Waste heat recovery system for power plant area heating

By introducing an electrostatic precipitator and a flue gas cooling/heat exchanger into the waste heat recovery system to process flue gas dust and reduce the temperature, the existing system resource waste and pollution problems are solved, and a waste heat recovery system with efficient heating and long life is achieved.

CN221923673UActive Publication Date: 2024-10-29ZHAODONG HUAQING NEW ENERGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420397118.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-01
Publication Date
2024-10-29
Estimated Expiration
2034-03-01

AI Technical Summary

Technical Problem

The existing waste heat recovery system has a high operating load during non-heating seasons, resulting in a waste of resources. It also fails to effectively handle dust or particles in the flue gas, leading to blockage of water pipelines and damage to the heating network system.

Method used

A waste heat recovery system including an electrostatic precipitator, a flue gas cooler and a flue gas heat exchanger is designed. The electrostatic precipitator is used to process the dust in the exhaust gas. The flue gas cooler and flue gas heat exchanger reduce the flue gas temperature, and Combined with energy storage and variable frequency pump, it allows for easy installation and efficient heating.

Benefits of technology

It reduces the system operating load, extends the service life of the pipeline, improves the system utilization, avoids blockage of water pipelines and damage to the heating network system, and adapts to the heating needs of different areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221923673U_ABST
    Figure CN221923673U_ABST
Patent Text Reader

Abstract

The utility model discloses a waste heat recovery system for power plant area heating, which comprises a coal-fired boiler or a heating furnace, exhaust smoke of the coal-fired boiler or the heating furnace is connected with an electrostatic dust collector, and the outlet end of the electrostatic dust collector is connected with the waste heat recovery system. The waste heat recovery system comprises a first waste heat recovery system and a second waste heat recovery system, and the first waste heat recovery system and the second waste heat recovery system are connected with a heating device of a factory office building. The first waste heat recovery system and the second waste heat recovery system are connected with exhaust smoke of a coal-fired boiler or a heating furnace in series to form the waste heat recovery system for power plant area heating.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of waste heat recovery, and in particular relates to a waste heat recovery system for heating a power plant area. Background Art

[0002] When a coal-fired power plant generates electricity, the heat generated during the power generation process is generally recovered through a waste heat recovery system. The existing waste heat recovery system can basically meet daily usage needs, but there are still some improvements that need to be made.

[0003] In particular, this part of waste heat can be recovered through the waste heat recovery system and used for heating in the plant area. However, in the non-heating season, especially in the northeast from winter to early spring, the demand for heating shrinks. Due to the complexity of the existing technical system, its operating load is high, and the system resources are wasted for heating different areas of the power plant.

[0004] In the existing technology, during the waste heat recovery of flue gas, the flue gas still contains a certain amount of dust or particulate matter. In order to save cost and consider the heating period, it is often ignored that the untreated high-temperature flue gas directly flows through the heating network system, which will adhere to dust or particulate matter, causing blockage of the water supply pipeline, damage to the water pump and the heat exchange system of the heating network, and shorten the service life.

[0005] In view of the above factors, a waste heat recovery system is specially designed for heating the power plant area, which can ensure that short-term installation / removal can be facilitated during waste heat recovery. The overall system is simple and has a low operating load, which can meet the heating needs of different areas in the power plant area. Utility Model Content

[0006] The purpose of the utility model is to provide a waste heat recovery system for heating a power plant area, so as to solve the problems raised in the above-mentioned background technology.

[0007] The purpose of the utility model is achieved through the following technical solutions: a waste heat recovery system for heating in a power plant area, comprising a coal-fired boiler or a heating furnace, the exhaust gas of the coal-fired boiler or the heating furnace is connected to an electrostatic precipitator, and the outlet end of the electrostatic precipitator is connected to the waste heat recovery system;

[0008] The waste heat recovery system includes a first waste heat recovery system and a second waste heat recovery system, and the first waste heat recovery system and the second waste heat recovery system are respectively connected to the heating device of the factory office building;

[0009] The first waste heat recovery system and the second waste heat recovery system are respectively connected in series with the tail gas and smoke exhaust of the coal-fired boiler or the heating furnace to form a waste heat recovery system for heating the power plant area.

[0010] Furthermore, the first waste heat recovery system includes a flue gas cooler and a heat network water heater connected to the flue gas cooler;

[0011] The water outlet end of the flue gas cooler is connected to the inlet end of the heat network water heater;

[0012] The water inlet end of the flue gas cooler is connected to the return water end of the heat network water heater.

