Degassing device for aluminum smelting furnace

By designing the degassing device of the aluminum smelting furnace, using the first and second cylinders connected by the connecting ring to move up and down, combined with the solenoid valve and the branch plate, the full mixing of nitrogen and aluminum liquid and the removal of hydrogen are achieved, solving the existing technical problems The problem of low nitrogen utilization rate has improved the quality of aluminum alloy castings.

CN221924546UActive Publication Date: 2024-10-29YUNNAN HEQING NANDU NEW MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420303001.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-19
Publication Date
2024-10-29
Estimated Expiration
2034-02-19

AI Technical Summary

Technical Problem

In the existing technology, the nitrogen utilization rate during the aluminum alloy smelting process is low and the hydrogen in the aluminum liquid cannot be effectively removed, resulting in the formation of pores and pinholes in the castings, which affects the quality of the aluminum alloy.

Method used

An aluminum smelting furnace degassing device is designed. The first and second cylinders connected through a connecting ring move up and down. The electromagnetic valve is used to control the aluminum liquid pump to drain the aluminum liquid, and the nitrogen gas is fully mixed with the shunt plate and the liquid-permeable pipe. The aluminum liquid is mixed, entrained with hydrogen, and then discharged through the outlet pipe to achieve efficient use of nitrogen.

Benefits of technology

It improves the utilization rate of nitrogen, avoids the waste of hydrogen, ensures that liquid aluminum and nitrogen are fully mixed, effectively removes hydrogen in liquid aluminum, and improves the quality of aluminum alloy castings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221924546U_ABST
    Figure CN221924546U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of aluminum smelting, and discloses an aluminum smelting furnace degassing device which comprises a bottom plate, a side plate is fixedly mounted on the right side of the bottom plate, a top plate is fixedly mounted at the top of the side plate, a sliding block is slidably mounted on the left side of the side plate, and a fixing rod is fixedly connected to the left side of the sliding block. A rotating shaft is rotatably installed below the fixing rod, a connecting ring is fixedly installed at the rear end of the rotating shaft, a first cylinder and a second cylinder with inner cavities communicating with each other are fixedly installed at the top and the bottom of the connecting ring correspondingly, and nitrogen is injected through a nitrogen pipe by opening an electromagnetic valve in a connector pipe on the first cylinder or the second cylinder above; and at the moment, gas in the first cylinder and the second cylinder is exhausted through the connector pipes above, so that gas replacement in the process is achieved, and after treatment is finished, the aluminum liquid without hydrogen is pumped out through the aluminum liquid pump on the bottom plate, and work can be completed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of aluminum smelting, and specifically relates to a degassing device for an aluminum smelting furnace. Background Art

[0002] Aluminum alloy castings are widely used in aerospace, shipbuilding, electric power, automobiles and many other fields due to their superior metal properties. Due to the characteristics of aluminum alloys themselves, the aluminum liquid is often mixed with hydrogen produced by the high-temperature decomposition of water vapor due to the high temperature during the aluminum alloy smelting process. If the gas in the aluminum liquid is not removed, the castings produced will form pores and pinholes due to the precipitation of hydrogen, affecting the quality of the aluminum alloy castings. Therefore, it is necessary to remove the hydrogen from the aluminum liquid.

[0003] Hydrogen is the only gas that can be dissolved in large quantities in molten aluminum. In the prior art, the method for removing hydrogen from molten aluminum is usually to insert a nitrogen tube into the molten aluminum, and to fill the molten aluminum with nitrogen that does not react with the molten aluminum by rotating it and stirring it, so that the hydrogen is dissolved in the nitrogen and discharged afterwards. However, when nitrogen is aerated in this method, since the nitrogen will be directly discharged from the surface of the molten aluminum shortly after entering the molten aluminum, the utilization rate of the nitrogen is not high. In order to solve this problem, it is necessary to design a degassing device for an aluminum smelting furnace. Utility Model Content

[0004] The purpose of the present application is to provide a degassing device for an aluminum smelting furnace in order to solve the above-mentioned problems.

