Electric hoist for electric power line construction

By designing an electric hoist device for power line construction, using the fixation device and turntable of the cone, screw and external expansion pin, the problem of fixed position limitation and dumping of the hoist is solved, and the construction efficiency and stability are improved.

CN221917153UActive Publication Date: 2024-10-29ZHENGZHOU LONGHUA ELECTRICAL & MECHANICAL ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323041143.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-10
Publication Date
2024-10-29
Estimated Expiration
2033-11-10

AI Technical Summary

Technical Problem

The fixed position of the lifting hoist in the existing power line construction is limited, resulting in frequent movement and toppling of the equipment.

Method used

Design an electric hoist device, including a base, main pole, support arm, hydraulic rod and fixing device. Through the combination of cone barrel, screw rod and external expansion pin, the base is firmly fixed on the ground, and a turntable is set in the middle of the base. to facilitate direction adjustment.

Benefits of technology

It improves the stability and movement efficiency of the equipment in field construction, reduces the possibility of equipment tipping, and simplifies the direction adjustment of the hoist.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221917153U_ABST
    Figure CN221917153U_ABST
Patent Text Reader

Abstract

The utility model provides an electric hoist for power line construction, which is characterized in that a main vertical rod is vertically mounted on a base, a support arm is hinged to the upper end of the main vertical rod, the front end and the rear end of a hydraulic rod are respectively hinged to the middle of the support arm and the lower part of the main vertical rod, and the electric hoist is fixed on the main vertical rod; a steel rope on the electric hoist bypasses a hanging wheel at the front end of the support arm and is fixed with an anchor seat at the front end of the support arm; the fixing device comprises a conical cylinder, a screw and external expansion pins, the conical cylinder is mounted on the base, internal threads are arranged on the upper portion of the inner wall of the conical cylinder, the screw is in threaded fit with the conical cylinder, hole grooves are circumferentially and evenly distributed in the side wall of the lower portion of the conical cylinder, the external expansion pins are arranged in the hole grooves, hinge shafts are arranged in the middles of the external expansion pins, and the two ends of the hinge shafts are fixed to the two side walls of the hole grooves. The upper end of the external expansion pin is hinged to the screw. The base of the device can be firmly fixed to the ground through the fixing device, the conical barrel is nailed into the ground, then the screw is screwed in to enable the external expansion pin to be unfolded outwards, the conical barrel and the ground are firmly combined, and the possibility that equipment topples over is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of power line construction, in particular to an electric hoist used for power line construction. Background Art

[0002] When installing power in the wild, some power equipment or lines need to be lifted to a higher place. Most of the existing lifting methods use lifting hoists. However, this type of hoist can complete most of the construction lifting work, but it can only be installed in a fixed position each time, and the lifting position will also be limited. However, on the workplace, the hoist often needs to be used in different positions, which requires the lifting equipment to be moved frequently, which will greatly reduce the efficiency of construction.

[0003] In addition, the lifting equipment is prone to tipping over when in use, and the reason for tipping over is mostly that the base is not firmly fixed on the ground. Utility Model Content

[0004] The utility model is based on at least one of the above technical problems and proposes an electric hoist for power line construction.

[0005] 1. An electric hoist for power line construction, comprising: a base, a main pole, a support arm, an electric hoist, and a hydraulic rod, wherein the base is fixed to the ground by a fixing device, the main pole is vertically installed on the base, the support arm is hinged at the upper end of the main pole, the front and rear ends of the hydraulic rod are respectively hinged to the middle part of the support arm and the lower part of the main pole, the electric hoist is fixed to the main pole, the steel rope on the electric hoist passes around the hanging wheel at the front end of the support arm and is fixed to the anchor seat at the front end of the support arm, and a hook is arranged at the front part of the steel rope; the fixing device comprises a cone cylinder, a screw rod, and an external expansion pin, the cone cylinder is installed on the base, the upper part of the inner wall of the cone cylinder has an internal thread, the screw rod cooperates with the thread of the cone cylinder, the side wall of the lower part of the cone cylinder is provided with hole grooves evenly distributed around the circumference, an external expansion pin is arranged in the hole groove, a hinge shaft is arranged in the middle part of the external expansion pin, the two ends of the hinge shaft are fixed to the two side walls of the hole groove, and the upper end of the external expansion pin is hinged to the screw rod.

[0006] Preferably, a fixing plate is provided in the middle of the base, a turntable is provided at the center of the fixing plate, and the main vertical pole is fixed at the center of the turntable.

[0007] Preferably, the electric hoist is fixed on a motor seat, and the motor seat is fixed behind the middle of the main pole.

[0008] Preferably, an adjusting wheel 1 is provided on the upper part of the main vertical pole, and the steel rope starts from the electric hoist and passes over the top of the adjusting wheel 1.

[0009] Preferably, a second adjusting wheel is provided at the front of the support arm, the second adjusting wheel is located behind the hanging wheel, and the steel rope is passed around the top of the second adjusting wheel.

