Transverse prestress tension hanging basket structure for integral rigid frame bridge
By introducing an optional pulley structure into the transversely prestressed tension basket of the integral rigid frame bridge, the problem of the lack of adjustment means for the movement speed of the basket is solved, the movement speed of the basket is flexibly adjusted, and construction efficiency and efficiency are improved. Security.
Patent Information
- Application Number
- CN202420403547.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-04
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing technology, the moving speed of the transverse prestressed tension basket of the integral rigid frame bridge lacks adjustment means and cannot meet the construction needs, resulting in high construction difficulty and high risk factor.
It adopts an optional pulley structure, including a removable upper and lower movable pulley assembly and a screw system that can be rotated. The moving speed of the hanging basket can be adjusted by adjusting the position of the pulley assembly, simplifying the adjustment of the moving speed of the hanging basket.
Through the use of the optional pulley structure, the moving speed of the hanging basket can be adjusted according to needs, which improves construction efficiency, meets construction needs, and reduces construction risks.
Smart Images

Figure CN221919034U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of transverse prestressed tensioning equipment, in particular to a transverse prestressed tensioning hanging basket structure for an integral rigid frame bridge. Background Art
[0002] An integral rigid frame bridge is a bridge structure whose main feature is that the piers and beams are consolidated and share the load. The advantage of this structure is that it can give full play to the compressive properties of concrete materials. At the same time, due to the consolidation of the piers and beams, the rigidity of the overall structure is relatively large and can withstand large bending moments and shear forces. Similar to the integral rigid frame bridge is the separated rigid frame bridge, which is a bridge structure characterized by the good rigidity and elastic modulus of the steel arch tube and steel box beam, so it performs well in terms of seismic performance. Whether it is an integral rigid frame bridge or a separated rigid frame bridge, during the construction process, it is usually necessary to apply prestress in the transverse direction of the bridge to increase the bending resistance and bearing capacity of the bridge. Traditional construction methods usually use equipment such as maintenance vehicle jacks for prestressing, but this method requires a lot of equipment and manpower investment, the construction operation is difficult, and it is difficult to ensure the construction quality and construction period, resulting in a high risk factor.
[0003] An existing separated rigid frame bridge adopts Figure 1 The method shown solves the technical problems of high construction difficulty and high risk factor when applying transverse prestress. It includes a hanging basket 1, which is arranged along the length extension direction of the anchor beam 3 of the separated rigid frame bridge 2, and a prestressed tensioning device is arranged in the hanging basket. Two tracks 4 extending along the length direction of the anchor beam are anchored on the anchor beam. The number of hanging baskets is two, and the two hanging baskets are distributed on both sides of the width of the separated rigid frame bridge. The two hanging baskets are connected by a transverse support rod, and the transverse support rod 5 is simultaneously guided and assembled on the two tracks to realize the guiding arrangement of the hanging basket along the length extension direction of the anchor beam. In addition, two vertical support rods 6 are connected to the lower end of the transverse support rod, and the two vertical support rods are respectively matched with the two track guides. The lower end of each vertical support rod is connected to a housing 7, and the housing has a plurality of pulleys matched with the track guide. The use of multiple pulleys to achieve the guiding match improves the smoothness of the movement of the hanging basket. The track is a T-shaped track, which includes a transverse plate arranged on the upper side and a vertical plate connected to the lower end of the transverse plate. The plurality of pulleys include two upper pulleys 8 in sliding contact with the upper end surface of the transverse plate, and two lower pulleys 9 in sliding contact with the lower end surface of the transverse plate.
[0004] During the movement of the hanging basket, the above-mentioned device mainly relies on the cooperation of horizontal support rods, vertical support rods and multiple pulleys to limit the movement speed of the hanging basket to a stable range. When the construction process needs to be accelerated, the means of adjusting the hanging basket speed are limited, and it is difficult to meet the construction needs. Utility Model Content
[0005] The utility model provides a transverse prestressed tensioning hanging basket structure for an integral rigid frame bridge, so as to solve the technical problem that the moving speed of the hanging basket in the prior art lacks adjustment means and cannot meet the construction requirements.