[0005] The cam is provided with a toothed plate on the top of which the top plate is fixedly mounted, and a top plate is fixedly mounted on the top of the side plate. A sliding block is slidably mounted on the left side of the side plate. A fixing rod is fixedly connected to the left side of the sliding block. A rotating shaft is rotatably mounted below the fixing rod. A connecting ring is fixedly mounted on the top and bottom of the connecting ring, respectively. A No. 1 cylinder and a No. 2 cylinder whose inner cavities are interconnected are fixedly mounted on the top and bottom of the connecting ring. A gear is fixedly mounted on the outer wall of the rotating shaft. A rack is meshed with the top of the gear that slides under the fixing rod. A joint pipe is fixedly mounted on the divergent ends of the No. 1 cylinder and the No. 2 cylinder. A branch plate is fixedly mounted on the inner cavities of the No. 1 cylinder and the No. 2 cylinder. A gas outlet pipe is fixedly mounted on the front walls of the No. 1 cylinder and the No. 2 cylinder. An gas inlet pipe is penetrated and connected to the outer side of the branch plate, and the branch plate and the gas inlet pipe are connected by a pipeline.

[0006] In a preferred embodiment, a slide groove adapted to the slider is provided on the left side of the side plate, a screw rod is threadedly connected to the slider, and the rotational power of the screw rod comes from a No. 1 motor at the top of the screw rod.

[0007] In a preferred embodiment, a second slide groove matched with the rack is provided below the fixed rod, a threaded rod is threadedly connected to the rack, and the rotational power of the threaded rod comes from a second motor at the right end of the threaded rod.

[0008] In a preferred embodiment, electromagnetic valves are provided on the joint pipes at the ends away from the first and second drums.

[0009] In a preferred embodiment, an aluminum liquid pump and a pipe seat adapted to the joint pipe are fixedly installed on the opposite surfaces of the bottom plate and the top plate, a sealing ring is provided on the inner circle of the pipe seat, and the right end of the pipe seat is connected to the aluminum liquid pump through a pipeline.

[0010] In a preferred embodiment, a central rotating joint is fixedly installed at the rear end of the connecting ring, and a nitrogen pipe is fixedly connected to the rear end of the central rotating joint.

[0011] In a preferred embodiment, the branching plates in the first and second horn tubes are installed at positions close to the connecting rings, and a plurality of groups of liquid-permeable tubes are connected through the branching plates.

[0012] In a preferred embodiment, the air outlet pipe is located at a position of the first horn and the second horn away from the connecting ring.

[0013] In summary, due to the adoption of the above technical solution, the beneficial effects of this application are:

[0014] In the present application, through this design, when the No. 1 motor is started to drive the screw rod to rotate, the slider can be pushed to drive the fixed rod to move up and down. Since the connecting ring is connected to the fixed rod through the rotating shaft, the up and down movement of the fixed rod can drive the No. 1 tube and the No. 2 tube which are interconnected at the upper and lower ends of the connecting ring to move up and down. When the No. 1 tube moves upward so that the joint pipe at the top of the No. 1 tube is connected to the tube seat under the top plate, the electromagnetic valve in the joint pipe on the No. 1 tube is opened. At this time, the aluminum liquid pump under the top plate is started to discharge the aluminum liquid into the No. 1 tube. When the No. 2 tube moves downward so that the joint pipe at the bottom end of the No. 2 tube is connected to the tube seat on the bottom plate, the electromagnetic valve in the joint pipe on the No. 2 tube is opened. At the same time, the aluminum liquid pump on the bottom plate is opened to extract the aluminum liquid. Based on the above-described function of the No. 1 and No. 2 tubes moving up and down to extract the aluminum liquid;

