Hole collapse prevention structure of anchor cable hole
By using the combined structure of steel pipe casing and steel mesh sleeve in the anchor cable drilling, the problem of anchor cable drilling collapse and stuck drill is solved, fast and effective anchor cable anchoring is achieved, and the stability of the slope is ensured. Construction efficiency.
Patent Information
- Application Number
- CN202323633631.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-12-29
AI Technical Summary
During the anchor cable drilling process, unpredicted adverse geological conditions caused drilling equipment to easily get stuck and hole collapsed, which extended the anchor cable construction period and affected the slope stability. Existing solutions include replacing equipment or The pre-consolidation method has the risk of extending the construction period and causing hole collapse.
An anti-collapse hole structure including a steel pipe casing and a steel mesh sleeve is adopted. The steel pipe casing extends along the borehole. The steel mesh sleeve is tightly installed in the casing. The open end is located in the casing and the closed end is located in the borehole. The anchor cable passes through the casing. It is extended with the steel wire mesh sleeve and combined with the pull-out mechanism to solve the problem of hole collapse.
It achieves fast and effective drilling and anchoring, reduces construction costs, improves the anchoring end consolidation effect, simplifies construction operations, and can effectively solve sudden adverse geological conditions and ensure slope stability.
Smart Images

Figure CN221919387U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of soil prestressed anchor cables, and in particular to an anti-collapse hole structure of an anchor cable hole. Background Art
[0002] At present, the equipment commonly used for anchor drilling is the down-the-hole drill. When encountering unforeseen adverse geological conditions, this type of drilling equipment is prone to drill jamming and hole collapse problems, which makes it impossible to complete the drilling smoothly, resulting in a longer anchor construction period, which is extremely detrimental to the stability of the slope. At present, in addition to replacing the drilling equipment, there are also methods such as pre-consolidation and pipe drilling to solve the problems of hole collapse and drill jamming. However, the above methods have some limitations on site: (1) Due to sudden situations, replacing equipment or using pre-consolidation methods will extend the construction period, which is not conducive to timely anchoring of the slope; (2) When using the pipe drilling method, when the casing penetrates to the anchor end, the casing needs to be pulled out, and the casing also has the problem of hole collapse during the pulling process, which makes the anchor unable to enter the hole smoothly. Utility Model Content
[0003] A first aspect of an embodiment of the present application provides an anti-collapse hole structure for an anchor cable hole, which can quickly and effectively complete the drilling and ensure the effectiveness of the anchoring end of the anchor cable, thereby ensuring the stability of the slope.
[0004] The first aspect of the embodiment of the present application provides an anti-collapse hole structure of an anchor hole, comprising: a drill hole, wherein the drill hole is arranged in the slope;
[0005] A steel pipe sleeve, the steel pipe sleeve extending along the length direction of the borehole, the steel pipe sleeve being sleeved in the borehole, and the outer wall of the steel pipe sleeve abutting against the inner wall of the borehole;
[0006] A wire mesh sleeve, the wire mesh sleeve is tightly arranged in the steel pipe casing and extends into the borehole by a preset length, the wire mesh sleeve has an open end and a closed end in the length direction, the closed end is located in the borehole, and the open end is located in the steel pipe casing;
[0007] Anchor cables are arranged in the steel pipe casing and the wire mesh casing and extend outside the slope.
[0008] In addition, the anti-collapse hole structure of the anchor hole provided in the embodiment of the present application may also have the following additional technical features:
[0009] In an optional solution, the steel pipe casing includes multiple sections of steel flower pipes, two adjacent sections of the steel flower pipes are connected by threads, and the steel flower pipes are provided with multiple slurry diffusion holes at intervals along the length direction.
[0010] In an optional solution, the spacing between the slurry diffusion holes of two adjacent sections is 20 to 30 cm, and the aperture of the slurry diffusion hole is not less than 1 cm.
[0011] In an optional solution, the wire mesh sleeve includes a main reinforcement frame and a wire mesh wrapped around the outside of the main reinforcement frame, the diameter of the steel wire of the main reinforcement frame is 3mm to 5mm, and the gap of the wire mesh is 5mm.
