Temporary protection structure for cover-excavation-method foundation pit soil outlet
By designing a temporary protective structure that combines movable waterproof retaining walls and heating pipes, the problem of rainwater intrusion into the excavation opening during the reverse construction of the foundation pit using the cover and excavation method is solved, ensuring construction safety and environmental protection, and improving the efficiency of construction in the rainy season. and stability.
Patent Information
- Application Number
- CN202422159244.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the reverse construction of the foundation pit using the cover and cut method, the excavation opening is susceptible to rainwater intrusion, causing the earth to get wet, causing construction safety hazards and environmental pollution problems. Especially during construction during the rainy season and flood season, the earth excavation rate slows down and the soil nail slope protection is eroded. .
Design a temporary protective structure including waterproof retaining walls, columns, beams, purlins, roof panels and heating pipes. The roof panels can be moved to cover the excavation opening to prevent rainwater intrusion, and accelerate the melting of snow through heating pipes, which are fixed with anchors. The structure ensures that it will not be blown away on windy days.
It can effectively prevent earth collapse and soil nail slope protection erosion, improve construction safety and excavation efficiency, reduce soil pollution during night transportation, achieve environmentally friendly construction, and accelerate snow melting in winter to improve construction stability.
Smart Images

Figure CN221838010U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of foundation pit construction, in particular to a temporary protective structure for an excavation opening of a foundation pit using a cover-and-excavation method. Background Art
[0002] Compared with the open-cut construction method, the cover-and-cut construction method can be carried out covertly in areas with high traffic flow such as urban areas. Temporary covers can be used as roads without affecting traffic operations, which has significant advantages. However, in the process of cover-and-cut reverse construction, reverse earth excavation is a major construction difficulty. Affected by factors such as the earth excavation process and spatial environment, the earth excavation rate is relatively slow. Especially in construction during the rainy season, rainwater will enter from the temporary cover-and-cut reverse construction outlet, causing the earth to be wetted by rainwater, which will cause earth collapse and erosion of the soil nail slope protection, causing safety problems.
[0003] At the same time, due to municipal environmental protection construction requirements, excavation and transportation are often carried out at night. The earthwork of the cover-excavation method is usually piled up near the excavation port. After being wetted, the viscosity increases, making it difficult to dig and easy to adhere to the wheels of the transport vehicles, which can easily cause soil contamination and municipal environment pollution, which has a great impact on the environmental protection construction at the construction site and municipal environmental protection.
[0004] Therefore, how to strengthen the protection of temporary excavation openings for cover-excavation and reverse construction, avoid the reverse excavation earthwork from getting wet, and ensure safe and civilized construction of cover-excavation and reverse construction is a key and difficult point. Utility Model Content
[0005] In order to overcome the problem that the excavation opening of the cover-excavation reverse construction is easily invaded by rainwater during the flood season, soaking the earth, causing construction safety hazards and affecting the efficiency of earth excavation.
[0006] The technical scheme of the utility model is: a temporary protective structure for a foundation pit excavation opening of a cover-excavation method, comprising a waterproof retaining wall enclosing a circle above the cover-excavation opening, a frame composed of columns, beams and purlins, a roof panel, a heating pipe and an anchoring member; anchoring rings are installed around the waterproof retaining wall, the columns are square steel pipes and are arranged at the four corners of the waterproof retaining wall, a beam is welded and fixed between the top ends of two adjacent columns, four purlins are equidistantly distributed and welded and fixed between the upper ends of two opposite beams, a roller is installed at the lower end of the column, the roof panel is made of low-wave pressure metal material and is installed on the upper end of the purlin by self-tapping screws, the purlin is a channel steel structure and a heating pipe for heating the roof panel is installed inside, and the beam is connected and fixed to the corresponding anchoring ring by an anchoring member.
[0007] Preferably, the frame and the roof panel are pushed to the top of the temporary unearthed opening by rollers so that the roof panel completely covers the temporary unearthed opening to prevent the earth from being wetted by rain, and to avoid the collapse of the piled earth and the erosion of the soil nail slope protection. This can effectively ensure the safety of the reverse excavation foundation pit construction and the safety of the reverse soil nail slope support during the flood season. Then, the anchor is connected and fixed to the adjacent anchor ring to stabilize the protective structure at the temporary unearthed opening to prevent it from being blown away by strong winds. When the roof panel is covered with snow, heat is generated by the heating pipe to accelerate the melting of the snow on the roof panel.
