Visual fracture grouting simulation mechanism convenient for experiments aiming at different coal seams

By designing a simulated crack unit and a transparent tank structure that are easy to disassemble, the problem in the existing technology of needing to replace the overall transparent tank to simulate different crack openings is solved, and a low-cost, high-efficiency visual grouting simulation experiment is realized.

CN221926058UActive Publication Date: 2024-10-29HENAN POLYTECHNIC UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420397418.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-01
Publication Date
2024-10-29
Estimated Expiration
2034-03-01

AI Technical Summary

Technical Problem

The existing visual grouting simulation experimental device requires the replacement of an integral transparent tank to simulate the crack openings of different coal seams, resulting in high experimental costs and complicated operations.

Method used

A simulated crack unit and transparent tank structure is designed that is easy to connect and disassemble. By replacing different types of transparent bolt accessories, different crack openings can be simulated, avoiding the need to replace the entire transparent tank.

Benefits of technology

It reduces the experimental cost, simplifies the operation process, improves the experimental efficiency and project progress, can conduct targeted experiments on the crack openings of different coal seams, and supports experiments in batches and with different crack widths.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221926058U_ABST
    Figure CN221926058U_ABST
Patent Text Reader

Abstract

The visual crack grouting simulation mechanism comprises an air compressor, a slurry storage tank and a transparent tank, crack simulation units are arranged on the front side face and the rear side face of the transparent tank respectively, and the front side face and the rear side face of the transparent tank are both called mounting faces. The simulated fracture unit comprises a transparent bolt which is in threaded connection with the mounting surface, and a central hole for simulating a fracture is formed in the axis of the transparent bolt; the large end of the transparent bolt is pressed on the outer surface of the mounting surface and is connected with a liquid outlet pipe, and the other end of the transparent bolt extends into the inner cavity of the transparent tank; one transparent tank is provided with transparent bolt accessories of various models, and center holes of transparent bolts of different models have different widths and are used for simulating different fracture opening degrees. When different fracture opening degrees need to be simulated, only transparent bolt accessories of corresponding models need to be replaced, the whole transparent tank does not need to be replaced, experiments can be conveniently carried out according to the fracture opening degree characteristics of different coal seams, and the cost is low.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of coal mining, in particular to a visualized grouting simulation experiment technology. Background Art

[0002] Grouting technology has been developed for a long time and is widely used in engineering practices such as construction, mining, tunnels and slopes, playing the role of reducing seepage, plugging leaks and strengthening.

[0003] In coal mine gas control, grouting technology is used to plug leaks, reduce seepage and reinforce coal rock fissures, improve gas extraction concentration and efficiency, and reinforce the coal rock mass, which to a large extent prevents production safety accidents such as gas explosions and collapses.

[0004] In recent decades, many experts and scholars in my country have conducted research on grouting and summarized the current grouting theories, namely, porous media theory, quasi-continuous media theory, fractured media theory, and dual media theory of pores and fractures. These theories are the theoretical basis for grouting research. Through laboratory tests and field tests, it is concluded that cement grouting reinforcement not only changes the microstructure, micropores and material composition of the rock, reduces the macroscopic porosity of the rock, increases the density and mechanical strength, but also fills and reinforces the structural surface after the slurry solidifies in the rock structure surface, improves the bonding force and internal friction angle of the structural surface, and enhances the ability of the engineering rock mass to resist external force damage.

[0005] Grouting is a very complex process with many influencing factors. The slurry water-cement ratio, grouting pressure, crack opening and density can all affect the grouting effect.

[0006] The uniaxial compression test was carried out using a YAW-3000 microcomputer-controlled pressure testing machine, and the reinforcement impact analysis was numerically simulated using the commercial program FLAC, so as to determine that the reinforcement effect of fractured rock mass is related to the fracture distribution state, connectivity and the fragmentation of the rock mass itself; a micro-fracture grouting visualization test system was independently developed. The monitoring subsystem of the system is divided into a microscopic monitoring system and a pressure and flow monitoring system, which is mainly composed of long-distance microscopes, high-speed cameras, image acquisition and control systems, etc., and can realize real-time observation of the percolation effect; based on the theoretical model of plate grouting slurry diffusion, it was analyzed that the fracture degree has the greatest influence on the slurry diffusion, followed by the grouting pressure, and then the slurry water-cement ratio; on the basis of explaining the mechanism of grouting reinforcement of tunnel surrounding rock, the factors affecting the grouting reinforcement effect were analyzed from three aspects: the properties of grouting materials, the properties of surrounding rock, and the selection of grouting process methods, mainly including the depth of grouting holes, the spacing between grouting holes, the grouting pressure, and the slurry diffusion radius.