[0012] In an optional scheme, the wire mesh sleeve and the steel pipe casing have a first connection state and a second connection state. In the first connection state, the wire mesh sleeve is located in the steel pipe casing. In the second connection state, the closed end of the wire mesh sleeve is located in the drilled hole and the open end is located in the steel pipe casing.
[0013] In an optional solution, the steel pipe casing is coated with butter near the orifice of the borehole, and the steel pipe casing can be partially pulled out of the borehole, so that the wire mesh sleeve and the steel pipe casing are changed from a first connection state to a second connection state.
[0014] In an optional solution, a pull-out mechanism is included, the pull-out mechanism includes a dowel, a steel wire rope and a push rod, and the dowel is in multiple numbers;
[0015] When part of the steel pipe casing is pulled out, a plurality of the dowels are inserted into the orifice attachment of the drill hole, one end of the push rod abuts against the closed end of the wire mesh sleeve, and the other end is connected to the dowels through the steel wire rope to fix the wire mesh sleeve.
[0016] In an optional solution, a circular abutment portion is provided at one end of the push rod, the diameter of which is smaller than the inner diameter of the wire mesh sleeve, the push rod is composed of steel bars connected by sleeves, and the length of each section of the steel bars is 2 to 3 m.
[0017] A second aspect of the present application provides a method for constructing an anchor hole, wherein the anchor hole is the anti-collapse hole structure of the anchor hole described in the first aspect of the present application, and the construction method comprises the following steps:
[0018] 1) Use down-the-hole drilling and pipe drilling to drill to the set hole depth;
[0019] 2) According to the length of the anchoring section of the anchor cable, a wire mesh sleeve is made and a push rod is used to push the wire mesh sleeve to the bottom of the hole;
[0020] 3) multiple dowel bars are evenly arranged around the hole, and the push rod is fixed to the dowel bars by steel wire rope;
[0021] 4) Place a pipe pulling machine at the hole mouth and pull out the steel pipe casing step by step. The pulling length is greater than the length of the anchor cable anchoring section and less than the length of the wire mesh sleeve;
[0022] 5) Remove the pipe pulling machine, take out the push rod, and place the anchor cable to the set position;
[0023] 6) After the anchor cable at the orifice section is protected by the PVC protective sleeve, the steel pipe sleeve at the orifice is rotated in the opposite direction, and the steel pipe sleeve at the orifice section is removed by local excavation or a pipe pulling machine;
[0024] 7) Complete the construction of anchor cables in accordance with the process requirements of anchor cable construction.
[0025] The beneficial effects of the embodiments of the present application are:
[0026] The anti-collapse hole structure of the anchor hole in the embodiment of the present application solves the problem of difficulty in drilling anchor holes in broken rock masses through the cooperation of wire mesh sleeves and steel pipe casings. It has low requirements for construction equipment and personnel operation, low drilling costs, and can efficiently solve sudden adverse geological conditions at the construction site. In addition, the wire mesh sleeve is wrapped around the anchor end of the anchor cable, which can improve the consolidation effect of the anchor end. The steel pipe remaining in the unbonded section has an auxiliary anti-corrosion effect on the anchor cable in the unbonded section.
[0027] It should be understood that the foregoing general description and the following detailed description are exemplary only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 A schematic diagram of the structure of the anti-collapse hole structure provided in the present application after the anchor hole is formed;
[0029] Figure 2 A schematic diagram of the structure of the anti-collapse hole structure provided in this application after the anchor cable is placed;
[0030] Figure 3 A schematic diagram of the structure of a wire mesh sleeve and a push rod provided in the present application in a specific embodiment;
[0031] Figure 4 A schematic diagram of the installation structure of the extraction mechanism provided in this application when extracting the steel pipe casing.
[0032] Figure numerals: slope 1, drill hole 2, steel pipe casing 3, wire mesh sleeve 4, collapsed hole and broken rock 5, anchor cable 6, main reinforcement skeleton 7, wire mesh 8, push rod 9, wire rope 10, inserted reinforcement 11, open end 12, closed end 13, circular abutment 14.