[0015] Before the aluminum liquid enters the No. 1 tube, the nitrogen is pre-discharged into the No. 1 and No. 2 tubes through the nitrogen pipe through the connecting ring connected by the central rotating joint. Then, when the aluminum liquid is first discharged into the No. 1 tube, since the No. 1 and No. 2 tubes are connected to each other through the connecting ring, the aluminum liquid will flow downward by its own weight into the No. 2 tube. When entering the No. 2 tube, it will be blocked by the branch plate, so that the aluminum liquid is divided into multiple streams by the liquid-permeable tube on the branch plate and flows downward, so that it is fully mixed with nitrogen. In the process of filling the No. 2 tube with aluminum liquid, the nitrogen entrained with hydrogen in the No. 2 tube will be squeezed and discharged into the No. 1 tube through the outlet pipe connected to the air inlet pipe. When the aluminum liquid in the No. 2 tube is full, the No. 2 motor is started to drive the threaded rod to rotate, thereby pushing The rack moves to mesh with the gear to drive the connecting ring at the rear end of the rotating shaft to rotate 180°. At this time, the positions of the No. 1 barrel and the No. 2 barrel are exchanged, and the above process is repeated, so that the nitrogen filled can fully play the role of entraining hydrogen, thereby avoiding the waste of nitrogen. Of course, if you want to fill nitrogen in this process, you only need to open the electromagnetic valve in the joint pipe on the upper No. 1 barrel or the No. 2 barrel after the aluminum liquid is completely discharged into the No. 1 barrel or the No. 2 barrel below, and then fill the nitrogen through the nitrogen pipe. At this time, the gas in the No. 1 barrel and the No. 2 barrel is discharged through the upper joint pipe to realize the gas replacement in the process. After the processing is completed, the aluminum liquid with hydrogen removed can be pumped out by the aluminum liquid pump on the bottom plate to complete the work. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A structural stereogram of the present application;

[0017] Figure 2 It is a front cross-sectional view of the structure of this application;

[0018] Figure 3 It is a rear plan view of the connecting ring in the structure of the present application;

[0019] Figure 4 This is a schematic diagram of the internal structure of the first and second drums in this application.

[0020] Markings in the figure: 1-bottom plate, 2-side plate, 3-top plate, 4-slider, 5-screw, 6-fixed rod, 7-rotating shaft, 8-connecting ring, 9-No. 1 tube, 10-No. 2 tube, 11-gear, 12-rack, 13-threaded rod, 14-connecting pipe, 15-tube seat, 16-aluminum liquid pump, 17-center rotating joint, 18-nitrogen pipe, 19-dividing plate, 20-exhaust pipe, 21-intake pipe. DETAILED DESCRIPTION

[0021] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0022] Reference Figure 1 , 2 , 3, 4, a degassing device for an aluminum smelting furnace, comprising a bottom plate 1, a side plate 2 is fixedly installed on the right side of the bottom plate 1, a top plate 3 is fixedly installed on the top of the side plate 2, a slider 4 is slidably installed on the left side of the side plate 2, a slide groove adapted to the slider 4 is opened on the left side of the side plate 2, a screw rod 5 is threadedly connected to the slider 4, the rotational power of the screw rod 5 comes from a No. 1 motor at the top of the screw rod 5, a fixed rod 6 is fixedly connected to the left side of the slider 4, and a rotating shaft 7 is rotatably installed below the fixed rod 6;

[0023] A connecting ring 8 is fixedly installed at the rear end of the rotating shaft 7, and a No. 1 cylinder 9 and a No. 2 cylinder 10 whose inner cavities are interconnected are fixedly installed on the top and bottom of the connecting ring 8 respectively. A gear 11 is fixedly installed on the outer wall of the rotating shaft 7. The top of the gear 11 is meshed with a rack 12 that slides under the fixed rod 6. A No. 2 slide groove that matches the rack 12 is provided under the fixed rod 6. A threaded rod 13 is threadedly connected to the rack 12. The rotational power of the threaded rod 13 comes from the No. 2 motor at the right end of the threaded rod 13. The divergent ends of the No. 1 cylinder 9 and the No. 2 cylinder 10 are fixedly installed with a joint pipe 14, and electromagnetic valves are provided on the joint pipes 14 at the divergent ends of the No. 1 cylinder 9 and the No. 2 cylinder 10. An aluminum liquid pump 16 and a pipe seat 15 that matches the joint pipe 14 are fixedly installed on the opposite surfaces of the bottom plate 1 and the top plate 3. A sealing ring is provided on the inner ring of the pipe seat 15, and the right end of the pipe seat 15 is connected to the aluminum liquid pump 16 through a pipeline.

