Movable crane beam and track butt joint device

By adopting the docking socket structure and elliptical cone design in the crane beam and track, the problem of insufficient reliability of the docking of the crane beam and track in the existing technology is solved, and a more stable connection and convenient maintenance are achieved, which is suitable for the construction industry. Crane equipment.

CN221917102UActive Publication Date: 2024-10-29POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420745095.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-11
Publication Date
2024-10-29
Estimated Expiration
2034-04-11

AI Technical Summary

Technical Problem

In the existing construction industry, the docking method of crane beams and tracks at the position of vertical fire-proof rolling shutter doors is not reliable and is easily misaligned, affecting the use function and making maintenance inconvenient.

Method used

A movable crane beam and track docking device including a docking socket structure, a docking receiving structure, and an elliptical cone inserted into the receiving elliptical hole are adopted. The design of the elliptical cone and trapezoidal insertion plate is used to ensure a firm connection between the crane beam and the track.

Benefits of technology

The crane beam and track have a simple structure, are easy to install, and are firmly and reliably connected, reducing structural deformation and improving safety in use and convenience in maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221917102U_ABST
    Figure CN221917102U_ABST
Patent Text Reader

Abstract

The utility model relates to a movable crane beam and rail butt joint device which comprises a movable crane beam, a fixed crane beam and a first butt joint structure, the movable crane beam is arranged on a first support, the movable crane beam can slide relative to the first support in the first direction, and the movable crane beam comprises a butt joint socket structure; the fixed crane beam is arranged on the second support, the fixed crane beam is fixedly connected with the second support, and the fixed crane beam comprises a butt joint receiving structure; the first butt joint structures are arranged on the movable crane beam and the fixed crane beam correspondingly, each first butt joint structure comprises an insertion elliptical cone and a receiving elliptical hole, and the movable crane beam and the fixed crane beam have a butt joint state; the insertion elliptical cone of one of the movable crane beam and the fixed crane beam is at least partially inserted into the receiving elliptical hole of the other one, and the butt joint socket structure is at least partially inserted into the butt joint receiving structure. The movable crane beam and rail butt joint device has the advantage of being firmer and more reliable in connection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of construction engineering, and in particular to a movable crane beam and track docking device. Background Art

[0002] At present, warehouses or factory projects in the construction industry set up loading and unloading channels and crane beams and rails in one or more spans. Generally, the crane beams and rails are disconnected at the position of the vertical fire shutter door. Generally, the crane beams and rails on both sides are directly connected or separated. This method is not reliable and is easy to dislocate, which causes inconvenience in use, affects the use function, and is also inconvenient for maintenance. Utility Model Content

[0003] The embodiment of the present application provides a movable crane beam and rail docking device, which has the characteristics of simple structure, easy installation, and more firm and reliable connection.

[0004] The movable crane beam and rail docking device provided in the embodiment of the present application include: a movable crane beam, the movable crane beam is arranged on a first support, and the movable crane beam can slide along a first direction relative to the first support, and the movable crane beam includes a docking socket structure;

[0005] A fixed crane beam, the fixed crane beam is arranged on a second support, the fixed crane beam is fixedly connected to the second support, and the fixed crane beam comprises a docking receiving structure;

[0006] A first docking structure, the first docking structure is respectively arranged on the movable crane beam and the fixed crane beam, the first docking structure includes an inserting elliptical cone and a receiving elliptical hole, the movable crane beam and the fixed crane beam have a docking state, in the docking state, the inserting elliptical cone of one of the movable crane beam and the fixed crane beam is at least partially inserted into the receiving elliptical hole of the other, and the docking socket structure is at least partially inserted into the docking receiving structure.

[0007] In addition, the movable crane beam and rail docking device provided in the embodiment of the present application may also have the following additional technical features:

[0008] In an optional scheme, the butt-jointed socket structure includes a baffle, a trapezoidal insert plate and a first fixed high-strength bolt, the baffle and the trapezoidal insert plate are arranged on the movable crane beam, the first fixed high-strength bolt fixedly connects the baffle and the movable crane beam, and the trapezoidal insert plate and the movable crane beam, and in the butt-jointed state, the trapezoidal insert plate can be at least partially inserted into the butt-jointed receiving structure.

