Plastering tool for double external corners

By designing a double sun angle plastering tool and using stepped plastering parts and hand-held rods to form double sun angles on the side walls of the structure, the problems of difficulty in forming double sun angles and high construction costs in the existing technology have been solved, and construction efficiency and cost have been achieved. of reduction.

CN221837904UActive Publication Date: 2024-10-15SHAANXI NO 11 CONSTR ENG CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420397429.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-29
Publication Date
2024-10-15
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

It is difficult for the existing single sun angle plastering tools to achieve the formation of double sun angles during on-site construction, resulting in high construction costs and numerous processes.

Method used

Design a double-positive angle plastering tool, which includes a stepped plastering piece and a hand-held rod. By setting a specific included angle, the plastering piece can form a double-positive angle on the side wall of the structure, simplifying the construction process.

Benefits of technology

It realizes the one-time forming of the double sun angle, reduces the construction process, improves the construction efficiency and flexibility, and reduces the cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221837904U_ABST
    Figure CN221837904U_ABST
Patent Text Reader

Abstract

The utility model discloses a plastering tool for double external corners. The plastering tool comprises a plastering piece and a handheld rod, wherein the plastering piece is used for troweling mortar located on the upper portion of the side wall of a structure, and the handheld rod is arranged on the upper portion of the plastering piece. The plastering piece comprises a first plate, a second plate, a third plate and a fourth plate which are sequentially connected in a step shape, the fourth plate is vertically arranged, and the handheld rod is connected with the second plate and the third plate through a connecting rod; an included angle a is formed between the first plate and the second plate, and an included angle b is formed between the second plate and the third plate. According to the utility model, aiming at the side walls of structures such as a sump, a trench and the like, the plastering piece is provided with two internal corners by arranging the step-shaped plastering piece, so that corresponding double external corners are formed when the plastering piece acts on mortar on the side walls of the structures, and the double external corners of the wellhead of the side walls of the structures are realized at one time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building structure plastering, and in particular relates to a double positive angle plastering tool. Background Art

[0002] During the on-site construction process, due to the limitations of the design materials in the drawings, some structural side walls with cement mortar as the main material cannot be formed in one go. During the actual on-site construction, the upper mouth of the cover plate cannot be sharp and angular, and the actual manpower and material costs are relatively high. At present, the structural side wall plastering only has a single positive angle plastering tool to assist in the construction, and it is difficult to use it for double positive angle construction. Therefore, it is necessary to develop a double positive angle plastering tool that can form the double positive angle plastering in one go, and the construction cost is low. When constructing the double positive angle mouth in the structural side wall, sump and other areas at the same time, it can replace the traditional single positive angle plastering tool in the current construction industry. Utility Model Content

[0003] The technical problem to be solved by the utility model is to provide a double positive angle plastering tool in view of the deficiencies in the above-mentioned prior art. The tool has a simple structure and a reasonable design. For the side walls of structures such as sump pits and trenches, a step-shaped plastering piece is provided so that the plastering piece has two negative angles. When the plastering piece is used to act on the mortar of the side wall of the structure, a corresponding double positive angle is formed, so that the double positive angles of the wellhead of the side wall of the structure can be achieved at one time, thereby reducing the construction process and having strong practicality.

[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is: a double external corner plastering tool, characterized in that it comprises a plastering piece for leveling the mortar located on the upper part of the structural side wall and a hand gripping rod arranged on the upper part of the plastering piece;

[0005] The plastering member comprises a first plate, a second plate, a third plate and a fourth plate which are sequentially connected in a step-shaped manner, the first plate and the third plate are both arranged horizontally, the fourth plate is arranged vertically, and the hand grip is connected to the second plate and the third plate through a connecting rod;

[0006] An angle a is formed between the first plate and the second plate, an angle b is formed between the second plate and the third plate, and an angle c is formed between the third plate and the fourth plate. The angle a is equal to the angle b, and the angle c is 90 degrees.

[0007] The above-mentioned double-external-corner plastering tool is characterized in that: the number of the connecting rods is four, the four connecting rods are grouped in pairs, and the two connecting rods in each group are respectively connected to the second plate and the third plate.

[0008] The above-mentioned double-external-angle plastering tool is characterized in that the angle a, the angle b and the angle c are all 90 degrees.

[0009] The above-mentioned double-external-angle plastering tool is characterized in that the value ranges of the angle a, the angle b and the angle c are all greater than 90 degrees and less than or equal to 120 degrees.

[0010] Compared with the prior art, the utility model has the following advantages:

[0011] 1. The utility model aims at the side walls of structures such as sump pits and trenches. By arranging the first plate, the second plate, the third plate and the fourth plate in a stepped shape, it is convenient to form a negative angle by using the first plate and the second plate, and to form another negative angle by using the third plate and the fourth plate, thereby forming a plastering piece with two negative angles. It is convenient for technicians to press the plastering piece on the mortar of the side wall of the structure to form corresponding double positive angles on the mortar. The operation is simple and quick, and the double positive angles on the side wall of the structure can be realized at one time, which reduces the construction process and has strong practicality.

[0012] 2. The utility model sets the angle a, angle b and angle c to 90 degrees, so as to adapt to the cover plate of the conventional structure side wall. By setting the value range of angle a and angle b to 90 degrees to 120 degrees, it is easy to adapt to different cover plate shapes, or form a gap between the second plate and the cover plate, so that technicians can use the gap to place tools such as crowbars to open the cover plate. The utility model has strong flexibility and is easy to promote and use.

