High-speed rail bridge settlement monitoring device

By designing an automated high-speed railway bridge settlement monitoring device, the settlement is used to drive the switch assembly to cause the warning device to issue an early warning, which solves the problem of slow response speed caused by manual operation in the existing technology, achieves rapid early warning and automatic monitoring, and improves bridge safety.

CN221925082UActive Publication Date: 2024-10-29CHINA RAILWAY 11TH BUREAU GRP CORP LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420482690.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-13
Publication Date
2024-10-29
Estimated Expiration
2034-03-13

AI Technical Summary

Technical Problem

The existing high-speed railway bridge settlement monitoring method requires manual operation and slow response speed. When settlement is detected, manual intervention is required for early warning. As a result, the response speed is not fast enough to effectively prevent serious consequences such as train derailment and track damage.

Method used

A high-speed railway bridge settlement monitoring device is designed, which includes a mounting plate, a detection steel wire and a warning device. The settlement drives the switch component to conduct the circuit and automatically sends out an early warning signal. It has a simple structure, is easy to install, and does not require manual operation.

Benefits of technology

It realizes automatic monitoring and rapid early warning of settlement of high-speed railway bridges, with fast response, saving manpower, and avoiding serious consequences such as train derailment and track damage caused by settlement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221925082U_ABST
    Figure CN221925082U_ABST
Patent Text Reader

Abstract

The utility model discloses a high-speed railway bridge settlement monitoring device which comprises a mounting plate and two parallel detection steel wires, a power supply is arranged on the mounting plate, a warning indicator is arranged on a shell of the power supply, two insulating cylinders are arranged on the mounting plate, conducting rods are arranged in the insulating cylinders, and the conducting rods are connected with the power supply. The two conducting rods are connected with the positive electrode and the negative electrode of a power source correspondingly. Switch assemblies are movably installed at the upper end and the lower end of the insulating cylinder correspondingly. And during settlement, the detection steel wire drives the switch assembly to move to be in contact with the conducting rod and enables the warning indicator to work. The high-speed railway bridge settlement monitoring device is simple in structure, convenient to install, capable of automatically monitoring the settlement condition of the high-speed railway bridge and actively conducting early warning when settlement of the high-speed railway bridge or settlement near a high-speed railway bridge support is monitored, high in response speed, free of manual monitoring through a measuring tool, capable of saving manpower and convenient to use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of road engineering, in particular to a high-speed railway bridge settlement monitoring device. Background Art

[0002] With the rapid development of high-speed railways, the safety of bridges as one of the important transportation hubs has become increasingly important. The settlement of high-speed railway bridges is caused by the settlement of high-speed railway bridge supports due to the settlement of high-speed railway subgrades, which further causes the settlement of high-speed railway railways. Due to various reasons, high-speed railway bridges may experience settlement. At present, the causes of high-speed bridge settlement can usually be attributed to geological factors, subgrade structure design and railway transportation load.

[0003] High-speed railway bridge settlement may lead to train derailment, track damage and other serious consequences, so it is very necessary to detect and warn of high-speed railway bridge settlement in a timely manner. Existing high-speed railway bridge settlement monitoring methods include the use of photometers, settlement meters, topographic survey instruments and other instruments for measurement. However, this measurement method requires manual operation and measurement; and when serious settlement is detected, manual intervention is required for early warning, and the response speed is slow. Utility Model Content

[0004] The technical problem to be solved by the utility model is to overcome the existing defects and provide a high-speed railway bridge settlement monitoring device with a simple structure and easy installation. The device can automatically monitor the settlement of the high-speed railway bridge and actively issue an early warning when the settlement of the high-speed railway bridge or the settlement near the high-speed railway bridge support is detected. The device has a fast response speed and does not require manual monitoring through measuring tools, thus saving manpower and being easy to use, which can effectively solve the problems in the background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a high-speed railway bridge settlement monitoring device, comprising a mounting plate and two parallel detection steel wires, a power supply is provided on the mounting plate, an alarm is provided on the outer shell of the power supply, two insulating cylinders are provided on the mounting plate, a conductive rod is provided inside the insulating cylinder, and the two conductive rods are respectively connected to the positive and negative poles of the power supply, and switch assemblies are movably installed at the upper and lower ends of the insulating cylinder; when settling, the detection steel wire drives the switch assembly to move and contact the conductive rod to make the alarm work.