[0033] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application. DETAILED DESCRIPTION
[0034] In order to better understand the technical solution of the present application, the embodiments of the present application are described in detail below with reference to the accompanying drawings.
[0035] It should be clear that the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.
[0036] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.
[0037] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0038] It should be noted that the directional words such as "upper", "lower", "left", and "right" described in the embodiments of the present application are described at the angles shown in the accompanying drawings and should not be understood as limiting the embodiments of the present application. In addition, in the context, it is also necessary to understand that when it is mentioned that an element is connected to another element "upper" or "lower", it can not only be directly connected to another element "upper" or "lower", but also indirectly connected to another element "upper" or "lower" through an intermediate element.
[0039] There are many drilling methods for drilling holes on slopes, but the special feature of anchor holes is that the casing in the innermost anchoring area needs to be pulled out. If the hole wall of the anchor hole collapses during the pulling out process, the anchor cannot be put in. However, if the anchor is put in first and then pulled out, the anchor and the casing will get stuck and the anchor will be pulled out together. It can be seen that how to prevent the hole wall of the anchor hole from collapsing is particularly important for the installation and fixation of the anchor, and there is no good solution in the relevant technology.
[0040] like Figure 1-4As shown, the first aspect of the embodiment of the present application provides an anti-collapse hole structure of an anchor hole, which can quickly and effectively complete the drilling and ensure the effectiveness of the anchor end of the anchor, thereby ensuring the stability of the slope 1. It specifically includes a borehole 2, a steel pipe casing 3, a wire mesh sleeve 4 and an anchor cable 6, wherein the extension direction of the borehole 2 is perpendicular or inclined to the slope surface of the slope 1 and is arranged in the slope 1; the steel pipe casing 3 extends along the length direction of the borehole 2, the steel pipe casing 3 is sleeved in the borehole 2, and the outer wall of the steel pipe casing 3 abuts against the inner wall of the borehole 2; the wire mesh sleeve 4 is tightly arranged in the steel pipe casing 3 and extends into the borehole 2 by a preset length, and the steel mesh sleeve 4 has an open end 12 and a closed end 13 in the length direction, the closed end 13 is located in the borehole 2, and the open end 12 is located in the steel pipe casing 3; the anchor cable 6 is arranged in the steel pipe casing 3 and the wire mesh sleeve 4 and extends out of the slope 1.
[0041] In this embodiment, the anti-collapse hole structure of the anchor hole solves the problem of difficulty in drilling anchor holes in broken rock masses through the cooperation of the wire mesh sleeve 4 and the steel pipe sleeve 3. It has low requirements for construction equipment and personnel operation, low drilling cost, and can efficiently solve sudden adverse geological conditions at the construction site. In addition, the wire mesh sleeve 4 is wrapped around the anchor end of the anchor cable 6, and at the same time can improve the consolidation effect of the anchor end. The steel pipe remaining in the unbonded section has an auxiliary anti-corrosion effect on the anchor cable 6 in the unbonded section.
[0042] It should be noted that the length and size of the wire mesh sleeve 4 and the steel pipe sleeve 3 can be adjusted according to the depth and aperture of the borehole 2. Generally speaking, the inner diameter of the steel pipe sleeve 3 is not less than the design aperture of the corresponding anchor cable 6. The steel pipe sleeve 3 includes multiple sections of steel flower pipes, and two adjacent sections of steel flower pipes are connected by threads. Slurry diffusion holes are set on the hole wall according to 4 holes per cross section with a spacing of about 20 to 30 cm. The aperture of the slurry diffusion hole is not less than 1 cm. The multiple sections of steel flower pipes can be combined or disassembled according to the depth of the different boreholes 2, so as to better adapt to the boreholes 2 of different depths.
