Steel structure, assembly frame and assembly process
By adopting an internal and external ring steel structure that can be assembled and connected, and a specific tire frame design, the problems of steel structure pipe sheet assembly accuracy and corrosion resistance are solved, and efficient and environmentally friendly steel structure pipe sheet assembly and installation are achieved, improving the efficiency and environmentally friendly steel structure pipe sheet assembly and installation. Productivity and recycling rate.
Patent Information
- Application Number
- CN202011617646.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-31
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2040-12-31
AI Technical Summary
The existing steel structure pipe sheets have low assembly accuracy and low production efficiency, many mold specifications and high cost, making it difficult to meet installation requirements and anti-corrosion performance requirements.
Adopt an inner and outer ring-shaped steel structure that can be assembled and connected, through a combination design of pre-bent outer, inner arc pipe sheet, vertical reinforcement plate and transverse partition, connected by welding, combining specific tire frame design and process Process to ensure high precision and corrosion resistance of components.
It improves the assembly accuracy and corrosion resistance of steel structure pipe sheets, shortens the assembly time on the construction site, reduces production costs, improves transportation and installation convenience, and achieves high recycling rate and environmental protection.
Smart Images

Figure CN112647986B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a steel structure, an assembly frame and an assembly process, and belongs to the technical field of tunnel machinery. Background Art
[0002] Today, Japan and Europe, which have relatively high levels of shield technology in the world, have reached a considerable level of shield technology design and are developing in the direction of automation, labor saving, high speed and economy. In particular, Japan has conducted a large number of experiments on segment structures and forms since the 1980s, and has developed more than 50 types of shield segments, from which 34 types of segments that have reached practical use have been selected and formally compiled into a book for public publication. In addition, according to a large number of practices in different projects, corresponding shield segment application standards (such as sewer shield segment standards, etc.) have been formulated for shield tunnels with different purposes for designers to choose when designing in different professional fields.
[0003] The earliest tunnel linings were made of wood, bricks and formed stones; later, steel beams, steel arches and steel ribs were used, often together with bricks and wooden partitions; later, bolted flat or corrugated lining steel plates became popular. These lining steel plates have the advantages of light weight, high strength, flame retardancy and suitability for post-grouting, and are widely used in the United States and other places. The use of cast iron to make lining segments began as early as the 19th century. Later, these segments were generally replaced by ductile iron with better toughness. It was not until the 1930s that concrete began to be used to replace cast iron to make lining segments.
[0004] The pipe segments are heavy and have limited transportation distance. At present, cities in my country that are carrying out subway construction, including Beijing, Tianjin, Shanghai, Shenzhen, Nanjing, Xi'an, Shenyang, Chengdu, Hangzhou, Chongqing, Wuhan, Ningbo, Zhengzhou, Harbin, Wuxi, Kunming, Nanchang, etc., have built pipe segment production bases. Other cities that plan to build rail transit are also planning to build pipe segment production enterprises. The use of pipe segments includes underground railway tunnels, cross-river highway tunnels, water conservancy engineering tunnels, etc. In the national standard GB / T22082-2008 "Precast Concrete Lining Segments", the application scope of the product is described as rail transit, highway, railway, hydraulic, electric power, municipal and other tunnel projects.
[0005] With the acceleration of my country's modernization and urbanization, as well as the continuous emergence of new technologies and new materials, the domestic building materials field is also facing unprecedented changes. Light steel structure and heavy steel structure, as a new structural form, have been favored by more and more users with their advantages of light weight, easy installation, safety, environmental protection, and strong plasticity. The scope of application is also becoming increasingly wide. With these advantages, as my country's steel industry continues to grow and the country and society pay more and more attention to new materials. Steel structure has become a new type of building material that the country vigorously promotes and applies. However, the commonly used steel structure segments currently have the following problems:
[0006] 1) The assembly accuracy of steel structure segments is low and cannot meet the installation requirements. At present, the processing of steel structure segments uses ground samples to determine the segment size. This process has low production efficiency and large size deviation, which brings certain difficulties to installation.