[0024] Through this design, when the No. 1 motor is started to drive the screw rod 5 to rotate, the slider 4 can be pushed to drive the fixed rod 6 to move up and down. Since the connecting ring 8 is connected to the fixed rod 6 through the rotating shaft 7, the up and down movement of the fixed rod 6 can drive the No. 1 tube 9 and the No. 2 tube 10 which are interconnected at the upper and lower ends of the connecting ring 8 to move up and down. When the No. 1 tube 9 moves upward so that the joint pipe 14 at the top of the No. 1 tube 9 is connected with the pipe seat 15 under the top plate 3, the electromagnetic valve in the joint pipe 14 on the No. 1 tube 9 is opened. At this time, the aluminum liquid pump 16 under the top plate 3 is started to discharge the aluminum liquid into the No. 1 tube 9. When the No. 2 tube 10 moves downward so that the joint pipe 14 at the bottom end of the No. 2 tube 10 is connected with the pipe seat 15 on the bottom plate 1, the electromagnetic valve in the joint pipe 14 on the No. 2 tube 10 is opened, and the aluminum liquid pump 16 on the bottom plate 1 is opened at the same time to extract the aluminum liquid.

[0025] Reference Figure 1 , 2, 3, 4, a center rotating joint 17 is fixedly installed on the rear end of the connecting ring 8, and a nitrogen pipe 18 is fixedly connected to the rear end of the center rotating joint 17, and a branch plate 19 is fixedly installed in the inner cavity of the No. 1 tube 9 and the No. 2 tube 10. The branch plates 19 in the No. 1 tube 9 and the No. 2 tube 10 are installed at a position close to the connecting ring 8, and a plurality of groups of liquid-permeable tubes are penetrated and connected on the branch plate 19, and an air outlet pipe 20 is fixedly connected to the front wall of the No. 1 tube 9 and the No. 2 tube 10, and the air outlet pipe 20 is located at a position of the No. 1 tube 9 and the No. 2 tube 10 away from the connecting ring 8, and an air inlet pipe 21 is penetrated and connected to the outer side of the branch plate 19, and the branch plate 19 and the air inlet pipe 21 are connected through a pipeline.

[0026] Through the above design, based on the function of the No. 1 cylinder 9 and the No. 2 cylinder 10 moving up and down to pump out the aluminum liquid as described above, before the aluminum liquid enters the No. 1 cylinder 9, the nitrogen is pre-discharged into the No. 1 cylinder 9 and the No. 2 cylinder 10 through the nitrogen pipe 18 through the connecting ring 8 connected to the central rotating joint 17. Then, when the aluminum liquid is first discharged into the No. 1 cylinder 9, since the No. 1 cylinder 9 and the No. 2 cylinder 10 are connected to each other through the connecting ring 8, the aluminum liquid will flow downward by its own weight into the No. 2 cylinder 10. When entering the No. 2 cylinder 10, it will be blocked by the branch plate 19, so that the aluminum liquid is divided into multiple streams by the liquid-permeable tube on the branch plate 19 and flows downward, so that it is fully mixed with the nitrogen.

