Bridge pile foundation underpinning jacking embracing column structure
By using the cooperation of joists, new caps, steel uprights, PLC jacks and isolation bearings in bridge pile foundation underpinning, the problems of complex prestressing and difficulty in automatic compensation of displacement in traditional bridge pile foundation underpinning technology are solved. Efficient working space and safety reserve are achieved, the process is simplified, and the cost and beam section thickness are reduced.
Patent Information
- Application Number
- CN202323237420.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-29
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-11-29
AI Technical Summary
Traditional bridge pile foundation underpinning technology has problems such as complex prestressed system, difficult maintenance, high cost, and the inability to realize automatic displacement compensation of PLC jacking underpinning, especially in the process of reinforcing or underpinning existing bridge foundations during underground engineering construction. , the structural displacement and node connections are complex, making it difficult to achieve effective working space and safety reserves.
Using the matching structure of joists, new caps, steel verticals, PLC jacks and isolation bearings, the beam height is reduced through shaped steel concrete column-holding beams, which improves the bending and shear resistance, realizes PLC jacking displacement compensation, and simplifies the process. Reduce beam section thickness, provide working space, and eliminate the need to close traffic.
It effectively reduces the thickness of the beam section, provides a strong working space for pile foundation underpinning and removal, improves the safety reserve of the underpinning beam, simplifies the process, reduces the construction cost, realizes automatic displacement compensation, and expands the scope of application.
Smart Images

Figure CN221919036U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge maintenance equipment, in particular to a bridge pile foundation supporting and lifting column structure. Background Art
[0002] Domestic cities are moving towards modernization and large-scale development, with large numbers of new constructions of high-rise buildings, urban bridges, underground subways, pipelines, etc. During the construction of underground projects, it is inevitable to pass directly under or near existing bridges, which will cause spatial conflicts between the two. To solve this problem, the foundation of the existing bridge needs to be reinforced or replaced.
[0003] During underpinning, the force system needs to be transformed, the transformation process is complex, and strict requirements are placed on structural displacement and deformation. During the underpinning process, the node connection problem between the underpinning beam and the underpinned structure is one of the engineering difficulties.
[0004] Traditional pile foundation underpinning technology 1: build new pile foundations on both sides of the underpinning structure → construct the underpinning cap above the pile foundation → construct the underpinning main beam above the old bridge pile foundation → use jacks to lift and compensate for displacement; the underpinning main beam is generally connected to the old bridge pile foundation by planting steel bars, and the cap prestress is applied, such as Figure 5 As shown, this method adopts the method of first planting reinforcement and then prestressing. The prestressed system has complex process, difficult maintenance and high cost.
[0005] Traditional pile foundation replacement method 2: New pile foundation → Existing pile foundation rebar installation to replace the main beam → Prestressing of the replaced main beam → Cutting off the old bridge pile foundation. Figure 6 As shown, the main disadvantage of this solution is that the existing foundation requires a large amount of rebar planting construction, and the automatic compensation displacement of PLC jacking and underpinning cannot be achieved, which is a passive underpinning method.
[0006] To this end, we need to propose a bridge pile foundation replacement jacking column structure to solve the above-mentioned problems, so that it can effectively reduce the beam cross-section and provide a strong working space for the later removal of the pile foundation. Utility Model Content
[0007] The purpose of the utility model is to provide a bridge pile foundation replacement jacking column structure, which effectively reduces the beam height through the cooperation of supporting beams, new pedestals, pile foundations, steel columns, PLC jacks and seismic isolation bearings, saving working space for pile foundation replacement and pile extraction. The steel concrete column beam has advantages in bending and shear resistance, improves the safety reserve of the replacement beam, can effectively reduce the beam cross-section, and provides a powerful working space for the later pile foundation extraction, so as to solve the problems raised in the background technology.
