Butt-joint installation tool for reinforced concrete drainage pipes

By introducing shock-absorbing plates, buffer springs and damping cylinder liners into reinforced concrete drainage pipe docking installation tools, combined with the adjustment mechanism of hydraulic cylinders and motors, the problem of insufficient shock-absorbing capacity of existing tools is solved, achieving a more stable and efficient installation. installation process.

CN221839093UActive Publication Date: 2024-10-15XIAN LONGFEI COMM CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323585583.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2024-10-15
Estimated Expiration
2033-12-27

AI Technical Summary

Technical Problem

The existing reinforced concrete drainage pipe docking and installation tools have poor shock absorption capabilities during use, resulting in inconvenient buffering of vibrations and affecting the stability of the connection.

Method used

A tool is designed that includes a main body mechanism, an adjustment mechanism and a clamping mechanism. The main body mechanism adopts a combination of shock absorbing plate, buffer spring and damping cylinder liner. The adjusting mechanism adjusts the height of the U-shaped support frame through a hydraulic cylinder and an electric motor. The clamping mechanism uses The electric push rod and clamping plate are clamped and fixed to achieve flexible installation and vibration mitigation of pipes of different heights.

Benefits of technology

It effectively improves the shock-absorbing capacity and stability of the tool, enhances the adaptability and efficiency of use for pipes of different heights, and ensures stable connection and quick fixing of drainage pipes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221839093U_ABST
    Figure CN221839093U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pipeline connection, and discloses a reinforced concrete drain pipe butt joint installation tool which comprises a main body mechanism, an adjusting mechanism and a clamping mechanism, the adjusting mechanism is located above the main body mechanism, and the clamping mechanism is located below the adjusting mechanism. The main body mechanism comprises a damping plate, a counterweight bottom plate, a damping cylinder sleeve, a piston, a buffer spring and supporting legs, the counterweight bottom plate is movably mounted below the damping plate, the damping cylinder sleeve is fixedly mounted at the upper end of the counterweight bottom plate, and the piston is movably mounted at the upper end of the damping cylinder sleeve and fixedly connected to the lower end of the damping plate. According to the butt-joint installation tool for the reinforced concrete drainage pipes, the buffering capacity of the butt-joint installation tool is improved by installing the main body mechanism, in the actual using process, vibration force generated in the using process can be effectively damped and buffered in time, and the using stability of the butt-joint installation tool for the reinforced concrete drainage pipes is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipeline connection, in particular to a reinforced concrete drainage pipe butt installation tool. Background Art

[0002] Reinforced concrete drain pipes are mainly used for drainage tasks such as rainwater, sewage and farmland irrigation and drainage. However, when the reinforced concrete drain pipes are connected during construction, they need to be aligned and positioned to facilitate manual connection operations. Therefore, a reinforced concrete drain pipe connection installation tool is needed.

[0003] The prior art patent document with publication number CN211690667U discloses a tool for butt-jointing installation and correction of reinforced concrete drainage pipes, comprising a groove block, wherein the outer wall of the sliding rod is slidably connected to the left and right sides with sliding sleeves, the tops of the two sliding sleeves are fixedly connected to a second lower circle sleeve, the inner walls of the two second lower circle sleeves are fitted with the outer wall of the reinforced concrete drainage pipe, and the front and rear end surfaces of the two second upper circle sleeves and the second lower circle sleeves are fixed together by threads of bolts and nuts.

[0004] However, due to the poor shock-absorbing ability of the prior art patent technology with publication number CN211690667U during use, it is not convenient to timely shock-absorb the vibration force generated during use during actual use, and the chair shakes during use, affecting the stability of the connection. Utility Model Content

[0005] 1. Technical issues to be resolved

[0006] The utility model aims to provide a reinforced concrete drainage pipe butt installation tool to solve the problem in the above background technology that the prior art is not convenient for timely damping and buffering the vibration force generated during use.

[0007] (II) Technical solution

[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a reinforced concrete drainage pipe docking installation tool, comprising a main body mechanism, an adjusting mechanism and a clamping mechanism, the adjusting mechanism is located above the main body mechanism, and the clamping mechanism is located below the adjusting mechanism, the main body mechanism comprises a shock absorbing plate, a counterweight base plate, a damping cylinder sleeve, a piston, a buffer spring and a supporting foot, the counterweight base plate is movably installed below the shock absorbing plate, the damping cylinder sleeve is fixedly installed on the upper end of the counterweight base plate, the piston is movably installed on the upper end of the damping cylinder sleeve, the piston is fixedly connected to the lower end of the shock absorbing plate, the buffer spring is fixedly installed in the middle of the shock absorbing plate and the counterweight base plate, the buffer spring is located at the outer end of the damping cylinder sleeve and the piston, and the supporting foot is fixedly installed at the lower end of the counterweight base plate. By installing the buffer spring, it is easy to drive the shock absorbing plate and the piston to extend and retract, thereby achieving the effect of buffering and shock absorption.

