Double-pump reverse circulation drilling machine
By using a dual-pump system in a reverse circulation drilling rig, the problem of reduced suction lift after drilling to a certain depth is solved, efficient extraction and circulation of mud is achieved, and the drilling speed and depth are increased.
Patent Information
- Application Number
- CN202420567070.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2034-03-22
AI Technical Summary
When the existing reverse circulation drilling rig drills to a certain depth, the suction lift decreases, the drilling speed slows down, and the mud is even unable to be pumped out, resulting in problems of low depth and speed.
A double-pump reverse circulation drilling rig is designed. By installing an upper pump and a lower pump on the power head and connecting them through the upper and lower pump connecting pipes, the lower pump starts working when drilling to a certain depth, extracts mud, and discharges it through the upper pump to The mud pool is sedimented and recycled to increase drilling speed and depth.
It realizes the efficient extraction and recycling of mud during the drilling process, increases the drilling speed and depth, and improves the working capacity of the drilling rig.
Smart Images

Figure CN221838285U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of rotary drilling rigs, in particular to a double-pump reverse circulation drilling rig. Background Art
[0002] Rotary drilling rig is a kind of construction machinery widely used in geotechnical construction at home and abroad for hole-making operations. It plays a significant role in the foundation construction process of municipal construction, highway bridges, high-rise buildings, etc.
[0003] The existing reverse circulation drilling rig has a motor and a pump placed on the power head, and uses a centrifugal pump to suck the mud from the wellbore. When drilling to a certain depth, the suction range is reduced, the drilling speed slows down, and even the mud cannot be pumped out. Utility Model Content
[0004] (I) The utility model provides a dual-pump reverse circulation drilling rig, which alleviates the technical problems of low drilling depth and drilling speed in the prior art.
[0005] (II) Technical solution
[0006] In order to solve the above technical problems, the embodiment of the utility model provides a double-pump reverse circulation drilling rig, including a traveling device, a lifting device, a power output device and a mounting assembly;
[0007] The lifting device comprises a gantry, the walking device is connected to the gantry, and the gantry is connected to a power output device;
[0008] The power output device includes a power head, an upper pump and a lower pump, wherein the upper pump is installed above the power head, and the lower pump is installed below the power head. The upper pump and the lower pump are connected through upper and lower pump connecting pipes. The bottom end of the power output device is connected to a mounting assembly, and the drill rod is connected below the mounting assembly.
[0009] Furthermore, the gantry is provided with a lifter and a hoisting frame, a rotating shaft is provided at the top of the gantry, one end of the lifter is connected with a steel wire, the steel wire passes through the rotating shaft and is connected to the winder on the walking device, the other end of the lifter is connected with the hoisting frame, and the hoisting frame is connected to the power head.
[0010] Furthermore, a slideway is provided on the inner wall of the side where the gantry is connected to the power head, and sliding members are provided on both sides of the power head, and the sliding members can slide along the extension direction of the slideway.
[0011] Furthermore, a driving sleeve is provided below the power head, a first transition flange is connected below the driving sleeve, a docking flange is provided on the upper and lower pump connecting pipes, and the first transition flange is connected to the docking flange.
[0012] Furthermore, a power head connecting pipe is connected below the docking flange, a first bearing is arranged between the docking flange and the power head connecting pipe, and first skeleton oil seals are arranged above and below the first bearing.
[0013] Furthermore, an outer cylinder is connected to the bottom of the power head connecting pipe, the bottom of the outer cylinder is connected to the lower flange, and the bottom of the lower flange is connected to the bearing sleeve.
[0014] Furthermore, a second bearing is provided on the inner diameter of the bearing sleeve, floating oil seals 314 are provided above and below the second bearing, and second skeleton oil seals are provided above and below the floating oil seal 314.
[0015] Furthermore, a lower oil seal mounting sleeve is provided at the lower end of the second skeleton oil seal below the second bearing, a second transition flange is connected below the lower oil seal mounting sleeve, and a drill pipe mounting assembly is connected below the second transition flange.
[0016] Furthermore, the drill rod installation assembly includes a drill rod installation flange and a drill rod removal flange. The drill rod installation flange is connected to the second transition flange at the top and is connected to the drill rod removal flange at the bottom.