[0006] In order to solve the above problems, the utility model provides an integral rigid frame bridge transverse prestressed tensioning hanging basket structure adopts the following technical solutions:
[0007] A transverse prestressed tensioning hanging basket structure for an integral rigid frame bridge comprises a hanging basket, which is arranged along the length extension direction of an anchor beam of the integral rigid frame bridge, and a prestressed tensioning device is arranged in the hanging basket, and the prestressed tensioning device is used to perform prestressed tensioning at different positions as the hanging basket moves; two tracks extending along the length direction of the anchor beam are anchored on the anchor beam, and the number of hanging baskets is two, and the two hanging baskets are distributed on both sides of the width of the integral rigid frame bridge, and the two hanging baskets are connected by a transverse support rod, and the transverse support rod is simultaneously guided and assembled on the two tracks;
[0008] Also includes:
[0009] The optional pulley structure can be detachably mounted on the transverse support rod and comprises at least two pulley assemblies movable up and down, each of which has a contact position for contacting the anchor beam and a separation position for separation from the anchor beam in the up and down directions.
[0010] The beneficial effect of the transverse prestressed tensioning hanging basket structure for an integral rigid frame bridge provided by the utility model is that by adding an optional pulley structure, the optional pulley structure can select one or more pulley assemblies to move down to the contact position of the anchor beam according to actual speed regulation requirements to increase the moving speed of the hanging basket. Compared with the prior art, the moving speed of the hanging basket is conveniently adjustable, which can effectively meet the construction requirements, thereby solving the technical problem that the moving speed of the hanging basket in the prior art lacks adjustment means and cannot meet the construction requirements.
[0011] Furthermore, the optional pulley structure includes a mounting plate, which is detachably mounted on the transverse support rod, and each of the pulley assemblies is provided on the mounting plate.
[0012] Furthermore, the cross support rod has a placement groove for placing the mounting plate, the placement groove has a plurality of threaded holes, the mounting plate has through holes corresponding to the threaded holes, and the mounting plate is detachably mounted on the cross support rod by bolts.
[0013] Furthermore, the pulley assembly includes a screw rod screwed on the mounting plate, the mounting plate and the cross rod are provided with screw holes for the screw rod to pass through from top to bottom, a pulley member is installed at the lower end of the screw rod, and the pulley assembly is used to achieve up and down movement by the screw rod's screwing degree. The pulley assembly is moved up and down by the screw rod's screwing degree, which has a simple structure, reliable effect, and convenient operation.
[0014] Furthermore, the pulley member includes a mounting frame fixed to the lower end of the screw rod, and a universal wheel rotatably mounted on the lower end of the mounting frame. The universal wheel has stronger adaptability and is easier to adjust.
[0015] Furthermore, there are two pulley assemblies, which are respectively arranged at two ends of the mounting plate in the length direction.
[0016] Furthermore, the number of the screw rods is four, and the four screw rods are arranged in a rectangular shape.
[0017] Furthermore, the number of the optional pulley structures is two, and the two optional pulley structures are respectively arranged on the opposite sides of the two tracks. The number of the optional pulley structures is adjustable, and the number of pulley assemblies is also adjustable, which fully enriches the speed regulation means and further facilitates the adjustment of the moving speed of the hanging basket. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] By reading the detailed description below with reference to the accompanying drawings, the above and other purposes, features and advantages of the exemplary embodiments of the present invention will become easy to understand. In the accompanying drawings, several embodiments of the present invention are shown in an exemplary and non-limiting manner, and the same or corresponding reference numerals represent the same or corresponding parts, wherein:
[0019] Figure 1 It is a main view of the transverse prestressed tensioning hanging basket structure used for the separated rigid frame bridge in the prior art;
[0020] Figure 2 This is a front view of the transverse prestressed tensioning hanging basket structure for the integral rigid frame bridge provided by the utility model;
[0021] Figure 3 A top view of the transverse prestressed tensioning hanging basket structure for the integral rigid frame bridge provided by the utility model Figure 1 (Install the optional pulley structure);
[0022] Figure 4 A top view of the transverse prestressed tensioning hanging basket structure for the integral rigid frame bridge provided by the utility model Figure 2 (optional pulley structure is not installed);
[0023] Figure 5 for Figure 4 The enlarged schematic diagram of point A in the middle;
[0024] Figure 6 It is a top view of the optional pulley structure;
[0025] Figure 7 This is the front view of the optional pulley structure.