[0007] Although the above studies have verified the influence of grouting pressure, grouting time, water-cement ratio, crack opening, etc. on the grouting effect from theoretical and experimental aspects, the experiment requires the cooperation of many equipments, and the cost of realizing visualization is high and the operation is complicated.

[0008] Visual grouting simulation experiments facilitate researchers to study the grouting process, so the visual grouting simulation experiment technology has been greatly developed in recent years. Through the visual grouting simulation experiment device, the influence of grouting influencing parameters on the grouting effect can be studied. Through the simulation experiment, the most suitable grouting parameters for a specific coal seam can be explored, which has important guiding significance for the experimental grouting operation of the coal seam.

[0009] The visual grouting simulation experimental device includes a hollow transparent tank (glass box), the hollow part of which is the grouting space, and a simulated fracture device is arranged in the grouting space. The simulated fracture device and the transparent tank are fixed. For example, the applicant has previously applied for a visual grouting simulation experimental device with simulated fractures etched on the glass surface. The existing simulated fracture device and the transparent tank are fixed, which means that when the fracture opening of different coal seams needs to be simulated, the entire transparent tank needs to be replaced, which results in high experimental costs.

[0010] For this purpose, in the previous patent application, three different sizes (crack openings) of cracks were etched on the glass surface, but the grouting simulation experiment could not be carried out for cracks other than these three sizes, and the whole transparent tank still needed to be replaced for the experiment. Utility Model Content

[0011] The utility model aims to provide a visual fracture grouting simulation mechanism which is convenient for conducting experiments on different coal seams. The simulated fracture unit and the transparent tank are convenient to connect and disassemble, and different fracture openings can be simulated as needed by simply replacing the simulated fracture unit.

[0012] To achieve the above-mentioned purpose, the utility model provides a visualized fracture grouting simulation mechanism that is convenient for conducting experiments on different coal seams, comprising an air compressor and a transparent tank, wherein the outlet of the air compressor is connected to the top of the slurry storage tank through a pipeline; the middle and lower part of the slurry storage tank is used to store experimental slurry, and the bottom of the slurry storage tank is connected to a slurry delivery pipe through a slurry outlet valve; the transparent tank has an inner cavity, and flanges are respectively provided at the left and right ends of the transparent tank, which are an inlet flange and an outlet flange respectively; the slurry delivery pipe is connected to the inner cavity of the transparent tank through the inlet flange, and a pressure relief valve is installed on the outlet flange;

[0013] Simulated crack units are respectively arranged on the front and rear side surfaces of the transparent tank, and the front and rear side surfaces of the transparent tank are collectively referred to as mounting surfaces. The simulated crack unit comprises a transparent bolt threadedly connected to the mounting surface, and a central hole for simulating cracks is arranged at the axis of the transparent bolt; the large head end of the transparent bolt is pressed on the outer surface of the mounting surface, and the other end of the transparent bolt extends into the inner cavity of the transparent tank; the large head end of the transparent bolt is connected to a liquid outlet pipe through a bolt connection valve, and the liquid outlet pipe is connected to the inner cavity of the transparent tank through the central hole for simulating cracks;

[0014] A transparent tank has transparent bolt accessories of various models, and central holes of transparent bolts of different models have different widths and are used to simulate different crack openings.

[0015] A plurality of simulated crack units are evenly spaced on the mounting surface.

[0016] A pressure gauge is provided on the slurry delivery pipe.

[0017] The utility model has the following advantages:

[0018] By adopting the structure of the utility model, when different crack openings need to be simulated, it is only necessary to replace the transparent bolt accessories of the corresponding type without replacing the entire transparent tank, and the threaded connection method is very convenient for disassembly and replacement, so that the utility model can carry out targeted visual grouting experiments according to the crack opening conditions of different coal seams. There is no need to make different transparent tanks according to the crack conditions of different coal seams, and only multiple types of transparent bolts need to be set up, and the overall cost is low.

