Road traffic stone drainage system
By installing curb stones and permeable curb stones with drainage cavities, as well as rainwater wells on the road, underground drainage ditches are formed, which solves the problem of rainwater not being able to flow into the rainwater inlets in traditional road drainage methods, and realizes the rapid drainage of road water. and reduction in maintenance costs.
Patent Information
- Application Number
- CN202420475711.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-12
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-12
AI Technical Summary
In the traditional road drainage method, uneven road surface and inaccurate slope control prevent local rainwater from flowing into the rainwater outlet, and the curbstone is an impermeable material, causing water to accumulate on both sides of the road and the interface water cannot be drained, making it difficult to quickly clean up the water on the road. .
A curbstone drainage system is designed, including curbstones with drainage cavities, permeable curb stones set between the curbstones and the road, and rainwater wells arranged at intervals along the bottom of the road to form underground drainage ditches, which pass through the first and the second water inlet to drain the accumulated water at the interface between the road surface layer and the base layer into the drainage cavity and further process it through the rainwater well.
It realizes the rapid discharge of road surface and interface water, improves the water cleaning efficiency, reduces road maintenance costs, and ensures the safety and service life of the road structure.
Smart Images

Figure CN221918833U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building engineering construction, in particular to a curbstone drainage system. Background Art
[0002] The traditional road drainage method is to drain the surface rainwater to the rainwater outlets on both sides of the road through the vertical and horizontal slope of the road, and finally drain it to the municipal rainwater well after being collected by the rainwater pipe network. However, the longitudinal slope of the road is generally small. If the road surface at the edge is uneven and the slope control is not accurate, the rainwater in some sections of the road will not be able to flow into the rainwater outlet. In addition, the curbstone is an impermeable material, which causes a large amount of water to accumulate on both sides of the road and the water at the interface between the road surface and the base cannot be discharged. Utility Model Content
[0003] The utility model aims to solve at least one technical problem in the background technology and provide a curbstone drainage system.
[0004] In order to achieve the above object, the utility model provides a curbstone drainage system, comprising:
[0005] The curbstones are equipped with drainage cavities to remove water from the road surface;
[0006] A flat curbstone is arranged between the curbstone and the road surface to drain the water accumulated at the interface between the road surface layer and the base layer into the drainage cavity;
[0007] Rainwater wells are arranged at intervals below the road surface along the length direction of the curbstone and are arranged adjacent to the curbstone;
[0008] The drainage cavity is communicated with the rainwater well pipeline.
[0009] According to one aspect of the utility model, a first water inlet and a second water inlet are provided on a side wall of the curb facing the road, wherein the first water inlet is arranged relative to the road surface; the second water inlet is located below the first water inlet and is arranged opposite to the water permeable part of the flat curb stone.
[0010] According to one aspect of the utility model, the flat curb stone includes a common concrete layer and a permeable concrete layer, and the permeable concrete layer is arranged at the bottom of the common concrete layer and is arranged opposite to the second water inlet.
[0011] According to one aspect of the utility model, the rainwater well comprises: a rainwater well body, a rainwater inlet, a rainwater outlet and a rainwater outlet grate;
[0012] The rainwater inlet is arranged on the top side wall of the rainwater well body and is connected with the drainage cavity through a first pipeline;
[0013] The rainwater outlet is arranged on the side wall of the bottom end of the rainwater well body, and the rainwater in the rainwater well body is discharged through the second pipeline;
[0014] The rainwater outlet grate is arranged at the top of the rainwater well body to discharge rainwater from the road surface into the rainwater well body.
[0015] According to one aspect of the utility model, a slope is provided on the side of the curbstone facing the road surface.
