Building settlement observation auxiliary device

By designing an auxiliary device for building settlement observation that includes an observation component, a lifting component, a support component and a positioning plate, the problem of difficulty for surveyors to reach the observation point is solved, the accuracy and convenience of building settlement observation are improved, and a more complete solution is achieved. Accurate settlement depth judgment.

CN221922599UActive Publication Date: 2024-10-29XIAN ZHONGDI ENG SURVEY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323558687.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2024-10-29
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

Due to the limitations of on-site conditions during the measurement process of existing building settlement observation devices, it is difficult for surveyors to reach the observation point, which affects the accuracy and integrity of the measurement data.

Method used

A building settlement observation auxiliary device including an observation component, a lifting component, a support component and a positioning plate is designed. The support component provides stable support, adjusts the position of the observation component so that it is away from the building and close to the ground, and uses the lifting component to The components move synchronously to determine the settlement depth and reduce human factor errors.

Benefits of technology

It improves the accuracy and convenience of building settlement observation, reduces measurement errors caused by human factors, and ensures the accuracy and completeness of data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221922599U_ABST
    Figure CN221922599U_ABST
Patent Text Reader

Abstract

The utility model discloses a building settlement observation auxiliary device, and relates to the technical field of observation devices. The building settlement observation auxiliary device comprises an observation assembly; the lifting assembly is movably inserted into the inner cavity of the observation assembly, and the lifting assembly is used for being matched with the observation assembly to achieve settlement observation on the building; the supporting assembly is arranged at the top end of the lifting assembly, and the supporting assembly is used for supporting and lifting up the lifting assembly; one end of the supporting assembly is arranged on the base, the other end of the supporting assembly is arranged on the base, the positioning plate is arranged at the other end of the supporting assembly, the positioning plate is used for being installed on the outer wall of a building and providing support for the supporting assembly, and the observation assembly comprises a sleeve. The operation is convenient, the measurement error caused by human factors can be reduced, and the settlement observation precision is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of observation devices, in particular to a building settlement observation auxiliary device. Background Art

[0002] In order to ensure the normal service life and safety of buildings (structures) and provide reliable data and corresponding settlement parameters for future survey, design and construction, the necessity and importance of building (structure) settlement observation have become increasingly obvious. The current specifications also stipulate that settlement observations must be carried out on high-rise buildings, tall structures, important ancient buildings, foundations of continuous production facilities, foundations of power equipment, landslide monitoring, etc. Especially in the construction process of high-rise buildings, settlement observations should be used to strengthen process monitoring, guide reasonable construction procedures, prevent uneven settlement during construction, and provide timely feedback to provide detailed first-hand information for survey, design and construction departments to avoid damage to the main structure of the building due to settlement or cracks that affect the structure's use function, causing huge economic losses.

[0003] However, the existing monitoring of building settlement usually involves setting up settlement observation points on the buildings, conducting settlement observations regularly, and monitoring the settlement values ​​of the buildings. The settlement observation points are generally placed at an elevation of 0.5m on the building's outer wall. Due to the limitations of on-site conditions, it is not easy for surveyors to hold the level steady, and some observation points are not easy for surveyors to reach. Therefore, the accuracy and completeness of the measurement data are affected. Therefore, we propose a building settlement observation auxiliary device to solve the above-mentioned problems. Utility Model Content

[0004] In view of the deficiencies of the prior art, the utility model provides a building settlement observation auxiliary device, which solves the problems of inaccurate measurement and poor integrity.

[0005] To achieve the above objectives, the utility model is implemented through the following technical solutions: a building settlement observation auxiliary device, comprising:

[0006] Observation component;

[0007] A lifting component, the lifting component is movably plugged into the inner cavity of the observation component, and the lifting component is used to cooperate with the observation component to realize settlement observation of the building;

[0008] A support assembly, the support assembly is disposed at the top of the lifting assembly, and the support assembly is used to support and lift the lifting assembly; and

[0009] A positioning plate is arranged at the other end of the support assembly, and is used to be installed on the outer wall of the building and provide support for the support assembly.

[0010] Preferably, the observation component comprises a sleeve, a through hole is provided in the middle of the outer wall surface of the sleeve, and an indicator mark is provided in the middle of the outer wall of the sleeve and on one side of the through hole.

[0011] Preferably, the observation component further comprises an observation window, wherein the observation window is arranged in the inner cavity of the through hole, and the observation window is used to prevent foreign matter from entering into the inner cavity of the sleeve.