[0017] Furthermore, a combined sleeve, a third transition flange, an intermediate flange pipe, a fourth transition flange and a lower flange pipe are sequentially connected to the inner side of the bearing sleeve below the lower pump.
[0018] Beneficial effects of the utility model:
[0019] The utility model provides a dual-pump reverse circulation drilling rig, including a walking device, a lifting device, a power output device and a mounting assembly; the lifting device includes a gantry, the walking device is connected to the gantry, and the gantry is connected with a power output device; the power output device includes a power head, an upper pump and a lower pump, the upper pump is installed above the power head, the lower pump is installed below the power head, the upper pump and the lower pump are connected through an upper and lower pump connecting pipe, and the bottom end of the power output device is connected to a drill pipe. In the utility model, when the drilling reaches a certain depth, the lower pump starts to work after it is submerged in the water surface to extract mud, and the extracted mud enters from the bottom of the drill pipe. Since the upper pump and the lower pump are connected through the upper and lower pump connecting pipes, the mud enters the upper pump from the lower pump through the upper and lower pump connecting pipes, and flows out from the upper pump, discharged to the mud pool for sedimentation, and the water after sedimentation continues to be recycled, so that its circulation capacity is high, and the upper pump and the lower pump work at the same time, the drilling speed is fast, and the drilling depth is high. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0021] Figure 1 A front view of a double-pump reverse circulation drilling rig provided by an embodiment of the utility model;
[0022] Figure 2 A schematic diagram of the overall structure of a double-pump reverse circulation drilling rig provided by an embodiment of the utility model;
[0023] Figure 3 A schematic diagram of the direction of mud extraction of a dual-pump reverse circulation drilling rig provided in an embodiment of the utility model;
[0024] Figure 4 A schematic diagram of the drill rod structure of a dual-pump reverse circulation drilling rig provided in an embodiment of the utility model.
[0025] icon:
[0026] 1-traveling device; 101-steel wire; 102-reel;
[0027] 2-lifting device; 201-gantry; 2011-hook; 2012-door panel; 2013-cage; 2014-lifter; 2015-lifting frame; 2016-slide;
[0028] 3-power output device; 301-power head; 3011-pump frame; 302-upper pump; 303-lower pump; 304-upper and lower pump connecting pipes; 305-first transition flange; 306-butt flange; 307-power head connecting pipe; 308-first bearing; 309-first skeleton oil seal; 310-outer cylinder; 311-lower flange; 312-bearing jacket; 313-second bearing; 314-floating oil seal; 315-second skeleton oil seal; 316-lower oil seal installation sleeve; 317-second transition flange; 318-drill pipe flange installation; 319-drill pipe flange removal; 320-combined casing; 321-third transition flange; 322-middle flange pipe; 323-fourth transition flange; 324-lower flange pipe;
[0029] 4-installation assembly; 401-key bar; 402-drill bit; 403-water outlet;
[0030] 5- Mud pool;
[0031] 6-slurry discharge pipe;
[0032] 7- Water inlet pipe. DETAILED DESCRIPTION
[0033] The technical solution of the utility model will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0034] In the description of the present invention, it should be noted that the terms "upper" and "lower" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0035] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the insides of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. In addition, in the description of the present invention, unless otherwise specified, "plurality" means two or more.
[0036] like Figures 1 to 4 As shown, the utility model provides a dual-pump reverse circulation drilling rig, including a traveling device 1, a lifting device 2, a power output device 3 and a mounting assembly 4; the lifting device 2 includes a gantry 201, the traveling device 1 is connected to the gantry 201, and the gantry 201 is connected with the power output device 3; the power output device 3 includes a power head 301, an upper pump 302 and a lower pump 303, the upper pump 302 is installed above the power head 301, and the lower pump 303 is installed below the power head 301, the upper pump 302 and the lower pump 303 are connected through an upper and lower pump connecting pipe 304, the bottom end of the power output device 3 is connected with the mounting assembly 4, and the drill rod is connected below the mounting assembly 4.