[0027] In the process of filling the second cylinder 10 with aluminum liquid, the nitrogen entrained with hydrogen in the second cylinder 10 will be squeezed and discharged into the first cylinder 9 through the outlet pipe 20 connected to the inlet pipe 21. When the aluminum liquid in the second cylinder 10 is full, the second motor is started to drive the threaded rod 13 to rotate, and then the rack 12 is driven to move to engage the gear 11 to drive the connecting ring 8 at the rear end of the rotating shaft 7 to rotate 180°. At this time, the positions of the first cylinder 9 and the second cylinder 10 are exchanged, and the above process is repeated, so that the filled nitrogen can give full play to the entrained hydrogen. To avoid the waste of nitrogen, of course, if you want to fill nitrogen in this process, you only need to open the electromagnetic valve in the joint pipe 14 on the upper No. 1 cylinder 9 or the No. 2 cylinder 10 after the aluminum liquid is completely discharged into the No. 1 cylinder 9 or the No. 2 cylinder 10 below, and then fill the nitrogen through the nitrogen pipe 18. At this time, the gas in the No. 1 cylinder 9 and the No. 2 cylinder 10 is discharged through the upper joint pipe 14 to realize the gas replacement in the process. After the processing is completed, the aluminum liquid with hydrogen removed can be pumped out by the aluminum liquid pump 16 on the bottom plate 1 to complete the work.

[0028] The implementation principle of the embodiment of the present application is:

[0029] First, when the No. 1 motor is started to drive the screw rod 5 to rotate, the slider 4 can be pushed to drive the fixed rod 6 to move up and down. Since the connecting ring 8 is connected to the fixed rod 6 through the rotating shaft 7, the up and down movement of the fixed rod 6 can drive the No. 1 tube 9 and the No. 2 tube 10 which are interconnected at the upper and lower ends of the connecting ring 8 to move up and down. When the No. 1 tube 9 moves upward so that the joint pipe 14 at the top of the No. 1 tube 9 is connected with the tube seat 15 under the top plate 3, the electromagnetic valve in the joint pipe 14 on the No. 1 tube 9 is opened. At this time, the aluminum liquid pump 16 under the top plate 3 is started to discharge the aluminum liquid into the No. 1 tube 9. When the No. 2 tube 10 moves downward so that the joint pipe 14 at the bottom end of the No. 2 tube 10 is connected with the tube seat 15 on the bottom plate 1, the electromagnetic valve in the joint pipe 14 on the No. 2 tube 10 is opened. At the same time, the aluminum liquid pump 16 on the bottom plate 1 can be opened to extract the aluminum liquid, based on the function of the No. 1 tube 9 and the No. 2 tube 10 moving up and down to extract the aluminum liquid described above.

[0030] Before the aluminum liquid enters the No. 1 cylinder 9, the nitrogen is pre-discharged into the No. 1 cylinder 9 and the No. 2 cylinder 10 through the nitrogen pipe 18 via the connecting ring 8 connected to the central rotating joint 17. Then, when the aluminum liquid is first discharged into the No. 1 cylinder 9, since the No. 1 cylinder 9 and the No. 2 cylinder 10 are connected to each other through the connecting ring 8, the aluminum liquid will flow downward by its own weight into the No. 2 cylinder 10. When entering the No. 2 cylinder 10, it will be blocked by the branch plate 19, so that the aluminum liquid is divided into multiple streams by the liquid-permeable tube on the branch plate 19 and flows downward, so that it is fully mixed with nitrogen. In the process of filling the No. 2 cylinder 10 with aluminum liquid, the nitrogen entrained with hydrogen in the No. 2 cylinder 10 will be squeezed and discharged into the No. 1 cylinder 9 through the outlet pipe 20 connected to the air inlet pipe 21. When the aluminum liquid in the No. 2 cylinder 10 is full, the No. 2 motor is started to drive the threaded rod 13 to rotate. Then the rack 12 is pushed to move to engage the gear 11 to drive the connecting ring 8 at the rear end of the rotating shaft 7 to rotate 180°. At this time, the positions of the No. 1 cylinder 9 and the No. 2 cylinder 10 are exchanged, and the above process is repeated, so that the filled nitrogen can fully play the role of entraining hydrogen, thereby avoiding the waste of nitrogen. Of course, if you want to fill nitrogen in this process, you only need to open the electromagnetic valve in the joint pipe 14 on the upper No. 1 cylinder 9 or the No. 2 cylinder 10 after the aluminum liquid is completely discharged into the No. 1 cylinder 9 or the No. 2 cylinder 10 below, and then inject nitrogen through the nitrogen pipe 18. At this time, the gas in the No. 1 cylinder 9 and the No. 2 cylinder 10 is discharged through the upper joint pipe 14 to realize the gas replacement in the process. The processing is completed, and the aluminum liquid with hydrogen removed is extracted by the aluminum liquid pump 16 on the bottom plate 1 to complete the work.

