Construction engineering concrete pipe pile pulling-out device

By designing a cleaning mechanism and servo motor system in the concrete pipe pile digging device, the problem of soil adhesion to the drill bit blades is solved, and the drill bit can be quickly cleaned and used efficiently.

CN221919412UActive Publication Date: 2024-10-29SHENZHEN YUSHENG ENGINEERING CONSTRUCTION MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420561340.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-21
Publication Date
2024-10-29
Estimated Expiration
2034-03-21

AI Technical Summary

Technical Problem

After the traditional concrete pipe pile digging device is used, a large amount of soil will adhere to the drill blade, making subsequent cleaning difficult and affecting the use effect.

Method used

A pile digging device including a fixed frame, a movable plate and a spiral drill bit is designed. It is equipped with a cleaning mechanism. The angle of the scraper is adjusted through a bolt-mounted rotating rod. It is combined with a servo motor and a threaded rod to clean the drill bit surface to avoid offset and improve cleaning. efficiency.

Benefits of technology

It effectively solves the problem of drill bit cleaning, improves the convenience and efficiency of subsequent use, and ensures the continuous and efficient operation of the drill bit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919412U_ABST
    Figure CN221919412U_ABST
Patent Text Reader

Abstract

The utility model discloses a constructional engineering concrete pipe pile digging device, which relates to the technical field of concrete pipe pile digging, and comprises a fixed frame, a movable plate and a spiral drill bit, the cleaning mechanism comprises a sliding plate, a first scraping plate and a second scraping plate, a sliding groove is formed in the mounting frame, the sliding plate is slidably connected into the sliding groove, a groove is formed in the sliding plate, a first rotating rod and a second rotating rod are fixedly mounted in the groove through bolts, and the first scraping plate is fixedly mounted on the side wall of the first rotating rod; according to the technical scheme, the cleaning mechanism is adopted, the first rotating rod and the second rotating rod are installed through the bolts, rotation of the rotating rods can be controlled by rotating the bolts, and therefore the angle of the scraping plates can be adjusted; and when the auger bit ascends, the surface of the auger bit can be cleaned, so that subsequent cleaning of the auger bit is more convenient and faster.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of concrete pipe pile digging, in particular to a concrete pipe pile digging device for construction engineering. Background Art

[0002] Construction engineering refers to the engineering entity formed by the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. "Buildings" refer to projects with roofs, beams, columns, walls, foundations, and internal spaces that can meet people's production, living, learning, and public activities. Concrete pipe piles have begun to be widely used in construction engineering. They have good upsetting properties and are very convenient for anchoring when used in on-site construction. When using pipe piles, they need to be piled at the construction site first. In actual use, a construction engineering concrete pipe pile digging device is required.

[0003] After the traditional concrete pipe pile driving device using a spiral drill bit is used, a large amount of mud will adhere to the drill blades, which makes subsequent cleaning extremely troublesome and may affect the subsequent use effect. Utility Model Content

[0004] The technical problem to be solved by the utility model is to overcome the deficiencies of the prior art and provide a concrete pipe pile digging device for construction engineering, so as to solve the problem in the prior art that a large amount of mud will adhere to the drill blades after use, which makes subsequent cleaning extremely troublesome and may affect the subsequent use effect.

[0005] In view of this, the utility model provides a construction engineering concrete pipe pile driving device, comprising a fixed frame, a movable plate and a spiral drill bit, a mounting frame is fixedly installed on one side of the fixed frame, a moving mechanism is installed on the fixed frame, and a cleaning mechanism is arranged inside the fixed frame;

[0006] The cleaning mechanism includes a sliding plate, a first scraper and a second scraper. A sliding groove is provided inside the mounting frame, the sliding plate is slidably connected inside the sliding groove, a groove is provided inside the sliding plate, a first rotating rod and a second rotating rod are fixedly installed inside the groove by bolts, the first scraper is fixedly installed on the side wall of the first rotating rod, the second scraper is fixedly installed on the side wall of the second rotating rod, the first scraper is located on the upper surface of the spiral drill bit blade, and the second scraper is located on the lower surface of the spiral drill bit blade.

[0007] Optionally, a pull rod is fixedly mounted on one side of the sliding plate.

[0008] Optionally, the groove matches the spiral drill bit.