[0012] Preferably, the lifting assembly comprises a column inserted into the inner cavity of the sleeve, a bottom plate is fixedly provided at the bottom end of the column, a groove is provided on the outer wall surface of the column, and a scale line is provided in the inner cavity of the groove.

[0013] Preferably, the inner diameter of the sleeve when viewed from above is the same as the outer diameter of the column when viewed from above, and the two are plug-connected.

[0014] Preferably, the support assembly comprises a locking telescopic rod, a fixing block for mounting the sleeve is provided at the telescopic end of the locking telescopic rod, and a level bubble is provided on the top surface of the fixing block;

[0015] A connecting rod is provided at the other end of the locking telescopic rod, and a C-shaped frame is provided at one end of the connecting rod, and the C-shaped frame is connected to one end of the connecting rod through a locking bolt;

[0016] An adjustment portion is provided on the top surface of the locking telescopic rod, and one end of the adjustment portion is connected to the side wall of the positioning plate.

[0017] Preferably, the adjustment part comprises a slide rail arranged on the top surface of the locking telescopic rod, a slider is slidably connected to the slide rail, screw holes are provided on both side walls of the slider, locking screws are rotatably connected to the inner cavities of the two screw holes, and one end of the locking screw is in contact with the outer wall of the slide rail;

[0018] A first stabilizing frame is fixedly arranged on the top surface of the sliding block, a top end of the first stabilizing frame is connected to a second stabilizing frame via a rope, and one end of the second stabilizing frame is connected to the outer wall of the positioning plate.

[0019] Beneficial Effects

[0020] The utility model provides a building settlement observation auxiliary device. Compared with the prior art, it has the following beneficial effects:

[0021] When the building settlement observation auxiliary device needs to observe the building settlement, the staff first fixes the positioning plate on the outer wall of the building, and then fixes one end of the support assembly on the positioning plate, so as to provide stable support for the support assembly. Then, the observation assembly can be installed and the horizontal position of the observation assembly can be adjusted through the support assembly, so that the observation assembly can be in a vertical state and the observation assembly can be kept away from the building. Then, the lifting assembly can be plugged and installed through the observation assembly, and the bottom end of the lifting assembly can be made to fit the ground.

[0022] Since the observation component is far away from the building, when the building settles, the support component will drive the observation component to move downward synchronously, so that the observation component can move downward along the lifting component. Then, by observing the front and back values ​​of the corresponding lifting component on the observation component, it is possible to judge how much the observation component moves downward along the lifting component, and then the settlement depth of the building can be judged. The operation is convenient and can reduce the measurement error caused by human factors, thereby improving the accuracy of settlement observation. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0024] Figure 2 It is a schematic diagram of the side structure of the utility model;

[0025] Figure 3 This is a schematic diagram of the structure of the observation component of the utility model;

[0026] Figure 4 This is a schematic diagram of the structure of the lifting component of the utility model;

[0027] Figure 5 This is a schematic diagram of the structure of the support assembly of the utility model;

[0028] Figure 6 This is a schematic diagram of the side structure of the support assembly of the utility model;

[0029] Figure 7 It is a structural schematic diagram of the adjustment part of the utility model.

[0030] In the figure: 1. observation component; 11. sleeve; 12. through hole; 13. observation window; 14. indicator; 2. lifting component; 21. column; 22. bottom plate; 23. groove; 24. scale line; 3. support component; 31. locking telescopic rod; 32. connecting rod; 33. C-shaped frame; 34. locking bolt; 35. fixing block; 36. level bubble; 37. adjustment part; 371. slide rail; 372. slider; 373. locking screw; 374. first stabilizing frame; 375. rope; 376. second stabilizing frame; 4. positioning plate. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0032] See also Figure 1-2 The utility model provides a technical solution: a building settlement observation auxiliary device, comprising: an observation component 1; a lifting component 2, the lifting component 2 is movably plugged into the inner cavity of the observation component 1, and the lifting component 2 is used to cooperate with the observation component 1 to realize the settlement observation of the building; a support component 3, the support component 3 is arranged at the top of the lifting component 2, and the support component 3 is used to support and lift the lifting component 2; and a positioning plate 4, the positioning plate 4 is arranged at the other end of the support component 3, and the positioning plate 4 is used to be installed on the outer wall of the building and provide support for the support component 3;