[0016] According to one scheme of the utility model, the curbstone drainage system includes: a curbstone, which is provided with a drainage cavity to drain the water on the road surface; a flat curbstone, which is arranged between the curbstone and the road surface, and discharges the water on the interface between the road surface layer and the base layer into the drainage cavity; a rainwater well, which is arranged at intervals below the road surface along the length direction of the curbstone and is arranged adjacent to the curbstone; and the drainage cavity is connected to the rainwater well pipeline. Such an arrangement can make the above-mentioned drainage cavity actually form an underground drainage ditch, which receives rainwater on the road flowing down from the side wall of the curbstone, and then discharges the collected rainwater to the rainwater well through a pipeline for further rainwater treatment. Moreover, through the arrangement of the flat curbstone, the water on the interface between the road surface layer and the base layer can be discharged into the above-mentioned drainage ditch. Therefore, the utility model can ensure that the water on the road surface and the water on the interface below the road surface can be quickly discharged, ensure that the water on the road can be quickly discharged, effectively improve the efficiency of cleaning the water, and reduce the cost of road maintenance.
[0017] According to one solution of the utility model, a first water inlet and a second water inlet are provided on a side wall of the curb facing the road, the first water inlet being arranged relative to the road surface; the second water inlet being located below the first water inlet and arranged relative to the water-permeable portion of the flat curb. With such an arrangement, rainwater on the road surface and water accumulated at the interface between the road surface layer and the base layer can be quickly discharged into the drainage cavity serving as the drainage ditch through the first water inlet and the second water inlet, so that water accumulated at the road surface and the interface can be quickly and smoothly discharged from the road range, ensuring drainage effect and drainage efficiency.
[0018] According to one solution of the utility model, the flat curbstone includes an ordinary concrete layer and a permeable concrete layer, and the permeable concrete layer is arranged at the bottom of the ordinary concrete layer and is arranged opposite to the second water inlet. In this way, the water accumulated at the interface between the road surface layer and the base layer can be quickly and efficiently penetrated through the permeable concrete layer and discharged into the drainage ditch through the second water inlet, ensuring that the water accumulated at the interface can be quickly discharged from the road, ensuring drainage efficiency and effect, and effectively protecting the road structure.
[0019] According to one scheme of the utility model, the rainwater well includes: a rainwater well body, a rainwater inlet, a rainwater outlet and a rainwater outlet grate; the rainwater inlet is arranged on the top side wall of the rainwater well body, and is connected with the drainage cavity through the first pipeline; the rainwater outlet is arranged on the bottom side wall of the rainwater well body, and the rainwater in the rainwater well body is discharged through the second pipeline; the rainwater outlet grate is arranged at the top of the rainwater well body, and the rainwater on the road surface is discharged into the rainwater well body. With such an arrangement, part of the rainwater on the road surface can be discharged into the rainwater well body through the rainwater outlet grate, and the rainwater in the drainage cavity can also be discharged into the rainwater well body through the first pipeline, so that the drainage of road rainwater can be further accelerated, the rainwater discharge speed and discharge effect can be effectively improved, the road is guaranteed to be free of water accumulation, the road structure is guaranteed to be safe, and the service life of the road structure is effectively improved.
[0020] According to one solution of the utility model, a slope is provided on the side of the curb facing the road surface. With this arrangement, rainwater on the upper part of the curb can quickly flow down the curb through the slope and enter the drainage cavity through the first water inlet, thereby increasing the drainage speed of rainwater on the upper side of the curb and ensuring that there is no water accumulation on the upper side of the curb. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 A schematic diagram showing the structural principle of a curbstone drainage system according to an embodiment of the utility model;
[0022] Figure 2 A cross-sectional view schematically showing a curbstone drainage system according to an embodiment of the present invention;
[0023] Figure 3 Another cross-sectional view schematically showing a curbstone drainage system according to an embodiment of the present invention;
[0024] Figure 4 The structural layout diagram of a flat edge stone according to an embodiment of the utility model is schematically shown. DETAILED DESCRIPTION
[0025] The present invention will now be discussed with reference to exemplary embodiments. It should be understood that the embodiments discussed are only intended to enable those skilled in the art to better understand and implement the present invention, rather than to imply any limitation on the scope of the present invention.
[0026] As used herein, the term “including” and variations thereof are to be interpreted as open-ended terms meaning “including, but not limited to.” The term “based on” is to be interpreted as “based, at least in part, on.” The terms “one embodiment” and “an embodiment” are to be interpreted as “at least one embodiment.”