[0007] 2) For the prefabrication of segments with different widths and different curve curvatures, there are many mold specifications and the mold cost investment is large.
[0008] Therefore, it is urgent to solve the above problems to improve the performance of steel pipe segments in all aspects. Summary of the invention
[0009] Purpose of the invention: In view of the problems and shortcomings existing in the prior art, the present invention provides a steel structure, a tire frame and a processing technology with high component precision, strong corrosion resistance and not easy to deform.
[0010] Technical solution: A steel structure, characterized in that it comprises a plurality of pre-bent outer arc segments and inner arc segments that can be assembled and connected to form inner and outer circular ring-shaped steel structures; a group of vertical ribs and transverse partitions are fixedly connected between the inner and outer circular arc segments of the inner and outer circular ring-shaped steel structures;
[0011] The transverse partition is an arc-shaped plate arranged along the circumference of the inner and outer arc segments, the outer edge of the arc-shaped plate is fixedly connected to the outer arc segment, the inner edge is fixedly connected to the inner arc segment, and a gap is left between two adjacent arc-shaped plates;
[0012] The vertical ribs are a group of rectangular plates arranged at equal intervals along the axial direction of the inner and outer arc segments. The outer edges of the rectangular plates are fixedly connected to the outer arc segments, and the inner edges are fixedly connected to the inner arc segments. The rectangular plates are embedded in the gap between the two adjacent arc plates and then fixedly connected to the arc plates.
[0013] The technical solution further defined in the present invention is that the pre-bent outer arc segments and inner arc segments are both 1 / 2, 1 / 3 or 1 / 4 arc segments.
[0014] Furthermore, the two adjacent pre-bent outer arc segments or the two adjacent pre-bent inner arc segments are connected by welding.
[0015] Furthermore, the transverse partitions, vertical ribs, pre-bent outer arc tube segments, and pre-bent inner arc tube segments are connected and fixed by spot welding.
[0016] The present invention also relates to a steel structure assembly frame, which is suitable for the above-mentioned steel structure, and includes a long arm frame and a short arm frame, wherein the long arm frame includes a group of first columns and a group of long rocker arms sleeved on the first columns through a fixed connection device, and the ends of the long rocker arms are provided with first H-shaped steels arranged in a horizontal direction, and the outer edge of the first H-shaped steel is an arc structure matching the curvature of the outer arc segment;
[0017] The short arm tire frame includes a group of second columns and a group of short rocker arms connected to the second columns through a fixed connection device. The ends of the short rocker arms are provided with second H-shaped steels arranged in a horizontal direction. The outer edge of the second H-shaped steel is an arc structure that matches the curvature of the inner arc tube segment.
[0018] The technical solution further limited by the above-mentioned assembled tire frame is: a group of limiting rings are respectively installed on the first column and the second column, and the fixed connection devices of the long rocker arm and the short rocker arm are both arranged on the limiting rings at corresponding positions.
[0019] Furthermore, the fixed connection device is a collar and a connecting arm fixedly welded to the collar, and the connecting arm is fixedly connected to the long rocker arm and the short rocker arm by bolts.