[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a bridge pile foundation replacement jacking column structure, comprising new caps on both sides of an existing bridge pier and a joist for supporting a bridge cap beam, the lower end of the existing bridge pier contains an old cap, the lower end of the new cap is fixed with a pile foundation, the upper end of the new cap is fixed with a steel column, the upper end of the steel column is fixed with a PLC jack, the lower ends of the two joists are respectively supported on the PLC jacks on the two groups of steel columns, and a seismic isolation bearing is also installed between the steel column and the joist;
[0009] The support beam is composed of two steel plates, a plurality of steel bars and concrete. The plurality of steel bars are fixed between the two steel plates, and the space between the two steel plates is filled with concrete.
[0010] Preferably, the steel column includes two groups of support frames consisting of two support rods and a connecting rod, the connecting rod is fixed between the two support rods, and the two groups of support frames are fixed side by side between the new pedestal and the supporting beam, wherein two PLC jacks are installed at the upper end of one group of support frames away from the existing bridge piers, and two seismic isolation bearings are installed at the upper end of the other group of support frames.
[0011] Preferably, the connecting rod comprises two cross bars and two oblique bars, the two oblique bars are fixed between the two cross bars in an X shape, and the two ends of the two cross bars are respectively fixed to the outer walls of the two support bars.
[0012] Preferably, a plurality of bolts are equidistantly screwed to the upper end of the steel plate, the spacing between two adjacent bolts is greater than 6 times the bolt diameter, and the bolt diameter is set to 19 mm or 22 mm.
[0013] Preferably, the diameter of the steel bar is set to 32 mm, and the steel plate is drilled with mounting holes for implanting the steel bar.
[0014] Preferably, the new foundation is arranged in a rectangular shape, and the pile foundation is composed of a plurality of parallel steel bars, and the plurality of steel bars are distributed in a rectangular array.
[0015] Preferably, the thickness of the new cap is greater than the thickness of the old cap on the existing pier, and the upper surface of the new cap is flush with the upper surface of the old cap.
[0016] Compared with the prior art, the beneficial effects of the utility model are:
[0017] 1. The utility model effectively reduces the beam height through the cooperation of supporting beams, new caps, pile foundations, steel columns, PLC jacks and seismic isolation bearings, saving working space for pile foundation underpinning and pile extraction. The steel concrete column beam has advantages in bending and shear resistance, which improves the safety reserve of the underpinning beam and can effectively reduce the beam cross-section, providing a powerful working space for the later removal of pile foundations. PLC jacking is used to realize displacement compensation after bridge underpinning, and the overall underpinning structure does not require closed traffic.
[0018] 2. The utility model uses two steel plates, multiple steel bars and concrete to form a support beam, so that the three systems of steel plates, steel bars and concrete work together to improve the bearing capacity of the replacement beam structure. It does not require prestressing, has a simple process, is formed in one step, and has a wide range of applications. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the structure of the utility model;
[0020] Figure 2 This is a schematic diagram of the three-dimensional structure of the utility model when it is installed;
[0021] Figure 3 This is a side view of the structure of the utility model;
[0022] Figure 4 This is a schematic diagram of the side structure of the utility model when it is installed;
[0023] Figure 5 It is a structural schematic diagram of the conventional method 1 of the prior art;
[0024] Figure 6 It is a structural schematic diagram of the second transmission mode of the prior art.
