Vibrating and trowelling integrated equipment for tunnel sewage side ditch construction

By designing an integrated vibrating and smoothing equipment for tunnel sewage ditches, using a combination of troweling steel plates and vibrators, the problem of inconvenient vibration in sewage ditch construction is solved, and efficient forming and boundary forming are achieved , improving construction efficiency and quality.

CN221838351UActive Publication Date: 2024-10-15CHINA FIRST HIGHWAY ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420904926.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-28
Publication Date
2024-10-15
Estimated Expiration
2034-04-28

AI Technical Summary

Technical Problem

In the construction of highway tunnels, it is inconvenient to vibrate the construction of sewage ditches, and it is difficult for existing equipment to effectively form and demarcate, affecting construction efficiency and quality.

Method used

An integrated vibrating and smoothing equipment is designed, including a smoothing steel plate and a vibrator. The steel plate is consistent with the top surface of the concrete structure and has a stepped shape. The vibrator is installed on the steel plate to drive the steel plate to vibrate the concrete and is equipped with a hinge. Handles and curved tubes are provided to facilitate operation and prevent the formwork from falling, and the steel plate length is suitable for movement along the trench.

Benefits of technology

The sewage ditch can be vibrated and flattened in one step, which reduces construction time and cost, improves construction quality, and eliminates the need for additional demarcation formwork, improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221838351U_ABST
    Figure CN221838351U_ABST
Patent Text Reader

Abstract

The utility model discloses vibrating and trowelling integrated equipment for tunnel sewage side ditch construction, a tunnel sewage side ditch comprises a concrete structure extending along the length direction of a tunnel, the section of the concrete structure is L-shaped, and the concrete structure is arranged close to a tunnel cable groove side wall so as to form a groove structure. The vibrating and trowelling integrated equipment comprises a trowelling steel plate and a vibrator, the trowelling steel plate and the top face of the concrete structure are consistent in contour shape and are both in a step shape, the width of the trowelling steel plate is matched with the width of the top face of the concrete structure, and the vibrator is installed on the top face of the trowelling steel plate and can drive the trowelling steel plate to vibrate concrete. The utility model has the advantages of low manufacturing cost and flexibility in operation, and compared with the traditional construction equipment, the investment cost is saved, the vibration problem is well solved, the time for vibration and trowelling construction is reduced, and the construction quality is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel construction, in particular to a vibrating and leveling integrated device used for tunnel sewage ditch construction. Background Art

[0002] According to the requirements of the highway tunnel design specification, the drainage system in the tunnel should achieve "water and sewage separation", requiring the tunnel pavement drainage system to be separated from the drainage system behind the tunnel lining. The sewage from the tunnel operation pavement cleaning is discharged from the tunnel through the roadside sewage ditch, and the seepage water behind the tunnel lining is discharged from the tunnel through the annular drainage blind pipe-longitudinal drainage pipe-transverse water pipe-drainage culvert-transverse water pipe-central drainage ditch. Usually, sewage ditches are designed along both sides of the tunnel. The sewage ditch structure is small, with a ditch bottom of only 5cm thick and 25cm wide, which is extremely inconvenient to vibrate with existing equipment. Utility Model Content

[0003] In view of the problems existing in the above-mentioned prior art, the utility model aims to provide an integrated vibrating and leveling device for tunnel sewage ditch construction, so as to solve the problem of inconvenience in vibration during sewage ditch construction.

[0004] In order to achieve the above-mentioned purpose, the utility model proposes an integrated vibrating and smoothing equipment for the construction of tunnel sewage ditch, wherein the tunnel sewage ditch includes a concrete structure extending along the length direction of the tunnel, the cross-section of the concrete structure is "L"-shaped, and the concrete structure is arranged close to the side wall of the tunnel cable trough, thereby forming a groove structure in combination, the integrated vibrating and smoothing equipment includes a smoothing steel plate and a vibrator, the smoothing steel plate is consistent with the top surface contour shape of the concrete structure, both are stepped, and the width of the smoothing steel plate matches the top surface width of the concrete structure, the vibrator is installed on the top surface of the smoothing steel plate, and the vibrator can drive the smoothing steel plate to vibrate the concrete.

[0005] In the above scheme: a handle is hinged on the top surface of the leveling steel plate to facilitate construction operations by workers.

[0006] In the above scheme: the handle is a "T"-shaped handle, and an upwardly bent arc tube is welded on the top surface of the leveling steel plate. The arc tube is higher than the vibrator, and a "U"-shaped clamping groove is provided on the top of the arc tube. The handle and the arc tube are arranged opposite to each other and are respectively located at the two ends of the leveling steel plate. When the handle is flipped to one side of the arc tube, the handle can be supported on the arc tube to prevent the handle from falling on the concrete surface after being stored, affecting the forming of the concrete structure.

[0007] In the above scheme: both ends of the leveling steel plate along the length direction are provided with vertical flanges upwards to play a blocking role and prevent concrete from overflowing onto the top surface of the leveling steel plate.

[0008] In the above scheme: the length of the leveling steel plate is 60 to 100 cm, which is convenient for workers to drag it along the direction of the tunnel sewage ditch to perform vibration and leveling construction.