[0020] The present invention also discloses a steel structure assembly process, which is applicable to the above-mentioned tire frame to assemble the above-mentioned steel structure, and is characterized in that it comprises the following steps:
[0021] The first step is to use a rounding machine to pre-bend the inner and outer round steel sheets into place and release the stress to ensure that no unnecessary deformation occurs during the assembly process;
[0022] The second step is to connect the required number of first columns into a concentric arc-shaped long arm frame according to the curvature of the pre-bent outer arc segment, and draw a sample line of the outer circle contour on the bottom of the long arm frame to ensure that all the tooling rotation axes are concentric;
[0023] The third step is to position the pre-bent outer arc segment on the long arm frame based on the ground sample line, ensure close contact with the frame, and use a plumb line to check the verticality of the outer arc segment. The verticality shall not be greater than 0.05%;
[0024] The fourth step is to mark the position of the transverse partition on the outer arc segment, install the end-milled transverse partition in place, and spot weld it to ensure that the assembly gap between the transverse partition and the outer arc segment and the vertical rib is 0~1mm;
[0025] The fifth step is to install the end-milled vertical ribs in place, spot weld them firmly, and ensure that the gap between the vertical ribs and the inner and outer arc segments is 0.5~0.75mm;
[0026] Step 6: Replace the long arm tire frame with a short arm tire frame, install the pre-bent inner arc segment in place and tighten it, so that the inner arc segment is closely connected with the transverse partition and vertical rib plate, and spot weld it in place;
[0027] In the seventh step, the same method is used to increase the number of first columns in sequence, so that all first columns are connected into concentric circles, and steps one to six are repeated until all inner and outer arc segments are fixed into a complete inner and outer circular ring and then welded in all positions, and support plates are used to reinforce the segments. After welding is completed, annealing is performed to eliminate internal forces.
[0028] Beneficial effects: Compared with the prior art, the present invention has the following advantages:
[0029] 1) Steel structure segments are easy to manufacture in factories and assembled on site, with high production efficiency, fast assembly speed on site and short construction period.
[0030] 2) As a welded structure, steel segments can improve the waterproof performance and durability of the tunnel compared to concrete segments.
[0031] 3) A breakthrough in the design of tooling frames suitable for batch production of steel pipe segments has been achieved, ensuring the processing accuracy requirements of the steel pipe segments and meeting on-site installation conditions.
[0032] 4) Steel structure segments have a very high recycling rate, which can reach more than 80%. They can be recycled and have less pollution to the environment during manufacturing and dismantling, which meets the requirements of today's sustainable development.
[0033] 5) Steel structure segments are made of high-strength materials and are light in weight. Compared with concrete, the ratio of its density to yield strength is relatively low. Therefore, under the same stress conditions, its components have small cross-sections and light weight, which makes them easy to transport and install. Steel structures can also be designed arbitrarily, and are suitable for shields, which have large spans and heavy loads.
[0034] 6) Compared with concrete segments, steel structure segments are more economical. The construction of steel structure is simple, its own weight is light, and its value-preserving function is outstanding.
[0035] 7) It is mainly used in military-civilian integration projects. At present, the market scale is large, the prospects are good, and it can improve the overall benefits and efficiency of the industry. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 This is an assembly flow chart of a long arm tire frame in an embodiment of the present invention;
[0037] Figure 2Schematic diagram of the structure of inner and outer arc steel sheets in an embodiment of the present invention;
[0038] Figure 3 It is a schematic diagram of the long arm tire frames connected into concentric circles in an embodiment of the present invention;
[0039] Figure 4 It is a schematic diagram of placing the pre-bent outer arc segment at the positioning reference using the long arm tire frame as the positioning reference in an embodiment of the present invention;
[0040] Figure 5 This is a schematic diagram of the installation of the transverse partition in an embodiment of the present invention;
[0041] Figure 6 This is a schematic diagram of the installation of a vertical rib plate in an embodiment of the present invention;
[0042] Figure 7 This is a schematic diagram of the installation of the inner arc segment in an embodiment of the present invention;
[0043] Figure 8 It is a schematic diagram of an assembled steel structure in an embodiment of the present invention. DETAILED DESCRIPTION
[0044] The present invention is further explained below in conjunction with the accompanying drawings and specific embodiments.
[0045] like Figure 1-8 As shown: This embodiment provides a steel structure, including two pre-bent 1 / 2 outer arc segments 8 and two 1 / 2 inner arc segments 7 that can be assembled and connected to form an inner and outer circular ring-shaped steel structure; a set of vertical ribs 10 and two horizontally arranged transverse partitions 9 are fixedly connected between the inner and outer circular arc segments of the inner and outer circular ring-shaped steel structure;
[0046] The transverse partition is an arc-shaped plate arranged along the circumference of the inner and outer arc segments. The outer edge of the arc-shaped plate is welded to the outer arc segment, and the inner edge is welded to the inner arc segment, and a gap is left between two adjacent arc-shaped plates.