[0006] As a preferred technical solution of the utility model, the switch assembly includes an insulating plate, on which are provided two conductive plug rods corresponding to the insulating tubes, and one end of the two conductive plug rods located inside the insulating plate is in a connected state.

[0007] As a preferred technical solution of the utility model, a limiting ring is provided on the side of the insulating plate away from the conductive plug rod, and the detection steel wire is movably inserted into the limiting ring.

[0008] As a preferred technical solution of the utility model, both ends of the detection wire are provided with mounting frames, the mounting frames include a fixed seat, a vertically arranged column is provided on the fixed seat, and a side movable sleeve of the column is provided with a take-up wheel for winding the detection wire.

[0009] As an optimal technical solution of the utility model, a positioning sleeve is provided at the bottom of the take-up wheel, the positioning sleeve is movably sleeved on the column, and the outer side of the positioning sleeve is a regular polygonal column structure, and the screw holes on the corresponding sides of the fixing seat and the positioning sleeve are internally threadedly connected with positioning bolts.

[0010] As a preferred technical solution of the utility model, a sleeve is provided on the portion of the mounting plate located between the two insulating cylinders, and sliding rods are slidably provided at both ends of the upper limit of the sleeve, one end of the sliding rod is connected to the insulating plate, and a spring is sleeved on the outer peripheral side surface of the portion of the sliding rod located between the insulating plate and the sleeve, and the two ends of the spring are respectively connected to the insulating plate and the sleeve.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] 1. In the high-speed railway bridge settlement monitoring device of the utility model example, when the high-speed railway bridge support settles, the bridge support drives the mounting plate to move downward, and the mounting plate drives the insulating tube and the conductive rod to move downward, and the conductive rod contacts the conductive plug rod on the lower side, thereby making the circuit of the alarm device conductive, and the alarm device emits sound and light for early warning.

[0013] 2. The high-speed railway bridge settlement monitoring device of the utility model example passes the detection steel wire through the limit ring, and fixes the fixing seats on both sides of the detection steel wire to the ground, and rotates the take-up wheel to tighten the detection steel wire to make the two detection steel wires parallel. When one end of the detection steel wire in the straight state moves up and down, it can drive the insulating plate and the conductive plug rod to move through the limit ring, thereby closing the circuit.

[0014] 3. The high-speed railway bridge settlement monitoring device of the utility model example has a simple structure and is easy to install. It can automatically monitor the settlement of the high-speed railway bridge and actively issue an early warning when settlement of the high-speed railway bridge or settlement near the high-speed railway bridge support is detected. It has a fast response speed and does not require manual monitoring through measuring tools, which can save manpower and is easy to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the structure of the utility model;

[0016] Figure 2 It is a partial front view structural schematic diagram of the utility model;

[0017] Figure 3 It is a structural schematic diagram of the conductive plug rod in the utility model.

[0018] In the figure: 1 mounting plate, 2 power supply, 21 alarm, 3 insulating tube, 31 conductive rod, 4 sleeve, 41 slide bar, 42 spring, 5 insulating plate, 51 conductive plug rod, 52 limit ring, 6 detection wire, 7 fixing seat, 71 column, 72 positioning bolt, 8 take-up wheel, 81 positioning sleeve. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] See also Figure 1-3 The utility model provides a technical solution: a high-speed railway bridge settlement monitoring device, comprising a mounting plate 1 and two parallel detection wires 6, a power supply 2 is provided on the mounting plate 1, a warning device 21 is provided on the outer shell of the power supply 2, two insulating cylinders 3 are provided on the mounting plate 1, a conductive rod 31 is provided inside the insulating cylinder 3, and the two conductive rods 31 are respectively connected to the positive and negative poles of the power supply 2, and switch components are movably installed at the upper and lower ends of the insulating cylinder 3; when settling, the detection wire 6 drives the switch component to move and contact with the conductive rod 31 and makes the warning device 21 work.

