Cement diverging platform truck loading device
By designing the dust collection half-ring and dust collection fan structure on the cement loading platform, the problem of dust pollution during the loading process was solved, the centralized treatment of dust and the effective absorption of dust were achieved, and the environmental conditions at the loading site were improved.
Patent Information
- Application Number
- CN202420574450.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-25
AI Technical Summary
The existing cement loading platform has dust problems during the loading process, resulting in serious environmental pollution. The existing technology cannot effectively suppress the emission of dust.
A cement divergence platform loading device is designed, which adopts a combined structure of a dust collecting half ring and a dust collecting fan. The dust collecting half ring and dust shielding surface are set up outside the hopper, and a hydraulic telescopic rod is used to adjust the height of the hopper to ensure that dust is raised. Be absorbed and processed effectively.
It effectively prevents dust from overflowing, improves the environment at the loading site, ensures the smooth progress of the loading process, and continuously absorbs dust through the dust collection fan, significantly reducing flying phenomena.
Smart Images

Figure CN221875857U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of cement dispersing platforms, in particular to a cement dispersing platform loading device. Background Art
[0002] The existing cement loading platform is mainly used for loading at the bottom of the warehouse. Due to the different heights of bulk cement vehicles, it is necessary to use the bulk elevator at the bottom of the platform to adjust the height of the discharge hopper to ensure that the discharge hopper at the bottom can be just aligned with the inlet of the cement truck.
[0003] In order to prevent the cement from pouring too quickly, the pressure at the tank mouth of the tank truck will increase instantly and cannot be cleared in time, causing the cement truck feed port to overflow, so it is necessary to ensure that there is a certain distance between the hopper of the silo and the feed port of the cement truck. Based on this design, during the continuous loading of cement, the positive pressure gas formed by the cement pouring into the loading truck will rush out of the filling port to form flying dust, resulting in a lot of dust at the loading site, which greatly affects the environment. Utility Model Content
[0004] The utility model aims to solve the shortcomings in the prior art and proposes a cement dispersing platform loading device.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] A cement dispersing platform loading device comprises a cement platform body, a silo is arranged on the cement platform body, a lower barrel is arranged at the bottom of the silo, a discharge hopper is connected to the bottom of the lower barrel through a lifting canvas bag, two dust collecting half rings are overlapped on the outer side of the discharge hopper, and the two dust collecting half rings are assembled into a complete circular ring structure through fasteners;
[0007] A dust collecting ring cavity is reserved inside the dust collecting half ring, a through opening is provided at the bottom of the dust collecting half ring, the bottom wall of the outer side of the dust collecting half ring is turned outward to form an outward expansion edge, and a dust shield surface is provided at the bottom of the outward expansion edge;
[0008] The outer expansion edge is expanded to cover the top inlet of the cement filling truck, and the lower end of the dust shield surface is in contact with the top surface of the cement filling truck;
[0009] The two dust collecting half rings respectively extend dust collecting pipes outwards, and the ends of the dust collecting pipes are provided with dust hoppers.
[0010] In a preferred technical solution, a circle at the bottom of the lower barrel is connected to a discharge hopper below via a hydraulic telescopic rod.
[0011] In a preferred technical solution, the material of the dust shield surface is consistent with the material of the lifting canvas bag.
[0012] In a preferred technical solution, the surface where the discharge hopper contacts the two dust collecting half rings is provided with a matching step, wherein the discharge hopper is provided with a lower step on the outer side of its upper port, and the inner surface of the dust collecting half ring is provided with an upper step, and the dust collecting half ring is assembled on the outside of the discharge hopper through the matching step.
[0013] In a preferred technical solution, the two dust collecting half rings are relatively fitted together, and a connecting block is provided at the fitting position. The two dust collecting half rings are kept fixedly connected by locking screws inserted into the connecting block.
[0014] In a preferred technical solution, the installation position of the connecting block and the installation position of the dust collecting duct are relatively staggered.
[0015] In a preferred technical solution, a dust collecting fan is installed in the port of the dust collecting duct connected to the dust collecting half ring.