[0037] In this embodiment, when the drilling reaches a certain depth, the lower pump 303 starts to work after it is above the water surface to extract mud. The extracted mud enters from the bottom of the drill pipe. Since the upper pump 302 and the lower pump 303 are connected through the upper and lower pump connecting pipes 304, the mud enters the upper pump 302 from the lower pump 303 through the upper and lower pump connecting pipes 304, and flows out from the upper pump 302 and is discharged into the mud pool 5 for sedimentation. After the sedimentation is completed, the water is continuously recycled, thereby making its circulation capacity high, and the upper pump 302 and the lower pump 303 work at the same time, the drilling speed is fast, and the drilling depth is high.
[0038] The outlet A of the upper pump 302 is connected to a slurry discharge pipe 6, which is directly connected to a slurry pool 5 where slurry is stored. After the slurry in the slurry pool 5 has settled, the generated water and fine particles flow back from the lower end C of the slurry pool 5 through a water inlet pipe 7 connected to the connecting pipes of the upper and lower pumps 303, completing the cycle.
[0039] A vacuum pump is also provided below the lower pump. When drilling begins, the lower pump 303 cannot work because it has not yet submerged the water surface. Therefore, the vacuum pump works at the beginning to extract mud. When a certain depth is reached, the lower pump 303 starts working, the vacuum pump valve is closed, and the vacuum pump stops working.
[0040] Among them, preferably, the gantry 201 is provided with a hook 2011 and a door panel 2012, the hook 2011 is arranged at the top of the gantry 201, and is used to lift the power output device 3, a through hole is provided at the lower end of the gantry 201, the power output device 3 and the drill rod pass through the through hole, the door panel 2012 is arranged on both sides of the through hole, and can be opened and closed along the axial direction of the gantry 201 to fix the drill rod.
[0041] A pump frame 3011 is installed above the power head 301 , and the upper pump 302 is installed on the pump frame 3011 .
[0042] Optionally, a key bar 401 is provided at the upper end of the drill rod, and a thread is provided inside the key bar 401. The drill rod also includes an extension rod, and a key bar 401 is also provided at one end of the extension rod, and a thread is provided at the other end. The thread is matched with the thread inside the key bar 401 to be fixed, so as to extend the drill rod, and the number of the extension rods can be increased or decreased according to actual conditions. A drill bit 402 is connected to the lower end of the drill rod, and a water outlet 403 is provided on the drill bit 402 to provide water required for drilling.
[0043] The walking device 1 is a known prior art, and thus will not be described in detail.
[0044] According to an embodiment provided by the utility model, Figure 1 and Figure 2As shown, a lifter 2014 and a hoisting frame 2015 are provided on the gantry 201, a rotating shaft is provided at the top of the gantry 201, one end of the lifter 2014 is connected to a steel wire 101, the steel wire 101 passes through the rotating shaft and is connected to a reel 102 on the walking device 1, the other end of the lifter 2014 is connected to the hoisting frame 2015, and the hoisting frame 2015 is connected to the power head 301.
[0045] In this embodiment, a rotating shaft is provided on the top of the gantry, and the lifter 2014 and the lifting frame 2015 are installed in sequence below the rotating shaft and connected by using a steel wire 101. The other end of the steel wire 101 is connected to the winder 102 on the walking device 1, and the lifting frame 2015 is used to connect to the power head 301, so that the winder 102 on the walking device 1 can control the lifting and lowering of the power output device 3.
[0046] Preferably, an oil cylinder is provided between the traveling device 1 and the gantry 201, one end of the oil cylinder is mounted on the traveling device 1, and the other end is connected to the gantry 201, so that the gantry 201 can be tilted.
[0047] According to an embodiment provided by the utility model, Figure 1 , Figure 2 and Figure 3 As shown, a slideway 2016 is provided on the inner wall of the side where the gantry 201 is connected to the power head 301 , and sliding members are provided on both sides of the power head 301 , and the sliding members can slide along the extension direction of the slideway 2016 .
[0048] In this embodiment, in order to facilitate the power output device 3 to rise or fall in the gantry 201 as the lifter 2014 moves, a slide 2016 is provided on the inner wall on the side where the gantry 201 is connected to the power head 301, and sliding parts that can be slidably cooperated with the slide 2016 are installed on both sides of the power head 301. The sliding parts can slide freely in the slide 2016, and the sliding direction is consistent with the extension direction of the slide 2016, so that the power head 301 can move up and down according to the winding and unwinding of the winder 102.