[0033] When it is necessary to observe the settlement of the building, the staff will first fix the positioning plate 4 on the outer wall of the building, and then fix one end of the support component 3 on the positioning plate 4, so as to provide stable support for the support component 3, and then through the support component 3, the observation component 1 can be installed and the horizontal position of the observation component 1 can be adjusted, so that the observation component 1 can be in a vertical state, and at the same time, the observation component 1 can be moved away from the building, and then the lifting component 2 can be plugged and installed through the observation component 1, and the bottom end of the lifting component 2 is in contact with the ground. Since the observation component 1 is away from the building, when the building settles, the observation component 1 will be driven to move downward synchronously through the support component 3, so that the observation component 1 can move downward along the lifting component 2, and then by observing the front and back values ​​of the observation component 1 corresponding to the lifting component 2, it is possible to judge how much the observation component 1 moves downward along the lifting component 2, and then the settlement depth of the building can be judged. The operation is convenient and can reduce the error of measurement caused by human factors, thereby improving the accuracy of settlement observation.

[0034] See also Figure 1-Figure 3 The observation assembly 1 includes a sleeve 11, a through hole 12 is opened in the middle of the outer wall surface of the sleeve 11, an indicator mark 14 is arranged in the middle of the outer wall of the sleeve 11 and located on one side of the through hole 12, and the observation assembly 1 also includes an observation window 13, which is arranged in the inner cavity of the through hole 12, and the observation window 13 is used to prevent foreign matter from entering the inner cavity of the sleeve 11;

[0035] Through the sleeve 11 in the observation component 1, it can be fixed on the telescopic end of the support component 3, and can be plugged and installed on the lifting component 2, and can move downward along the lifting component 2, and at the same time, it can provide a space for opening the through hole 12, and then through the observation window 13, it is convenient for the staff to view the data on the lifting component 2 plugged in the sleeve 11, and through the indicator mark 14, it is convenient for the staff to read the designated position data, thereby preventing data from being read incorrectly, thereby improving the convenience of equipment use.

[0036] See also Figure 2-Figure 4 The lifting assembly 2 includes a column 21 inserted into the inner cavity of the sleeve 11, a bottom plate 22 is fixedly arranged at the bottom end of the column 21, a groove 23 is opened on the outer wall surface of the column 21, and a scale line 24 is arranged in the inner cavity of the groove 23, the inner diameter of the sleeve 11 when viewed from above is the same as the outer diameter of the column 21 when viewed from above, and the two are plugged and connected;

[0037] The column 21 in the lifting assembly 2 can be inserted into the inner cavity of the sleeve 11 and stand on the ground through the bottom plate 22. At the same time, it can provide a space for the groove 23. Then, through the groove 23, an installation foundation can be provided for the scale line 24. Then, through the scale line 24, it can cooperate with the indicator 14 to read the values ​​before and after the building settles, and then the settlement amount can be calculated. Since the inner diameter of the sleeve 11 when viewed from above is the same as the outer diameter of the column 21 when viewed from above, and the two are plugged in and connected, the stability of the column 21 in lifting and lowering on the sleeve 11 can be improved.

[0038] See also Figure 2 , Figure 3 , Figure 5-Figure 7 The support assembly 3 includes a locking telescopic rod 31, a fixing block 35 for installing the sleeve 11 is provided at the telescopic end of the locking telescopic rod 31, and a level bubble 36 is provided on the top surface of the fixing block 35; a connecting rod 32 is provided at the other end of the locking telescopic rod 31, and a C-shaped frame 33 is provided at one end of the connecting rod 32, and the C-shaped frame 33 is connected to one end of the connecting rod 32 through a locking bolt 34; an adjusting portion 37 is provided on the top surface of the locking telescopic rod 31, and one end of the adjusting portion 37 is connected to the side wall of the positioning plate 4;

[0039] The C-shaped frame 33 in the support assembly 3 can be fixed on the positioning plate 4 and the connecting rod 32 can be installed through the locking bolt 34. Then, the locking telescopic rod 31 can be installed and fixed through the connecting rod 32, so that the locking telescopic rod 31 can be rotated with the locking bolt 34. Since the telescopic end of the locking telescopic rod 31 is provided with a fixing block 35, and the top surface of the fixing block 35 is provided with a level bubble 36, and the bottom surface of the fixing block 35 is connected to the top surface of the sleeve 11, the locking bolt 34 can be tightened by checking the level bubble 36. The locking telescopic rod 31 and the fixing block 35 can be placed in a horizontal state, so that the sleeve 11 can be placed in a vertical state, ensuring the stability of the sleeve 11 when being lifted and lowered on the column 21. Then, the adjusting portion 37 can be fixed to the top surface of the locking telescopic rod 31 and one end of the locking telescopic rod can be fixed to the side wall of the positioning plate 4. By adjusting the adjusting portion 37, the locking telescopic rod 31 can be assisted in being pulled, thereby preventing the locking bolt 34 from loosening and causing the locking telescopic rod 31 to tilt, so as to ensure the accuracy of subsequent measurements.