[0047] The vertical ribs are a group of rectangular plates arranged at equal intervals along the axis direction of the inner and outer arc segments. The outer sides of the rectangular plates are fixedly welded to the outer arc segments, and the inner sides are fixedly welded to the inner arc segments. The rectangular plates are embedded in the gap between two adjacent arc plates and then fixedly connected to the arc plates.
[0048] In addition to the 1 / 2 pre-bent outer arc segments and inner arc segments used in this embodiment, 1 / 3 or 1 / 4 arc segments can also be prepared as needed.
[0049] The present embodiment also discloses an assembly frame of the steel structure, comprising a long arm frame 6 and a short arm frame 11, wherein the long arm frame comprises a group of first columns 4 and a group of long rocker arms 2 sleeved on the first columns through a fixed connection device 1, wherein the ends of the long rocker arms are provided with first H-shaped steels 3 arranged in a horizontal direction, wherein the outer edge of the first H-shaped steels is an arc-shaped structure matching the curvature of the outer arc segment;
[0050] The short arm tire frame includes a group of second columns and a group of short rocker arms connected to the second columns through a fixed connection device. The ends of the short rocker arms are provided with second H-shaped steels arranged in a horizontal direction. The outer edge of the second H-shaped steel is an arc structure that matches the curvature of the inner arc tube segment.
[0051] Preferably, a set of limiting rings 5 are respectively installed on the first column and the second column, and the fixed connection devices of the long rocker arm and the short rocker arm are arranged on the limiting rings at corresponding positions.
[0052] Preferably, the fixed connection device is a collar and a connecting arm fixedly welded to the collar, and the connecting arm is fixedly connected to the long rocker arm and the short rocker arm by bolts.
[0053] This embodiment also discloses a steel structure assembly process, which is applicable to the above-mentioned tire frame to assemble the above-mentioned steel structure, and is characterized by comprising the following steps:
[0054] The first step is to use a rounding machine to pre-bend the inner and outer round steel sheets into place and release the stress to ensure that no unnecessary deformation occurs during the assembly process;
[0055] The second step is to connect the required number of first columns into a concentric arc-shaped long arm frame according to the curvature of the pre-bent outer arc segment, and draw a sample line of the outer circle contour on the bottom of the long arm frame to ensure that all the tooling rotation axes are concentric;
[0056] The third step is to position the pre-bent outer arc segment on the long arm frame based on the ground sample line, ensure close contact with the frame, and use a plumb line to check the verticality of the outer arc segment. The verticality shall not be greater than 0.05%;
[0057] The fourth step is to mark the position of the transverse partition on the outer arc segment, install the end-milled transverse partition in place, and spot weld it to ensure that the assembly gap between the transverse partition and the outer arc segment and the vertical rib is 0~1mm;
[0058] The fifth step is to install the end-milled vertical ribs in place, spot weld them firmly, and ensure that the gap between the vertical ribs and the inner and outer arc segments is 0.5~0.75mm;
[0059] Step 6: Replace the long arm tire frame with a short arm tire frame, install the pre-bent inner arc segment in place and tighten it, so that the inner arc segment is closely connected with the transverse partition and vertical rib plate, and spot weld it in place;
[0060] In the seventh step, the same method is used to increase the number of first columns in sequence, so that all first columns are connected into concentric circles, and steps one to six are repeated until the two inner arc segments and the two outer arc segments are fixed into a complete inner and outer circular ring and then welded in all positions, and the segments are reinforced with support plates. After welding is completed, annealing is performed to eliminate internal forces.
[0061] The above description is only a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements without departing from the principle of the present invention. These improvements should also be regarded as within the scope of protection of the present invention.