[0019] Multiple simulated crack units are evenly spaced. When the widths of the central holes of the transparent bolts are the same, batch simulation experiments with the same crack width can be carried out. When the widths of the central holes of the transparent bolts are different, experiments with different crack widths can be carried out under the same grouting parameters, thereby improving experimental efficiency and accelerating project progress.

[0020] The pressure gauge makes it easy for the experimenter to grasp the slurry pressure in the transparent tank. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a structural schematic diagram of the utility model.

[0022] Figure 2 It is a schematic diagram of the structure of a transparent tank equipped with a simulated fracture unit.

[0023] Figure 3 yes Figure 2 Top view of the .

[0024] Figure 4 It is a schematic diagram of the structure of the simulation fracture unit.

[0025] Figure 5It is a schematic diagram of the cross-sectional structure of the simulated fracture unit. DETAILED DESCRIPTION

[0026] like Figures 1 to 5 As shown, the utility model provides a visual fracture grouting simulation mechanism that is convenient for conducting experiments on different coal seams, including an air compressor 1 and a transparent tank 2, the outlet of the air compressor 1 is communicated with the top of a slurry storage tank 4 through a pipeline 3; the middle and lower part of the slurry storage tank 4 is used to store experimental slurry, and the bottom of the slurry storage tank 4 is connected to a slurry delivery pipe 6 through a slurry outlet valve 5; the transparent tank 2 has an inner cavity 7, and flanges are respectively provided at the left and right ends of the transparent tank 2, which are an inlet flange 8 and an outlet flange 9 respectively; the slurry delivery pipe 6 is communicated with the inner cavity 7 of the transparent tank 2 through the inlet flange 8, and the outlet flange 9 is installed with a pressure relief valve or a plug 10;

[0027] Simulated crack units are respectively provided on the front and rear side surfaces of the transparent tank 2, and the front and rear side surfaces of the transparent tank 2 are collectively referred to as mounting surfaces 11. The simulated crack unit includes a transparent bolt 12 threadedly connected to the mounting surface 11, and a center hole 13 for simulating cracks is provided at the axis of the transparent bolt 12; the large head end of the transparent bolt 12 is pressed on the outer surface of the mounting surface 11, and the other end of the transparent bolt 12 extends into the inner cavity 7 of the transparent tank 2; the large head end of the transparent bolt 12 is connected to a liquid outlet pipe 15 through a bolt connection valve 14, and the liquid outlet pipe 15 is connected to the inner cavity 7 of the transparent tank 2 through the center hole 13 for simulating cracks;

[0028] A transparent tank 2 has transparent bolt 12 accessories of multiple models (at least three or more, and any number of transparent bolt 12 accessories can be matched as needed). The central holes 13 of transparent bolts 12 of different models have different widths and are used to simulate different crack openings.

[0029] The air compressor 1 is connected to a pressure controller 17 for controlling the output pressure of the air compressor 1, and the slurry storage tank 4 is preferably provided with an agitator 18 for stirring the slurry evenly. The pressure controller 17 and the agitator 18 are conventional equipment and are not described in detail.

[0030] The transparent bolt 12 is made of glass or plastic. When assembled on the mounting surface 11, a sealing ring is preferably pressed at the joint surface between the large end of the transparent bolt 12 and the mounting surface 11 to ensure sealing.

[0031] In this embodiment, the transparent tank 2 is made of organic glass and is horizontally placed in a cylindrical or square shape (the cross section is circular or square, of course, it can also be other shapes), and the cross section of its inner cavity 7 can be circular or square. When a cylindrical transparent tank 2 is used, the transparent tank 2 has an outer diameter of 55 mm, an inner diameter of 25 mm, an axial length of 640 mm, and 5 groups of simulated crack units are respectively provided on the front and rear sides.

[0032] By adopting the structure of the present invention, when it is necessary to simulate different crack openings, it is only necessary to replace the corresponding type of transparent bolt 12 accessories, without replacing the entire transparent tank 2, and the threaded connection method is very convenient for disassembly and replacement, so that the present invention can carry out targeted visual grouting experiments according to the crack opening conditions of different coal seams, without the need to manufacture different transparent tanks 2 according to the crack conditions of different coal seams, and only multiple types of transparent bolts 12 need to be set up, and the overall cost is relatively low.

