Drainage structure of spillway discharge chute
By utilizing a negative pressure drainage structure and a zoning drainage system in the spillway chute, the problems of rising pressure on the chute floor and long seepage paths were solved, achieving more efficient drainage and reducing the risk of blockage, and improving the drainage effect.
Patent Information
- Application Number
- CN202420339572.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-23
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-23
AI Technical Summary
In the spillway project, the upward pressure of the chute floor increases the risk of cracks in the chute floor. Moreover, due to the long seepage path and harsh environment, the drainage system is easily blocked, resulting in poor drainage effects, and may even cause the failure of the entire drainage system.
Adopt a negative pressure drainage structure and a partitioned drainage system, using the steps on the drain bottom plate to form negative pressure. Through the combination of longitudinal and transverse drainage channels and drainage holes, the drainage path is shortened, and the risk of blockage is reduced through stainless steel drainage pipes and anti-clogging pipes.
It accelerates drainage, reduces the risk of mud siltation, improves drainage effect, shortens drainage paths, and reduces the risk of overall drainage failure without increasing construction difficulty and engineering volume.
Smart Images

Figure CN221919294U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of spillway engineering, and in particular to a spillway chute drainage structure. Background Art
[0002] The groundwater in the mountain or the water that penetrates into the lower part of the chute floor through structural joints and cracks during flood discharge forms an uplift pressure on the chute floor, which increases the risk of cracks in the chute floor and even causes the top support to be lifted and damaged. In order to solve this technical problem, in addition to the water stop of the chute and the retaining walls on both sides, and the slope drainage, a systematic drainage system needs to be set up on the floor. The drainage points in the floor are finally connected in series to both sides of the chute floor through the drainage grooves, and then led to the lower part for drainage through the drainage pipes. However, since all the seepage water is discharged to the lower part through the main pipe, the drainage path in the area far away from the outlet is long, which affects the drainage effect. In addition, due to the poor bottom operating environment, there is a risk of slag blockage due to long-term seepage. Once the main pipe is partially blocked, the entire drainage system of its upstream part may fail. Utility Model Content
[0003] A first aspect of an embodiment of the present application provides a spillway chute drainage structure, which can utilize the negative pressure formed by the high-speed water flow in the chute on the overflow surface to form negative pressure drainage, and utilize a zoned drainage system to shorten the drainage path and improve the drainage effect.
[0004] The spillway chute drainage structure provided in the first aspect of the embodiment of the present application includes a chute and at least one drainage unit arranged along the length direction of the chute, the chute includes a chute bottom plate and chute side walls arranged on both sides of the chute bottom plate, the chute bottom plate has a plurality of steps, and the drainage unit includes:
[0005] Longitudinal drainage grooves, the longitudinal drainage grooves are located on both sides of the chute bottom plate, and the longitudinal drainage grooves extend along the length direction of the chute bottom plate;
[0006] A plurality of transverse drainage grooves, both ends of which are respectively connected to the longitudinal drainage grooves on both sides of the chute bottom plate, and the plurality of transverse drainage grooves are arranged at intervals along the length direction of the chute bottom plate;
[0007] A plurality of longitudinal basic drainage holes, wherein the longitudinal basic drainage holes are arranged in the longitudinal drainage groove and extend in a horizontal direction, and the plurality of longitudinal basic drainage holes are arranged at intervals along the extension direction of the longitudinal drainage groove;
[0008] A plurality of transverse basic drainage holes, wherein the transverse basic drainage holes are arranged in the transverse drainage groove and extend in a horizontal direction, and the plurality of transverse basic drainage holes are arranged at intervals along the extension direction of the transverse drainage groove;
[0009] A drainage steel pipe is located at the downstream end of the drainage unit, and the drainage steel pipe is connected to the longitudinal drainage groove and the step surface of the chute bottom plate.
[0010] In addition, the spillway chute drainage structure provided in the embodiment of the present application may also have the following additional technical features:
[0011] In an optional solution, if a virtual line segment located in the middle of the chute bottom plate and extending in the length direction is defined as the center line of the chute bottom plate, the transverse drainage grooves are symmetrical to the center line and arranged in an "eight" shape, and the elevation of the connecting part between the transverse drainage grooves and the longitudinal drainage grooves is lower than the elevation of the center line position, so that the water in the transverse drainage grooves can gather to both sides.
[0012] In an optional scheme, orifice anti-blocking tubes are respectively inserted into the orifice positions of the longitudinal foundation drainage hole and the transverse foundation drainage hole, and the orifice anti-blocking tubes are exposed from the longitudinal foundation drainage hole and the transverse foundation drainage hole, and sealing mortar is provided at the gap between the orifice anti-blocking tube and the longitudinal foundation drainage hole and the transverse foundation drainage hole.
