Movable positioning frame for inserting and driving construction of steel pipe piles in water

By designing a mobile positioning frame during the construction of the cross-river bridge, and using the crossbar and guide rail sliding mechanism to reduce the number of ship movements, the problem of low construction efficiency was solved and more efficient steel pipe pile insertion and driving construction was achieved.

CN221837588UActive Publication Date: 2024-10-15ROAD & BRIDGE INT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420280910.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-05
Publication Date
2024-10-15
Estimated Expiration
2034-02-05

AI Technical Summary

Technical Problem

In the construction of cross-river bridges, when steel pipe piles are inserted and driven in the water, the frequent movement and positioning of ships results in low construction efficiency.

Method used

Design a mobile positioning frame, including an upper platform and a lower platform, which is set on one side of the ship. Through the crossbar and guide rail sliding mechanism, the number of movements of the ship is reduced, and the positioning frame can slide along the track. The ship can be positioned one row at a time. Steel pipe piles.

Benefits of technology

It improves the efficiency of steel pipe pile driving construction, reduces the anchoring and anchoring operations of ships, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221837588U_ABST
    Figure CN221837588U_ABST
Patent Text Reader

Abstract

The movable positioning frame is arranged on one side of a steel pipe pile inserting and driving construction ship and comprises an upper platform and a lower platform, vertical rods are welded between the four corners of the upper platform and the four corners of the lower platform respectively, and steel pipe pile inserting holes are formed in the upper platform and the lower platform respectively. Two transverse rods are fixedly arranged on the side, facing the ship, of the upper platform, the two transverse rods are arranged in parallel and extend to the position above a ship deck, two guide rails are fixedly arranged on the ship deck in the longitudinal direction of the ship, and two rail wheels which are supported on the two guide rails respectively and slide along the guide rails are arranged at the bottom of each transverse rod. The two vertical rods, facing the side of the ship, of the positioning frame are each provided with a transverse supporting wheel, and the transverse supporting wheels are supported on a side plate of the ship. The device can slide along the track, a ship can be positioned once, a row of steel pipe piles can be inserted and driven, frequent anchor weighing and anchor dropping positioning of the ship are avoided, and therefore construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of bridge construction, relates to driving steel pipe piles in water during the construction of a bridge across a river, and specifically relates to a mobile positioning frame used for driving steel pipe piles in water. Background Art

[0002] In the construction of cross-river bridges, temporary structures such as brackets and steel trestles are usually set up in the water. These temporary structures generally use steel pipe piles as the lower support. The underwater steel pipe piles are usually driven by ships as construction platforms, and pile drivers are installed on the ships. During construction, after the ship drops anchor and positions, the pile drivers drive the steel pipe piles into the water. In order to ensure the accuracy of steel pipe pile driving, a steel pipe pile driving positioning frame is usually welded on one side of the ship. After a steel pipe pile is driven, the ship moves to the next position to continue construction. However, this requires the ship to move and position frequently, and the construction efficiency is low. Summary of the invention

[0003] The utility model aims to solve the above problems and provides a mobile positioning frame for underwater steel pipe pile driving construction, which can reduce the movement times of the steel pipe pile driving construction ship and improve the construction efficiency.

[0004] The technical solution of the utility model is as follows:

[0005] A mobile positioning frame for underwater steel pipe pile driving construction is arranged on one side of a steel pipe pile driving construction ship, comprises an upper platform and a lower platform, a vertical rod is welded between the four corners of the upper platform and the lower platform respectively, steel pipe pile insertion holes are arranged on the upper platform and the lower platform, and a plurality of steel pipe pile positioning wheels are arranged circumferentially and equidistantly at the steel pipe pile insertion holes, characterized in that: two cross bars are fixedly arranged on the upper platform toward the ship side, the two cross bars are arranged in parallel and extend above the ship deck, two guide rails are fixedly arranged on the ship deck along the longitudinal direction of the ship, and two track wheels are arranged at the bottom of each cross bar, which are respectively supported on the two guide rails and slide along the guide rails; a transverse support wheel is respectively arranged on the two vertical bars on the side of the positioning frame facing the ship, and the transverse support wheel is supported on the ship side plate.

[0006] The utility model can slide along the track laid on the ship. After one steel pipe pile is driven, the positioning frame can be slid to the next construction position. The ship can be positioned once and a row of steel pipe piles can be driven, so that the ship can avoid frequent anchoring and anchoring positioning, thereby improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0007] Figure 1 It is a schematic diagram of the elevation structure of the utility model;

[0008] Figure 2 yes Figure 1 Schematic diagram of the arrangement structure of the middle track wheel;

[0009] Figure 3 This is a schematic diagram of the configuration structure of the lateral support wheels in route 1;

[0010] Figure 4 It is a schematic diagram of the plane structure of the utility model;

[0011] Figure 5 It is a plan view of the utility model in use state. DETAILED DESCRIPTION