[0016] The beneficial effects of the utility model are:
[0017] 1. During the cement loading process, the design of the dust collecting ring can ensure that the dust scattered in all directions is uniformly absorbed and centrally processed, preventing the dust from escaping into the air and protecting the environment.
[0018] 2. The dust recovery system and cement feeding system are designed relatively independently and do not affect each other, so the cement feeding process can proceed smoothly.
[0019] To summarize, the cement loading platform proposed in this scheme solves the problem that dust cannot be suppressed during cement filling, resulting in a poor environment at the cement loading site. A dust collecting ring is installed on the outside of the discharge hopper. The dust shield at the bottom of the dust collecting ring can effectively prevent dust from overflowing. At the same time, the dust collecting fan added to the dust collecting ring can continuously absorb the dust that is blown out, effectively preventing dust from flying, and improving the environment at the cement loading site. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the overall main structure of the cement loading platform proposed by the utility model;
[0021] Figure 2 This is a schematic diagram of the structure of half of the dust collecting cylinder proposed by the utility model;
[0022] Figure 3 This is a schematic diagram of the overall structure of the dust collecting tube proposed by the utility model.
[0023] In the figure: 1. Cement platform body; 2. Silo; 3. Discharge barrel; 4. Lifting canvas bag; 5. Discharge hopper; 6. Hydraulic telescopic rod; 7. Dust collecting half ring; 71. Outward expansion edge; 72. Dust collecting ring cavity; 8. Dust shielding cover; 9. Dust collecting duct; 10. Dust hopper; 11. Matching step; 12. Connection block; 13. Dust collecting fan. DETAILED DESCRIPTION
[0024] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0025] In this embodiment, refer to Figure 1-3 A cement dispersing platform loading device includes a cement platform body 1, a silo 2 is arranged on the cement platform body 1, a lower barrel 3 is arranged at the bottom of the silo 2, and a discharge hopper 5 is connected to the bottom of the lower barrel 3 through a lifting canvas bag 4. In the prior art, a circle of the bottom of the lower barrel 3 is connected to the discharge hopper 5 below through a hydraulic telescopic rod 6. The discharge hopper 5 is raised and lowered by hydraulic control, so as to adjust the distance between the discharge hopper 5 and the cement tanker to ensure smooth discharge.
[0026] As attached Figure 3 As shown, two dust collecting half rings 7 are overlapped on the outer side of the discharge hopper 5. The two dust collecting half rings 7 are relatively fitted together, and a connecting block 12 is provided at the fitting position. The two dust collecting half rings 7 are fixedly connected by locking screws inserted into the connecting block 12 and are finally assembled into a complete circular ring structure.
[0027] Here, combined with the attached Figure 2 The assembly design of the discharge hopper 5 and the two dust collecting half rings 7 is specifically described: the surface where the discharge hopper 5 contacts the two dust collecting half rings 7 is provided with a matching step 11, wherein the discharge hopper 5 is provided with a lower step on the outer side of its upper port, and the inner surface of the dust collecting half ring 7 is provided with an upper step, and the dust collecting half ring 7 is assembled on the outside of the discharge hopper 5 through the matching step 11.
[0028] Before fastening the two dust collecting half rings 7 with fasteners, first ensure that the two dust collecting half rings 7 are placed on the steps outside the discharge hopper 5, then assemble them into a complete ring, and finally lock them, as shown in the attached figure. Figure 3 As shown, a dust collecting ring cavity 72 is reserved inside the dust collecting half ring 7. When the two dust collecting half rings 7 are fixed on one side, the sealing of the dust collecting ring cavity 72 can be ensured.
[0029] A through opening is provided at the bottom of the dust collecting semi-ring 7, and the bottom wall of the outer side of the dust collecting semi-ring 7 is turned outward to form an outward expansion edge 71. A dust shield 8 is provided at the bottom of the outward expansion edge 71. The material of the dust shield 8 is consistent with that of the lifting canvas bag 4. The dust shield 8 helps to isolate dust and prevent dust from escaping outward.