[0013] In an optional solution, the hole depth of the longitudinal foundation drainage hole is greater than the hole depth of the transverse foundation drainage hole, the hole depth of the longitudinal foundation drainage hole is approximately 5m, and the hole depth of the transverse foundation drainage hole is approximately 3m.
[0014] In an optional solution, the length of the orifice anti-blocking pipe is approximately 0.5 m, and the length of the orifice anti-blocking pipe exposed outside the longitudinal foundation drainage hole and the transverse foundation drainage hole is approximately 0.1 m;
[0015] The drainage steel pipe is a stainless steel drainage pipe, and the wall thickness of the stainless steel drainage pipe is not less than 5mm.
[0016] In an optional solution, a structural seam is provided at the connection between the chute bottom plate and the chute side wall, a longitudinal seam water stop is provided in the structural seam, and the longitudinal drainage groove is located at the bottom of the structural seam;
[0017] A longitudinal geotextile drainage pipe and a first covering layer are arranged in the longitudinal drainage ditch. The first covering layer is wrapped around the outer side of the longitudinal geotextile drainage pipe. The first covering layer is crushed stone or sandless concrete.
[0018] In an optional solution, a transverse geotextile drainage pipe and a second covering layer are provided in the transverse drainage ditch, the transverse geotextile drainage pipe is connected to the longitudinal geotextile drainage pipe, the second covering layer is wrapped around the outside of the transverse geotextile drainage pipe, and the second covering layer is crushed stone or sandless concrete.
[0019] A second aspect of the embodiments of the present application provides a construction method for a spillway chute drainage structure, wherein the spillway chute drainage structure is the spillway chute drainage structure provided in the first aspect of the embodiments, and the construction method comprises the following steps: 1) completing the excavation of the spillway chute foundation and the trench excavation of the longitudinal drainage trough and the transverse drainage trough;
[0020] 2) Avoid the areas of transverse drainage grooves and longitudinal drainage grooves, pour the base plate foundation leveling layer, and perform consolidation grouting treatment on the leveling layer foundation (such as setting grouting treatment measures);
[0021] 3) Drilling horizontal longitudinal foundation drainage holes and transverse foundation drainage holes along the grooves of the longitudinal drainage grooves and the transverse drainage grooves and cleaning them, inserting hole anti-blocking pipes into the longitudinal foundation drainage holes and the transverse foundation drainage holes respectively, and using sealing mortar to block the gaps between the hole anti-blocking pipes and the corresponding drainage holes;
[0022] 4) Laying a first layer of crushed stone or sandless concrete, a geotextile drainage pipe, and a second layer of crushed stone or sandless concrete in the grooves of the longitudinal drainage groove and the transverse drainage groove in sequence, forming a longitudinal drainage groove and a transverse drainage groove in which the geotextile drainage pipe is wrapped by crushed stone or sandless concrete, and inserting the exposed part of the orifice anti-blocking pipe into the geotextile drainage pipe;
[0023] 5) Apply a 5 cm thick layer of mortar to the surface of the second layer of crushed stone or sandless concrete;
[0024] 6) Tie up the chute side wall steel bars on both sides of the chute bottom plate, fix the water stop strips between the chute side wall and the chute bottom plate, and at the end of each drainage unit, connect a drainage steel pipe to the chute bottom plate area through the geotextile drainage pipe of the longitudinal drainage trough;
[0025] 7) Tie up the steel bars of the chute bottom plate, pour the chute bottom plate concrete, and insert the pre-buried drainage steel pipe through the side wall of the step;
[0026] 8) Cut off the part of the steel pipe that extends beyond the side wall and grind it smooth.
[0027] The beneficial effects of the embodiments of the present application are:
[0028] The spillway chute drainage structure in the embodiment of the present application utilizes the negative pressure formed in the step triangle area by the step energy dissipation to change the defect of gravity drainage of the drainage system, which can not only accelerate drainage but also reduce the risk of mud clogging in the hole; horizontally arranged drainage holes and zoned drainage settings are used to increase the longitudinal drainage range of a single drainage hole, shorten the drainage path, further improve the drainage effect, and reduce the overall drainage failure problem caused by local blockage of the longitudinal drainage trough; in addition, the entire drainage structure does not increase the construction difficulty and engineering volume, and has almost no adverse impact on investment.