[0026] Description of reference numerals:
[0027] 1. Hanging basket; 2. Separate rigid frame bridge; 3. Anchor beam; 4. Track; 5. Horizontal support rod; 6. Vertical support rod; 7. Shell; 8. Upper pulley; 9. Lower pulley;
[0028] 10. Integral rigid frame bridge; 11. Mounting plate; 12. Placement groove; 13. Threaded hole; 14. Bolt; 15. Screw; 16. Mounting frame; 17. Universal wheel. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Those skilled in the art should know that the embodiments described below are part of the embodiments of the present disclosure, rather than all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.
[0030] The principle and spirit of the present invention are explained in detail below with reference to several representative embodiments of the present invention.
[0031] Embodiment 1 of the transverse prestressed tensioning hanging basket structure for an integral rigid frame bridge provided by the utility model:
[0032] like Figures 1 to 7 As shown, the transverse prestressed tensioning basket structure for the integral rigid frame bridge includes a basket, which is arranged and guided along the length extension direction of the anchor beam of the integral rigid frame bridge 10, and a prestressed tensioning device is arranged in the basket. The prestressed tensioning device is used to perform prestressed tensioning at different positions as the basket moves; two tracks extending along the length direction of the anchor beam are anchored on the anchor beam, and the number of the baskets is two. The two baskets are distributed on both sides of the width of the integral rigid frame bridge 10, and the two baskets are connected by a transverse support rod, and the transverse support rod is guided and assembled on the two tracks at the same time.
[0033] On the basis of the above structure, an optional pulley structure is also included. The optional pulley structure can be detachably installed on the horizontal support rod and includes at least two pulley assemblies movable up and down, each pulley assembly having a contact position contacting the anchor beam and a separation position separated from the anchor beam in the up and down direction.
[0034] The optional pulley structure is described below. It includes a mounting plate 11 that can be detachably mounted on the horizontal support rod, and each pulley assembly is provided on the mounting plate 11. Corresponding to the mounting plate 11, the horizontal support rod has a placement groove 12 for the mounting plate 11 to be placed, and the placement groove 12 has a plurality of threaded holes 13, and the mounting plate 11 has through holes corresponding to the threaded holes 13. The mounting plate 11 is detachably mounted on the horizontal support rod by bolts 14.
[0035] About the pulley assembly. The pulley assembly includes a screw rod 15 screwed on the mounting plate 11. The mounting plate 11 and the cross rod are provided with screw holes for the screw rod 15 to pass through from top to bottom. A pulley is installed at the lower end of the screw rod 15. The pulley assembly is used to achieve up and down movement by the degree of screwing of the screw rod 15. The up and down movement of the pulley assembly is achieved by the degree of screwing of the screw rod 15. The structure is simple, the effect is reliable, and the operation is convenient.
[0036] About the pulley. The pulley comprises a mounting frame 16 fixed to the lower end of the screw rod 15, and a universal wheel 17 rotatably mounted on the lower end of the mounting frame 16. The universal wheel 17 is more adaptable and easier to adjust. In other embodiments, a rolling ball may be provided to replace the universal wheel 17.