[0025] In the figure: 1. New cap; 2. Steel column; 21. Cross bar; 22. Diagonal bar; 3. Support beam; 31. Steel plate; 32. Concrete; 4. Pile foundation; 5. Existing bridge pier; 6. Cap beam; 7. Old cap; 8. Upper hollow slab; 9. PLC jack; 10. Seismic isolation bearing. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] See also Figure 1-3The utility model provides a technical solution: a bridge pile foundation replacement jacking column structure, including a new cap 1 located on both sides of an existing bridge pier 5 and a joist 3 for supporting a bridge cap beam 6, the lower end of the existing bridge pier 5 contains an old cap 7, an upper hollow slab 8 for traffic is installed on the cap beam 6, a pile foundation 4 is fixed to the lower end of the new cap 1, a steel column 2 is fixed to the upper end of the new cap 1, a PLC jack 9 is fixed to the upper end of the steel column 2, the lower surfaces of the two joists 3 are respectively supported on the PLC jacks 9 on the two groups of steel columns 2, and a seismic isolation bearing 10 is also installed between the steel column 2 and the joist 3;
[0028] Through the cooperation of the supporting beam 3, the new pedestal 1, the pile foundation 4, the steel column 2, the PLC jack 9 and the seismic isolation bearing 10, the beam height is effectively reduced, which saves working space for the replacement and extraction of the pile foundation 4, makes the steel concrete column beam more advantageous in bending and shear resistance, improves the safety reserve of the underpinning beam, can effectively reduce the beam cross-section, and provide a strong working space for the later removal of the pile foundation 4. PLC jacking is used to realize displacement compensation after the bridge is replaced, and the overall underpinning structure does not need to be closed to traffic.
[0029] The support beam 3 is composed of two steel plates 31, multiple steel bars and concrete 32. The multiple steel bars are fixed between the two steel plates 31, and the space between the two steel plates 31 is filled with concrete 32. By forming the support beam 3 with two steel plates 31, multiple steel bars and concrete 32, the three systems of the steel plates 31, the steel bars and the concrete 32 work together to improve the bearing capacity of the replacement beam structure. No prestressing is required, the process is simple, the molding is done in one step, and the application range is wide.
[0030] The support beam 3 adopts a steel reinforced concrete structure (SRC), also known as a steel frame concrete structure or a rigid reinforced concrete structure. It refers to a structure in which steel is mainly configured in concrete and is equipped with certain longitudinal steel bars and stirrups. According to the different steel configuration forms, steel concrete structures can be divided into two categories: solid web steel configuration and hollow web steel configuration. The difference between this application and reinforced concrete beams is that the steel web is continuously configured along the beam height and has greater rigidity. After the concrete cracks, the steel web bears the stress released by the concrete on the inclined crack surface, and at the same time plays an effective restraining role on the tensile and compressive deformation of the concrete.
[0031] The steel column 2 includes two groups of support frames consisting of two support rods and a connecting rod, the connecting rod is fixed between the two support rods, and the two groups of support frames are fixed side by side between the new pedestal 1 and the support beam 3. Two PLC jacks 9 are installed on the upper end of one group of support frames away from the existing bridge pier 5, and two seismic isolation bearings 10 are installed on the upper end of the other group of support frames. The steel column 2 provides supporting force to the support beam 3 to ensure the stability of the support of the support beam 3.
[0032] The connecting rod includes two cross bars 21 and two oblique bars 22. The two oblique bars 22 are fixed between the two cross bars 21 in an X shape, and the two ends of the two cross bars 21 are respectively fixed to the outer walls of the two support bars. The connecting rod is used to improve the stability between the two support bars.
[0033] A plurality of bolts are equidistantly screwed at the upper end of the steel plate 31, the spacing between two adjacent bolts is greater than 6 times the bolt diameter, the length of the bolt is greater than 4 times the bolt diameter, and the diameter of the bolt is set to 19 mm or 22 mm to increase the firmness of the connection between the two steel plates 31. The steel plate 31 can be regarded as an independent load-bearing member, and its bending and shear stiffness are calculated separately. It bears the role of external loads together with the reinforced concrete beam. The role of the steel web of the steel-concrete beam greatly reduces the thickness of the compressed zone of the concrete, which is beneficial to reducing the thickness of the beam section.
[0034] The diameter of the steel bar is set to 32 mm, and mounting holes for implanting the steel bars are drilled on the steel plate 31 to facilitate the installation of the steel bars.
