Plugging structure for dewatering well of foundation raft under quicksand condition

By using dewatering wells and reinforced solid structures under quicksand conditions, combined with water pumps to control the groundwater level, the problem of inability to balance water pressure in the existing technology is solved, the risk of leakage and cracking of the foundation raft is reduced, and the geological conditions are improved.

CN221919490UActive Publication Date: 2024-10-29CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420395819.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-01
Publication Date
2024-10-29
Estimated Expiration
2034-03-01

AI Technical Summary

Technical Problem

Under quicksand conditions, existing technology cannot effectively balance groundwater pressure, leading to leakage and cracking of foundation rafts, affecting construction safety and geological conditions.

Method used

A structure including a dewatering well, a first reinforcement body, a second reinforcement body, a foundation raft, dewatering equipment and a cover plate is adopted. The stability around the dewatering well is maintained through the first reinforcement body and the second reinforcement body, and is controlled by a water pump. groundwater level, reducing hydrodynamic pressure.

Benefits of technology

Effectively controls the groundwater level, reduces the risk of leakage and cracking of the foundation raft, improves geological conditions, and solves the problem of inability to balance water pressure in the existing technology.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919490U_ABST
    Figure CN221919490U_ABST
Patent Text Reader

Abstract

The utility model relates to a dewatering well plugging structure of a foundation raft under a quicksand condition. Comprising a dewatering well, a first reinforcing body backfilled on the periphery of the dewatering well, a second reinforcing body backfilled on the periphery of the first reinforcing body, a foundation raft covering the first reinforcing body and the second reinforcing body, dewatering equipment used for lowering the water level in the dewatering well, and a plugging body backfilled in the dewatering well when the underground water level is at a designed position, and the cover plate covers the basic raft and is used for blocking the dewatering well. The stability of the periphery of the dewatering well is maintained through the first reinforcing body and the second reinforcing body, the water level of the dewatering well is controlled through the water suction pump buried below the dewatering well, and therefore the technical problem that in the prior art, the water pressure cannot be balanced through a method for manually lowering the underground water level is solved. According to the utility model, the underground water level can be effectively controlled, the dynamic water pressure is reduced and balanced, the risks of leakage and cracking of the foundation raft plate are reduced, and meanwhile, the geological conditions are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of building construction, in particular to a precipitation well blocking structure of a foundation raft under quicksand conditions. Background Art

[0002] During the construction process, groundwater and quicksand are one of the primary hidden dangers that must be solved. If the geological conditions of the site are sandy rock and soil, and there is sufficient water at the bottom of the foundation pit, quicksand is likely to occur. When quicksand occurs, the soil completely loses its bearing capacity, which not only deteriorates the construction conditions, but also causes foundation slope collapse when the quicksand is serious, causing nearby buildings to sink, tilt, or even collapse due to the hollowing out of the foundation, which has a great impact on construction safety and the safety of the use of surrounding buildings (structures).

[0003] Conventional method of artificially lowering the groundwater level. That is, using well point dewatering method (such as light well point, tube well point, jet well point, etc.), rush digging and shoveling big stones, etc., to lower the groundwater level to below the bottom of the foundation pit. The groundwater seeps downward, and the direction of the dynamic water pressure is also downward, so that water cannot seep into the foundation pit, which can effectively prevent the occurrence of quicksand. However, this method has a long construction period, high cost and cannot balance the water pressure. At the same time, if the groundwater pressure is large, the groundwater in the raft area cannot be effectively drained and guided, and the reverse buoyancy of the groundwater will continue to act on the foundation raft, causing the foundation raft to crack and prone to quicksand, causing serious adverse consequences for the project. Utility Model Content

[0004] In view of the deficiencies existing in the above-mentioned prior art, the utility model provides a drainage well sealing structure of a foundation raft under quicksand conditions, which solves the technical problem that the method of artificially lowering the groundwater level in the prior art cannot balance the water pressure.