[0013] Furthermore, the flue gas outlet channel of the flue gas cooler is connected to the cooling tower through a connecting pipe, and the flue gas outlet end of the cooling tower is connected to the chimney.

[0014] Furthermore, the second waste heat recovery system includes a flue gas heat exchanger and an energy storage device connected to the flue gas heat exchanger;

[0015] The water outlet end of the flue gas heat exchanger is connected to the inlet end of the energy storage device;

[0016] The water return end of the flue gas heat exchanger is connected to the outlet end of the energy storage device.

[0017] Furthermore, the energy storage device is connected to the heating device of the factory office building through a connecting pipeline, and a heating variable frequency pump is provided on the connecting pipeline.

[0018] Furthermore, the heating device of the factory office building includes a pipeline for supplying water from the heating network and a pipeline for returning water from the heating network.

[0019] Furthermore, the electrostatic precipitator and the first waste heat recovery system or the second waste heat recovery system are provided with an induced draft fan.

[0020] Furthermore, a circulation pump is provided between the flue gas cooler and the heat network water heater in the first waste heat recovery system.

[0021] Furthermore, the inlet water temperature of the heating network water heater is controlled to be 80-90°C, and the return water temperature of the heating network water heater is controlled to be 50-65°C.

[0022] Compared with the prior art, the utility model has the following beneficial effects:

[0023] The implementation of the above two embodiments can ensure that short-term installation / removal can be facilitated during waste heat recovery. Due to the complexity of the prior art system, its operating load is high, and the system resource waste is relatively high for heating different areas of the power plant. The above two embodiments are used in the recovery of waste heat flue gas to deal with dust or particulate matter in the flue gas, reduce the blockage of water pipes caused by dust or particulate matter, and damage to water pumps and heat exchange systems of the heat network, thereby increasing the service life of the overall pipeline.

[0024] The utility model has a simple structure and a high utilization rate and adopts different processing forms according to different heating sites and requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the first waste heat recovery system of the utility model;

[0026] Figure 2 It is a schematic diagram of the second waste heat recovery system of the utility model. DETAILED DESCRIPTION

[0027] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0028] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0029] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0030] like Figure 1-2 As shown, a waste heat recovery system for heating a power plant area includes a coal-fired boiler or a heating furnace 1, the tail gas exhaust of the coal-fired boiler or the heating furnace 1 is connected to an electrostatic precipitator 2, and the outlet end of the electrostatic precipitator 2 is connected to the waste heat recovery system;

[0031] The waste heat recovery system includes a first waste heat recovery system A and a second waste heat recovery system B, wherein the first waste heat recovery system A and the second waste heat recovery system B are respectively connected to a heating device 9 of an office building in the factory area;

[0032] The first waste heat recovery system A and the second waste heat recovery system B are respectively connected in series with the tail gas and smoke exhaust of the coal-fired boiler or the heating furnace 1 to form a waste heat recovery system for heating the power plant area. Specific embodiment one:

[0034] A waste heat recovery system for heating a power plant area, comprising a coal-fired boiler or a heating furnace 1, the tail gas exhaust of the coal-fired boiler or the heating furnace 1 is connected to an electrostatic precipitator 2, and the outlet end of the electrostatic precipitator 2 is connected to the waste heat recovery system;

[0035] The waste heat recovery system includes a first waste heat recovery system A, which includes a flue gas cooler 3 and a heat network water heater 6 connected to the flue gas cooler 3;

[0036] The water outlet end of the flue gas cooler 3 is connected to the inlet end of the heat network water heater 6;

[0037] The water inlet end of the flue gas cooler 3 is connected to the return water end of the hot network water heater 6 .

[0038] The flue gas outlet channel of the flue gas cooler 3 is connected to the cooling tower 4 through a connecting pipe, and the flue gas outlet end of the cooling tower 4 is connected to the chimney 5.

[0039] The inlet water temperature of the heating network water heater 6 is controlled to be 80-90°C, and the return water temperature of the heating network water heater 6 is controlled to be 50-65°C.

[0040] In the above embodiment, the waste heat recovery system is provided with a first waste heat recovery system A. When in use, the flue gas is directly cooled by the flue gas cooler 3 and then passed through the heat network water heater 6 for water intake and recovery heating to meet the local heating needs of the factory area, or to recover and utilize the waste heat for winter heating of the factory staff buildings. Specific embodiment 2:

[0042] A waste heat recovery system for heating a power plant area, comprising a coal-fired boiler or a heating furnace 1, the tail gas exhaust of the coal-fired boiler or the heating furnace 1 is connected to an electrostatic precipitator 2, and the outlet end of the electrostatic precipitator 2 is connected to the waste heat recovery system;

[0043] The waste heat recovery system includes a second waste heat recovery system B, which is connected to a heating device 9 of a factory office building;

[0044] The second waste heat recovery system B comprises a flue gas heat exchanger 7 and an energy storage device 8 connected to the flue gas heat exchanger 7;

[0045] The water outlet of the flue gas heat exchanger 7 is connected to the inlet of the energy storage device 8;

[0046] The water return end of the flue gas heat exchanger 7 is connected to the outlet end of the energy storage device 8 .