[0027] Figure 1 A schematic diagram showing the structural principle of a curbstone drainage system according to an embodiment of the utility model; Figure 2 A cross-sectional view schematically showing a curbstone drainage system according to an embodiment of the present utility model; Figure 3 Another cross-sectional view of a curbstone drainage system according to an embodiment of the present invention is schematically shown. Figure 1-Figure 3 As shown, in this embodiment, the curbstone drainage system includes:
[0028] The curbstone 1 is provided with a drainage cavity 2 to drain the water accumulated on the road surface 3;
[0029] The flat curbstone 4 is arranged between the curbstone 1 and the road surface 3 to drain the water accumulated at the interface between the road surface layer and the base layer into the drainage cavity 2;
[0030] Rainwater wells 5 are arranged below the road surface 3 at intervals along the length direction of the curbstone 1 and are arranged adjacent to the curbstone 1;
[0031] The drainage cavity 1 is connected to the rainwater well 5 by pipeline. With such arrangement, the drainage cavity can actually form an underground drainage ditch, which receives rainwater flowing down from the side wall of the curbstone on the road, and then discharges the collected rainwater to the rainwater well through the pipeline for further rainwater treatment. Moreover, by setting the flat curbstone, the water accumulated at the interface between the road surface and the base layer can be discharged to the drainage ditch. Therefore, the utility model can ensure that the accumulated water on the road surface and the accumulated water at the interface below the road surface can be quickly discharged, ensure that the accumulated water on the road can be quickly discharged, effectively improve the efficiency of clearing the accumulated water, and reduce the road maintenance cost.
[0032] Furthermore, if Figure 3 As shown, in this embodiment, a first water inlet 6 and a second water inlet 7 are provided on a side wall of the curbstone 1 facing the road, and the first water inlet 6 is arranged relative to the road surface; the second water inlet 7 is located below the first water inlet 6 and is arranged relative to the water-permeable portion of the flat curbstone 4. In this way, rainwater on the road surface and water accumulated at the interface between the road surface layer and the base layer can be quickly discharged into the drainage cavity 2 serving as a drainage ditch through the first water inlet 6 and the second water inlet 7, so that water accumulated at the road surface and the interface can be quickly and smoothly discharged from the road range, ensuring drainage effect and drainage efficiency.
[0033] Further, Figure 4 The structural layout diagram of the flat edge stone according to one embodiment of the utility model is schematically shown. Figure 4As shown, in this embodiment, the flat curb 4 includes an ordinary concrete layer 8 and a permeable concrete layer 9, and the permeable concrete layer 9 is arranged at the bottom of the ordinary concrete layer 8 and is arranged opposite to the second water inlet 7. In this way, the interface water between the road surface layer 17 and the base layer 18 can be quickly and efficiently penetrated through the permeable concrete layer 9 and discharged into the drainage ditch through the second water inlet 7, ensuring that the interface water can be quickly discharged from the road, ensuring drainage efficiency and effect, and effectively protecting the road structure.
[0034] Furthermore, if Figure 3 As shown, in this embodiment, the rainwater well 5 includes: a rainwater well body 10, a rainwater inlet 11, a rainwater outlet 12 and a rainwater outlet grate 13;
[0035] The rainwater inlet 11 is arranged on the top side wall of the rainwater well body 10 and is connected with the drainage cavity 2 through the first pipe 14;
[0036] The rainwater outlet 12 is arranged on the side wall of the bottom end of the rainwater well body 10, and the rainwater in the rainwater well body 10 is discharged through the second pipe 15;
[0037] The rainwater outlet grate 13 is arranged at the top of the rainwater well body 10 to discharge the rainwater on the road surface into the rainwater well body 10. In this way, the rainwater on the road surface can be discharged into the rainwater well body 10 through the rainwater outlet grate 13, and the rainwater in the drainage cavity 2 can be discharged into the rainwater well body 10 through the first pipeline 14, so that the drainage of road rainwater can be further accelerated, the rainwater discharge speed and discharge effect can be effectively improved, the road can be guaranteed to be free of water accumulation, the road structure can be guaranteed to be safe, and the service life of the road structure can be effectively improved.