[0040] See also Figure 1 , Figure 6 and Figure 7 The adjusting part 37 includes a slide rail 371 arranged on the top surface of the locking telescopic rod 31, and a slider 372 is slidably connected to the slide rail 371. Screw holes are opened on both side walls of the slider 372. The inner cavities of the two screw holes are rotatably connected with locking screws 373, and one end of the locking screw 373 is in contact with the outer wall of the slide rail 371; a first stabilizing frame 374 is fixedly arranged on the top surface of the slider 372, and a second stabilizing frame 376 is connected to the top of the first stabilizing frame 374 through a rope 375, and one end of the second stabilizing frame 376 is connected to the outer wall of the positioning plate 4;

[0041] Through the slide rail 371 in the adjustment part 37, it can be fixed on the top surface of the locking telescopic rod 31, and the slider 372 can be installed. Then, through the second stabilizing frame 376, it can be fixed on the side wall of the positioning plate 4, and can be connected to the first stabilizing frame 374 through the rope 375, so that the slider 372 can be towed, and then by rotating the locking screw 373 on the screw hole, the slider 372 can be fixed on the slide rail 371, and then by adjusting the position of the slider 372, the locking telescopic rod 31 can be pulled to a horizontal state, thereby ensuring the accuracy of subsequent measurements.

[0042] During work, when it is necessary to observe the settlement of the building, the staff first fixes the positioning plate 4 on the outer wall of the building, and then fixes one end of the support component 3 on the positioning plate 4, so as to provide stable support for the support component 3, and then the observation component 1 can be installed and the horizontal position of the observation component 1 can be adjusted through the support component 3, so that the observation component 1 can be in a vertical state, and the observation component 1 can be moved away from the building at the same time, and then the lifting component 2 can be plugged and installed through the observation component 1, and the bottom end of the lifting component 2 is in contact with the ground. Since the observation component 1 is away from the building, when the building settles, the observation component 1 will be driven to move downward synchronously through the support component 3, so that the observation component 1 can move downward along the lifting component 2, and then by observing the front and back values ​​of the observation component 1 corresponding to the lifting component 2, it is possible to judge how much the observation component 1 moves downward along the lifting component 2, and then the settlement depth of the building can be judged. The operation is convenient and can reduce the error of measurement caused by human factors, thereby improving the accuracy of settlement observation.

[0043] Through the sleeve 11 in the observation component 1, it can be fixed on the telescopic end of the support component 3, and can be plugged and installed on the lifting component 2, and can move downward along the lifting component 2, and at the same time, it can provide a space for opening the through hole 12, and then through the observation window 13, it is convenient for the staff to view the data on the lifting component 2 plugged in the sleeve 11, and through the indicator mark 14, it is convenient for the staff to read the designated position data, thereby preventing data from being read incorrectly, thereby improving the convenience of equipment use.

[0044] The column 21 in the lifting assembly 2 can be inserted into the inner cavity of the sleeve 11 and stand on the ground through the bottom plate 22. At the same time, it can provide a space for the groove 23. Then, through the groove 23, an installation foundation can be provided for the scale line 24. Then, through the scale line 24, it can cooperate with the indicator 14 to read the values ​​before and after the building settles, and then the settlement amount can be calculated. Since the inner diameter of the sleeve 11 when viewed from above is the same as the outer diameter of the column 21 when viewed from above, and the two are plugged in and connected, the stability of the column 21 in lifting and lowering on the sleeve 11 can be improved.

[0045] The C-shaped frame 33 in the support assembly 3 can be fixed on the positioning plate 4 and the connecting rod 32 can be installed through the locking bolt 34. Then, the locking telescopic rod 31 can be installed and fixed through the connecting rod 32, so that the locking telescopic rod 31 can be rotated with the locking bolt 34. Since the telescopic end of the locking telescopic rod 31 is provided with a fixing block 35, and the top surface of the fixing block 35 is provided with a level bubble 36, and the bottom surface of the fixing block 35 is connected to the top surface of the sleeve 11, the locking bolt 34 can be tightened by checking the level bubble 36. The locking telescopic rod 31 and the fixing block 35 can be placed in a horizontal state, so that the sleeve 11 can be placed in a vertical state, ensuring the stability of the sleeve 11 when being lifted and lowered on the column 21. Then, the adjusting portion 37 can be fixed to the top surface of the locking telescopic rod 31 and one end of the locking telescopic rod can be fixed to the side wall of the positioning plate 4. By adjusting the adjusting portion 37, the locking telescopic rod 31 can be assisted in being pulled, thereby preventing the locking bolt 34 from loosening and causing the locking telescopic rod 31 to tilt, so as to ensure the accuracy of subsequent measurements.