[0009] Optionally, the moving mechanism includes a first servo motor, a threaded rod and a second servo motor, the first servo motor is fixedly mounted on the top of the fixed frame, the threaded rod is fixedly mounted on the output end of the first servo motor, the second servo motor is fixedly mounted on the top of the movable plate, and the spiral drill bit is fixedly mounted on the output end of the second servo motor.

[0010] Optionally, a threaded hole is provided inside the movable plate, and the threaded hole matches the threaded rod.

[0011] Optionally, a guide rail is fixedly mounted on one side of the mounting frame, and the movable plate is slidably connected to a side wall of the guide rail.

[0012] It can be seen from the above technical solutions that the embodiments of the utility model have the following advantages:

[0013] 1. The utility model is a construction engineering concrete pipe pile digging device, which adopts a cleaning mechanism. A first rotating rod and a second rotating rod are installed by setting bolts. The rotation of the rotating rod can be controlled by turning the bolts to loosen or tighten them, so that the angle of the scraper can be adjusted. By setting the first scraper and the second scraper, the surface of the spiral drill bit can be cleaned when the spiral drill bit rises, making the subsequent cleaning of the drill bit more convenient and quick.

[0014] 2. The utility model is a construction engineering concrete pipe pile digging device, which adopts a guide rail design. Such a design can prevent the movable plate from deviating when sliding.

[0015] These features and advantages of the present invention will be disclosed in detail in the following specific implementation manners and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The utility model is further described below in conjunction with the accompanying drawings:

[0017] Figure 1 It is a schematic diagram of the structure of the utility model;

[0018] Figure 2 This is a schematic diagram of the structure of the movable plate of the utility model;

[0019] Figure 3 This is a schematic diagram of the structure of the sliding plate of the utility model;

[0020] Figure 4 This is a schematic diagram of the second scraper structure of the utility model.

[0021] Explanation of the accompanying drawings: 1. fixed frame; 2. mounting frame; 3. guide rail; 4. movable plate; 5. first servo motor; 6. threaded rod; 7. second servo motor; 8. spiral drill bit; 9. slide groove; 10. sliding plate; 11. threaded hole; 12. pull rod; 13. groove; 14. first rotating rod; 15. first scraper; 16. second rotating rod; 17. second scraper. DETAILED DESCRIPTION

[0022] The following is an explanation and description of the technical scheme of the embodiment of the utility model in conjunction with the drawings of the embodiment of the utility model, but the following embodiment is only a preferred embodiment of the utility model, not all. Based on the embodiment in the implementation mode, other embodiments obtained by those skilled in the art without creative work are all within the protection scope of the utility model.

[0023] A concrete pipe pile digging device for construction engineering according to an embodiment of the utility model will be described in detail below in conjunction with the accompanying drawings.

[0024] Example 1

[0025] For easier understanding, see Figures 1 to 4 The utility model provides an embodiment of a construction engineering concrete pipe pile digging device, comprising a fixed frame 1, a movable plate 4 and a spiral drill bit 8, a mounting frame 2 is fixedly mounted on one side of the fixed frame 1, a moving mechanism is installed on the fixed frame 1, and a cleaning mechanism is arranged inside the fixed frame 1;

[0026] The cleaning mechanism includes a sliding plate 10, a first scraper 15 and a second scraper 17. A sliding groove 9 is opened inside the mounting frame 2, and the sliding plate 10 is slidably connected inside the sliding groove 9. A groove 13 is opened inside the sliding plate 10. A first rotating rod 14 and a second rotating rod 16 are fixedly installed inside the groove 13 by bolts. The first scraper 15 is fixedly installed on the side wall of the first rotating rod 14, and the second scraper 17 is fixedly installed on the side wall of the second rotating rod 16. The first scraper 15 is located on the upper surface of the blade of the spiral drill bit 8, and the second scraper 17 is located on the lower surface of the blade of the spiral drill bit 8.

[0027] It should be noted that, by setting bolts to install the first rotating rod 14 and the second rotating rod 16, the rotation of the rotating rod can be controlled by turning the bolts to tighten them, so that the angle of the scraper can be adjusted, and by setting the first scraper 15 and the second scraper 17, the surface of the spiral drill bit 8 can be cleaned when the spiral drill bit 8 rises, making the subsequent cleaning of the drill bit more convenient and quick.

[0028] In some embodiments, Figure 3 As shown, a pull rod 12 is fixedly mounted on one side of the sliding plate 10 , and the groove 13 matches the spiral drill bit 8 .