[0009] Preferably, the adjustment mechanism includes a support column, a support rod, a hydraulic cylinder, a hydraulic push rod, a mounting cross plate, a mounting groove, a transmission motor, a transmission shaft, a double-sided threaded rod, a movable disk, a positioning nut and a connecting rod. The support column is fixedly mounted on the upper end of the shock-absorbing plate, the support rod is fixedly mounted on the upper end of the support column, the hydraulic cylinder is fixedly mounted on the lower end of the support rod, and the hydraulic push rod is fixedly mounted on the transmission end of the lower end of the hydraulic cylinder. By installing the hydraulic cylinder and the hydraulic push rod, it is possible to facilitate the adjustment of the use height of the U-shaped support frame and to facilitate the clamping and fixing of drainage pipes of different heights.

[0010] Preferably, the mounting cross plate is fixedly mounted on the lower end of the hydraulic push rod, the mounting groove is fixedly arranged on the lower end of the mounting cross plate, the transmission motor is fixedly mounted on the right end of the inner end of the mounting groove, and the transmission shaft is fixedly mounted on the transmission end of the left end of the transmission motor. By installing the transmission motor and the transmission shaft, the function of facilitating the rotation of the double-sided threaded rod is achieved.

[0011] Preferably, the double-sided threaded rod is fixedly installed on the left end of the transmission shaft, and the movable disk is fixedly installed on the left end of the inner end of the installation groove. The left end of the double-sided threaded rod is rotatably connected to the movable disk. By installing the double-sided threaded rod, it is possible to facilitate the positioning nut to move its position.

[0012] Preferably, the positioning nut is threadedly connected to the left and right ends of the outer end of the double-sided threaded rod, and the connecting rod is fixedly installed at the lower end of the positioning nut. By installing the positioning nut, the U-shaped support frame can be easily driven to move.

[0013] Preferably, the clamping mechanism includes a U-shaped support frame, an electric push rod, a push rod and a clamping plate. The U-shaped support frame is fixedly installed at the lower end of the connecting rod. By installing the U-shaped support frame, the electric push rod can be supported and installed conveniently.

[0014] The electric push rod is fixedly installed on the front and rear ends of the inner end of the U-shaped support frame, the push rod is fixedly installed on the transmission ends of the front and rear ends of the inner end of the electric push rod, and the clamping plate is fixedly installed on the front and rear ends of the inner end of the push rod. By installing the electric push rod and the push rod, it is easy to drive the clamping plate to clamp and fix the drain pipe.

[0015] Compared with the prior art, the beneficial effects of the utility model are:

[0016] 1. The reinforced concrete drain pipe docking installation tool improves the buffering capacity of the utility model by installing the main body mechanism. In actual use, the vibration force generated during use can be timely and effectively damped, thereby improving the use stability of the reinforced concrete drain pipe docking installation tool;

[0017] 2. The reinforced concrete drain pipe butt installation tool improves the adjustment ability of the utility model by installing the adjustment mechanism. In actual use, drain pipes of different heights can be conveniently connected and fixed according to the use needs, and two drain pipes can be conveniently connected and fixed, thereby improving the use efficiency of the reinforced concrete drain pipe butt installation tool;

[0018] 3. The clamping capacity of the reinforced concrete drain pipe butt installation tool is improved by installing a clamping mechanism. In actual use, the drain pipe can be clamped and fixed quickly and effectively, which is convenient for connection and use, thereby improving the practicality of the reinforced concrete drain pipe butt installation tool. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;

[0020] Figure 2 This is a schematic diagram of the partial structure of the adjustment mechanism of the utility model;

[0021] Figure 3 This is a schematic diagram of the structure of the clamping mechanism of the utility model;

[0022] Figure 4 This is a schematic diagram of the enlarged structure of the local details of the adjustment mechanism of the utility model;

[0023] Figure 5 It is a schematic diagram of the enlarged structure of the local details of the main mechanism of the utility model.