[0005] The utility model discloses a drainage well sealing structure of a foundation raft under quicksand conditions, comprising a drainage well, a first reinforcement body backfilled at the outer periphery of the drainage well, a second reinforcement body backfilled at the outer periphery of the first reinforcement body, a foundation raft covering the first reinforcement body and the second reinforcement body, drainage equipment for lowering the water level in the drainage well, a sealing body backfilled in the drainage well when the groundwater level is at the designed position, and a cover plate arranged on the foundation raft and used for sealing the drainage well.

[0006] The further improvement of the drainage well blocking structure of the foundation raft under quicksand conditions of the utility model lies in that an isolation net is arranged between the first reinforcement body and the second reinforcement body.

[0007] The utility model further improves the drainage well blocking structure of the foundation raft under quicksand conditions in that the second reinforcement body is formed by piling up a plurality of stones.

[0008] The utility model is further improved in that the drainage well blocking structure of the foundation raft under quicksand conditions is that the diameter of the stone ranges from 30 to 40 cm.

[0009] The utility model further improves the drainage well blocking structure of the foundation raft under quicksand conditions in that the first reinforcement body is formed by piling up a plurality of bags of bagged concrete.

[0010] The utility model further improves the drainage well blocking structure of the foundation raft under quicksand conditions in that the drainage equipment comprises a water pump and a drainage pipe connected to the water pump, and an opening is provided on the cover plate for the drainage pipe to pass through.

[0011] The utility model is further improved in that the drainage well plugging structure of the foundation raft under quicksand conditions is that the plugging body is a reinforced concrete structure.

[0012] Compared with the prior art, the utility model has a positive and obvious effect. The utility model maintains the stability around the precipitation well through the first reinforcement body and the second reinforcement body, and controls the water level of the precipitation well through the water pump buried under the precipitation well, thereby solving the technical problem that the method of artificially lowering the groundwater level in the prior art cannot balance the water pressure. The utility model can effectively control the groundwater level, reduce and balance the dynamic water pressure, reduce the risk of leakage and cracking of the foundation raft, and improve the geological conditions at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0014] Figure 1 The utility model is a structural schematic diagram of the drainage well blocking structure of the foundation raft under quicksand conditions. DETAILED DESCRIPTION

[0015] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0016] like Figure 1As shown, the utility model provides a drainage well plugging structure of a foundation raft 3 under quicksand conditions, including a drainage well, a first reinforcement body 2 backfilled on the outer periphery of the drainage well, a second reinforcement body 1 backfilled on the outer periphery of the first reinforcement body 2, a foundation raft 3 covering the first reinforcement body 2 and the second reinforcement body 1, a drainage device for lowering the water level in the drainage well, a plugging body 9 backfilled in the drainage well when the groundwater level is at the designed position, and a cover plate 5 covered on the foundation raft 3 and used to block the drainage well. The utility model is aimed at the main principles of preventing and controlling quicksand: reducing or balancing the dynamic water pressure; trying to make the dynamic water pressure direction downward to cut off the groundwater flow. In this embodiment, the foundation raft 3 is a reinforced concrete structure, and the steel bar joints of the raft steel bars 4 are reserved at the drainage well position. When the plugging body 9 is cast, the steel bar joints are cast in the plugging body 9.

[0017] Preferably, an isolation net 8 is provided between the first reinforcement body 2 and the second reinforcement body 1. In this embodiment, the isolation is a safety green net, and a protective dense mesh net can also be used to prevent the soil from flowing into the precipitation well with the water flow and being discharged, thereby preventing the soil from being lost.

[0018] Preferably, the second reinforcement body 1 is formed by stacking a plurality of stones. In this embodiment, the stones are dog-head stones to ensure that there is a certain friction between adjacent stones and to ensure the stability of the second reinforcement body 1.

[0019] Preferably, the diameter of the stone ranges from 30 to 40 cm to ensure that each stone has a certain strength.

[0020] Preferably, the first reinforcement body 2 is formed by piling up a plurality of bags of bagged concrete. In this embodiment, the bagged concrete can be a finished bagged concrete for filling the first reinforcement body 2 to ensure the stability of the precipitation well.