[0029] It should be understood that the foregoing general description and the following detailed description are exemplary only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 A schematic diagram of the plan layout of the spillway chute drainage structure provided for this application;
[0031] Figure 2 for Figure 1 Longitudinal section of the drainage structure of the middle spillway chute;
[0032] Figure 3 for Figure 1 Cross-section of the middle spillway chute drainage structure;
[0033] Figure 4 Structural diagram of the lateral drainage trough provided for this application;
[0034] Figure 5 A structural diagram of the longitudinal drainage trough provided for this application;
[0035] Figure 6 This is a schematic diagram of the connection of the orifice anti-blocking tube provided in this application.
[0036] Figure numerals: chute bottom plate 1, chute side wall 2, longitudinal drainage chute 3, transverse drainage chute 4, longitudinal foundation drainage hole 5, transverse foundation drainage hole 6, drainage steel pipe 7, center line 8, hole anti-blocking pipe 9, sealing mortar 10, longitudinal seam water stopping 11, longitudinal geotextile drainage pipe 12, first coating layer 13, transverse geotextile drainage pipe 14, second coating layer 15, mortar 16.
[0037] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application. DETAILED DESCRIPTION
[0038] In order to better understand the technical solution of the present application, the embodiments of the present application are described in detail below with reference to the accompanying drawings.
[0039] It should be clear that the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.
[0040] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.
[0041] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0042] It should be noted that the directional words such as "upper", "lower", "left", and "right" described in the embodiments of the present application are described at the angles shown in the accompanying drawings and should not be understood as limiting the embodiments of the present application. In addition, in the context, it is also necessary to understand that when it is mentioned that an element is connected to another element "upper" or "lower", it can not only be directly connected to another element "upper" or "lower", but also indirectly connected to another element "upper" or "lower" through an intermediate element.
[0043] like Figure 1-6 As shown, the first aspect of the embodiment of the present application provides a spillway chute drainage structure, which can use the negative pressure formed by the high-speed water flow of the chute on the overflow surface to form negative pressure drainage, and use the drainage system arranged in partitions to shorten the drainage path, thereby improving the drainage effect. The spillway chute drainage structure includes a chute and at least one drainage unit arranged along the length direction of the chute, the chute includes a chute bottom plate 1 and chute side walls 2 arranged on both sides of the chute bottom plate 1, the chute bottom plate 1 has a plurality of steps, and the chute uses the steps of the chute bottom plate 1 for energy dissipation; the drainage unit includes a longitudinal drainage trough 3, a plurality of transverse drainage troughs 4, a plurality of longitudinal foundation drainage holes 5, a plurality of transverse foundation drainage holes 6, and a drainage steel pipe 7.
[0044] Specifically, the longitudinal drainage grooves 3 are located on both sides of the chute bottom plate 1, and the longitudinal drainage grooves 3 extend along the length direction of the chute bottom plate 1; the two ends of the transverse drainage grooves 4 are respectively connected to the longitudinal drainage grooves 3 on both sides of the chute bottom plate 1, and multiple transverse drainage grooves 4 are arranged at intervals along the length direction of the chute bottom plate 1; the longitudinal basic drainage holes 5 are arranged in the longitudinal drainage grooves 3 and extend in the horizontal direction, and multiple longitudinal basic drainage holes 5 are arranged at intervals along the extension direction of the longitudinal drainage grooves 3; the transverse basic drainage holes 6 are arranged in the transverse drainage grooves 4 and extend in the horizontal direction, and multiple transverse basic drainage holes 6 are arranged at intervals along the extension direction of the transverse drainage grooves 4; the drainage steel pipe 7 is located at the downstream end of the drainage unit, and the drainage steel pipe 7 connects the longitudinal drainage grooves 3 and the step surface of the chute bottom plate 1.
[0045] The spillway chute drainage structure in the embodiment of the present application utilizes the negative pressure formed in the step triangle area by the step energy dissipation to change the defect of gravity drainage of the drainage system, which can not only accelerate drainage but also reduce the risk of mud clogging in the hole; horizontally arranged drainage holes and zoned drainage settings are used to increase the longitudinal drainage range of a single drainage hole, shorten the drainage path, further improve the drainage effect, and reduce the overall drainage failure problem caused by local blockage of the longitudinal drainage trough; in addition, the entire drainage structure does not increase the construction difficulty and engineering volume, and has almost no adverse impact on investment.
[0046] like Figure 1 As shown, in a specific embodiment, if a virtual line segment located in the middle of the chute bottom plate 1 and extending in the length direction is defined as the center line 8 of the chute bottom plate 1, the transverse drainage grooves 4 are symmetrical with the center line 8 and arranged in an "eight" shape, and the elevation of the connecting portion between the transverse drainage grooves 4 and the longitudinal drainage grooves 3 is lower than the elevation of the center line 8, so that the water in the transverse drainage grooves 4 can be gathered to both sides.