[0031] The above are only preferred embodiments of the present application and are not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims

1. A degassing device for an aluminum smelting furnace, comprising a bottom plate (1), characterized in that: The right side of the bottom plate (1) is fixedly mounted with a side plate (2), the top of the side plate (2) is fixedly mounted with a top plate (3), the left side of the side plate (2) is slidably mounted with a slider (4), the left side of the slider (4) is fixedly connected with a fixing rod (6), a rotating shaft (7) is rotatably mounted below the fixing rod (6), a connecting ring (8) is fixedly mounted at the rear end of the rotating shaft (7), a first barrel (9) and a second barrel (10) whose inner cavities are interconnected are fixedly mounted on the top and bottom of the connecting ring (8), and a gear is fixedly mounted on the outer wall of the rotating shaft (7). (11), the top of the gear (11) is meshed with a rack (12) that slides under the fixed rod (6), the divergent ends of the first and second cylinders (9) (10) are fixedly installed with a joint pipe (14), the inner cavities of the first and second cylinders (9) (10) are fixedly installed with a branch plate (19), the front walls of the first and second cylinders (9) (10) are fixedly connected with an air outlet pipe (20), the outer side of the branch plate (19) is penetrated and connected with an air inlet pipe (21), and the branch plate (19) and the air inlet pipe (21) are connected through a pipeline.

2. A degassing device for an aluminum smelting furnace as claimed in claim 1, characterized in that: A slide groove matched with the slider (4) is provided on the left side of the side plate (2); a screw rod (5) is threadedly connected to the slider (4); and the rotational power of the screw rod (5) comes from a No. 1 motor at the top of the screw rod (5).

3. A degassing device for an aluminum smelting furnace as claimed in claim 1, characterized in that: A second slide groove matched with the rack (12) is provided below the fixed rod (6); a threaded rod (13) is threadedly connected to the rack (12); and the rotational power of the threaded rod (13) comes from a second motor at the right end of the threaded rod (13).

4. A degassing device for an aluminum smelting furnace as claimed in claim 1, characterized in that: Electromagnetic valves are provided on the joint pipes (14) at the ends away from the first cylinder (9) and the second cylinder (10).

5. The degassing device for an aluminum smelting furnace according to claim 1, characterized in that: An aluminum liquid pump (16) and a pipe seat (15) adapted to the joint pipe (14) are fixedly mounted on the opposing surfaces of the bottom plate (1) and the top plate (3); a sealing ring is arranged on the inner ring of the pipe seat (15), and the right end of the pipe seat (15) is connected to the aluminum liquid pump (16) via a pipeline.

6. The degassing device for an aluminum smelting furnace according to claim 1, characterized in that: A central rotating joint (17) is fixedly mounted on the rear end of the connecting ring (8), and a nitrogen pipe (18) is fixedly connected to the rear end of the central rotating joint (17).

7. The degassing device for an aluminum smelting furnace according to claim 1, characterized in that: The branching plates (19) in the first barrel (9) and the second barrel (10) are installed at positions close to the connecting ring (8), and a plurality of groups of liquid-permeable tubes are connected through the branching plates (19).

8. The degassing device for an aluminum smelting furnace according to claim 1, characterized in that: The air outlet pipe (20) is located at a position of the first barrel (9) and the second barrel (10) far away from the connecting ring (8).