated bolt corrosion: If the connecting bolt 1 corrodes under natural conditions, the time required is too long for this experiment. This experiment uses an electrochemical accelerated corrosion method to shorten the corrosion time and improve the test efficiency. At the same time, a wire mesh 4 is used to ensure that the outer surface of the corroded section of the screw 8 of the connecting bolt 1 corrodes evenly, making the test simulation more realistic. During the test, the electrolyte 7 should be replaced regularly to ensure the accuracy of the test.

[0020] The above two functional test methods are combined and applied. First, a hollow hydraulic jack 3 is used to apply load pressure to the connecting bolt 1, and the detection value of the pressure sensor 2 is observed. When the preset target value is reached, it is stopped, and then the pre-set current is used for power corrosion. During this period, the voltage, pressure and other data are recorded regularly. After completing a set of tests, the data are sorted and analyzed and the next test is carried out.

[0021] The above embodiments are only preferred embodiments of the present utility model and are not limitations on the technical solutions of the present utility model. Any technical solution that can be implemented on the basis of the above embodiments without creative work should be deemed to fall within the scope of protection of the patent of the present utility model.

Claims

1. A shield segment connection bolt corrosion test device under load, comprising connection bolts, an electrolyte tank and a support frame, characterized in that: It also includes a hollow hydraulic jack, a pressure sensor, a concrete block and a nut. The upper part of the electrolyte tank is open and filled with electrolyte. The concrete block is placed at the bottom of the electrolyte tank. The nut is embedded and pre-installed in the upper part of the concrete block. The support frame is located above the concrete block. The support frame and the concrete block are both placed in the electrolyte and the support frame cannot block the electrolyte. The hollow hydraulic jack is located above the support frame and is not placed in the electrolyte. The pressure sensor is located above the hollow hydraulic jack. The screw of the connecting bolt passes through the central through hole of the pressure sensor, the central through hole of the hollow hydraulic jack and the support frame in sequence from top to bottom and is then connected to the nut.

2. The shield segment connection bolt corrosion test device under load according to claim 1 is characterized in that: A wire mesh is also provided in the electrolyte, and the wire mesh is cylindrical and surrounds the screw rod of the connecting bolt and is located in the area where the supporting frame is located.