[0008] Preferably, hooks are welded and fixed on the four edges of the roof panel, and hanging rings are fastened to the upper edge of the canvas cover cloth. The hanging rings are hooked one by one and the cover cloth is fixed to the edge of the roof panel. After the roof panel is moved above the temporary excavation opening, its surface is in close contact with the upper surface of the waterproof retaining wall, but there will inevitably be gaps. When it rains, rainwater will flow in from the gaps. Using the cover cloth to cover the gaps can further reduce the intrusion of rainwater.
[0009] Preferably, clamps are installed at equal intervals in the grooves of the purlins, and the heating tubes are clamped and fixed in the clamps. The heating tubes are provided with heating resistance wires with a heating temperature of 40-45°C. The purlins of the channel steel structure have hollow grooves, in which heating tubes can be installed to accelerate the melting of snow on the roof panels in rainy and snowy weather in winter. Other equipment such as light tubes can also be installed to provide internal lighting at the temporary excavation port to facilitate mechanical construction inside the excavation port.
[0010] Preferably, a photovoltaic module including a photovoltaic panel and a battery is provided on the roof panel. The photovoltaic panel is installed and fixed by means of vertical poles and purlins passing through the roof panel. The heating resistor in the heating tube is electrically connected to the photovoltaic module. During the day, the photovoltaic module absorbs solar energy and converts it into electrical energy for storage to supply power to the heating tube. The installation of the photovoltaic module on the vertical poles and purlins is more stable than fixing it on the roof panel.
[0011] Preferably, a U-shaped handle is welded on the side of the beam, and one end of the anchor ring is integrally fixedly connected with a threaded steel bar, which is embedded in the waterproof retaining wall. When moving the protective structure, the handle on one side is held by hand to apply force, and the protective structure is moved to the top of the temporary excavation port for covering by rolling on the ground with rollers. The anchor ring is fixed to the waterproof retaining wall by pre-embedded threaded steel bars, and has good integrity.
[0012] Preferably, the anchoring device includes a No. 1 lifting rope and a limiting rod; one end of the No. 1 lifting rope is tied to the crossbeam, and the other end is fixedly connected to the limiting rod, the limiting rod is vertically inserted into the corresponding anchor ring and flipped horizontally for limiting. After the protective structure is moved above the temporary excavation port, the No. 1 lifting rope is pulled to make the limiting rod on it vertically inserted into the corresponding anchor ring, and then the limiting rod is flipped horizontally and supported at the lower end of the anchor ring. If the No. 1 lifting rope is too long, in order to avoid the shaking of the protective structure, the No. 1 lifting rope can be untied from the crossbeam, re-bound, wrapped and tied to ensure that the limiting rod is close to the bottom of the anchor ring to form a stable limit.
[0013] Preferably, the anchoring device includes a No. 2 lifting rope and a positioning frame; one end of the No. 2 lifting rope is tied to the crossbeam, and the other end is fixedly connected to the positioning frame with a U-shaped structure. One vertical rod of the positioning frame is inserted into the anchor ring, and the other vertical rod is inserted into the soil around the waterproof retaining wall. After the protective structure is moved above the temporary excavation port, the No. 2 lifting rope is pulled to insert one vertical rod of the positioning frame into the corresponding anchor ring and continue to apply force to insert it into the soil. At the same time, the other vertical rod is also inserted into the surrounding soil. The positioning frame is prevented from moving by the gripping effect of the soil, and a stable limit is formed between the vertical rod inserted into the anchor ring and the anchor ring.