[0021] Furthermore, the switch assembly includes an insulating plate 5, on which are provided two conductive plug rods 51 corresponding to the insulating tube 3. The two conductive plug rods 51 are located at one end inside the insulating plate 5 and are in a connected state. The power supply 2 and the alarm 21 are connected in series. The two conductive rods 31 are respectively connected to the positive and negative poles of the power supply 2. The conductive plug rods 51 cooperate with the conductive rods 31 to form a switch to control the alarm 21.

[0022] Furthermore, a limiting ring 52 is provided on the side of the insulating plate 5 away from the conductive plug rod 51, and the detection steel wire 6 is movably inserted in the limiting ring 52. When sedimentation occurs, the detection steel wire 6 can drive the insulating plate 5 and the conductive plug rod 51 to move through the limiting ring 52, so that the circuit is closed and the alarm device 21 sounds an alarm.

[0023] Furthermore, mounting frames are provided at both ends of the detection steel wire 6, and the mounting frames include a fixing seat 7, a vertically arranged column 71 is provided on the fixing seat 7, and a side movable sleeve of the column 71 is provided with a take-up wheel 8 for winding the detection steel wire 6. The detection steel wire 6 is passed through the limiting ring 52, and the fixing seats 7 on both sides of the detection steel wire 6 are fixed to the ground. The take-up wheel 8 is rotated to tighten the detection steel wire 6 so that the two detection steel wires 6 are parallel. When one end of the detection steel wire 6 in the straight state moves up and down, it can drive the insulating plate 5 and the conductive plug 51 to move through the limiting ring 52, thereby closing the circuit.

[0024] Furthermore, a positioning sleeve 81 is provided at the bottom of the take-up wheel 8, and the positioning sleeve 81 is movably sleeved on the column 71, and the outer side surface of the positioning sleeve 81 is a regular polygonal column structure, and the screw holes on the corresponding sides of the fixed seat 7 and the positioning sleeve 81 are internally threadedly connected with positioning bolts 72, and then the positioning bolts 72 are rotated to position the positioning sleeve 81, thereby preventing the take-up wheel 8 from rotating.

[0025] Furthermore, a sleeve 4 is provided at the portion of the mounting plate 1 located between the two insulating cylinders 3, and sliding rods 41 are slidably provided at both ends of the upper limit of the sleeve 4, one end of the sliding rod 41 is connected to the insulating plate 5, and a spring 42 is sleeved on the outer peripheral side surface of the portion of the sliding rod 41 located between the insulating plate 5 and the sleeve 4, and both ends of the spring 42 are respectively connected to the insulating plate 5 and the sleeve 4. In the initial state, under the action of the spring 42, the conductive plug 51 is inserted into the insulating cylinder 3 and does not contact the conductive rod 31.

[0026] The alarm device 21 used in the utility model is a commonly used electronic component in the prior art, and its working mode and circuit structure are well-known technologies and will not be elaborated here. The power supply 2 can be a mobile power supply to power the alarm device 21. The power supply 2 and the alarm device 21 are connected in series, and the two conductive rods 31 are respectively connected to the positive and negative poles of the power supply 2. The conductive plug 51 cooperates with the conductive rod 31 to form a switch to control the alarm device 21.

[0027] When using:

[0028] The mounting plate 1 is mounted on the high-speed railway bridge support. Under the action of the spring 42, the conductive plug 51 is inserted into the insulating cylinder 3 and does not contact the conductive rod 31.