[0024] In the figure: 1. Main body; 101. Shock-absorbing plate; 102. Counterweight base plate; 103. Damping cylinder sleeve; 104. Piston; 105. Buffer spring; 106. Support foot; 2. Adjustment mechanism; 201. Support column; 202. Support rod; 203. Hydraulic cylinder; 204. Hydraulic push rod; 205. Mounting cross plate; 206. Mounting groove; 207. Transmission motor; 208. Transmission shaft; 209. Double-sided threaded rod; 210. Movable disk; 211. Positioning nut; 212. Connecting rod; 3. Clamping mechanism; 301. U-shaped support frame; 302. Electric push rod; 303. Push rod; 304. Clamping plate. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] See also Figure 1-Figure 5 The utility model provides a technical solution: a reinforced concrete drainage pipe docking installation tool, including a main body mechanism 1, an adjustment mechanism 2 and a clamping mechanism 3, the adjustment mechanism 2 is located above the main body mechanism 1, and the clamping mechanism 3 is located below the adjustment mechanism 2. The main body mechanism 1 includes a shock absorbing plate 101, a counterweight base plate 102, a damping cylinder sleeve 103, a piston 104, a buffer spring 105 and a supporting foot 106. The counterweight base plate 102 is movably installed below the shock absorbing plate 101, and the damping cylinder sleeve 103 is fixedly installed on the upper end of the counterweight base plate 102. The piston 104 is movably mounted on the upper end of the damping cylinder sleeve 103, the piston 104 is fixedly connected to the lower end of the shock absorbing plate 101, the buffer spring 105 is fixedly mounted in the middle of the shock absorbing plate 101 and the counterweight base plate 102, the buffer spring 105 is located at the outer ends of the damping cylinder sleeve 103 and the piston 104, and the supporting foot 106 is fixedly mounted on the lower end of the counterweight base plate 102. The piston 104 is squeezed by the shock absorbing plate 101, and the buffer spring 105 is compressed at the same time, and the elastic force of the buffer spring 105 is used to damp and buffer the vibration force.

[0027] The adjusting mechanism 2 includes a supporting column 201, a supporting rod 202, a hydraulic cylinder 203, a hydraulic push rod 204, a mounting cross plate 205, a mounting groove 206, a transmission motor 207, a transmission shaft 208, a double-sided threaded rod 209, a movable disk 210, a positioning nut 211 and a connecting rod 212. The supporting column 201 is fixedly mounted on the upper end of the shock absorbing plate 101, the supporting rod 202 is fixedly mounted on the upper end of the supporting column 201, the hydraulic cylinder 203 is fixedly mounted on the lower end of the supporting rod 202, the hydraulic push rod 204 is fixedly mounted on the transmission end of the lower end of the hydraulic cylinder 203, the mounting cross plate 205 is fixedly mounted on the lower end of the hydraulic push rod 204, the mounting groove 206 is fixedly set at the lower end of the mounting cross plate 205, and the transmission motor 207 is fixedly mounted on the right end of the inner end of the mounting groove 206. The transmission shaft 208 is fixedly installed on the transmission end of the left end of the transmission motor 207, the double-sided threaded rod 209 is fixedly installed on the left end of the transmission shaft 208, the movable disk 210 is fixedly installed on the left end of the inner end of the mounting groove 206, the left end of the double-sided threaded rod 209 is rotatably connected to the movable disk 210, the positioning nut 211 is threadedly connected to the left and right ends of the outer end of the double-sided threaded rod 209, the connecting rod 212 is fixedly installed at the lower end of the positioning nut 211, the hydraulic cylinder 203 is started to adjust the height of the hydraulic push rod 204 so that it pushes the mounting cross plate 205 downward, the transmission motor 207 is started to rotate the transmission shaft 208, so that the transmission shaft 208 drives the double-sided threaded rod 209 to rotate, and the positioning nut 211 moves in opposite directions on the double-sided threaded rod 209, and at the same time drives the clamping plate 304 to move.

[0028] The clamping mechanism 3 includes a U-shaped support frame 301, an electric push rod 302, a pushing rod 303 and a clamping plate 304. The U-shaped support frame 301 is fixedly installed at the lower end of the connecting rod 212, the electric push rod 302 is fixedly installed at the front and rear ends of the inner end of the U-shaped support frame 301, the pushing rod 303 is fixedly installed at the transmission ends at the front and rear ends of the inner end of the electric push rod 302, and the clamping plate 304 is fixedly installed at the front and rear ends of the inner end of the pushing rod 303. Start the electric push rod 302 to adjust the length of the pushing rod 303 so that it pushes the clamping plate 304 to clamp and fix the drain pipe.

