New and old bridge plate splicing seam continuous construction device for bridge widening
By designing a continuous construction device for jointing joints of new and old bridge plates for the bridge widening of the roof, bottom plate and buffer components, the problem of insufficient joint protection in the existing technology has been solved, effective protection of the joints has been achieved, and the efficiency of bridge widening has been improved. Structural stability and practicality.
Patent Information
- Application Number
- CN202420332490.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-22
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-22
AI Technical Summary
The existing continuous construction device for jointing joints between old and new bridge slabs is inconvenient to protect during use, resulting in pressure on the construction position of the joints when there are too many vehicles, increasing maintenance costs and the risk of structural damage.
A continuous construction device for jointing new and old bridge plates for bridge widening, including a roof plate, a bottom plate, a thickened plate, a support component and a buffer component, is designed. Stable support and resistance are provided through installation sleeves, I-beams, buffer bars and spring components. Impact resistance prevents vehicles from directly extruding the pouring layer and protects joints.
It effectively prevents damage to the splicing seams, improves the stability and practicality of the bridge widening structure, ensures vehicle traffic safety, and reduces maintenance costs.
Smart Images

Figure CN221919006U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge construction, in particular to a continuous construction device for the splicing seams of new and old bridge plates used for bridge widening. Background Art
[0002] As one of the important carriers of highways, bridges are the key and difficult projects in highway reconstruction and expansion. How to ensure the good operating performance of the bridge structure after widening is the difficulty and key point in the bridge reconstruction and expansion project. Among them, the splicing form of the new and old bridge plates not only affects the stress of the main beam structure of the new and old bridges, but also has a far-reaching impact on the traffic organization, bridge deck driving conditions and maintenance work in the later operation stage. At the same time, it is restricted by the design and construction level in different periods. From the current development status at home and abroad, due to different structural forms and different spans, the splicing methods chosen when widening bridges will also be different.
[0003] After searching, the Chinese utility model patent with authorization announcement number CN219410517U discloses a continuous construction device for the joints of new and old bridge panels, which solves the defect of the existing construction process that templates and clamps need to be used for collaborative operation. It is a two-in-one template device; it includes a bottom plate, a top plate and a sealing plate, and is characterized in that the top plate and the bottom plate are steel plates and are respectively placed on the upper and lower sides of the new and old bridge panels to be spliced, and are pre-tightened and fixed between the top plate and the bottom plate by multiple groups of tension anchoring components, and at least grouting holes are set on the top plate, and the sealing plate blocks the ends of the top plate and the bottom plate at the new and old bridge panels to be spliced to form a secondary concrete pouring space.
[0004] In the process of implementing the present application, there are at least the following problems in the technology: the above-mentioned construction device is not convenient for protecting the splicing seams during use, while the flow of vehicles needs to be ensured during maintenance. When there are too many vehicles coming and going, it is easy to cause pressure on the construction position of the splicing seams, thereby causing damage to the construction position of the splicing seams, increasing maintenance costs. Therefore, a continuous construction device for the splicing seams of new and old bridge plates for bridge widening is proposed to solve the above-mentioned problems. Utility Model Content
[0005] In view of the shortcomings of the prior art, the present application provides a continuous construction device for the splicing seams of new and old bridge slabs for bridge widening, which has the advantages of protecting the splicing seams, etc., and solves the problem that the existing continuous construction device for the splicing seams of new and old bridge slabs is not convenient for protecting the splicing seams during use, while the flow of vehicles needs to be ensured during maintenance. When there are too many vehicles coming and going, it is easy to cause pressure on the construction position of the splicing seam, thereby causing damage to the construction position of the splicing seam.
[0006] In summary, the present application provides the following technical solutions: a continuous construction device for the joint seam of new and old bridge slabs for bridge widening, comprising a top plate installed on the upper side of the bridge slab and a bottom plate installed on the lower side of the bridge slab, a casting layer is arranged between the top plate and the bottom plate, a thickening plate is arranged on the upper side of the top plate, and a support assembly is arranged between the thickening plate and the top plate;
[0007] The support assembly includes a mounting sleeve and an I-beam, wherein the mounting sleeve is fixedly connected to the bottom of the thickened plate, the I-beam is fixedly connected to the top of the top plate, and the mounting sleeve is arranged on the outside of the I-beam, and a buffer assembly is arranged between the mounting sleeve and the I-beam;
[0008] The buffer assembly includes a buffer rod obliquely arranged inside the mounting sleeve and a first spring fixedly connected to the bottom of the mounting sleeve, the lower end of the first spring is fixedly connected to the outer wall of the I-beam, the upper end of the buffer rod is hinged to the inner wall of the mounting sleeve, the lower end of the buffer rod is hinged with a sliding sleeve, the outer side of the sliding sleeve is slidably matched with a mounting seat, the mounting seat is fixedly connected to the top of the I-beam, and the inner side of the mounting seat is provided with a second spring that abuts against the sliding sleeve.