[0038] Furthermore, if Figure 1-Figure 3 As shown, in this embodiment, a slope 16 is provided on the side of the curbstone 1 facing the road surface. With such a configuration, rainwater on the upper part of the curbstone 1 can quickly flow down the curbstone 1 through the slope 16 and enter the drainage cavity 2 through the first water inlet 6, thereby increasing the drainage speed of rainwater on the upper side of the curbstone 1 and ensuring that there is no water accumulation on the upper side of the curbstone 1.
[0039] Based on the above scheme of the utility model, the actual process of making the curbstone drainage system of the utility model is as follows:
[0040] Construction preparation: Careful planning should be done before construction. The layout of the integrated curbstones should be optimized according to the site road plan. The processing drawings should be completed in cooperation with the manufacturer. Standard blocks should be used to minimize the use of special-shaped blocks. The design top elevation of the curbstones of each road should be calculated according to the construction drawings.
[0041] Measurement and layout: Before construction preparation and measurement and layout, the technicians will first check the construction drawings, and accurately position and lay out the curbstones and drainage ditch positions and elevations provided in the construction drawings to control the direction and elevation. Measure the center line of the trench and determine the edge line of the base trench. Paint marks will be set on the edge line. The spacing between the nail piles should be 20 to 25 meters for straight sections and 5 to 10 meters for curved sections.
[0042] Excavation of foundation trench: The trench should be excavated in sections, from low to high. The trench is excavated with a slot milling machine, with manual assistance. The excavated soil is transported to the designated location for disposal by a muck truck. The net width of the trench bottom is calculated by adding 150mm working surface on both sides of the curbstone drainage ditch. The original soil 200mm above the bottom elevation of the foundation trench is manually cleared to the design elevation.
[0043] Casting the base of the foundation trench: After cleaning and watering the foundation trench, cast a C15 strength plain concrete cushion layer at the bottom of the trench with a thickness of 100mm. The cushion layer should be vibrated as it is laid, and the vibration should be dense and uniform, with a flat and straight surface. After the cushion layer is poured, it should be kept warm and moisturized in time, and the curing time should be no less than 7 days.
[0044] Laying of curbstones and drainage ditches: 1) Before laying curbstones and drainage ditches (i.e. drainage cavities), the coordinate axis and top surface elevation should be checked first, and new piles should be re-engraved. The pile spacing is 10-15m in the straight part, 5-10m in the curve, and 1-5m in the arc at the intersection. Lay out the lines according to the newly nailed piles. Small lines can be used to lay out the lines in the straight part, and white lime powder should be used to mark the curved part; 2) After nailing the piles and hanging the lines, arrange the curbstones and drainage ditches in order along one side of the foundation according to the numbers, and then spread the mortar evenly according to the design requirements, and install them according to the layout position; 3) The curbstones are connected by the mother-and-child slot method. The arc section or the entrance is installed first, and then the straight section is installed, and they are installed in sequence from low to high against the direction of water flow; 4) The curbstones of barrier-free passages, blind road entrances, and sidewalk openings are installed according to the design requirements; 5) An inspection port is set every 15-20m in the curbstone drainage ditch.
[0045] Concrete the side wings: After the installation of the curbstone drainage ditch is completed, the front and back concrete is constructed. Concrete with strength C15 is poured on the edges of both sides, compacted with a steel chisel, and watered for maintenance in time. During the concrete pouring process, avoid the curbstone drainage ditch from shifting left and right, and avoid concrete blocking the culvert or entering the drainage ditch.
[0046] Backfill and compaction: The back of the curbstone drainage ditch should be backfilled and compacted according to the design requirements. The width should be greater than 50cm, the thickness should be greater than 15cm, and the compaction degree should be above 93%. If the curbstone drainage ditch is found to be tilted or moved, it should be repaired immediately.
[0047] Connect to the rainwater well: Set up a water outlet at the bottom of the drainage ditch, use a 110mm diameter PVC pipe to connect to the rainwater well with a slope of 5%, and apply two coats of leak-proof agent on the interface.