[0029] It should be noted that, by providing the pull rod 12 , the sliding plate 10 can be easily taken out, so that the scraper inside the sliding plate 10 can be cleaned.

[0030] In some embodiments, Figure 2 As shown, the moving mechanism includes a first servo motor 5, a threaded rod 6 and a second servo motor 7. The first servo motor 5 is fixedly mounted on the top of the fixed frame 1, the threaded rod 6 is fixedly mounted on the output end of the first servo motor 5, the second servo motor 7 is fixedly mounted on the top of the movable plate 4, and the spiral drill bit 8 is fixedly mounted on the output end of the second servo motor 7. A threaded hole 11 is opened inside the movable plate 4, and the threaded hole 11 matches the threaded rod 6.

[0031] It should be noted that by setting up a first servo motor 5, the threaded rod 6 can be driven to rotate, and by rotating the threaded rod 6 to cooperate with the threaded hole 11, the movable plate 4 can be moved on one side of the mounting frame 2, thereby driving the spiral drill bit 8 to move, and by setting up a second servo motor 7, the spiral drill bit 8 can be driven, so that drilling can be performed.

[0032] Example 2

[0033] In some embodiments, Figure 1 As shown, a guide rail 3 is fixedly installed on one side of the mounting frame 2, and a movable plate 4 is slidably connected to the side wall of the guide rail 3.

[0034] It should be noted that the guide rail 3 can be provided to prevent the movable plate 4 from being offset when sliding.

[0035] The first servo motor 5, the second servo motor 7 and the spiral drill bit 8 in the present invention are well-known components and will not be described in detail herein.

[0036] Working principle: When in use, the first servo motor 5 can drive the threaded rod 6 to rotate, and the threaded rod 6 can rotate to cooperate with the threaded hole 11 to make the movable plate 4 move on one side of the mounting frame 2, thereby driving the spiral drill bit 8 to move. By setting the second servo motor 7, the spiral drill bit 8 can be driven to drill holes. When the spiral drill bit 8 rises, the surface of the spiral drill bit 8 can be cleaned, making the subsequent cleaning of the drill bit more convenient and quick.

[0037] As described above, the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. A concrete pipe pile digging device for construction engineering, characterized in that: It comprises a fixed frame (1), a movable plate (4) and a spiral drill bit (8); a mounting frame (2) is fixedly mounted on one side of the fixed frame (1); a moving mechanism is mounted on the fixed frame (1); and a cleaning mechanism is arranged inside the fixed frame (1); The cleaning mechanism comprises a sliding plate (10), a first scraper (15) and a second scraper (17); a sliding groove (9) is provided inside the mounting frame (2); the sliding plate (10) is slidably connected inside the sliding groove (9); a groove (13) is provided inside the sliding plate (10); a first rotating rod (14) and a second rotating rod (16) are fixedly installed inside the groove (13) by bolts; the first scraper (15) is fixedly installed on the side wall of the first rotating rod (14); the second scraper (17) is fixedly installed on the side wall of the second rotating rod (16); the first scraper (15) is located on the upper surface of the blade of the spiral drill bit (8); and the second scraper (17) is located on the lower surface of the blade of the spiral drill bit (8).

2. A construction engineering concrete pipe pile digging device according to claim 1, characterized in that: A pull rod (12) is fixedly mounted on one side of the sliding plate (10).

3. A construction engineering concrete pipe pile digging device according to claim 1, characterized in that: The groove (13) matches the spiral drill bit (8).

4. A construction engineering concrete pipe pile digging device according to claim 1, characterized in that: The moving mechanism comprises a first servo motor (5), a threaded rod (6) and a second servo motor (7); the first servo motor (5) is fixedly mounted on the top of the fixed frame (1); the threaded rod (6) is fixedly mounted on the output end of the first servo motor (5); the second servo motor (7) is fixedly mounted on the top of the movable plate (4); and the spiral drill head (8) is fixedly mounted on the output end of the second servo motor (7).

5. A construction engineering concrete pipe pile digging device according to claim 4, characterized in that: A threaded hole (11) is provided inside the movable plate (4), and the threaded hole (11) matches the threaded rod (6).

6. A construction engineering concrete pipe pile digging device according to claim 1, characterized in that: A guide rail (3) is fixedly mounted on one side of the mounting frame (2), and the movable plate (4) is slidably connected to the side wall of the guide rail (3).