[0037] In this embodiment, the number of pulley assemblies is two, and the two pulley assemblies are respectively arranged at the two ends of the length direction of the mounting plate 11. The number of screw rods 15 is four, and the four screw rods 15 are arranged in a rectangular shape. In addition, the number of optional pulley structures is two, and the two optional pulley structures are respectively arranged on the opposite sides of the two tracks. The number of optional pulley structures is adjustable, and the number of pulley assemblies is also adjustable, which fully enriches the speed regulation means and further facilitates the adjustment of the moving speed of the hanging basket. In other embodiments, the number of the above-mentioned pulley assemblies can be adjusted according to actual needs, and can be three, four or other numbers; of course, the number of optional pulley structures can also be three, four or other numbers.
[0038] The working principle of the transverse prestressed tensioning hanging basket structure for the integral rigid frame bridge provided by the utility model is: when the bridge is cast, the hanging basket is moved and the prestressed tensioning device is arranged in the hanging basket. The hanging basket moves smoothly and stably, can move smoothly with the continuous casting of the beam section, and prestressed tensioning is performed. At the same time, when the moving speed of the hanging basket is adjusted according to construction requirements, an optional pulley structure is added. The optional pulley structure can select one or more pulley assemblies to move down to the contact position of the contact anchor beam according to actual speed regulation requirements to increase the moving speed of the hanging basket.
Claims
1. A transverse prestressed tensioning hanging basket structure for an integral rigid frame bridge, comprising a hanging basket, which is arranged along the length extension direction of the anchor beam of the integral rigid frame bridge, and a prestressed tensioning device is arranged in the hanging basket, and the prestressed tensioning device is used to perform prestressed tensioning at different positions as the hanging basket moves; two tracks extending along the length direction of the anchor beam are anchored on the anchor beam, the number of hanging baskets is two, the two hanging baskets are distributed on both sides of the width of the integral rigid frame bridge, the two hanging baskets are connected by a transverse support rod, and the transverse support rod is guided and assembled on the two tracks at the same time; It is characterized in that Also includes: The optional pulley structure can be detachably mounted on the transverse support rod and comprises at least two pulley assemblies movable up and down, each of which has a contact position for contacting the anchor beam and a separation position for separation from the anchor beam in the up and down directions.
2. The transverse prestressed tensioning hanging basket structure for an integral rigid frame bridge according to claim 1 is characterized in that: The optional pulley structure comprises a mounting plate, which is detachably mounted on the cross support rod, and each of the pulley assemblies is disposed on the mounting plate.
3. The transverse prestressed tensioning hanging basket structure for an integral rigid frame bridge according to claim 2 is characterized in that: The horizontal support rod is provided with a placement groove for placing the mounting plate, the placement groove is provided with a plurality of threaded holes, the mounting plate is provided with through holes corresponding to the threaded holes, and the mounting plate is detachably mounted on the horizontal support rod by bolts.
4. The transverse prestressed tensioning hanging basket structure for an integral rigid frame bridge according to claim 2 or 3, characterized in that: The pulley assembly includes a screw rod screwed on the mounting plate. The mounting plate and the cross support rod are provided with screw holes for the screw rod to pass through from top to bottom. A pulley is installed at the lower end of the screw rod. The pulley assembly is used to achieve up and down movement according to the degree of screw rod screwing.
5. The transverse prestressed tensioning hanging basket structure for an integral rigid frame bridge according to claim 4 is characterized in that: The pulley member comprises a mounting frame fixed on the lower end of the screw rod, and a universal wheel rotatably assembled on the lower end of the mounting frame.
6. The transverse prestressed tensioning hanging basket structure for an integral rigid frame bridge according to claim 4 is characterized in that: The number of the pulley assemblies is two, and the two pulley assemblies are respectively arranged at two ends of the mounting plate in the length direction.
7. The transverse prestressed tensioning hanging basket structure for an integral rigid frame bridge according to claim 4 is characterized in that: The number of the screw rods is four, and the four screw rods are arranged in a rectangular shape.
8. The transverse prestressed tensioning hanging basket structure for an integral rigid frame bridge according to any one of claims 1 to 3, characterized in that: The number of the optional pulley structures is two, and the two optional pulley structures are respectively arranged on the opposite sides of the two tracks.