[0021] Preferably, the precipitation device comprises a water pump 6 and a drainage pipe 7 connected to the water pump 6, and the cover plate 5 is provided with an opening for the drainage pipe 7 to pass through. The precipitation device is always buried in the precipitation well to meet the demand for precipitation in the later stage.

[0022] Preferably, the plugging body 9 is a reinforced concrete structure. In this embodiment, concrete accelerating agent, concrete early strength agent and expansion agent are added to the concrete of the plugging body 9 according to the actual situation on site, so that the concrete can quickly solidify, expand and quickly reach the effect of design strength, and the concrete grade is one level higher than the concrete grade of the foundation raft 3.

[0023] The construction method of this structure is as follows:

[0024] Before the construction of the foundation raft 3, the quicksand geological area in the area of ​​the foundation raft 3 is backfilled with dog-head stones in advance, and a safety green net is set inside to prevent soil loss. Then, the finished bagged concrete is filled inside the safety green net to form a circular well with a radius of 1 meter. After the filling is completed, a water pump is placed in the well and a drainage hose is connected to discharge the groundwater in the circular well to the water storage facilities outside the foundation pit. At the same time, the foundation raft 3 is constructed, and the circular well is not constructed for the time being. A 35d (35 times the thickness of the protective layer) or 500mm (the larger value) long steel bar joint is reserved. When the water level drops to meet the design requirements, after the main construction is completed and the settlement is stable, the cover plate 5 is removed, the steel bars in the circular well are tied and sealed with concrete one level higher than the foundation raft 3, and the water pump 6 is directly buried in the well.

[0025] The utility model maintains the stability around the precipitation well through the first reinforcement body and the second reinforcement body, and controls the water level of the precipitation well through the water pump buried under the precipitation well, thereby solving the technical problem that the method of artificially lowering the groundwater level in the prior art cannot balance the water pressure. The utility model can effectively control the groundwater level, reduce and balance the dynamic water pressure, reduce the risk of leakage and cracking of the foundation raft, and improve the geological conditions at the same time.

[0026] The parts not involved in the present utility model are the same as the prior art or can be implemented by the prior art. The above is only the preferred embodiment of the present utility model, and does not limit the present utility model in any form. Although the present utility model has been disclosed as the preferred embodiment, it is not used to limit the present utility model. Any technician familiar with this profession can make some changes or modify the technical content disclosed above to an equivalent embodiment of equivalent changes without departing from the scope of the technical solution of the present utility model. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present utility model without departing from the content of the technical solution of the present utility model still belongs to the scope of the technical solution of the present utility model.

Claims

1. A drainage well plugging structure of a foundation raft under quicksand conditions, characterized in that: It includes a precipitation well, a first reinforcement body backfilled at the periphery of the precipitation well, a second reinforcement body backfilled at the periphery of the first reinforcement body, a basic raft covering the first reinforcement body and the second reinforcement body, precipitation equipment for lowering the water level in the precipitation well, a blocking body backfilled in the precipitation well when the groundwater level is at the designed position, and a cover plate covered on the basic raft and used to block the precipitation well.

2. The drainage well plugging structure of the foundation raft under quicksand conditions according to claim 1 is characterized in that: An isolation net is provided between the first reinforcement body and the second reinforcement body.

3. The drainage well plugging structure of the foundation raft under quicksand conditions according to claim 1 is characterized in that: The second reinforcement body is formed by piling up a plurality of stones.

4. The drainage well plugging structure of the foundation raft under quicksand conditions according to claim 3 is characterized in that: The diameter of the stone ranges from 30 to 40 cm.

5. The drainage well plugging structure of the foundation raft under quicksand conditions according to claim 1, characterized in that: The first reinforcement body is formed by piling up a plurality of bags of bagged concrete.

6. The drainage well plugging structure of the foundation raft under quicksand conditions according to claim 1, characterized in that: The precipitation equipment comprises a water pump and a drainage pipe connected to the water pump, and the cover plate is provided with an opening for the drainage pipe to pass through.

7. The drainage well plugging structure of the foundation raft under quicksand conditions according to claim 1, characterized in that: The blocking body is a reinforced concrete structure.