[0043] like Figure 3 As shown, in a specific embodiment, the wire mesh sleeve 4 includes a main reinforcement frame 7 and a wire mesh 8 wrapped outside the main reinforcement frame 7. The main reinforcement frame 7 is made of steel wire with a thickness of about 3mm to 5mm and is made into a cylindrical tube shape. The spacing between adjacent steel wires is about 5cm to ensure a certain rigidity; the hole spacing of the wire mesh 8 outside the main reinforcement frame 7 is about 5mm. In addition, the outer diameter of the wire mesh sleeve 4 is consistent with the inner diameter of the steel pipe sleeve 3, and the length is greater than the length of the anchoring area of the anchoring end of the anchor cable 6, which is not less than 0.5m.
[0044] like Figure 1-2As shown, in a specific embodiment, the wire mesh sleeve 4 and the steel pipe casing 3 have a first connection state and a second connection state. In the first connection state, the wire mesh sleeve 4 is located in the steel pipe casing 3. In the second connection state, the closed end 13 of the wire mesh sleeve 4 is located in the borehole 2, and the open end 12 is located in the steel pipe casing 3. The steel pipe casing 3 can be partially pulled out of the borehole 2, so that the wire mesh sleeve 4 and the steel pipe casing 3 are changed from the first connection state to the second connection state. It should be noted that the second connection state between the wire mesh sleeve 4 and the steel pipe casing 3 is the final state of the anti-collapse hole structure of the anchor hole. In the process of changing from the first connection state to the second connection state, in order to prevent the wire mesh sleeve 4 from shifting, it needs to be fixed.
[0045] like Figure 3-4 As shown, in a specific embodiment, in order to enable the steel pipe casing 3 to be partially pulled out of the borehole 2, the anti-collapse hole structure of the anchor hole also includes a pulling-out mechanism, the pulling-out mechanism includes a dowel rod 11, a steel wire rope 10 and a pushing rod 9, and the number of the dowel rod 11 is multiple; when partially pulling out the steel pipe casing 3, the multiple dowel rods 11 are inserted into the hole mouth attachment of the borehole 2, one end of the pushing rod 9 abuts against the closed end 13 of the steel wire mesh sleeve 4, and the other end is connected to the dowel rod 11 through the steel wire rope 10 to fix the steel wire mesh sleeve 4, thereby preventing the steel wire mesh sleeve 4 from shifting with the steel pipe casing 3 during the pulling-out process.
[0046] It should be noted that the orifice section of the steel pipe casing 3 needs to be removed after the anchor cable 6 is placed to reduce the influence of the steel pipe casing 3 on the prestressed stress transfer effect. The specific method is to reversely rotate at least one section of the steel pipe casing 3, release the connection between the steel pipe casing 3 and the next section of the steel pipe casing 3, and then use a pipe pulling machine or loosen the surface rock mass before pulling it out. In order to facilitate the pulling out of the outermost level of the steel pipe casing 3, butter can be applied to the outer wall of the section of the steel pipe casing 3 when the steel pipe casing 3 is placed. After the steel pipe casing 3 is pulled out, the collapsed rock 5 in the borehole 2 can make the wire mesh sleeve 4 more firmly fixed in the borehole 2.
[0047] like Figure 3 As shown, in a specific embodiment, a circular abutment portion 14 is provided at one end of the push rod 9, and the diameter of the circular abutment portion 14 is smaller than the inner diameter of the wire mesh sleeve 4, so that the push rod 9 will not damage the wire protective mesh sleeve during the pushing process; the push rod 9 is composed of steel bars connected by sleeves, and the length of each section of the steel bar is 2 to 3 meters, which is convenient for manual operation by personnel.
[0048] A second aspect of the embodiment of the present application provides a construction method for an anchor hole, wherein the anchor hole is the anti-collapse hole structure of the anchor hole in the embodiment of the first aspect, and the construction method comprises the following steps:
[0049] 1) Drill hole 2 to the set hole depth by using down-the-hole drilling and pipe drilling;
[0050] 2) According to the length of the anchoring section of the anchor cable 6, a wire mesh sleeve 4 is made, and a push rod 9 is used to push the wire mesh sleeve 4 to the bottom of the hole;
[0051] 3) Multiple dowel bars 11 are evenly arranged around the hole, and the push rod 9 is fixed to the dowel bars 11 using a steel wire rope 10;
[0052] 4) A pipe pulling machine is placed at the hole mouth to pull out the steel pipe casing 3 step by step. The pulling length is greater than the length of the anchoring section of the anchor cable 6 and less than the length of the wire mesh sleeve 4;
[0053] 5) Remove the pipe pulling machine, take out the push rod 9, and place the anchor cable 6 to the set position;
[0054] 6) After the anchor cable 6 at the orifice section is protected by the PVC protective sleeve, the steel pipe sleeve 3 at the orifice is rotated in the reverse direction, and the steel pipe sleeve 3 (1 to 2 sections) at the orifice section is taken out by local excavation or a pipe pulling machine;
[0055] 7) Complete the construction of anchor cable 6 according to the process requirements of anchor cable construction.