[0035] The new cap 1 is arranged in a rectangular shape, and the pile foundation 4 is composed of a plurality of parallel steel bars, which are distributed in a rectangular array. The pile foundation 4 is used to improve the firmness of the fixation with the existing road surface, so as to improve the supporting force of the new cap 1.
[0036] The thickness of the new cap 1 is greater than the thickness of the old cap 7 on the existing pier 5, and the upper surface of the new cap 1 is flush with the upper surface of the old cap 7, and reinforcement is embedded between the underpinning piles and the supporting beams.
[0037] like Figure 4 As shown, the steps of reinforcing bar planting construction are as follows:
[0038] Drilling: Use an impact drill to drill holes according to the location of the implanted steel bars, with a diameter of 32mm. After drilling, use a hole cleaning air cylinder and a brush to clean the dust in the hole.
[0039] Injection anchor: The anchor is made of two-component glue and is injected into the drill hole using a professional injection gun.
[0040] Rebar planting: Insert the steel bars spirally into the drilled hole with a length of 15d-20d. Plant a circle of steel bars every 300-350mm along the height of the beam. There are 12-16 steel bars in each circle, evenly distributed, and tied with the vertical steel bars and stirrups to form a whole.
[0041] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A bridge pile foundation replacement jacking column structure, comprising new caps (1) located on both sides of an existing bridge pier (5) and a support beam (3) for supporting a bridge cap beam (6), wherein the lower end of the existing bridge pier (5) contains an old cap (7), characterized in that: A pile foundation (4) is fixed to the lower end of the new cap (1), a steel column (2) is fixed to the upper end of the new cap (1), a PLC jack (9) is fixed to the upper end of the steel column (2), the lower ends of the two supporting beams (3) are respectively supported on the PLC jacks (9) on the two groups of steel columns (2), and a seismic isolation bearing (10) is also installed between the steel column (2) and the supporting beam (3); The supporting beam (3) is composed of two profiled steel plates (31), a plurality of steel bars and concrete (32); the plurality of steel bars are fixed between the two profiled steel plates (31), and the space between the two profiled steel plates (31) is filled with concrete (32).
2. A bridge pile foundation supporting and lifting column structure according to claim 1, characterized in that: The steel column (2) includes two groups of support frames consisting of two support rods and a connecting rod, wherein the connecting rod is fixed between the two support rods. The two groups of support frames are fixed side by side between the new pedestal (1) and the supporting beam (3), wherein two PLC jacks (9) are installed at the upper end of one group of support frames away from the existing bridge pier (5), and two seismic isolation bearings (10) are installed at the upper end of the other group of support frames.
3. A bridge pile foundation supporting and lifting column structure according to claim 2, characterized in that: The connecting rod comprises two cross bars (21) and two oblique bars (22); the two oblique bars (22) are fixed between the two cross bars (21) in an X shape, and the two ends of the two cross bars (21) are respectively fixed to the outer walls of the two support bars.
4. The bridge pile foundation supporting and lifting column structure according to claim 1 is characterized in that: A plurality of bolts are equidistantly screwed to the upper end of the profiled steel plate (31), the spacing between two adjacent bolts is greater than 6 times the bolt diameter, and the bolt diameter is set to 19 mm or 22 mm.
5. A bridge pile foundation supporting and lifting column structure according to claim 4, characterized in that: The diameter of the steel bar is set to 32 mm, and the profiled steel plate (31) is drilled with mounting holes for implanting the steel bar.
6. The bridge pile foundation supporting and lifting column structure according to claim 1 is characterized by: The new cap (1) is arranged in a rectangular shape, and the pile foundation (4) is composed of a plurality of parallel steel bars, and the plurality of steel bars are distributed in a rectangular array.
7. The bridge pile foundation supporting and lifting column structure according to claim 1 is characterized by: The thickness of the new cap (1) is greater than the thickness of the old cap (7) on the existing bridge pier (5), and the upper surface of the new cap (1) is flush with the upper surface of the old cap (7).