[0014] Beneficial effects of the utility model:
[0015] 1. The temporary excavation opening is protected by a movable roof panel to prevent the earthwork from being wetted by rain, thus avoiding the collapse of the piled earthwork and the erosion of the soil nail slope protection. This can effectively ensure the safety of the top-down foundation pit construction and the safety of the top-down soil nail slope support during the flood season;
[0016] 2. Prevent the temporarily piled soil from getting wet during rain, ensure the efficiency of earth excavation, prevent vehicles from being contaminated with mud during excavation at night, reduce municipal environmental pollution, and achieve environmentally friendly construction;
[0017] 3. The entire protective structure is easy to move and operate, which can avoid the impact of seasonal construction and improve the excavation rate during construction in the rainy season;
[0018] 4. Use anchors to connect and fix the frame and roof panels to the waterproof retaining wall to prevent the protective structure from being blown away and moving in windy weather, causing the temporary excavation opening to be exposed;
[0019] 5. By using the heating tubes installed in the purlins, the snow on the roof panels can be melted faster in heavy snow weather, preventing the roof panels from being crushed and deformed by a large amount of snow. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 What is shown is a first three-dimensional structural schematic diagram of a temporary protective structure for a foundation pit excavation opening of the utility model;
[0021] Figure 2 What is shown is a first structural schematic diagram of the side of the temporary protective structure of the foundation pit excavation opening of the utility model;
[0022] Figure 3 The three-dimensional structure schematic diagram of the first embodiment of the temporary protective structure anchoring member of the foundation pit excavation opening of the cover-excavation method of the utility model is shown;
[0023] Figure 4 The second three-dimensional structural schematic diagram of the temporary protective structure of the foundation pit excavation opening of the utility model is shown;
[0024] Figure 5 The diagram shows the side structure of the temporary protective structure of the excavation opening of the foundation pit of the utility model;
[0025] Figure 6 The three-dimensional structure schematic diagram of the second embodiment of the temporary protective structure anchoring member of the foundation pit excavation opening of the cover-excavation method of the utility model is shown;
[0026] Figure 7 The three-dimensional structure schematic diagram of the waterproof retaining wall of the temporary protective structure of the foundation pit excavation opening of the utility model is shown;
[0027] Figure 8 What is shown is a schematic diagram of the overall assembly of a temporary protective structure for the excavation opening of a foundation pit using the cover-and-excavation method of the present utility model;
[0028] Fig. 9 What is shown is the schematic diagram of the overall assembly front structure of the temporary protective structure for the excavation opening of the foundation pit using the cover-and-excavation method of the present utility model.
[0029] Explanation of the reference numerals in the accompanying drawings: 1. Waterproof retaining wall; 2. Anchor ring; 3. Column; 4. Beam; 5. Purlin; 6. Roller; 7. Roof panel; 8. Heating tube; 10. Cover cloth; 11. Photovoltaic module; 12. Handle; 901. Lifting rope No. 1; 902. Limit rod; 903. Lifting rope No. 2; 904. Positioning frame. DETAILED DESCRIPTION
[0030] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0031] See also Figure 1-Figure 9The utility model provides a temporary protective structure for the excavation opening of a foundation pit by a cover-excavation method, comprising a waterproof retaining wall 1 enclosed around the excavation opening, a frame composed of columns 3, beams 4 and purlins 5, a roof panel 7, a heating pipe 8 and an anchoring member; an anchoring ring 2 is installed around the waterproof retaining wall 1, the columns 3 are square steel pipes and are arranged at the four corners of the waterproof retaining wall 1, a beam 4 is welded and fixed between the tops of two adjacent columns 3, four purlins 5 are equidistantly distributed and welded and fixed between the upper ends of two opposite beams 4, a roller 6 is installed at the lower end of the column 3, the roof panel 7 is made of low-wave pressure metal material and is installed on the upper end of the purlin 5 by self-tapping screws, the purlin 5 is a channel steel structure and is internally installed A heating pipe 8 for heating the roof panel 7 is installed, and the crossbeam 4 is connected and fixed to the corresponding anchor ring 2 by an anchor. The skeleton and the roof panel 7 are pushed to the top of the temporary excavation port by the roller 6, so that the roof panel 7 completely covers the temporary excavation port to prevent the earth from being wetted by rain, and to avoid the collapse of the piled earth and the erosion of the soil nail slope protection. This can effectively ensure the safety of the construction of the top-down foundation pit during the flood season and the safety of the top-down soil nail slope support. Then, the anchor is connected and fixed to the adjacent anchor ring 2 to stabilize the protective structure at the temporary excavation port to avoid being blown away by strong winds. When the roof panel 7 is covered with snow, heat is generated by the heating pipe 8 to accelerate the melting of the snow on the roof panel 7.