[0009] The present application adopts the above-mentioned technical scheme, and the installation sleeve and I-beam are used to provide stable support for the thickened plate, and the thickened plate can be used to protect the casting layer between the top plate and the bottom plate. At the same time, the buffer component is provided to greatly improve the impact resistance of the thickened plate. When passing vehicles, it can avoid the vehicles directly squeezing the casting layer between the two bridge plates, and prevent the top plate from being squeezed into unevenness, thereby playing a good protective role at the construction position of the joint seam, improving the stability of the bridge widening structure, and having strong practicality.
[0010] Furthermore, a plurality of anchors are fixedly installed between the top plate and the bottom plate, and the anchors penetrate the inner side of the casting layer.
[0011] The beneficial effect of adopting the above further solution is that the top plate and the bottom plate can be fixed by the provided anchor pieces, thereby improving the overall stability of the structure.
[0012] Furthermore, the number of the support assemblies is two, and the two support assemblies are respectively arranged at the left and right sides of the top of the casting layer.
[0013] The beneficial effect of adopting the above further scheme is that the two support components can provide stable support for the thickened plate, and the thickened plate is in contact with passing vehicles, thereby preventing the vehicles from directly squeezing the casting layer, thereby playing a good protective role.
[0014] Furthermore, a connecting rod is fixedly connected to the inner side of the mounting seat, and the sliding sleeve is sleeved on the outer wall of the connecting rod.
[0015] The beneficial effect of adopting the above further solution is that the connecting rod can be used to enable the sliding sleeve to maintain a stable movement trajectory, thereby improving the stability of the structure.
[0016] Furthermore, the second spring is sleeved on the outer wall of the connecting rod, and one end of the second spring away from the sliding sleeve is in contact with the bottom wall of the mounting seat.
[0017] The beneficial effect of adopting the above further solution is that the second spring can provide elastic support for the sliding sleeve, thereby providing elastic support for the thickened plate through the buffer rod and the mounting sleeve, thereby improving the impact resistance of the thickened plate.
[0018] Furthermore, inclined plates are fixedly connected to both left and right sides of the thickened plate.
[0019] The beneficial effect of adopting the above further solution is that the inclined plate can provide a transition between the thickened plate and the bridge plate, thereby facilitating the safe passage of vehicles.
[0020] Furthermore, a shock-absorbing pad is fixedly connected to one end of the inclined plate close to the bridge plate, and the shock-absorbing pad abuts against the upper surface of the bridge plate.
[0021] The beneficial effect of adopting the above further solution is that the shock-absorbing pad can reduce the wear of the inclined plate on the surface of the bridge plate, thereby achieving a good buffering effect.
[0022] Furthermore, retaining frames are provided on both the left and right sides of the casting layer, and the inner sides of the retaining frames are threadedly connected with chemical bolts, and the chemical bolts extend to the interior of the bridge plate.
[0023] The beneficial effect of adopting the above further solution is that the chemical bolts are provided to facilitate the stable fixation of the retaining frame and the bridge plate, and a casting space is formed with the cooperation of the two retaining frames, which facilitates the construction.
[0024] Compared with the prior art, the present application provides a continuous construction device for the joint seam of new and old bridge plates for bridge widening, which has the following beneficial effects:
[0025] The continuous construction device for the joints of the new and old bridge plates used for bridge widening can provide stable support for the thickened plates by means of the arranged mounting sleeves and I-beams, and can protect the casting layer between the top plate and the bottom plate by means of the thickened plates. At the same time, the impact resistance of the thickened plates can be greatly improved by means of the arranged buffer components. When passing vehicles pass by, the vehicles can be prevented from directly squeezing the casting layer between the two bridge plates, and the top plate can be prevented from being squeezed into unevenness, thereby playing a good protective role for the construction position of the joints, improving the stability of the bridge widening structure, and having strong practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1It is a cross-sectional view of the structure of this application;
[0027] Figure 2 This application Figure 1 A is a schematic diagram of the enlarged structure shown;
[0028] Figure 3 It is a front view of the structure of this application.