Claims
1. A steel structure assembly process, wherein the steel structure comprises a plurality of pre-bent outer arc segments and inner arc segments that can be assembled and connected to form an inner and outer circular ring-shaped steel structure; a group of vertical ribs and transverse partitions are fixedly connected between the inner and outer circular arc segments of the inner and outer circular ring-shaped steel structure; The transverse partition is an arc-shaped plate arranged along the circumference of the inner and outer arc segments, the outer edge of the arc-shaped plate is fixedly connected to the outer arc segment, the inner edge is fixedly connected to the inner arc segment, and a gap is left between two adjacent arc-shaped plates; The vertical ribs are a group of rectangular plates arranged at equal intervals along the axis direction of the inner and outer arc segments, the outer sides of the rectangular plates are fixedly connected to the outer arc segments, the inner sides are fixedly connected to the inner arc segments, and the rectangular plates are fixedly connected to the arc plates after being embedded in the gap between the two adjacent arc plates; It also includes a tire frame composed of the steel structure, the tire frame includes a long arm tire frame and a short arm tire frame, the long arm tire frame includes a group of first columns and a group of long rocker arms sleeved on the first columns through a fixed connection device, and the ends of the long rocker arms are provided with first H-shaped steels arranged in a horizontal direction, and the outer edge of the first H-shaped steel is an arc structure matching the curvature of the outer arc segment; The short arm tire frame includes a group of second columns and a group of short rocker arms sleeved on the second columns through a fixed connection device, and the ends of the short rocker arms are provided with second H-shaped steels arranged in a horizontal direction, and the outer edges of the second H-shaped steels are arc-shaped structures matching the curvature of the inner arc segment; It is characterized in that The following steps are involved: The first step is to use a rounding machine to pre-bend the inner and outer round steel sheets into place and release the stress to ensure that no unnecessary deformation occurs during the assembly process; The second step is to connect the required number of first columns into a concentric arc-shaped long arm frame according to the curvature of the pre-bent outer arc segment, and draw a sample line of the outer circle contour on the bottom of the long arm frame to ensure that all the tooling rotation axes are concentric; The third step is to position the pre-bent outer arc segment on the long arm frame based on the ground sample line, ensure close contact with the frame, and use a plumb line to check the verticality of the outer arc segment. The verticality shall not be greater than 0.05%; The fourth step is to mark the position of the transverse partition on the outer arc segment, install the end-milled transverse partition in place, and spot weld it to ensure that the assembly gap between the transverse partition and the outer arc segment and the vertical rib is 0~1mm; The fifth step is to install the end-milled vertical ribs in place, spot weld them firmly, and ensure that the gap between the vertical ribs and the inner and outer arc segments is 0.5~0.75mm; Step 6: Replace the long arm tire frame with a short arm tire frame, install the pre-bent inner arc segment in place and tighten it, so that the inner arc segment is closely connected with the transverse partition and vertical rib plate, and spot weld it in place; In the seventh step, the same method is used to increase the number of first columns in sequence, so that all first columns are connected into concentric circles, and steps one to six are repeated until all inner and outer arc segments are fixed into a complete inner and outer circular ring and then welded in all positions, and support plates are used to reinforce the segments. After welding is completed, annealing is performed to eliminate internal forces.
2. The steel structure assembly process according to claim 1, characterized in that: The pre-bent outer arc segments and inner arc segments are all 1 / 2, 1 / 3 or 1 / 4 arc segments.
3. The steel structure assembly process according to claim 2, characterized in that: Two adjacent pre-bent outer arc segments or two adjacent pre-bent inner arc segments are connected by welding.
4. The steel structure assembly process according to claim 3, characterized in that: The transverse partitions, vertical ribs, pre-bent outer arc tube segments, and pre-bent inner arc tube segments are connected and fixed by spot welding.
5. The steel structure assembly process according to claim 4, characterized in that: A set of limiting rings are respectively installed on the first column and the second column, and the fixing connection devices of the long rocker arm and the short rocker arm are both arranged on the limiting rings at corresponding positions.
6. The steel structure assembly process according to claim 5, characterized in that: The fixed connection device is a collar and a connecting arm fixedly welded to the collar, and the connecting arm is fixedly connected to the long rocker arm and the short rocker arm by bolts.