[0056] The anchor hole construction method provided in the second aspect of the embodiment of the present application can quickly construct the anchor hole. The entire construction process is simple and efficient, and has low requirements for construction equipment and personnel operation. It also solves the problem of difficulty in drilling anchor holes in broken rock.
[0057] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. An anti-collapse structure for anchor cable holes, It is characterized in that include: drilling a hole, wherein the hole is arranged in the slope; A steel pipe sleeve, the steel pipe sleeve extending along the length direction of the borehole, the steel pipe sleeve being sleeved in the borehole, and the outer wall of the steel pipe sleeve abutting against the inner wall of the borehole; A wire mesh sleeve, the wire mesh sleeve is tightly arranged in the steel pipe casing and extends into the borehole by a preset length, the wire mesh sleeve has an open end and a closed end in the length direction, the closed end is located in the borehole, and the open end is located in the steel pipe casing; Anchor cables are arranged in the steel pipe casing and the wire mesh casing and extend outside the slope.
2. The anti-collapse hole structure of the anchor hole according to claim 1, It is characterized in that The steel pipe casing comprises a plurality of sections of steel flower pipes, two adjacent sections of the steel flower pipes are connected by threads, and the steel flower pipes are provided with a plurality of slurry diffusion holes at intervals along the length direction.
3. The anti-collapse hole structure of the anchor hole according to claim 2, It is characterized in that The spacing between the slurry diffusion holes of two adjacent sections is 20-30 cm, and the aperture of the slurry diffusion hole is not less than 1 cm.
4. The anti-collapse hole structure of the anchor hole according to claim 2, It is characterized in that The wire mesh sleeve includes a main reinforcement frame and a wire mesh wrapped around the outside of the main reinforcement frame. The diameter of the steel wire of the main reinforcement frame is 3mm~5mm, and the gap of the wire mesh is 5mm.
5. The anti-collapse hole structure of the anchor hole according to any one of claims 1 to 4, It is characterized in that The wire mesh sleeve and the steel pipe casing have a first connection state and a second connection state. In the first connection state, the wire mesh sleeve is located in the steel pipe casing. In the second connection state, the closed end of the wire mesh sleeve is located in the drilled hole and the open end is located in the steel pipe casing.
6. The anti-collapse structure of the anchor hole according to claim 5, It is characterized in that The steel pipe casing is coated with butter near the orifice of the borehole, and the steel pipe casing can be partially pulled out of the borehole, so that the wire mesh sleeve and the steel pipe casing are changed from a first connection state to a second connection state.
7. The anti-collapse hole structure of the anchor hole according to claim 6, It is characterized in that It includes a pulling-out mechanism, which includes a dowel, a steel wire rope and a push rod, and the dowel is in multiple numbers; When part of the steel pipe casing is pulled out, a plurality of the dowels are inserted into the orifice attachment of the drill hole, one end of the push rod abuts against the closed end of the wire mesh sleeve, and the other end is connected to the dowels through the steel wire rope to fix the wire mesh sleeve.
8. The anti-collapse structure of the anchor hole according to claim 7, It is characterized in that A circular abutment portion is provided at one end of the push rod, the diameter of which is smaller than the inner diameter of the wire mesh sleeve. The push rod is composed of steel bars connected by sleeves, and the length of each section of the steel bars is 2 to 3 meters.
Citation Information
Cited By
Anchor cable hole collapse prevention structure and drilling method
CN117822573A