[0046] Through the slide rail 371 in the adjustment part 37, it can be fixed on the top surface of the locking telescopic rod 31, and the slider 372 can be installed. Then, through the second stabilizing frame 376, it can be fixed on the side wall of the positioning plate 4, and can be connected to the first stabilizing frame 374 through the rope 375, so that the slider 372 can be towed, and then by rotating the locking screw 373 on the screw hole, the slider 372 can be fixed on the slide rail 371, and then by adjusting the position of the slider 372, the locking telescopic rod 31 can be pulled to a horizontal state, thereby ensuring the accuracy of subsequent measurements.

[0047] In summary, the device can determine the settlement depth of the building by judging how much the observation component 1 moves downward along the lifting component 2. It is easy to operate and can reduce the measurement error caused by human factors, thereby improving the accuracy of settlement observation.

[0048] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

Claims

1. A building settlement observation auxiliary device, Features: include: Observation component (1); A lifting component (2), the lifting component (2) being movably plugged into the inner cavity of the observation component (1), the lifting component (2) being used to cooperate with the observation component (1) to realize settlement observation of the building; A support assembly (3), the support assembly (3) being arranged at the top end of the lifting assembly (2), the support assembly (3) being used to support and lift the lifting assembly (2); and A positioning plate (4), wherein the positioning plate (4) is arranged at the other end of the support assembly (3), and the positioning plate (4) is used to be installed on the outer wall of a building and to provide support for the support assembly (3).

2. A building settlement observation auxiliary device according to claim 1, Features: The observation assembly (1) comprises a sleeve (11), a through hole (12) is provided in the middle of the outer wall surface of the sleeve (11), and an indicator mark (14) is provided in the middle of the outer wall of the sleeve (11) and on one side of the through hole (12).

3. A building settlement observation auxiliary device according to claim 2, Features: The observation assembly (1) further comprises an observation window (13), wherein the observation window (13) is arranged in the inner cavity of the through hole (12), and the observation window (13) is used to prevent foreign matter from entering the inner cavity of the sleeve (11).

4. A building settlement observation auxiliary device according to claim 3, Features: The lifting assembly (2) comprises a column (21) inserted into the inner cavity of the sleeve (11), a bottom plate (22) is fixedly arranged at the bottom end of the column (21), a groove (23) is provided on the outer wall surface of the column (21), and a scale line (24) is provided in the inner cavity of the groove (23).

5. A building settlement observation auxiliary device according to claim 4, Features: The inner diameter of the sleeve (11) when viewed from above is the same as the outer diameter of the column (21) when viewed from above, and the two are plug-connected.

6. A building settlement observation auxiliary device according to claim 2, Features: The support assembly (3) comprises a locking telescopic rod (31), the telescopic end of the locking telescopic rod (31) is provided with a fixing block (35) for mounting the sleeve (11), and the top surface of the fixing block (35) is provided with a level bubble (36); The other end of the locking telescopic rod (31) is provided with a connecting rod (32), and one end of the connecting rod (32) is provided with a C-shaped frame (33), and the C-shaped frame (33) is connected to one end of the connecting rod (32) through a locking bolt (34); An adjustment portion (37) is provided on the top surface of the locking telescopic rod (31), and one end of the adjustment portion (37) is connected to the side wall of the positioning plate (4).

7. A building settlement observation auxiliary device according to claim 6, Features: The adjustment part (37) comprises a slide rail (371) arranged on the top surface of the locking telescopic rod (31), a slider (372) is slidably connected to the slide rail (371), both side walls of the slider (372) are provided with screw holes, and the inner cavities of the two screw holes are rotatably connected with locking screws (373), and one end of the locking screw (373) is in contact with the outer wall of the slide rail (371); A first stabilizing frame (374) is fixedly arranged on the top surface of the sliding block (372); the top of the first stabilizing frame (374) is connected to a second stabilizing frame (376) via a rope (375); and one end of the second stabilizing frame (376) is connected to the outer wall of the positioning plate (4).