[0010] Beneficial effects: The base of the device can be firmly fixed on the ground through a fixing device. When in field construction, when the device is moved to the working position, the cone is nailed into the ground, and then the screw is screwed in to make the outer expansion pin expand outward, so that the cone is firmly combined with the ground, reducing the possibility of the equipment tipping over; in addition, a rotatable turntable is set in the middle of the base, and the hoist is installed on the turntable, and its adjustment direction will also be simpler. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 The utility model is shown in the structural diagram. DETAILED DESCRIPTION

[0012] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0013] like Figure 1 An electric hoist for power line construction shown in the figure includes: a base 1, a main pole 2, a support arm 3, an electric hoist 4, and a hydraulic rod 5. The base 1 is fixed to the ground by a fixing device 12. The fixing device 12 includes a cone 1201, a screw 1202, and an external expansion pin 1203. The cone 1201 is installed on the base 1. Openings 13 are arranged around the base 1. The cone 1201 is inserted into the opening 13, and the diameter of the upper part of the cone 1201 is larger than the diameter of the opening 13, so that the cone 1201 can clamp the entire base 1.

[0014] The upper part of the inner wall of the cone cylinder 1201 is provided with an internal thread, and the screw rod 1202 cooperates with the thread of the cone cylinder 1201. The bottom of the cone cylinder 1201 is a pointed cone, and the side wall of the lower part of the cone cylinder 1201 is provided with hole grooves 1205 evenly distributed around the circumference, and an external expansion pin 1203 is provided in the hole groove 1205. The external expansion pin 1203 will not exceed the side wall of the cone cylinder 1201 when it shrinks in the hole groove 1205. A hinge shaft is provided in the middle part of the external expansion pin 1203, and both ends of the hinge shaft are fixed on the two side walls of the hole groove 1205. The upper end of the external expansion pin 1203 is hinged to the screw rod 1202. When the screw rod 1202 is pressed down, the external expansion pin 1203 will expand outward.

[0015] In order to facilitate the operation of the screw rod 1202 , an operating panel 1204 is provided on the upper portion of the screw rod 1202 .

[0016] The main pole 2 is vertically installed on the base 1, the support arm 3 is hinged at the upper end of the main pole 2, the front and rear ends of the hydraulic rod 5 are respectively hinged to the middle part of the support arm 3 and the lower part of the main pole 2, the electric hoist 4 is fixed on the main pole 2, the steel rope 6 on the electric hoist 4 passes around the lifting wheel 9 at the front end of the support arm 3 and is fixed to the anchor seat 8 at the front end of the support arm 3, and a hook 7 is arranged at the front of the steel rope 6.

[0017] A fixing plate 14 is provided in the middle of the base 1 , a turntable 15 is provided in the center of the fixing plate 14 , and the main upright pole 2 is fixed at the center of the turntable 15 .

[0018] The electric hoist 4 is fixed on the motor seat, and the motor seat is fixed at the rear of the middle part of the main vertical pole 2.

[0019] An adjusting wheel 11 is provided on the upper part of the main vertical pole 2, and the steel rope 6 starts from the electric hoist 4 and passes over the top of the adjusting wheel 11. An adjusting wheel 2 10 is provided on the front part of the support arm 3, and the adjusting wheel 2 10 is located behind the hanging wheel 9, and the steel rope 6 passes over the top of the adjusting wheel 2 10.

[0020] The adjusting wheel 1 11 and the adjusting wheel 2 10 can make the adjustment of the steel rope 6 more convenient and prevent the steel rope 6 from contacting the support arm 3 and the main pole 2.

[0021] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. An electric hoist for power line construction, characterized in that: include: The yoke is provided with a hook at the front end of the hydraulic cylinder to control the lifting of the hydraulic cylinder to move upwards and downwards to move the hydraulic cylinder to move upwards and downwards to move the hydraulic cylinder to move upwards and downwards to move the hydraulic cylinder to move upwards and downwards to move the hydraulic cylinder to move upwards and downwards.

2. The electric hoist for power line construction according to claim 1, characterized in that: A fixing plate is provided in the middle of the base, a rotating disk is provided at the center of the fixing plate, and the main vertical pole is fixed at the center of the rotating disk.

3. The electric hoist for power line construction according to claim 2, characterized in that: The electric hoist is fixed on a motor seat, and the motor seat is fixed behind the middle of the main vertical pole.

4. The electric hoist for power line construction according to claim 1, characterized in that: An adjusting wheel is arranged on the upper part of the main vertical pole, and the steel rope starts from the electric hoist and passes over the upper part of the adjusting wheel.

5. The electric hoist for power line construction according to claim 1, characterized in that: A second adjusting wheel is arranged at the front of the supporting arm, and the second adjusting wheel is located behind the hanging wheel, and the steel rope is passed around the top of the second adjusting wheel.