[0047] The energy storage device 8 is connected to the heating device 9 of the factory office building through a connecting pipeline, and a heating variable frequency pump is arranged on the connecting pipeline.

[0048] The heating device 9 of the factory office building includes a pipeline for supplying water from the heating network and a pipeline for returning water from the heating network.

[0049] In the above embodiment, a technical solution different from that of the specific embodiment 1 is adopted, in which the required inlet water / return water is heated after being preheated by high-temperature flue gas through the flue gas heat exchanger 7. The inlet water / return water flows in the pipe of the flue gas heat exchanger 7. The heating inlet water / return water treated by the flue gas heat exchanger 7 is stored in the energy storage device 8, and is extracted and transported to the hot water supply pipeline and the hot water return pipeline of the heating device 9 of the factory office building through the heating variable frequency pump.

[0050] The implementation of the above two embodiments can ensure that short-term installation / removal can be facilitated when waste heat recovery is performed.

[0051] Due to the complexity of the prior art system, its operating load is high, and the system resources are wasted relatively high for heating different areas of the power plant. The above two embodiments are used to recover the waste heat flue gas, which can handle the dust or particulate matter in the flue gas, reduce the blockage of the water pipe caused by the dust or particulate matter, and damage the water pump and the heat exchange system of the heat network, thereby increasing the service life of the overall pipeline.

[0052] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

[0053] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A waste heat recovery system for heating a power plant area, comprising a coal-fired boiler or a heating furnace (1), Features: The tail gas exhaust of the coal-fired boiler or heating furnace (1) is connected to the electrostatic precipitator (2), and the outlet end of the electrostatic precipitator (2) is connected to the waste heat recovery system; The waste heat recovery system comprises a first waste heat recovery system (A) and a second waste heat recovery system (B), and the first waste heat recovery system (A) and the second waste heat recovery system (B) are respectively connected to a heating device (9) of an office building in a factory area; The first waste heat recovery system (A) and the second waste heat recovery system (B) are respectively connected in series with the tail gas and smoke exhaust of the coal-fired boiler or the heating furnace (1) to form a waste heat recovery system for heating the power plant area.

2. The waste heat recovery system for heating a power plant area according to claim 1, Features: The first waste heat recovery system (A) comprises a flue gas cooler (3) and a hot water network heater (6) connected to the flue gas cooler (3); The water outlet end of the flue gas cooler (3) is connected to the inlet end of the hot network water heater (6); The water inlet end of the flue gas cooler (3) is connected to the water return end of the hot network water heater (6).

3. The waste heat recovery system for heating a power plant area according to claim 2, Features: The flue gas outlet channel of the flue gas cooler (3) is connected to the cooling tower (4) via a connecting pipe, and the flue gas outlet end of the cooling tower (4) is connected to the chimney (5).

4. The waste heat recovery system for heating a power plant area according to claim 1, Features: The second waste heat recovery system (B) comprises a flue gas heat exchanger (7) and an energy storage device (8) connected to the flue gas heat exchanger (7); The water outlet of the flue gas heat exchanger (7) is connected to the inlet of the energy storage device (8); The water return end of the flue gas heat exchanger (7) is connected to the outlet end of the energy storage device (8).

5. The waste heat recovery system for heating a power plant area according to claim 4, Features: The energy storage device (8) is connected to the heating device (9) of the factory office building via a connecting pipeline, and a heating variable frequency pump is provided on the connecting pipeline.

6. The waste heat recovery system for heating a power plant area according to claim 5, Features: The heating device (9) of the factory office building comprises a hot water supply pipeline and a hot water return pipeline.

7. The waste heat recovery system for heating a power plant area according to claim 3, Features: The electrostatic precipitator (2) and the first waste heat recovery system (A) or the second waste heat recovery system (B) are provided with an induced draft fan.

8. The waste heat recovery system for heating the power plant area according to claim 7, Features: A circulation pump is provided between the flue gas cooler (3) and the heat network water heater (6) in the first waste heat recovery system (A).