[0033] Multiple simulated crack units are evenly spaced on the mounting surface 11. Multiple simulated crack units are evenly spaced. When the widths of the center holes 13 of the transparent bolts 12 are the same, batch simulation experiments of the same crack width can be carried out. When the widths of the center holes 13 of the transparent bolts 12 are different, experiments of different crack widths can be carried out under the same grouting parameters, thereby improving the experimental efficiency and accelerating the project progress. A pressure gauge 16 is provided on the slurry delivery pipe 6, which is convenient for the experimenter to grasp the slurry pressure in the transparent tank 2.

[0034] Before the experiment, one or more types of transparent bolt 12 accessories are selected and threadedly connected to the mounting surface 11 according to the actual fracture opening conditions of the simulated coal seam. Close the threaded valves in the simulated fracture units that do not need to participate in the experiment, and connect the threaded valves in the simulated fracture units that need to participate in the experiment to the liquid outlet pipe 15, so that the ends of each liquid outlet pipe 15 are connected to the container for recovering the slurry. Among them, the threaded valve is preferably fixedly connected to the big end of the transparent bolt 12 and threadedly connected to the liquid outlet pipe 15. Configure the corresponding grouting liquid according to the experimental design and inject it into the slurry storage tank 4, and stir it evenly by the agitator 18. The grouting liquid is a prior art and is not described in detail. It is possible to discover the grouting law of a specific grouting liquid and obtain the optimal grouting parameters through experiments, or to select the specific ratio of the grouting liquid with the best grouting effect through experiments.

[0035] During the experiment, turn on the air compressor 1, open the slurry outlet valve 5, adjust the outlet air pressure of the air compressor 1 through the pressure controller 17, and under the action of the upper air pressure, the slurry in the slurry storage tank 4 enters the inner cavity 7 of the transparent tank 2 through the slurry delivery pipe 6, and then flows out through the center hole 13 of each transparent bolt 12 (i.e., a simulated crack simulating a certain crack opening), and is discharged into the recovery container through the liquid outlet pipe 15 after connecting the connecting valve. By adopting the present invention, not only can the grouting simulation experiment be carried out, but also the flow process of the slurry in the simulated crack (i.e., the center hole 13 of the transparent bolt 12) is visible, which is convenient for the experimenter to observe. After the experiment is completed, open the pressure relief valve or plug 10 on the outlet flange 9 to discharge the grouting liquid in the inner cavity 7 of the transparent tank 2. Preferably, clean water is added to the slurry storage tank 4 to rinse the system.

[0036] The above embodiments are only used to illustrate rather than limit the technical solutions of the present invention. Although the present invention is described in detail with reference to the above embodiments, those skilled in the art should understand that the present invention can still be modified or replaced by equivalents. Any modification or partial replacement that does not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention.

Claims

1. A visual fracture grouting simulation mechanism for conducting experiments on different coal seams, comprising an air compressor and a transparent tank, wherein the outlet of the air compressor is connected to the top of the slurry storage tank through a pipeline; the middle and lower part of the slurry storage tank is used to store experimental slurry, and the bottom of the slurry storage tank is connected to a slurry delivery pipe through a slurry outlet valve; the transparent tank has an inner cavity, and flanges are respectively provided at the left and right ends of the transparent tank, which are an inlet flange and an outlet flange respectively; the slurry delivery pipe is connected to the inner cavity of the transparent tank through the inlet flange, and a pressure relief valve is installed on the outlet flange; the characteristics are: Simulated crack units are respectively arranged on the front and rear side surfaces of the transparent tank, and the front and rear side surfaces of the transparent tank are collectively referred to as mounting surfaces. The simulated crack unit comprises a transparent bolt threadedly connected to the mounting surface, and a central hole for simulating cracks is arranged at the axis of the transparent bolt; the large head end of the transparent bolt is pressed on the outer surface of the mounting surface, and the other end of the transparent bolt extends into the inner cavity of the transparent tank; the large head end of the transparent bolt is connected to a liquid outlet pipe through a bolt connection valve, and the liquid outlet pipe is connected to the inner cavity of the transparent tank through the central hole for simulating cracks; A transparent tank has transparent bolt accessories of various models, and central holes of transparent bolts of different models have different widths and are used to simulate different crack openings.

2. The visual fracture grouting simulation mechanism for conducting experiments on different coal seams according to claim 1 is characterized in that: A plurality of simulated crack units are evenly spaced on the mounting surface.

3. The visual fracture grouting simulation mechanism for conducting experiments on different coal seams according to claim 1 is characterized in that: A pressure gauge is provided on the slurry delivery pipe.