[0009] In an optional scheme, the butt-jointed socket structure also includes a flat-head high-strength fixing bolt, which connects the trapezoidal insertion plate and the movable crane beam; a groove is provided between the baffle plate and the movable crane beam, and the side of the trapezoidal insertion plate facing the baffle plate can be partially inserted into the groove and fixed by the first fixing high-strength bolt.

[0010] In an optional solution, the docking receiving structure includes a receiving baffle and a second fixed high-strength bolt, the receiving baffle has a slot capable of accommodating the trapezoidal insertion plate, and the second fixed high-strength bolt fixedly connects the receiving baffle and the fixed crane beam.

[0011] In an optional solution, a tongue-and-groove step is provided at the upper portion of the first docking structure, and a bell mouth is provided at the opening of the receiving elliptical hole.

[0012] In an optional solution, the flat head high-strength fixing bolt is an extrusion-fixed flat head bolt or a detachable flat head bolt.

[0013] The beneficial effects of the embodiments of the present application are:

[0014] The movable crane beam and rail docking device in the embodiment of the present application includes a docking socket structure, a docking receiving structure and a first docking structure respectively arranged on the movable crane beam and the fixed crane beam. The connection can be made more firm and reliable through the docking of the docking socket structure and the docking receiving structure, as well as the docking of the two first docking structures. In addition, the movable crane beam and rail docking device also has the characteristics of simple structure, easy installation, and easy maintenance.

[0015] It should be understood that the foregoing general description and the following detailed description are exemplary only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A schematic diagram of the overall structure of the movable crane beam and rail docking device provided for this application;

[0017] Figure 2 A schematic diagram of the cross-sectional structure of the movable crane beam provided for this application;

[0018] Figure 3 A schematic diagram of a docking structure of a first docking structure provided in this application;

[0019] Figure 4 A structural schematic diagram of the butt-jointed socket structure provided for this application;

[0020] Figure 5 A structural schematic diagram of the docking receiving structure provided in this application.

[0021] Figure numerals: movable crane beam 1, first support 2, docking socket structure 3, baffle 31, trapezoidal insertion plate 32, first fixed high-strength bolt 33, flat head high-strength fixing bolt 34, groove 35, fixed crane beam 4, second support 5, docking receiving structure 6, receiving baffle 61, second fixed high-strength bolt 62, slot 63, first docking structure 7, inserting elliptical cone 71, receiving elliptical hole 72, bell mouth 73.

[0022] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application. DETAILED DESCRIPTION

[0023] In order to better understand the technical solution of the present application, the embodiments of the present application are described in detail below with reference to the accompanying drawings.

[0024] It should be clear that the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0025] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.

[0026] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0027] It should be noted that the directional words such as "upper", "lower", "left", and "right" described in the embodiments of the present application are described at the angles shown in the accompanying drawings and should not be understood as limiting the embodiments of the present application. In addition, in the context, it is also necessary to understand that when it is mentioned that an element is connected to another element "upper" or "lower", it can not only be directly connected to another element "upper" or "lower", but also indirectly connected to another element "upper" or "lower" through an intermediate element.

[0028] like Figure 1-5As shown, an embodiment of the present application provides a movable crane beam and rail docking device, which can be used for suspension during high-altitude operations such as scaffolding erection and steel structure, and can also be used in other similar usage environments, which is not specifically limited in this article.