[0047] like Figure 6 As shown, in a specific embodiment, the orifice positions of the longitudinal foundation drainage hole 5 and the transverse foundation drainage hole 6 are respectively inserted with orifice anti-blocking tubes 9, the orifice anti-blocking tubes 9 are exposed from the longitudinal foundation drainage hole 5 and the transverse foundation drainage hole 6, and the gaps between the orifice anti-blocking tubes 9 and the longitudinal foundation drainage hole 5 and the transverse foundation drainage hole 6 are provided with blocking mortar 10. Specifically, the length of the orifice anti-blocking tube 9 is approximately 0.5m, and the length of the orifice anti-blocking tube 9 exposed from the longitudinal foundation drainage hole 5 and the transverse foundation drainage hole 6 is approximately 0.1m, and the material of the orifice anti-blocking tube 9 is PE tube or other materials with excellent durability.
[0048] like Figure 1-3 As shown, in a specific embodiment, the hole depth of the longitudinal foundation drainage hole 5 is greater than the hole depth of the transverse foundation drainage hole 6. Generally speaking, the hole depth of the longitudinal foundation drainage hole 5 is about 5m, and the hole depth of the transverse foundation drainage hole 6 is about 3m. The drainage steel pipe 7 is a stainless steel drainage pipe, and the wall thickness of the stainless steel drainage pipe is not less than 5mm. By presetting the hole depths of the longitudinal foundation drainage hole 5 and the transverse foundation drainage hole 6, the construction cost can be scientifically and reasonably reduced while ensuring the drainage effect.
[0049] like Figure 4-5 As shown, in a specific embodiment, a structural joint is provided at the connection between the chute bottom plate 1 and the chute side wall 2, a longitudinal joint water stop 11 is arranged in the structural joint, and the longitudinal drainage groove 3 is located at the bottom of the structural joint; a longitudinal geotextile drainage pipe 12 and a first coating layer 13 are arranged in the longitudinal drainage groove 3, the first coating layer 13 is wrapped around the outer side of the longitudinal geotextile drainage pipe 12, and the first coating layer 13 is crushed stone or sandless concrete.
[0050] A transverse geodrain pipe 14 and a second coating layer 15 are arranged in the transverse drainage groove 4. The transverse geodrain pipe 14 is connected to the longitudinal geodrain pipe 12. The second coating layer 15 is wrapped around the outside of the transverse geodrain pipe 14, and the second coating layer 15 is crushed stone or sandless concrete. In addition, a layer of mortar 16 about 5 cm thick is applied on the outer surface of the crushed stone or sandless concrete.
[0051] A second aspect of the embodiments of the present application provides a construction method for a spillway chute drainage structure, wherein the spillway chute drainage structure is the spillway chute drainage structure provided in the first aspect of the embodiments, and the construction method comprises the following steps:
[0052] 1) Complete the excavation of the spillway chute foundation and the trench excavation of the longitudinal drainage chute 3 and the transverse drainage chute 4;
[0053] 2) Avoid the areas of the transverse drainage groove 4 and the longitudinal drainage groove 3, cast the base plate foundation leveling layer, and perform consolidation grouting treatment on the leveling layer foundation (such as setting grouting treatment measures);
[0054] 3) Drill horizontal longitudinal foundation drainage holes 5 and transverse foundation drainage holes 6 along the grooves of the longitudinal drainage grooves 3 and transverse drainage grooves 4 and clean them. Insert a 0.5m PE (or other materials with excellent durability) hole-blocking pipe 9 into the longitudinal foundation drainage holes 5 and transverse foundation drainage holes 6 respectively, extending about 10cm from the hole, and use sealing mortar 10 to block the gap between the hole-blocking pipe 9 and the corresponding drainage hole;
[0055] 4) Lay the first layer of crushed stone or sandless concrete, geotextile drainage pipe and the second layer of crushed stone or sandless concrete in the grooves of the longitudinal drainage groove 3 and the transverse drainage groove 4 in sequence, so as to form the longitudinal drainage groove 3 and the transverse drainage groove 4 in which the geotextile drainage pipe is wrapped by crushed stone or sandless concrete, and insert the exposed part of the orifice anti-blocking pipe 9 into the geotextile drainage pipe;
[0056] 5) Apply a 5 cm thick layer of mortar 16 to the surface of the second layer of crushed stone or sandless concrete;
[0057] 6) Tie up the steel bars of the chute side walls 2 on both sides of the chute bottom plate 1, fix the water stop strips between the chute side walls 2 and the chute bottom plate 1, and connect a drainage steel pipe 7 to the chute bottom plate 1 area in the geotextile drainage pipe of the longitudinal drainage trough 3 at the end of each drainage unit;
[0058] 7) Tie up the steel bars of the chute bottom plate 1, pour concrete of the chute bottom plate 1, and insert the pre-buried drainage steel pipe 7 through the side wall of the step;
[0059] 8) Cut off the part of the steel pipe that extends beyond the side wall and grind it smooth.