[0009] The beneficial effects of the utility model are:

[0010] A small vibrator is combined with a steel plate, and the vibrator is fixed on top of the smoothing steel plate. The smoothing steel plate is made to be consistent with the designed top surface shape of the tunnel sewage ditch. When constructing the tunnel sewage ditch, the side formwork is set up in advance according to the design requirements, and the waterproof layer and steel bars are constructed as required, and then the concrete is poured. At this time, the integrated vibrating and smoothing equipment is used to move along the direction of the sewage ditch above the concrete, which can make the surface of the tunnel sewage ditch vibrate and smooth it into shape at one time. Moreover, since the smoothing steel plate is stepped, the boundary between the bottom of the tunnel sewage ditch and the corresponding side wall can be achieved directly by constructing the smoothing steel plate, without the need to set up a boundary template, which further speeds up the construction efficiency.

[0011] In short, the utility model has low cost and flexible operation, saves investment cost compared with traditional construction equipment, solves the vibration problem well, reduces the time of vibration and smoothing construction, and improves construction quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a structural schematic diagram of the utility model. DETAILED DESCRIPTION

[0013] like Figure 1 As shown, an integrated vibrating and leveling device for tunnel sewage ditch construction is provided. The tunnel sewage ditch includes a concrete structure 1 extending along the length direction of the tunnel. The cross-section of the concrete structure 1 is "L"-shaped. The concrete structure 1 is arranged close to the side wall 2 of the tunnel cable trough, thereby forming a ditch structure.

[0014] The integrated vibrating and leveling equipment includes a leveling steel plate 3 and a vibrator 4. The leveling steel plate 3 is consistent with the top surface contour shape of the concrete structure 1. Both are stepped, and the width of the leveling steel plate 3 matches the top surface width of the concrete structure 1.

[0015] The vibrator 4 is installed on the top surface of the smoothing steel plate 3, and the vibrator 4 can drive the smoothing steel plate 3 to vibrate the concrete.

[0016] During the construction of the tunnel sewage ditch, on the premise that the tunnel cable trough side wall 2 already exists, the side formwork 7 is first erected on the tunnel ground in advance according to the design requirements, and the waterproof layer and steel bars are constructed as required, and then the concrete is poured. At this time, the integrated vibration and leveling equipment is used to move along the tunnel sewage ditch above the concrete, so that the surface of the tunnel sewage ditch is vibrated and leveled at one time to form a concrete structure 1 with an "L"-shaped cross-section, and the top surface of the concrete structure 1 is in a "Z"-shaped stepped shape.

[0017] That is, the tunnel sewage ditch and the tunnel cable duct share a side wall. Since the tunnel cable duct is cast in advance, only the concrete structure 1 needs to be cast during the construction of the tunnel sewage ditch.

[0018] Preferably, a handle 5 is hinged on the top surface of the leveling steel plate 3 to facilitate construction operations by workers.

[0019] Preferably, the handle 5 is a "T"-shaped handle, and an upwardly curved arc tube 6 is welded on the top surface of the smoothing steel plate 3. The arc tube 6 is higher than the vibrator 4, and a "U"-shaped clamping groove is provided at the top of the arc tube 6. The handle 5 and the arc tube 6 are arranged opposite to each other and are respectively located at the two ends of the smoothing steel plate 3. When the handle 5 is flipped to one side of the arc tube, the handle 5 can be supported on the arc tube 6 to prevent the handle 5 from falling on the concrete surface after being stored, thereby affecting the forming of the concrete structure 1.

[0020] Preferably, both ends of the leveling steel plate 3 along the length direction are provided with vertical flanges (not shown) upwards to play a blocking role and prevent concrete from overflowing onto the top surface of the leveling steel plate 3.

[0021] Preferably, the length of the leveling steel plate 3 is 60 to 100 cm, so that workers can drag it along the direction of the tunnel sewage ditch to perform vibration and leveling construction.

Claims

1. An integrated vibrating and leveling device for tunnel sewage ditch construction, the tunnel sewage ditch comprising a concrete structure (1) extending along the length direction of the tunnel, the cross section of the concrete structure (1) being "L"-shaped, the concrete structure (1) being arranged close to the side wall (2) of the tunnel cable trough, thereby forming a ditch structure, characterized in that: The integrated vibrating and smoothing equipment comprises a smoothing steel plate (3) and a vibrator (4); the smoothing steel plate (3) and the top surface contour shape of the concrete structure (1) are consistent, both are stepped, and the width of the smoothing steel plate (3) matches the width of the top surface of the concrete structure (1); the vibrator (4) is installed on the top surface of the smoothing steel plate (3), and the vibrator (4) can drive the smoothing steel plate (3) to vibrate concrete.

2. The integrated vibrating and leveling equipment for tunnel sewage ditch construction according to claim 1 is characterized in that: A handle (5) is hinged on the top surface of the smoothing steel plate (3).

3. The integrated vibrating and leveling equipment for tunnel sewage ditch construction according to claim 2 is characterized in that: The handle (5) is a "T"-shaped handle. An upwardly curved arc tube (6) is welded on the top surface of the smoothing steel plate (3). The arc tube (6) is higher than the vibrator (4). A "U"-shaped clamping groove is provided at the top of the arc tube (6). The handle (5) and the arc tube (6) are arranged opposite to each other and are respectively located at two ends of the smoothing steel plate (3). When the handle (5) is turned toward one side of the arc tube, the handle (5) can be supported on the arc tube (6).

4. The integrated vibrating and leveling equipment for tunnel sewage ditch construction according to claim 1 is characterized in that: Both ends of the smoothing steel plate (3) along the length direction are provided with vertical flanges upwards.

5. The integrated vibrating and leveling equipment for tunnel sewage ditch construction according to claim 1 is characterized in that: The length of the smoothing steel plate (3) is 60 to 100 cm.