[0029] Working principle: When it is necessary to dock and install the reinforced concrete drainage pipe, first, the reinforced concrete drainage pipe docking installation tool is stably placed at the position where it needs to be used through the support foot 106, and the hydraulic cylinder 203 is started to adjust the height of the hydraulic push rod 204, so that it pushes the installation cross plate 205 downward, and at the same time adjusts the height of the clamping plate 304, and then the electric push rod 302 is started to adjust the length of the push rod 303, so that it pushes the clamping plate 304 to clamp and fix the drainage pipe, and then the transmission motor 207 is started to rotate the transmission shaft 208, so that the transmission shaft 208 drives the double-sided threaded rod 209 to rotate, so that the positioning nut 211 moves oppositely on the double-sided threaded rod 209, and at the same time drives the clamping plate 304 to move, so that the two drainage pipes are docked and fixed, which is convenient for connection operation. When vibration occurs during use, the piston 104 is squeezed by the shock-absorbing plate 101, and the buffer spring 105 is compressed at the same time, and the elastic force of the buffer spring 105 is used to damp and buffer the vibration force.

[0030] Finally, it should be noted that the above content is only used to illustrate the technical solution of the utility model, rather than to limit the protection scope of the utility model. Simple modifications or equivalent substitutions of the technical solution of the utility model by ordinary technicians in this field do not deviate from the essence and scope of the technical solution of the utility model.

Claims

1. A reinforced concrete drainage pipe butt installation tool, comprising a main body mechanism (1), an adjustment mechanism (2) and a clamping mechanism (3), characterized in that: The adjusting mechanism (2) is located above the main mechanism (1), and the clamping mechanism (3) is located below the adjusting mechanism (2). The main mechanism (1) comprises a shock absorbing plate (101), a counterweight base plate (102), a damping cylinder sleeve (103), a piston (104), a buffer spring (105) and a supporting foot (106). The counterweight base plate (102) is movably mounted below the shock absorbing plate (101), and the damping cylinder sleeve (103) is fixedly mounted on the counterweight base plate (102). The piston (104) is movably mounted on the upper end of the damping cylinder sleeve (103), the piston (104) is fixedly connected to the lower end of the damping plate (101), the buffer spring (105) is fixedly mounted in the middle of the damping plate (101) and the counterweight base plate (102), the buffer spring (105) is located at the outer ends of the damping cylinder sleeve (103) and the piston (104), and the supporting foot (106) is fixedly mounted on the lower end of the counterweight base plate (102).

2. A reinforced concrete drainage pipe docking installation tool according to claim 1, characterized in that: The adjustment mechanism (2) comprises a support column (201), a support rod (202), a hydraulic cylinder (203), a hydraulic push rod (204), a mounting cross plate (205), a mounting groove (206), a transmission motor (207), a transmission shaft (208), a double-sided threaded rod (209), a movable plate (210), a positioning nut (211) and a connecting rod (212); the support column (201) is fixedly mounted on the upper end of the shock absorbing plate (101); the support rod (202) is fixedly mounted on the upper end of the support column (201); the hydraulic cylinder (203) is fixedly mounted on the lower end of the support rod (202); and the hydraulic push rod (204) is fixedly mounted on the transmission end of the lower end of the hydraulic cylinder (203).

3. A reinforced concrete drainage pipe butt installation tool according to claim 2, characterized in that: The mounting cross plate (205) is fixedly mounted on the lower end of the hydraulic push rod (204), the mounting groove (206) is fixedly arranged on the lower end of the mounting cross plate (205), the transmission motor (207) is fixedly mounted on the right end of the inner end of the mounting groove (206), and the transmission shaft (208) is fixedly mounted on the transmission end of the left end of the transmission motor (207).

4. A reinforced concrete drainage pipe butt installation tool according to claim 3, characterized in that: The double-sided threaded rod (209) is fixedly mounted on the left end of the transmission shaft (208), and the movable disk (210) is fixedly mounted on the left end of the inner end of the mounting groove (206). The left end of the double-sided threaded rod (209) is rotatably connected to the movable disk (210).

5. A reinforced concrete drainage pipe butt installation tool according to claim 4, characterized in that: The positioning nut (211) is threadedly connected to the left and right ends of the outer end of the double-sided threaded rod (209), and the connecting rod (212) is fixedly installed on the lower end of the positioning nut (211).

6. A reinforced concrete drainage pipe butt installation tool according to claim 5, characterized in that: The clamping mechanism (3) comprises a U-shaped support frame (301), an electric push rod (302), a push rod (303) and a clamping plate (304); the U-shaped support frame (301) is fixedly mounted on the lower end of the connecting rod (212).

7. A reinforced concrete drainage pipe butt installation tool according to claim 6, characterized in that: The electric push rod (302) is fixedly mounted on the front and rear ends of the inner end of the U-shaped support frame (301), the push rod (303) is fixedly mounted on the transmission ends of the front and rear ends of the inner end of the electric push rod (302), and the clamping plate (304) is fixedly mounted on the front and rear ends of the inner end of the push rod (303).