[0012] like Figures 1 to 4 As shown, the utility model is arranged on one side of a steel pipe pile driving construction ship 100, including an upper platform 1 and a lower platform 2, a vertical rod 3 is welded between the four corners of the upper platform and the lower platform respectively, and steel pipe pile insertion holes 4 are provided on the upper platform and the lower platform, and a plurality of steel pipe pile positioning wheels 5 are circumferentially and equidistantly arranged on the steel pipe pile insertion holes; two cross bars 6 are fixedly arranged on the upper platform 1 toward the side of the ship, the two cross bars are arranged in parallel and extend above the ship deck, two guide rails 7 are fixedly arranged on the deck of the ship 100 along the longitudinal direction of the ship, and two track wheels 8 are respectively supported on the two guide rails 7 and slide along the guide rails at the bottom of each cross bar 6; a transverse support wheel 9 is respectively arranged on the two vertical rods 3 on the side of the positioning frame facing the ship, and the transverse support wheel 9 is supported on the side plate of the ship 100.

[0013] like Figure 2 As shown, when the utility model is implemented, the guide rail 7 can be made of channel steel, the notch of the channel steel faces one side, a leg plate of the channel steel is welded on the ship deck, and the track wheel is supported on the leg plate on the top of the channel steel.

[0014] Two vertical support plates 10 are set at the bottom of the cross bar 6 corresponding to each track wheel 5, and the upper ends of the two vertical support plates 10 are welded to the cross bar 6 respectively, and the track wheel 5 is arranged between the two support plates 10, and the wheel axle of the track wheel is arranged on the two vertical support plates; An anti-derail stopper 11 is welded on a vertical support plate positioned at a side of the channel steel notch, and the lower ends of the anti-derail stopper 11 are L-shaped and are positioned in the notch of the channel steel track.

[0015] like Figure 3 As shown, two transverse support plates 12 are arranged on each vertical rod 3 for lateral support wheels corresponding to the transverse support wheels 9, one end of the two transverse support plates is welded to the vertical rod, the transverse support wheels 9 are located between the two transverse support plates 12, the axles of the transverse support wheels are passed through the two transverse support plates, and the axles of the transverse support wheels 9 are parallel to the vertical rod 3. The transverse support wheels 9 are rubber wheels.

[0016] like Figure 5As shown, the steel pipe pile driving construction vessel 100 is anchored and positioned along the designed driving position of a row of steel pipe piles 101, and the positioning frame is slid along the track to above a steel pipe pile driving position, and a steel pipe pile is lifted by a pile driver on the ship, and is lowered from the steel pipe pile insertion hole on the positioning frame to the riverbed for driving; after the driving of a steel pipe pile 101 is completed, the vessel does not move, and the positioning frame is slid to the next steel pipe pile driving position to continue construction until the driving of a row of steel pipe piles is completed.

Claims

1. A mobile positioning frame for underwater steel pipe pile driving construction, arranged on one side of a steel pipe pile driving construction vessel, comprising an upper platform and a lower platform, a vertical rod is welded between the four corners of the upper platform and the lower platform, and steel pipe pile insertion holes are arranged on the upper platform and the lower platform, and a plurality of steel pipe pile positioning wheels are arranged equidistantly in the annular direction of the steel pipe pile insertion holes, characterized in that: The upper platform is fixedly provided with two cross bars on one side facing the ship, the two cross bars are arranged in parallel and extend above the ship deck, two guide rails are fixedly provided on the ship deck along the longitudinal direction of the ship, and two track wheels are provided at the bottom of each cross bar, which are respectively supported on the two guide rails and slide along the guide rails; a transverse supporting wheel is respectively provided on the two vertical bars of the positioning frame on the side facing the ship, and the transverse supporting wheels are supported on the side plate of the ship.

2. The mobile positioning frame for underwater steel pipe pile driving construction according to claim 1 is characterized in that: A channel steel is used as a guide rail, the notch of the channel steel faces one side, a leg plate of the channel steel is welded on the ship deck, and the track wheel is supported on the leg plate on the top of the channel steel.

3. The mobile positioning frame for underwater steel pipe pile driving construction according to claim 2 is characterized by: Two vertical support plates are arranged at the bottom of the cross bar corresponding to each track wheel, the upper ends of the two vertical support plates are respectively welded to the cross bar, the track wheel is arranged between the two support plates, and the wheel axle of the track wheel is penetrated through the two vertical support plates; an anti-derail limiter is welded on a vertical support plate located at one side of the channel steel notch, and the lower end of the anti-derail limiter is L-shaped and is located in the channel steel notch.

4. The mobile positioning frame for underwater steel pipe pile driving construction according to claim 1 is characterized by: Two transverse support plates are arranged on each vertical rod on which the transverse support wheels are arranged corresponding to the transverse support wheels, one end of the two transverse support plates is welded to the vertical rod, the transverse support wheels are located between the two transverse support plates, the axles of the transverse support wheels are passed through the two transverse support plates, and the axles of the transverse support wheels are parallel to the vertical rod.

5. The mobile positioning frame for underwater steel pipe pile driving construction according to claim 1 is characterized by: The lateral supporting wheels are rubber wheels.