[0029] Pass the detection wire 6 through the limit ring 52, and fix the fixing seats 7 on both sides of the detection wire 6 to the ground, rotate the take-up wheel 8 to tighten the detection wire 6, so that the two detection wires 6 are parallel, and then rotate the positioning bolt 72 to position the positioning sleeve 81, so as to prevent the take-up wheel 8 from rotating;

[0030] When the high-speed railway bridge support sinks, the bridge support drives the mounting plate 1 to move downward, and the mounting plate 1 drives the insulating tube 3 and the conductive rod 31 to move downward, and the conductive rod 31 contacts the conductive plug 51 on the lower side, so that the circuit of the alarm 21 is turned on, and the alarm 21 emits sound and light for early warning;

[0031] Similarly, when the fixing seats 7 on both sides of the detection wire 6 sink, the fixing seats 7 drive the take-up wheel 8 to move downward through the column 71, and the take-up wheel 8 drives the detection wire 6 to move downward. The upper detection wire 6 pushes the upper insulating plate 5 and the conductive plug 51 to move downward, so that the conductive plug 51 contacts the conductive rod 31, and the circuit of the alarm 21 is turned on, and the alarm 21 emits sound and light for early warning.

[0032] The utility model has a simple structure and is easy to install. It can automatically monitor the settlement of the high-speed railway bridge and actively issue an early warning when settlement of the high-speed railway bridge or settlement near the high-speed railway bridge support is detected. It has a fast response speed and does not require manual monitoring through measuring tools, thus saving manpower and being easy to use.

[0033] The undisclosed parts in the present utility model are all prior art, and their specific structures, materials and working principles are not described in detail. Although the embodiments of the present utility model have been shown and described, it is understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present utility model, and the scope of the present utility model is defined by the attached claims and their equivalents.

Claims

1. A high-speed railway bridge settlement monitoring device, comprising a mounting plate (1) and two parallel detection steel wires (6), characterized in that: The mounting plate (1) is provided with a power source (2), the outer shell of the power source (2) is provided with an alarm (21), the mounting plate (1) is provided with two insulating cylinders (3), the interior of the insulating cylinders (3) is provided with conductive rods (31), and the two conductive rods (31) are respectively connected to the positive electrode and the negative electrode of the power source (2), and the upper and lower ends of the insulating cylinder (3) are movably provided with switch components; when sinking, the detection steel wire (6) drives the switch component to move and contact with the conductive rods (31) and activates the alarm (21).

2. The high-speed railway bridge settlement monitoring device according to claim 1 is characterized in that: The switch assembly comprises an insulating plate (5), on which two conductive plug rods (51) are arranged corresponding to the insulating cylinder (3), and one end of the two conductive plug rods (51) located inside the insulating plate (5) is in a connected state.

3. The high-speed railway bridge settlement monitoring device according to claim 2 is characterized in that: A limiting ring (52) is provided on the side of the insulating plate (5) away from the conductive plug rod (51), and the detection steel wire (6) is movably inserted into the limiting ring (52).

4. The high-speed railway bridge settlement monitoring device according to claim 1 is characterized in that: Both ends of the detection steel wire (6) are provided with mounting frames, the mounting frames comprising a fixing seat (7), a vertically arranged column (71) is provided on the fixing seat (7), and a take-up wheel (8) for winding the detection steel wire (6) is provided on the side of the column (71).

5. The high-speed railway bridge settlement monitoring device according to claim 4 is characterized in that: A positioning sleeve (81) is provided at the bottom of the take-up wheel (8), the positioning sleeve (81) is movably sleeved on the column (71), and the outer side surface of the positioning sleeve (81) is a regular polygonal column structure, and the screw holes on the corresponding sides of the fixing seat (7) and the positioning sleeve (81) are internally threadedly connected with positioning bolts (72).

6. The high-speed railway bridge settlement monitoring device according to claim 2 is characterized in that: The portion of the mounting plate (1) located between the two insulating cylinders (3) is provided with a sleeve (4), and both ends of the upper limit of the sleeve (4) are slidably provided with sliding rods (41), one end of the sliding rod (41) is connected to the insulating plate (5), and a spring (42) is sleeved on the outer peripheral side surface of the portion of the sliding rod (41) located between the insulating plate (5) and the sleeve (4), and the two ends of the spring (42) are respectively connected to the insulating plate (5) and the sleeve (4).