[0030] The outer expansion edge 71 is expanded to cover the top inlet of the cement filling truck, and the lower end of the dust shield 8 is in contact with the top surface of the cement filling truck. When the height of the discharge hopper 5 is adjusted, it can be ensured that the dust shield 8 is annularly pressed on the inlet of the cement tanker. With the outer expansion edge 71, during the cement unloading process, the space inside the dust shield 8 can be approximately considered as a closed environment. Figure 1 As shown, the height of the outwardly expanded edge 71 should be higher than the height of the discharge hopper 5. With such a design, the outwardly expanded edge 71 can be prevented from touching the top of the cement tank truck, and only the dust shield 8 needs to be used to cover the surface of the cement tank truck.
[0031] The two dust collecting half rings 7 extend the dust collecting pipe 9 outwards respectively, and the end of the dust collecting pipe 9 is provided with a dust hopper 10, and the dust collecting pipe 9 is installed with a dust collecting fan 13 in the port connected to the dust collecting half ring 7. When unloading, the dust collecting fans 13 on both sides are started at the same time, so that the flying dust can be quickly absorbed into the dust collecting pipe 9 and finally discharged outwards. Here, it should be supplemented that the installation position of the connecting block 12 is relatively staggered with the installation position of the dust collecting pipe 9. When the position of the dust collecting pipe 9 is different from the joint of the two dust collecting half rings 7, it is helpful for sealing, so that when the dust collecting fan 13 is working, the possibility of air leakage is small, and the dust in the dust collecting ring cavity 72 can be smoothly sucked away.
[0032] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A cement dispersing platform loading device, comprising a cement platform body (1), a silo (2) is arranged on the cement platform body (1), a discharge barrel (3) is arranged at the bottom of the silo (2), and the bottom of the discharge barrel (3) is connected to a discharge hopper (5) through a lifting canvas bag (4), characterized in that: Two dust collecting half rings (7) are overlapped on the outer side of the discharge hopper (5), and the two dust collecting half rings (7) are assembled into a complete circular ring structure through fasteners; A dust collecting ring cavity (72) is reserved inside the dust collecting half ring (7), a through opening is provided at the bottom of the dust collecting half ring (7), the bottom wall of the outer side of the dust collecting half ring (7) is turned outward to form an outward expansion edge (71), and a dust shield surface (8) is provided at the bottom of the outward expansion edge (71); The outer expansion edge (71) is expanded to cover the top inlet of the cement filling truck, and the lower end of the dust shield surface (8) is in contact with the top surface of the cement filling truck; The two dust collecting half rings (7) respectively extend outwards to form dust collecting pipes (9), and a dust outlet hopper (10) is provided at the end of the dust collecting pipe (9).
2. A cement dispersing platform loading device according to claim 1, characterized in that: The bottom circle of the lower barrel (3) is connected to the discharge hopper (5) below through a hydraulic telescopic rod (6).
3. The cement dispersing platform loading device according to claim 1, characterized in that: The material of the dust shield surface (8) is consistent with the material of the lifting canvas bag (4).
4. The cement dispersing platform loading device according to claim 1, characterized in that: The surface of the discharge hopper (5) in contact with the two dust collecting half rings (7) is provided with a matching step (11), wherein the discharge hopper (5) is provided with a lower step on the outer side of its upper port, and the inner surface of the dust collecting half ring (7) is provided with an upper step, and the dust collecting half ring (7) is assembled on the outside of the discharge hopper (5) through the matching step (11).
5. The cement dispersing platform loading device according to claim 1, characterized in that: The two dust collecting half rings (7) are relatively fitted together, and a connecting block (12) is provided at the fitting position. The two dust collecting half rings (7) are fixedly connected by locking screws inserted into the connecting block (12).
6. A cement dispersing platform loading device according to claim 5, characterized in that: The installation position of the connection block (12) and the installation position of the dust collection duct (9) are relatively staggered.
7. The cement dispersing platform loading device according to claim 1, characterized in that: The dust collecting pipe (9) is provided with a dust collecting fan (13) in the port thereof connected to the dust collecting half ring (7).