[0029] Description of reference numerals:
[0030] 1. Bridge plate; 2. Top plate; 3. Bottom plate; 4. Casting layer; 5. Anchor; 6. Thickened plate; 7. Mounting sleeve; 8. I-beam; 9. Buffer rod; 10. Mounting seat; 11. Connecting rod; 12. Sliding sleeve; 13. First spring; 14. Second spring; 15. Inclined plate; 16. Shock pad; 17. Retaining frame; 18. Chemical bolt. DETAILED DESCRIPTION
[0031] See also Figure 1-3 A continuous construction device for the joints of new and old bridge slabs for bridge widening, comprising a top plate 2 installed on the upper side of the bridge slab 1 and a bottom plate 3 installed on the lower side of the bridge slab 1, a casting layer 4 is arranged between the top plate 2 and the bottom plate 3, and the casting layer 4 is used to fill the joints between the two bridge slabs 1.
[0032] It should be noted that a plurality of anchors 5 are fixedly installed between the top plate 2 and the bottom plate 3, and the anchors 5 penetrate the inner side of the casting layer 4. The top plate 2 and the bottom plate 3 can be fixed by the provided anchors 5, thereby improving the overall stability of the structure. At the same time, retainers 17 are provided on both the left and right sides of the casting layer 4, and the inner side of the retainers 17 is threadedly connected with chemical bolts 18, which extend to the inside of the bridge plate 1. The provided chemical bolts 18 facilitate the stable fixation of the retainers 17 and the bridge plate 1, and a casting space is formed under the cooperation of the two retainers 17, thereby facilitating the construction.
[0033] See also Figure 2 In this embodiment, a thickened plate 6 is provided on the upper side of the top plate 2, and a support assembly is provided between the thickened plate 6 and the top plate 2. The support assembly includes a mounting sleeve 7 and an I-beam 8. The mounting sleeve 7 is fixedly connected to the bottom of the thickened plate 6, and the I-beam 8 is fixedly connected to the top of the top plate 2, and the mounting sleeve 7 is sleeved on the outside of the I-beam 8. There are two support assemblies, which are respectively provided at the left and right sides of the top of the casting layer 4. The two support assemblies can provide stable support for the thickened plate 6, and the thickened plate 6 is in contact with the passing vehicles, thereby preventing the vehicles from directly squeezing the casting layer 4, which plays a good protective role.
[0034] It should be noted that the left and right sides of the thickened plate 6 are fixedly connected with inclined plates 15, and the inclined plates 15 can provide a transition between the thickened plate 6 and the bridge plate 1, which facilitates the safe passage of vehicles. In addition, the end of the inclined plate 15 close to the bridge plate 1 is fixedly connected with a shock-absorbing pad 16, which abuts against the upper surface of the bridge plate 1. The shock-absorbing pad 16 can reduce the wear of the inclined plate 15 on the surface of the bridge plate 1, and has a good buffering effect.
[0035] See also Figure 2 In this embodiment, a buffer assembly is provided between the mounting sleeve 7 and the I-beam 8, and the buffer assembly includes a buffer rod 9 obliquely provided inside the mounting sleeve 7 and a first spring 13 fixedly connected to the bottom of the mounting sleeve 7, the lower end of the first spring 13 is fixedly connected to the outer wall of the I-beam 8, the upper end of the buffer rod 9 is hinged to the inner wall of the mounting sleeve 7, the lower end of the buffer rod 9 is hinged with a sliding sleeve 12, the outer side of the sliding sleeve 12 is slidably matched with a mounting seat 10, the mounting seat 10 is fixedly connected to the top of the I-beam 8, and the inner side of the mounting seat 10 is provided with a second spring 14 abutting against the sliding sleeve 12. Among them, the inner side of the mounting seat 10 is fixedly connected with a connecting rod 11, the sliding sleeve 12 is sleeved on the outer wall of the connecting rod 11, the second spring 14 is sleeved on the outer wall of the connecting rod 11, and the end of the second spring 14 away from the sliding sleeve 12 abuts against the bottom wall of the mounting seat 10. The connecting rod 11 is provided so that the sliding sleeve 12 can maintain a stable motion trajectory, thereby improving the stability of the structure. At the same time, the second spring 14 is provided so that the sliding sleeve 12 can be elastically supported, thereby providing elastic support for the thickened plate 6 through the buffer rod 9 and the mounting sleeve 7, thereby improving the impact resistance of the thickened plate 6.