[0032] See also Figure 1-Figure 2 , Figure 4-Figure 5 , Figure 7-Figure 9, hooks are welded and fixed on the edges of the four sides of the roof panel 7, and a hanging ring is fastened on the upper edge of the canvas cover cloth 10. The hanging ring is hooked with the hook one by one and the cover cloth 10 is fixed to the edge of the roof panel 7 for a week. After the roof panel 7 is moved above the temporary excavation port, its surface is in close contact with the upper surface of the waterproof retaining wall 1, but there will inevitably be a gap. When it rains, rainwater will flow in from the gap. Using the cover cloth 10 to cover the gap can further reduce the intrusion of rainwater. Clamps are equidistantly installed in the notches of the purlins 5, and the heating pipes 8 are clamped and fixed in the clamps. The heating pipes 8 are provided with heating resistance wires with a heating temperature of 40-45°C. The purlins 5 of the channel steel structure have hollow notches, and the heating pipes 8 can be installed to accelerate the melting of snow on the roof panel 7 in rainy and snowy weather in winter. Other equipment such as lamps can also be installed to provide internal lighting at the temporary excavation port. In order to facilitate the mechanical construction in the excavation opening, a photovoltaic module 11 including a photovoltaic panel and a battery is arranged on the roof panel 7. The photovoltaic panel is fixed to the purlin 5 by passing through the vertical pole of the roof panel 7. The heating resistor in the heating tube 8 is electrically connected to the photovoltaic module 11. During the day, the photovoltaic module 11 absorbs solar energy and converts it into electrical energy for storage to supply power to the heating tube 8. The installation of the vertical column 3 and the purlin 5 of the photovoltaic module 11 is more stable than that fixed on the roof panel 7. A U-shaped handle 12 is welded and installed on the side of the crossbeam 4. One end of the anchor ring 2 is integrally fixedly connected with threaded steel. The threaded steel is embedded in the waterproof retaining wall 1. When moving the protective structure, hold the handle 12 on one side with your hand to apply force, and roll it on the ground through the roller 6 to move the protective structure to the top of the temporary excavation opening for shielding and covering. The anchor ring 2 is fixed to the waterproof retaining wall 1 by pre-embedded threaded steel, and has good integrity.
[0033] Example 1: Please refer to Figure 1-Figure 3 In this embodiment, the anchoring member includes a No. 1 lifting rope 901 and a limiting rod 902; one end of the No. 1 lifting rope 901 is tied to the crossbeam 4, and the other end is fixedly connected to the limiting rod 902. The limiting rod 902 is vertically inserted into the corresponding anchor ring 2 and turned horizontally for limiting. After the protective structure is moved above the temporary excavation port, the No. 1 lifting rope 901 is pulled to make the limiting rod 902 thereon vertically inserted into the corresponding anchor ring 2, and then the limiting rod 902 is turned horizontally and supported at the lower end of the anchor ring 2. If the No. 1 lifting rope 901 is too long, in order to avoid the shaking of the protective structure, the No. 1 lifting rope 901 can be untied from the crossbeam 4, re-bound, wrapped and tied to ensure that the limiting rod 902 is close to the bottom of the anchor ring 2 to form a stable limit.
[0034] Example 2: Please refer to Figure 4-Figure 6In this embodiment, the anchoring member includes a No. 2 lifting rope 903 and a positioning frame 904; one end of the No. 2 lifting rope 903 is tied to the crossbeam 4, and the other end is fixedly connected to the positioning frame 904 with a U-shaped structure. A vertical rod of the positioning frame 904 is inserted into the anchor ring 2, and the other vertical rod is inserted into the soil around the waterproof retaining wall 1. After the protective structure is moved above the temporary excavation port, the No. 2 lifting rope 903 is pulled to insert a vertical rod of the positioning frame 904 into the corresponding anchor ring 2 and continue to apply force to insert it into the soil. At the same time, the other vertical rod is also inserted into the surrounding soil. The positioning frame 904 is prevented from moving by the gripping effect of the soil, and the vertical rod inserted into the anchor ring 2 forms a stable limit with the anchor ring 2.