[0048] Production and installation of curbstones: 1) The curbstones are made of double-layer materials, with the lower layer cast with 50mm thick permeable concrete and the upper layer cast with 70mm thick ordinary concrete. 2) The curbstones and the curbstone drainage ditch should be installed with staggered joints, and the joint width should be 5mm. The cushion layer is leveled with 1:3 cement mortar, with a virtual thickness of about 3cm and not more than 4cm, and the curbstones are installed according to the layout position; 3) The curbstones should be constructed by hanging through lines, and the top surface should be flush with the bottom surface of the upper culvert of the curbstone drainage ditch, not higher than the bottom surface of the culvert, and the slope should be 3% inward (the height difference between the inside and outside is preferably 10mm); 4) The curbstones should be constructed in conjunction with the downspouts, and the calculated surface elevation of the flat grate type rainwater outlet should be 30mm lower than the surrounding road surface elevation; 5) The curbstones must be firm after installation, and the line segments should be straight and the curves should be round and smooth. The joints should be tight and the slope should be correct, and water should not be blocked.
[0049] Asphalt road construction: 1) Asphalt road surface construction can only be carried out after the installation of curbstones, drainage ditches and flat curbstones has been completed and accepted. The construction process and standards are the same as those of asphalt roads; 2) During the construction of the asphalt road surface, the finished products of curbstones, drainage ditches and flat curbstones should be well protected to prevent pollution and blockage caused by asphalt concrete.
[0050] Water spray test: Before acceptance, arrange for a dedicated person to conduct a water spray test on the road drainage system and keep records. Inspection method: It should be carried out after observation after rain or after continuous water spraying for 2 hours to check whether the road drainage system is unobstructed, whether the drainage slope is correct, and whether there is obvious water accumulation on the road surface.
[0051] According to the above scheme of the utility model, by staggeredly arranging the upper and lower drainage holes (i.e., the first water inlet and the second water inlet) on the water-facing surface of the ditch wall, it has the dual functions of curbstone and drainage. The bottom of the upper hole culvert is flush with the road surface, and the lower hole culvert is buried between the surface layer and the base layer. The rainwater on the road surface quickly flows into the drainage ditch through the upper hole culvert, and the water accumulated at the interface between the surface layer and the base layer flows into the drainage ditch through the lower hole culvert. The drainage ditch is connected to the rainwater outlet on the curbstone, and the rainwater is collected by the rainwater pipe network and discharged into the municipal rainwater well; the integrated curbstone drainage system of the utility model has low cleaning and maintenance costs, can timely drain the stagnant water on the road surface, and reduce the daily drainage cost. It has room for sustainable development and is bound to be vigorously promoted in the future.
[0052] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the utility model.
Claims
1. A curbstone drainage system, It is characterized in that include: The curbstones are equipped with drainage cavities to remove water from the road surface; A flat curbstone is arranged between the curbstone and the road surface to drain the water accumulated at the interface between the road surface layer and the base layer into the drainage cavity; Rainwater wells are arranged at intervals below the road surface along the length direction of the curbstone and are arranged adjacent to the curbstone; The drainage cavity is communicated with the rainwater well pipeline.
2. The curbstone drainage system according to claim 1, It is characterized in that A first water inlet and a second water inlet are provided on a side wall of the curb facing the road, wherein the first water inlet is arranged relative to the road surface; and the second water inlet is located below the first water inlet and is arranged opposite to the water-permeable part of the flat curb.
3. The curbstone drainage system according to claim 2, It is characterized in that The flat edge stone comprises a common concrete layer and a permeable concrete layer. The permeable concrete layer is arranged at the bottom of the common concrete layer and is arranged opposite to the second water inlet.
4. The curbstone drainage system according to claim 1, It is characterized in that The rainwater well comprises: a rainwater well body, a rainwater inlet, a rainwater outlet and a rainwater outlet grate; The rainwater inlet is arranged on the top side wall of the rainwater well body and is connected with the drainage cavity through a first pipeline; The rainwater outlet is arranged on the side wall of the bottom end of the rainwater well body, and the rainwater in the rainwater well body is discharged through the second pipeline; The rainwater outlet grate is arranged at the top of the rainwater well body to discharge rainwater from the road surface into the rainwater well body.
5. The curbstone drainage system according to any one of claims 1 to 4, It is characterized in that The side of the curbstone facing the road surface is provided with an inclined surface.