[0029] The movable crane beam and track docking device provided in the embodiment of the present application includes a movable crane beam 1, a fixed crane beam 4 and a first docking structure 7. The movable crane beam 1 is arranged on the first support 2, and the movable crane beam 1 can slide relative to the first support 2 along the first direction, the first direction refers to the length direction of the movable crane beam 1, and the movable crane beam 1 includes a docking socket structure 3; the fixed crane beam 4 is arranged on the second support 5, the fixed crane beam 4 is fixedly connected to the second support 5, and the fixed crane beam 4 includes a docking receiving structure 6; the first docking structure 7 is respectively arranged on the movable crane beam 1 and the fixed crane beam 4, the first docking structure 7 includes an insertion elliptical cone 71 and a receiving elliptical hole 72, the movable crane beam 1 and the fixed crane beam 4 have a docking state, in the docking state, the insertion elliptical cone 71 of one of the movable crane beam 1 and the fixed crane beam 4 is at least partially inserted into the receiving elliptical hole 72 of the other, and the docking socket structure 3 is at least partially inserted into the docking receiving structure 6.

[0030] It should be noted that the number of the butt-jointed socket structures 3, the butt-jointed receiving structures 6 and the first butt-jointed structures 7 can be arranged in pairs of multiple groups, such as two or more groups, and the number is not specifically limited in this document. In addition, the sliding mode of the movable crane beam 1 relative to the first support 2 can be a sliding mode connected by a pulley, or a sliding mode of a slider and a slide rail, which is not specifically limited in this document.

[0031] In this embodiment, the movable crane beam and the rail docking device include a docking socket structure 3, a docking receiving structure 6 and a first docking structure 7 respectively arranged on the movable crane beam 1 and the fixed crane beam 4. The docking of the docking socket structure 3 and the docking receiving structure 6, as well as the docking of the two first docking structures 7 can make the entire connection structure more solid and reliable, ensuring the rigidity of the safety belt when used as a tool for high hanging and low use and convenient suspension and fixing, reducing structural deformation, and also having the advantages of easy operation, reusability, easy operation and low cost.

[0032] like Figure 1-3As shown, in a specific embodiment, a tongue-and-groove step is provided on the upper portion of the first docking structure 7. Specifically, the tongue-and-groove step includes a groove 35 located on one of the first docking structures 7 and a step surface located on the other first docking structure 7. When in the docking state, the step surface can form a tight fit with the groove 35, so that the tracks of the movable crane beam 1 and the fixed crane beam 4 are firmly spliced, thereby facilitating the smooth passage of the lifting trolley wheels. The first docking structure 7 can be fixed to the movable crane beam 1 and the fixed crane beam 4 according to the design requirements, and serve as a load-bearing structure.

[0033] In addition, the insertion elliptical cone 71 and the receiving elliptical hole 72 are used in conjunction with each other, and the opening of the receiving elliptical hole 72 is configured as a bell mouth 73 to facilitate the insertion of the elliptical cone 71, so that even if the first docking structure 7 is offset during docking, it can be smoothly inserted and docking can be completed. The matching depth of the elliptical cone and the receiving ellipse can be preset according to actual conditions, so it is not specifically limited in this article.

[0034] like Figure 4 As shown, in a specific embodiment, the docking socket structure 3 includes a baffle 31, a trapezoidal insert plate 32 and a first fixed high-strength bolt 33. The baffle 31 and the trapezoidal insert plate 32 are arranged on the movable crane beam 1. The first fixed high-strength bolt 33 fixes the baffle 31 and the movable crane beam 1, as well as the trapezoidal insert plate 32 and the movable crane beam 1. When in the docking state, the trapezoidal insert plate 32 can be at least partially inserted into the docking receiving structure 6.

[0035] like Figure 4 As shown, in a specific embodiment, the butt-jointed socket structure 3 further includes a flat head high-strength fixing bolt 34, which connects the trapezoidal insert plate 32 and the movable crane beam 1; a groove 35 is provided between the baffle plate 31 and the movable crane beam 1, and the side of the trapezoidal insert plate 32 facing the baffle plate 31 can be partially inserted into the groove 35 and fixed by the first fixing high-strength bolt 33. Specifically, the flat head high-strength fixing bolt 34 can be a flat head bolt fixed by extrusion or a detachable flat head bolt.