[0036] The working principle of the above embodiment is:
[0037] When the present application is in use, the cooperation of the mounting sleeve 7 and the I-beam 8 provides stable support for the thickened plate 6, and the thickened plate 6 can be used to protect the casting layer 4 between the top plate 2 and the bottom plate 3. When passing vehicles pass by, the vehicles are prevented from directly squeezing the casting layer 4 between the two bridge plates 1. At the same time, when the thickened plate 6 is under pressure, the buffer rod 9 and the first spring 13 are squeezed by the mounting sleeve 7, and the buffer rod 9 squeezes the second spring 14 through the sliding sleeve 12, and plays a buffering role with the cooperation of the first spring 13 and the second spring 14, thereby improving the impact resistance of the thickened plate 6, so as to improve the stability of the bridge widening structure.
Claims
1. A continuous construction device for joining new and old bridge slabs for bridge widening, comprising a top plate (2) installed on the upper side of the bridge slab (1) and a bottom plate (3) installed on the lower side of the bridge slab (1), wherein a casting layer (4) is arranged between the top plate (2) and the bottom plate (3). Features: A thickened plate (6) is provided on the upper side of the top plate (2), and a support component is provided between the thickened plate (6) and the top plate (2); The support assembly comprises a mounting sleeve (7) and an I-beam (8), wherein the mounting sleeve (7) is fixedly connected to the bottom of the thickened plate (6), the I-beam (8) is fixedly connected to the top of the top plate (2), and the mounting sleeve (7) is sleeved on the outside of the I-beam (8), and a buffer assembly is provided between the mounting sleeve (7) and the I-beam (8); The buffer assembly comprises a buffer rod (9) obliquely arranged inside the mounting sleeve (7) and a first spring (13) fixedly connected to the bottom of the mounting sleeve (7), the lower end of the first spring (13) is fixedly connected to the outer wall of the I-beam (8), the upper end of the buffer rod (9) is hinged to the inner wall of the mounting sleeve (7), the lower end of the buffer rod (9) is hinged with a sliding sleeve (12), the outer side of the sliding sleeve (12) is slidably matched with a mounting seat (10), the mounting seat (10) is fixedly connected to the top of the I-beam (8), and the inner side of the mounting seat (10) is provided with a second spring (14) abutting against the sliding sleeve (12).
2. A continuous construction device for the joint of new and old bridge slabs for bridge widening according to claim 1, Features: A plurality of anchoring pieces (5) are fixedly installed between the top plate (2) and the bottom plate (3), and the anchoring pieces (5) penetrate the inner side of the casting layer (4).
3. A continuous construction device for the joint of new and old bridge slabs for bridge widening according to claim 1, Features: The number of the support assemblies is two, and the two support assemblies are respectively arranged on the left and right sides of the top of the casting layer (4).
4. A continuous construction device for the joint of new and old bridge slabs for bridge widening according to claim 1, Features: A connecting rod (11) is fixedly connected to the inner side of the mounting seat (10), and the sliding sleeve (12) is sleeved on the outer wall of the connecting rod (11).
5. A continuous construction device for the joint of new and old bridge slabs for bridge widening according to claim 4, Features: The second spring (14) is sleeved on the outer wall of the connecting rod (11), and one end of the second spring (14) away from the sliding sleeve (12) abuts against the bottom wall of the mounting seat (10).
6. A continuous construction device for the joint seam of new and old bridge slabs for bridge widening according to claim 1, Features: Inclined plates (15) are fixedly connected to both left and right sides of the thickened plate (6).
7. A continuous construction device for the joint of new and old bridge slabs for bridge widening according to claim 6, Features: One end of the inclined plate (15) close to the bridge plate (1) is fixedly connected to a shock-absorbing pad (16), and the shock-absorbing pad (16) abuts against the upper surface of the bridge plate (1).
8. A continuous construction device for the joint seam of new and old bridge slabs for bridge widening according to claim 1, Features: A retaining frame (17) is provided on both the left and right sides of the casting layer (4), and a chemical bolt (18) is threadedly connected to the inner side of the retaining frame (17), and the chemical bolt (18) extends to the interior of the bridge plate (1).