[0013] To sum up, the utility model has a simple structure and a reasonable design. For the side walls of structures such as sump pits and trenches, a step-shaped plastering piece is provided so that the plastering piece has two inner corners. When the plastering piece is used on the mortar of the side wall of the structure, a corresponding double outer corner is formed, so that the double outer corners of the wellhead of the side wall of the structure can be realized at one time, which reduces the construction process and has strong practicality.

[0014] The technical solution of the utility model is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural schematic diagram of the utility model.

[0016] Figure 2 This is a schematic diagram of the usage status of Example 1 of the utility model.

[0017] Figure 3 This is a schematic diagram of the usage status of Example 2 of the utility model.

[0018] Description of reference numerals:

[0019] 1- first plate; 2- second plate; 3- third plate;

[0020] 4-the fourth board; 5-the hand grip rod; 6-the connecting rod;

[0021] 7-Structural side wall; 8-Mortar. DETAILED DESCRIPTION

[0022] Example 1

[0023] like Figure 1 and Figure 2 As shown, the utility model comprises a plastering piece for smoothing the mortar 8 located on the upper part of the structural side wall 7 and a hand-grip rod 5 arranged on the upper part of the plastering piece.

[0024] The plastering parts include a first plate 1, a second plate 2, a third plate 3 and a fourth plate 4 which are sequentially connected in a step-like manner. The fourth plate 4 is arranged vertically. The handle bar 5 is connected to the second plate 2 and the third plate 3 through a connecting rod 6.

[0025] An angle a is formed between the first plate 1 and the second plate 2 , an angle b is formed between the second plate 2 and the third plate 3 , and an angle c is formed between the third plate 3 and the fourth plate 4 .

[0026] In actual use, by arranging the first plate 1, the second plate 2, the third plate 3 and the fourth plate 4 in a stepped shape, it is convenient to use the first plate 1 and the second plate 2 to form a inner angle, and at the same time use the third plate 3 and the fourth plate 4 to form another inner angle, thereby forming a plastering piece with two inner angles, which is convenient for technicians to press the plastering piece on the mortar 8 of the side wall 7 of the structure to form corresponding double outer angles on the mortar 8. The operation is simple and quick, so that the double outer angles of the wellhead of the side wall of the structure can be realized at one time, reducing the construction process and having strong practicality.

[0027] In this embodiment, the number of the connecting rods 6 is four, and the four connecting rods 6 are grouped in pairs, and the two connecting rods 6 in each group are respectively connected to the second plate 2 and the third plate 3 .

[0028] During actual use, the two groups of connecting rods 6 are respectively located at the two ends of the handle bar 5 , so that the technician can hold the middle part of the handle bar 5 for construction.

[0029] In this embodiment, the angle a, the angle b and the angle c are all 90 degrees.

[0030] It should be noted that by setting the angle a and the angle b equal, the first plate 1 and the third plate 3 are both in a horizontal state, thereby facilitating the placement of the cover plate; by setting the angle a and the angle b to 90 degrees, it is easy to adapt to the cover plate of the conventional structure side wall 7.

[0031] It should be noted that the structural side wall 7 can be a side wall of a structure such as a sump, a trench, or a structural groove.

[0032] Example 2

[0033] like Figure 3 As shown, the difference between this embodiment and embodiment 1 is that the value ranges of the angle a, the angle b and the angle c are all greater than 90 degrees and less than or equal to 120 degrees.

[0034] In actual use, the angle a and the angle b can be 120 degrees. By setting the value range of the angle a, the angle b and the angle c to 90 degrees to 120 degrees, it is easy to adapt to different cover shapes, or to form a gap between the second plate 2 and the cover, so that technicians can use the gap to place tools such as crowbars to open the cover, and it is also easy to form a horizontal slope, which is convenient for guiding ground water flow and has strong flexibility.

[0035] The above is only a preferred embodiment of the present invention and does not constitute any limitation to the present invention. Any simple modification, change and equivalent structural change made to the above embodiments according to the technical essence of the present invention shall still fall within the protection scope of the technical solution of the present invention.

Claims

1. A double external corner plastering tool, characterized in that: It comprises a plastering piece for leveling mortar (8) located on the upper part of the structural side wall (7) and a hand gripping rod (5) arranged on the upper part of the plastering piece; The plastering member comprises a first plate (1), a second plate (2), a third plate (3) and a fourth plate (4) which are sequentially connected in a step-like manner, the fourth plate (4) being arranged vertically, and the hand gripping rod (5) being connected to the second plate (2) and the third plate (3) via a connecting rod (6); An angle a is formed between the first plate (1) and the second plate (2), an angle b is formed between the second plate (2) and the third plate (3), and an angle c is formed between the third plate (3) and the fourth plate (4).

2. A double external corner plastering tool according to claim 1, characterized in that: The number of the connecting rods (6) is four, and the four connecting rods (6) are arranged in groups of two, and the two connecting rods (6) in each group are respectively connected to the second plate (2) and the third plate (3).

3. A double external corner plastering tool according to claim 2, characterized in that: The angle a, the angle b and the angle c are all 90 degrees.

4. A double external corner plastering tool according to claim 2, characterized in that: The value ranges of the angle a, the angle b and the angle c are all greater than 90 degrees and less than or equal to 120 degrees.