[0060] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A spillway chute drainage structure, characterized in that: The invention comprises a chute and at least one drainage unit arranged along the length direction of the chute, wherein the chute comprises a chute bottom plate and chute side walls arranged on both sides of the chute bottom plate, the chute bottom plate has a plurality of steps, and the drainage unit comprises: Longitudinal drainage grooves, the longitudinal drainage grooves are located on both sides of the chute bottom plate, and the longitudinal drainage grooves extend along the length direction of the chute bottom plate; A plurality of transverse drainage grooves, both ends of which are respectively connected to the longitudinal drainage grooves on both sides of the chute bottom plate, and the plurality of transverse drainage grooves are arranged at intervals along the length direction of the chute bottom plate; A plurality of longitudinal basic drainage holes, wherein the longitudinal basic drainage holes are arranged in the longitudinal drainage groove and extend in a horizontal direction, and the plurality of longitudinal basic drainage holes are arranged at intervals along the extension direction of the longitudinal drainage groove; A plurality of transverse basic drainage holes, wherein the transverse basic drainage holes are arranged in the transverse drainage groove and extend in a horizontal direction, and the plurality of transverse basic drainage holes are arranged at intervals along the extension direction of the transverse drainage groove; A drainage steel pipe is located at the downstream end of the drainage unit, and the drainage steel pipe is connected to the longitudinal drainage groove and the step surface of the chute bottom plate.
2. The spillway chute drainage structure according to claim 1, characterized in that: A virtual line segment located in the middle of the chute bottom plate and extending in the length direction is defined as the center line of the chute bottom plate, and the transverse drainage grooves are symmetrical to the center line and arranged in an "eight" shape. The elevation of the connecting part of the transverse drainage grooves and the longitudinal drainage grooves is lower than the elevation of the center line position, so that the water in the transverse drainage grooves can be gathered to both sides.
3. The spillway chute drainage structure according to claim 1 or 2, characterized in that: Orifice anti-blocking tubes are respectively inserted into the orifice positions of the longitudinal foundation drainage hole and the transverse foundation drainage hole. The orifice anti-blocking tubes are exposed from the longitudinal foundation drainage hole and the transverse foundation drainage hole, and sealing mortar is provided at the gap between the orifice anti-blocking tube and the longitudinal foundation drainage hole and the transverse foundation drainage hole.
4. The spillway chute drainage structure according to claim 3, characterized in that: The hole depth of the longitudinal foundation drainage hole is greater than the hole depth of the transverse foundation drainage hole. The hole depth of the longitudinal foundation drainage hole is approximately 5m, and the hole depth of the transverse foundation drainage hole is approximately 3m.
5. The spillway chute drainage structure according to claim 3, characterized in that: The length of the orifice anti-blocking pipe is approximately 0.5m, and the length of the orifice anti-blocking pipe exposed from the longitudinal foundation drainage hole and the transverse foundation drainage hole is approximately 0.1m; The drainage steel pipe is a stainless steel drainage pipe, and the wall thickness of the stainless steel drainage pipe is not less than 5mm.
6. The spillway chute drainage structure according to claim 3, characterized in that: A structural seam is provided at the connection between the chute bottom plate and the chute side wall, a longitudinal seam water stop is provided in the structural seam, and the longitudinal drainage groove is located at the bottom of the structural seam; A longitudinal geotextile drainage pipe and a first covering layer are arranged in the longitudinal drainage ditch. The first covering layer is wrapped around the outer side of the longitudinal geotextile drainage pipe. The first covering layer is crushed stone or sandless concrete.
7. The spillway chute drainage structure according to claim 6, characterized in that: A transverse geotextile drainage pipe and a second coating layer are arranged in the transverse drainage ditch. The transverse geotextile drainage pipe is connected to the longitudinal geotextile drainage pipe. The second coating layer is wrapped around the outer side of the transverse geotextile drainage pipe, and the second coating layer is crushed stone or sandless concrete.
Citation Information
Cited By
Subarea negative-pressure drainage structure for bottom plate of discharge chute and construction method of subarea negative-pressure drainage structure
CN118007602A