[0035] Through the above steps, the temporary excavation opening is protected by the movable roof panel 7 to prevent the earth from being wetted by rain, avoid the collapse of the piled earth and the erosion of the soil nail slope protection, which can effectively ensure the safety of the covered excavation and reverse foundation pit construction during the flood season and the safety of the reverse soil nail slope support, avoid the temporary piled soil from being wetted during rain, ensure the efficiency of earth excavation, avoid vehicles being contaminated with mud during night excavation, reduce municipal environmental pollution, and achieve environmentally friendly construction, so as to solve the problem that the excavation opening of the covered excavation and reverse construction is easily invaded by rainwater during the flood season, wetting the earth, causing construction safety hazards and affecting the efficiency of earth excavation.
Claims
1. A temporary protective structure for a foundation pit excavation opening of a cover excavation method, comprising a waterproof retaining wall (1) surrounding the cover excavation opening; characterized in that: The invention also comprises a frame consisting of columns (3), beams (4) and purlins (5), a roof panel (7), a heating pipe (8) and anchoring members; anchoring rings (2) are installed around the waterproof retaining wall (1); the columns (3) are square steel pipes and are arranged at the four corners of the waterproof retaining wall (1); a beam (4) is welded and fixed between the tops of two adjacent columns (3); four purlins (5) are equidistantly distributed and welded and fixed between the upper ends of two opposite beams (4); a roller (6) is installed at the lower end of the column (3); The panel (7) is made of low-wave pressure metal and is installed on the upper end of the purlin (5) by self-tapping screws. The purlin (5) is a channel steel structure and is internally installed with a heating tube (8) for heating the roof panel (7). The crossbeam (4) is connected and fixed to the corresponding anchor ring (2) by anchoring members. Hooks are welded and fixed on the edges of the roof panel (7). A hanging ring is fastened to the upper edge of a canvas cover cloth (10). The hanging ring is hooked to the hook one by one and fixes the cover cloth (10) around the edge of the roof panel (7).
2. The temporary protective structure for the excavation opening of a foundation pit of the cover-and-excavation method according to claim 1 is characterized by: Clamps are equidistantly installed in the notches of the purlins (5), the heating tubes (8) are clamped and fixed in the clamps, and a heating resistance wire with a heating temperature of 40-45° C. is arranged in the heating tubes (8).
3. The temporary protective structure for the excavation opening of the foundation pit of the cover-excavation method according to claim 2 is characterized by: A photovoltaic module (11) including a photovoltaic panel and a storage battery is arranged on the roof panel (7); the photovoltaic panel is installed and fixed via a vertical pole and a purlin (5) passing through the roof panel (7); and a heating resistor wire in the heating tube (8) is electrically connected to the photovoltaic module (11).
4. The temporary protective structure for the excavation opening of a foundation pit of the cover-and-excavation method according to claim 1 is characterized by: A U-shaped handle (12) is welded to the side of the crossbeam (4), and a threaded steel bar is integrally fixedly connected to one end of the anchor ring (2), and the threaded steel bar is embedded in the waterproof retaining wall (1).
5. The temporary protective structure for the excavation opening of a foundation pit using the cover-and-excavation method according to claim 1 is characterized by: The anchoring member comprises a No. 1 lifting rope (901) and a limiting rod (902); one end of the No. 1 lifting rope (901) is fastened to the crossbeam (4), and the other end is fixedly connected to the limiting rod (902); the limiting rod (902) is vertically inserted into the corresponding anchoring ring (2) and turned horizontally for limiting.
6. The temporary protective structure for the excavation opening of a foundation pit of the cover-and-excavation method according to claim 1 is characterized by: The anchoring member comprises a No. 2 lifting rope (903) and a positioning frame (904); one end of the No. 2 lifting rope (903) is fastened to the crossbeam (4), and the other end is fixedly connected to the positioning frame (904) with a U-shaped structure; one vertical rod of the positioning frame (904) is inserted into the anchor ring (2), and the other vertical rod is inserted into the soil around the waterproof retaining wall (1).