[0036] like Figure 5 As shown, in a specific embodiment, the docking receiving structure 6 includes a receiving baffle 61 and a second fixed high-strength bolt 62, the receiving baffle 61 has a slot 63 capable of accommodating the trapezoidal insert plate 32, and the second fixed high-strength bolt 62 is fixedly connected to the receiving baffle 61 and the fixed crane beam 4. In addition, when the receiving baffle 61 and the trapezoidal insert plate 32 are docked, the trapezoidal insert plate 32 is inserted into the receiving baffle 61, and the two can form a match. In addition, part of the outer wall of the receiving baffle 61 can also form a match with the inner wall of the baffle 31, so that the entire connection structure is more stable and firm, and no loosening of the match will occur during use.

[0037] The movable crane beam and rail docking device in the embodiment of the present application can be used according to the following steps:

[0038] 1) When the crane beam and track are in normal operation, the linkage motor drives the movable crane beam 1;

[0039] 2) When the movable crane beam 1 and the fixed crane beam 4 are docked, the trapezoidal insertion plate 32 is first inserted into the receiving baffle 61, and then the elliptical cone 71 is inserted into the receiving elliptical hole 72, so that the movable crane beam 1 and the fixed crane beam 4 form a joint body, which is convenient for the smooth operation of the upper lifting mechanism trolley. In such an insertion process, the trapezoidal insertion plate 32 can guide the insertion process of the elliptical cone 71 and the receiving elliptical hole 72 after being inserted into the receiving baffle 61, so as to facilitate the insertion of the elliptical cone 71 into the receiving elliptical hole 72.

[0040] 3) When a fire occurs, the linked lifting trolley first moves to the outside of the rolling door position, and then the linked motor drives the movable crane beam 1 to separate the movable crane beam 1 and the fixed crane beam 4, that is, the inserted elliptical cone 71 is separated from the receiving elliptical hole 72 and the trapezoidal insertion plate 32 is separated from the receiving baffle 61; 4) The rolling door descends until it is closed.

[0041] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A movable crane beam and rail docking device, characterized in that: include: A movable crane beam, the movable crane beam being arranged on a first support and being able to slide along a first direction relative to the first support, the movable crane beam comprising a butt-jointed socket structure; A fixed crane beam, the fixed crane beam is arranged on a second support, the fixed crane beam is fixedly connected to the second support, and the fixed crane beam comprises a docking receiving structure; A first docking structure, the first docking structure is respectively arranged on the movable crane beam and the fixed crane beam, the first docking structure includes an inserting elliptical cone and a receiving elliptical hole, the movable crane beam and the fixed crane beam have a docking state, in the docking state, the inserting elliptical cone of one of the movable crane beam and the fixed crane beam is at least partially inserted into the receiving elliptical hole of the other, and the docking socket structure is at least partially inserted into the docking receiving structure.

2. The movable crane beam and rail docking device according to claim 1, characterized in that: The butt-jointed socket structure includes a baffle, a trapezoidal insert plate and a first fixed high-strength bolt, the baffle and the trapezoidal insert plate are arranged on the movable crane beam, the first fixed high-strength bolt fixedly connects the baffle and the movable crane beam, as well as the trapezoidal insert plate and the movable crane beam, and in the butt-jointed state, the trapezoidal insert plate can be at least partially inserted into the butt-jointed receiving structure.

3. The movable crane beam and rail docking device according to claim 2, characterized in that: The butt-jointed socket structure also includes a flat-head high-strength fixing bolt, which connects the trapezoidal insertion plate and the movable crane beam; a groove is provided between the baffle and the movable crane beam, and the side of the trapezoidal insertion plate facing the baffle can be partially inserted into the groove and fixed by the first fixing high-strength bolt.

4. The movable crane beam and rail docking device according to claim 2 or 3, characterized in that: The docking receiving structure includes a receiving baffle and a second fixed high-strength bolt, the receiving baffle has a slot capable of accommodating the trapezoidal insertion plate, and the second fixed high-strength bolt fixedly connects the receiving baffle and the fixed crane beam.

5. The movable crane beam and rail docking device according to claim 4, characterized in that: A tongue-and-groove step is provided at the upper portion of the first docking structure, and a bell mouth is provided at the opening of the receiving elliptical hole.