[0049] According to an embodiment provided by the utility model, Figure 1 and Figure 2 As shown, a driving sleeve is provided below the power head 301 , a first transition flange 305 is connected below the driving sleeve, a docking flange 306 is provided on the upper and lower pump connecting pipes 304 , and the first transition flange 305 is connected to the docking flange 306 .
[0050] In this embodiment, a first transition flange 305 is connected to the driving sleeve below the power head 301, and the first transition flange 305 is directly connected to the docking flange 306 on the upper and lower pump connecting pipes 304, thereby completing the fixation between the power head 301 and the upper and lower pump connecting pipes 304. By using the first transition flange 305 to connect with the docking flange 306, the safety of use can be effectively increased.
[0051] According to an embodiment provided by the utility model, Figure 1 and Figure 2 As shown, a power head connecting pipe 307 is connected to the lower part of the docking flange 306 , a first bearing 308 is arranged between the docking flange 306 and the power head connecting pipe 307 , and first skeleton oil seals 309 are arranged above and below the first bearing 308 .
[0052] In this embodiment, a power head connecting pipe 307 is connected below the docking flange 306 and is connected through a first bearing 308. A first skeleton oil seal 309 is provided above and below the first bearing 308. By setting the first oil seal skeleton, the connection between the docking flange 306 and the power head connecting pipe 307 can be effectively sealed, dustproof, waterproof and oil-proof, and the internal key components can be protected from external substances such as dust, impurities and water vapor.
[0053] According to an embodiment provided by the utility model, Figure 1 and Figure 2 As shown, an outer cylinder 310 is connected to the bottom of the power head connecting pipe 307, the bottom of the outer cylinder 310 is connected to the lower flange 311, and the bottom of the lower flange 311 is connected to the bearing sleeve 312.
[0054] Furthermore, a second bearing 313 is disposed on the inner diameter of the bearing sleeve 312 , floating oil seals 314 are disposed above and below the second bearing 313 , and second skeleton oil seals 315 are disposed above and below the floating oil seal 314 .
[0055] In this embodiment, an outer cylinder 310 is also connected below the power head connecting pipe 307, and a lower flange 311 is connected below the outer cylinder 310 for fixation. The lower flange 311 is directly connected and fixed to the bearing sleeve 312. A second bearing 313 is provided on the inner diameter of the bearing sleeve 312. Floating oil seals 314 are provided above and below the second bearing 313, and second skeleton oil seals 315 are provided above and below the floating oil seal 314. The floating oil seal 314 can prevent fluid leakage by arranging the floating oil seal 314. The second skeleton oil seal 315 is arranged above and below the floating oil seal 314, which can be used more effectively to ensure the sealing, dustproof, waterproof and oilproof of the connection, and can also protect the key components inside from being invaded by external substances such as dust, impurities and water vapor.
[0056] According to an embodiment provided by the utility model, Figure 1 and Figure 2 As shown, a lower oil seal mounting sleeve 316 is provided at the lower end of the second skeleton oil seal 315 below the second bearing 313 , a second transition flange 317 is connected below the lower oil seal mounting sleeve 316 , and a drill pipe mounting assembly is connected below the second transition flange 317 .
[0057] In this embodiment, a lower oil seal mounting sleeve 316 is provided at the lower end of the second skeleton oil seal 315, and the lower oil seal mounting sleeve is connected to the drill pipe mounting assembly through a second transition flange 317, which is very stable and increases safety in use.
[0058] According to an embodiment provided by the utility model, Figure 1 and Figure 2 As shown, the drill pipe installation assembly includes a drill pipe installation flange 318 and a drill pipe removal flange 319. The drill pipe installation flange 318 is connected to the second transition flange 317 at the top and is connected to the drill pipe removal flange 319 at the bottom.
[0059] In this embodiment, when in use, after drilling to a certain depth, the power head 301 is lifted, the door panel 2012 is closed, the drill bit 402 is placed in the drill bit 402 slot 2013, the power head 301 is reversed to release the drill bit 402, the drill rod is placed above the drill bit 402 with the hook 2011, the power head 301 is lowered, and after reaching a suitable position, it is rotated forward to tighten the drill rod, the drill bit 402 and the drill rod mounting flange 318, the power head 301 is lifted, the door panel 2012 is opened, and drilling continues. When removing the drill rod, the drill rod removal flange 319 is installed below the drill rod mounting flange 318, and the remaining steps are opposite to the drill rod installation steps.
[0060] According to an embodiment provided by the utility model, Figure 1 and Figure 2 As shown, below the lower pump 303 and located inside the bearing sleeve 312 , a combined sleeve 320 , a third transition flange 321 , an intermediate flange pipe 322 , a fourth transition flange 323 and a lower flange pipe 324 are sequentially connected.
[0061] In this embodiment, the combined sleeve 320, the third transition flange 321, the middle flange tube 322, the fourth transition flange 323 and the lower flange tube 324 are all used to cooperate with the bearing and the sealing inner diameter therebelow.
[0062] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A double pump reverse circulation drilling rig, characterized in that: It comprises a walking device (1), a lifting device (2), a power output device (3) and a mounting assembly (4); The lifting device (2) comprises a gantry (201), the walking device (1) is connected to the gantry (201), and the gantry (201) is connected to a power output device (3); The power output device (3) comprises a power head (301), an upper pump (302) and a lower pump (303); the upper pump (302) is installed above the power head (301), and the lower pump (303) is installed below the power head (301); the upper pump (302) and the lower pump (303) are connected via an upper and lower pump connecting pipe (304); the bottom end of the power output device (3) is connected to a mounting assembly (4), and a drill rod is connected below the mounting assembly (4).
2. A dual-pump reverse circulation drilling rig according to claim 1, characterized in that: The gantry (201) is provided with a lifter (2014) and a hoisting frame (2015); a rotating shaft is provided at the top of the gantry (201); one end of the lifter (2014) is connected to a steel wire (101); the steel wire (101) passes through the rotating shaft and is connected to a reel (102) on the walking device (1); the other end of the lifter (2014) is connected to the hoisting frame (2015); and the hoisting frame (2015) is connected to the power head (301).
3. A dual-pump reverse circulation drilling rig according to claim 2, characterized in that: A slideway (2016) is provided on the inner wall of the side where the gantry (201) is connected to the power head (301), and sliding members are provided on both sides of the power head (301), and the sliding members can slide along the extension direction of the slideway (2016).
4. A dual-pump reverse circulation drilling rig according to claim 1, characterized in that: A driving sleeve is provided below the power head (301), a first transition flange (305) is connected below the driving sleeve, a docking flange (306) is provided on the upper and lower pump connecting pipes (304), and the first transition flange (305) is connected to the docking flange (306).
5. A dual-pump reverse circulation drilling rig according to claim 4, characterized in that: A power head connecting pipe (307) is connected below the docking flange (306), a first bearing (308) is provided between the docking flange (306) and the power head connecting pipe (307), and first skeleton oil seals (309) are provided above and below the first bearing (308).
6. A dual-pump reverse circulation drilling rig according to claim 5, characterized in that: The power head connecting pipe (307) is connected to an outer cylinder (310) below, the outer cylinder (310) is connected to a lower flange (311) below, and the lower flange (311) is connected to a bearing sleeve (312) below.
7. A dual-pump reverse circulation drilling rig according to claim 6, characterized in that: The inner diameter of the bearing sleeve (312) is provided with a second bearing (313), the upper and lower parts of the second bearing (313) are provided with floating oil seals (314), and the upper and lower parts of the floating oil seal (314) are provided with second skeleton oil seals (315).
8. A dual-pump reverse circulation drilling rig according to claim 7, characterized in that: A lower oil seal mounting sleeve (316) is provided at the lower end of the second skeleton oil seal (315) below the second bearing (313), a second transition flange (317) is connected below the lower oil seal mounting sleeve (316), and a drill pipe mounting assembly is connected below the second transition flange (317).
9. A dual-pump reverse circulation drilling rig according to claim 8, characterized in that: The drill rod installation assembly comprises a drill rod installation flange (318) and a drill rod removal flange (319). The drill rod installation flange (318) is connected to the second transition flange (317) at the top and is connected to the drill rod removal flange (319) at the bottom.
10. A dual-pump reverse circulation drilling rig according to claim 8, characterized in that: Below the lower pump (303), the inner side of the bearing sleeve (312) is also connected in sequence with a combined sleeve (320), a third transition flange (321), an intermediate flange pipe (322), a fourth transition flange (323) and a lower flange pipe (324).